before we count the bricks we cost plan

65
“Before we count bricks we cost plan” A Cost Planning Presentation Nick Dean Wednesday 16 th April 2014 1

Upload: association-for-project-management

Post on 05-Dec-2014

317 views

Category:

Education


0 download

DESCRIPTION

A cost plan or budget is a key document in the scheme development process. The protocol has been developed as a design manual rather than outlining a rigid prescriptive format. Advising cost and associated information in a form that allows management decisions by client or others is fundamental. DBK cost planners are encouraged to approach any exercise with "client eyes" and tailor the format accordingly.

TRANSCRIPT

Page 1: Before we count the bricks we cost plan

“Before we count bricks

we cost plan”

A Cost Planning Presentation

Nick Dean

Wednesday 16th April 2014

1

Page 2: Before we count the bricks we cost plan

DBK Cost Planning

Protocol

What should I expect from my QS ?

2

Page 3: Before we count the bricks we cost plan

1. Product

2. Process

3. Some Examples

4. Questions

3

Page 4: Before we count the bricks we cost plan

4

Page 5: Before we count the bricks we cost plan

5

Page 6: Before we count the bricks we cost plan

6

Page 7: Before we count the bricks we cost plan

7

Page 8: Before we count the bricks we cost plan

Offices

Birmingham

London

Manchester

Bournemouth

8

Page 9: Before we count the bricks we cost plan

Sectors

Data / Education / Health / Hotels / Industrial

Mixed Use / Offices / Residential / Retail

Sports & Leisure / Student Accommodation

9

Page 10: Before we count the bricks we cost plan

Services

Building Surveying / Cost Consultancy

Expert Witness / Health & Safety

Project Management / Residential Consultancy

Sustainability / Utilities

10

Page 11: Before we count the bricks we cost plan

11

Page 12: Before we count the bricks we cost plan

Product

12

Page 13: Before we count the bricks we cost plan

50p each13

Page 14: Before we count the bricks we cost plan

45p each14

Page 15: Before we count the bricks we cost plan

Initial Questions

Why ?

Appropriate ?

Client objectives ?

Information required ?

Nature and scope of scheme understood ?

Is the QS fully briefed ?

Timescales ?

15

Page 16: Before we count the bricks we cost plan

Questions After Cost Plan Issue

QA ?

Authorised ?

Information provided?

Client presentation?

Design team presentation?

16

Page 17: Before we count the bricks we cost plan

Contents

Scope of Works

Objectives

17

Page 18: Before we count the bricks we cost plan

Inflation Forecast

Document is base dated

Inflation during the estimated construction period

Deferment period from the base date

(included or excluded?)

Current market forecasts

18

Page 19: Before we count the bricks we cost plan

19

Page 20: Before we count the bricks we cost plan

Cost Analysis

Site Abnormals

Basebuild (Shell & Fit Out)

Tenants Requirements

External Works

Preliminaries/ OH & P/ Design Fees/ Contingencies

20

Page 21: Before we count the bricks we cost plan

Financial Data

£ / ft2 or m2

Nett saleable area (Residential & Offices)

Gross Internal area (Industrial)

£ / bedroom (Hotel & Student Acc’n)

£ / car space

21

Page 22: Before we count the bricks we cost plan

Schedule of Areas

Functional Data

22

Page 23: Before we count the bricks we cost plan

Cost Basis

Exclusions

23

Page 24: Before we count the bricks we cost plan

Risk Register

Cost & Value Engineering

Reconciliation

24

Page 25: Before we count the bricks we cost plan

Any Questions ?

25

Page 26: Before we count the bricks we cost plan

Process

26

Page 27: Before we count the bricks we cost plan

27

Page 28: Before we count the bricks we cost plan

28

Page 29: Before we count the bricks we cost plan

The Way To Get Lost

29

Page 30: Before we count the bricks we cost plan

The Way To Success

30

Page 31: Before we count the bricks we cost plan

Not simply cost allowances

Design team “buy in”

Properly communicated

Conveys an obligation on design team

A Robust Cost Plan

31

Page 32: Before we count the bricks we cost plan

Surveys / SI & GI investigations

Reports / New legislation

Specifications / Drawings / Areas

Programme / Procurement

Quotes / Client & 3rd party requirements

Monitoring

32

Page 33: Before we count the bricks we cost plan

Latest Formal Budget

Interim reporting

Pre-tender estimates

Post tender

Cost Reporting

33

Page 34: Before we count the bricks we cost plan

Tender returns

Evaluation

Cost Feedback

34

Page 35: Before we count the bricks we cost plan

Any Questions ?

35

Page 36: Before we count the bricks we cost plan

Some Examples

36

Page 37: Before we count the bricks we cost plan

How much for an industrial shed ?

Industrial

37

Page 38: Before we count the bricks we cost plan

38

Page 39: Before we count the bricks we cost plan

39

Page 40: Before we count the bricks we cost plan

40

Page 41: Before we count the bricks we cost plan

41

Page 42: Before we count the bricks we cost plan

How much for an office ?

Offices

42

Page 43: Before we count the bricks we cost plan

43

Page 44: Before we count the bricks we cost plan

44

Page 45: Before we count the bricks we cost plan

45

Page 46: Before we count the bricks we cost plan

46

Page 47: Before we count the bricks we cost plan

How much for a residential scheme?

Residential

47

Page 48: Before we count the bricks we cost plan

48

Page 49: Before we count the bricks we cost plan

49

Page 50: Before we count the bricks we cost plan

50

Page 51: Before we count the bricks we cost plan

How much for a hotel bedroom?

Hotels

51

Page 52: Before we count the bricks we cost plan

52

Page 53: Before we count the bricks we cost plan

53

Page 54: Before we count the bricks we cost plan

54

Page 55: Before we count the bricks we cost plan

How much for a students bedroom?

Student Accommodation

55

Page 56: Before we count the bricks we cost plan

56

Page 57: Before we count the bricks we cost plan

57

Page 58: Before we count the bricks we cost plan

58

Page 59: Before we count the bricks we cost plan

59

Page 60: Before we count the bricks we cost plan

60

Page 61: Before we count the bricks we cost plan

How much for a retail unit ?

Retail

61

Page 62: Before we count the bricks we cost plan

62

Page 63: Before we count the bricks we cost plan

63

Page 64: Before we count the bricks we cost plan

64

Page 65: Before we count the bricks we cost plan

Any Questions ?

65