THE STATE OF NEW HAMPSHIRE BEFORE THE
NEW HAMPSHIRE SITE EVALUATION COMMITTEE
SEC DOCKET NO. 2019-02
APPLICATION OF CHINOOK SOLAR, LLC FOR A CERTIFICATE OF SITE AND FACILITY FOR THE CHINOOK SOLAR PROJECT IN FITZWILLIAM,
NEW HAMPSHIRE
PREFILED SUPPLEMENTAL TESTIMONY OF JOSEPH PERSECHINO ON BEHALF OF
CHINOOK SOLAR, LLC August 31, 2020
Q. Please state your name and business address. 1
A. My name is Joseph Persechino. My business address is Tighe & Bond, 177 2
Corporate Drive, Portsmouth, New Hampshire 03801. 3
Q. Who is your current employer and what position do you hold? 4
A. I am a Senior Project Manager at Tighe & Bond. Tighe & Bond is a company 5
that specializes in engineering and environmental services consulting, including 6
renewable energy, site/civil design, permitting and planning, geotechnical, structural, 7
electrical, site assessment, planning and remediation, health and safety, regulatory 8
compliance, wetlands and ecological services, design transportation engineering, 9
including traffic and roadways, and wastewater and stormwater engineering. 10
Q. Have you testified previously in this docket? 11
A. Yes. On October 18, 2019, I submitted pre-filed direct testimony which provided 12
the Committee with an overview of the design of the Chinook Solar Project, including the 13
civil design, the soils analysis, the AoT permit application (which was included as 14
Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility
August 31, 2020 Page 2 of 4
Appendix 4 to the Application), the stormwater design, the decommissioning plan, and 1
various other aspects of the Project. 2
Q. Since you filed your direct testimony in this docket is there any additional 3
information relevant to your direct pre-filed testimony that you want to bring to the 4
Committee’s attention? 5
A. Yes. Since that time I have been involved in discussions with the New 6
Hampshire Department of Environmental Services (“DES”) regarding our alteration of 7
terrain permit. While recent discussions have been fruitful, we have not yet finalized 8
some details, but we are working diligently to complete those discussions and any 9
necessary changes to the Project plans. We understand that the deadline for DES to 10
submit final recommendations to the Committee is the same date as that this testimony is 11
due. For this reason we will continue to work with DES to make sure that the Committee 12
receives all information pertaining to changes resulting from those discussions as soon as 13
possible. 14
Q. Are there any specific design changes to the Project from the time the 15
Application was submitted in October of 2019 which you would like to describe for 16
the Committee and explain why these changes have been made? 17
A. Other than the design changes that are likely to result from discussions with 18
DES, there is also one change to the internal project roads from what was in the original 19
design. In the July 8, 2020 pre-filed testimony of Michael Lew-Smith, Jeff Parsons, and 20
Dr. D. Scott Reynolds on behalf of Counsel for the Public, at page 6, they described two 21
Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility
August 31, 2020 Page 3 of 4
roads, which encircle the wetlands to access the southern arrays, and indicated that they 1
did not believe two roads are necessary to access these arrays and in their opinion 2
Chinook had not done a sufficient job of avoiding wetland buffer impact. As a result of 3
that testimony and further review of the plans, we have decided to remove one of the 4
roads. The road being removed is what would have been a newly constructed road on the 5
attached permit drawing that was parallel to an existing road. See Attachment A to this 6
testimony. By removing this road on the east side of the Project and to the east of the 7
existing road there will be less impact on wetland buffers and less disturbance of the 8
terrain, while still maintaining the ability to access the panels when necessary. We will 9
have to add a vehicle turn around at the end of the existing road. When we submit 10
updated plans to reflect changes agreed to with DES we will include an updated plan that 11
reflects theses changes. 12
In addition, the location of the substation has been moved to the southeast to by 13
approximately 23 feet to avoid a wetland delineated during an additional wetland survey 14
which was completed on July 22, 2020. The additional wetland survey was performed as 15
a result of a site review by Rick Van de Poll, an environmental consultant hired by the 16
Town of Fitzwilliam, as outlined in his July 14th , 2020 memorandum. The stream 17
crossing at the southwestern portion of the site was also extended to avoid impacts to 18
wetlands as a result of the review by Mr. Van de Poll and the additional wetland 19
delineation. 20
21
Supplemental Testimony of Joseph Persechino Application of Chinook Solar, LLC for Certificate of Site and Facility
August 31, 2020 Page 4 of 4
Q. Does this conclude your supplemental testimony? 1
A. Yes. 2
2869267_1 3
XX
XX
X
X
X
X
X
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X XX
XX
XX
XX
XX
XX
XX
XX
X
X
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
X
X
XX
X
XXXXXXXXXX
XX
X
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
X
X
X
X
X
X X X X X X X X X X X
X
X
X X X X X X X
CONST. PCB-5RIM=1139.70
INV IN=1131.50 NINV OUT=1134.40 SW
CONST. FES-20INV OUT=1134.00 NE
20' SIDE/REAR SETBACK
20' SIDE/REAR SETBACK
B-6
B-7
B-8
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
STONE WALL(TBR) (TYP.)
CONST. SILT SOCK OREROSION CONTROL
BERM TO LIMITSSHOWN (TYP.)
CONST. SILT SOCK ON SLOPES GREATER THAN 5%.SPACE EVERY 200' (MAX.) RUNNING PARALLEL WITH CONTOURS.CONTRACTOR MAY ADJUST LOCATIONS BASED ON ACTUALCONDITIONS IN FIELD DURING CONSTRUCTION. (TYP.)
STONE WALL(TBR) (TYP.)
2%
2%
207.
59'
25' (MIN.)
342.
00'
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
PUD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CONST. OCS-RRIM=1187.90INV OUT=1186.10 SE
12 LF 12" HDPE @ 0.83%
X
XX
XX
XX
XX
XX
X X X X X XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX X X X X X X X X X X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XXX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
X
1198.40
1156.25
1189.00
1189.00
1136.00
1140.00
1140.00
1136.00
CONST. RRA-25W1=5', W2=34'L=28', D50=12"DEPTH=24"
CONST. RRA-24 TOLIMITS SHOWN
D50=12"DEPTH=24"
CONST. RRA-20W1=4'
W2=13'L=9'
D50=6"DEPTH=18"
CONST. RRA-27W1=5'
W2=34'L=28'
D50=12"DEPTH=24"
CONST. RRA-26 TOLIMITS SHOWND50=12"DEPTH=24"
CONST. RRA-22TO LIMITSSHOWND50=6"DEPTH=18"
CONST. RIP-RAP SWALETO LIMITS SHOWN
(TYP.)D50=8", DEPTH=18"
CONST. RIP-RAP SWALE TOLIMITS SHOWN (TYP.)D50=8", DEPTH=18"
42 LF 18" HDPE @ 0.95%
44 LF 18" HDPE @ 0.68%
40 LF 15" RCP @ 4.38%
44 LF15" RCP
@ 2.27%
41 LF 15" RCP @ 1.22%
15 LF 12" HDPE @ 3.33%
13 LF 15" HDPE @ 0.77%
CONST. PCB-4 (DOUBLE)RIM=1136.00
INV OUT=1131.80 S
CONST. HEADWALL-18INV OUT=1189.00 S
CONST. FES-17INV OUT=1176.25 E
CONST. FES-16INV OUT=1178.00 W
CONST. FES-21INV OUT=1157.00 SW
CONST. RRA-OW1=3', W2=12'L=9', D50=6"DEPTH=15"
CONST. FES-RINV OUT=1186.00 NW
CONST. FES-22INV OUT=1156.50 NE
CONST. FES-19INV OUT=1188.00 N
CONST. OCS-ORIM=1138.90INV OUT=1136.00 S
CONST. FES-OINV OUT=1135.50 N
CONST. HEADWALL-TINV OUT=1132.00 NE
CONST. OCS-TRIM=1134.90
INV OUT=1132.10 SW
CONST. RRA-TW1=4', W2=22'L=18', D50=6"
DEPTH=15"
CONST. STONE LINED LEVEL SPREADERBERM ELEVATION=1132.00
BOTTOM ELEVATION=1130.50WIDTH=22'
1135.50
1186.00
CONST. RRA-RW1=3', W2=18'L=15', D50=6"DEPTH=15"
1154.10
1154.10
PROPOSED INTERCONNECTION SUBSTATION & SECURITY FENCE(SEE DRAWINGS BY MSE ENGINEERING, LCC DATED 9/16/2019)
PROPOSED CHAIN LINKFENCE (TYP.)
PROPOSED CHAIN LINKFENCE (TYP.)
PROPOSED SOLARMODULE (TYP.)
PROPOSED LIMIT OFCLEARING (TYP.)
PROPOSED 20' SWINGGATE (TYP.)
PROPOSED 12' WIDEGRAVEL ACCESS ROAD(TYP.)
PROPOSED LIMIT OFCLEARING (TYP.)
PROPOSED 20'SWING GATE (TYP.)
PROPOSED 20'SWING GATE
PROPOSED 20'SWING GATE
PROPOSED 16'SWING GATE
APPROXIMATELIMIT OF WORK(TYP.)
PROPOSED LIMITOF CLEARING
PROPOSED LIMIT OFCLEARING (TYP.) APPROXIMATE LIMIT
OF WORK (TYP.)
PROPOSEDPEDESTRIAN GATE
PROPOSEDPEDESTRIAN GATE
PROPOSEDPOND-T
PROPOSEDPOND-R
PROPOSEDPOND-O
1193.50
1192.50
1196.10
1196.90
1197.00
129.79'
157.18'
212.00'
11901192
CONST. 22 LF 6" HDPES=0.030INV.OUT=1189.00CONNECT TO SUBSTATION UNDERDRAIN (SEE DETAIL)
1196.00
119812
02
1204
2%
1196
2%
1186
1188
1189
1190
1192
1192
11921190
1192
1186
1188
1189
1188
1182
1178
1166
1164
1162
1160
1156
1162
1190
1188
1140
1170
1180
1170
1180
1190
1192
1184
11661164
1158
1156
1158
1140
1144
1146
1148
1142
1154
1162
1150
1152
1156
1158
1166
1160
1168
1164
1174
1170
1172
1178
1176
1186 1188
1138
1142
1190
1188
1192
1194
1196
1186
1138
11381140
1150
1136
1160
1140
1156 1164
1190
1162
1160
1184
1174
1176
1168
1158
1184
1186
1156
1172
1182
1192
1192
1198.20
1198.50
1198
1196
16.00'1196
1194 1194
1200
1202
1204
1180
1182
1184
1196
1194
1194
1196
1198
1178
1176
1174
1172
1168
1 OF 1
N-0758-017-DSGN.dwg
CHECKED:
DRAWN BY:
FILE:
EGD
JMP
BLM
SCALE:
APPROVED:
Fitzwilliam, NH
Chinook SolarProject
Chinook Solar,LLC
DATE:
PROJECT NO: N0758-019
1 INCH0
VERIFY SCALE
IF NOT ONE INCH ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
BAR IS 1 INCH ONORIGINAL DRAWING
Plot
ted
On:
Aug
04,
202
0-8:
43am
By:
ED
orem
usLa
st S
aved
:8/4
/202
0
Tigh
e &
Bon
d:\\
tighe
bond
.com
\dat
a\D
ata\
Proj
ects
\N\N
0758
Nex
tEra
\N-0
758-
017
Chi
nook
\Dra
win
gs_F
igur
es\A
utoC
AD
\CH
INO
OK S
ITE
I\N
-075
8-01
7-D
SG
N.d
wg
MARK DATE DESCRIPTION
AS SHOWN
PERMIT DRAWINGSNOT FOR CONSTRUCTION
07/23/2020
DRAFTSITE PLAN
N
00 60' 120'SCALE IN FEET
GRAPHIC SCALE