Under the Construction (Design and Management) Regulations 2015 (CDM 2015) a construction phase plan is required for every construction project. This does not need to be complicated. This template will help you think through the relevant safety implications of your project. The list of essential points below will help you to plan and organise the job, and work together with others involved to make sure that the work is carried out without risks to health and safety. It will also help you to comply with CDM 2015. BBC CDM Planning Sheet A – General Details Date 23 rd May 2016 Division / Programme BBC Childrens / Justin’s House: Series 4 Location HQ3 Studios, MediaCityUK, Salford Name of Set / Area of works HQ3 Studio Floor & Tech Store, plus Loading Bay @ Studios, MediaCityUK Production Office: 1 st Floor Bridge House, MediaCityUK Proposed Start Date Lighting Set Mon 23rd May Tue 24th May Wed 25th May Thu 26th May Overnight Overhead Rig Fri 27th May Steelwork/Flat Construction Sat 28th May Set Specials/LEDs Construction/ Dressing Sun 29th May Rigging Cabling/Under Set Lights/Wires Cut Traps/Dressing Mon 30th May FIRST REHEARSAL ON SET Reh Tue 31st May Reh Wed 1st June Programming/Sound Rig Reh & Light Thu 2nd June Camera Rig RX 1 & 2 Fri 3rd June Read through 5&6 Reh 3 & 4 Estimated Finish Date Mon 1st August Reh Tue 2nd August Reh Wed 3rd August Reh Thu 4th August RX 17 & 18 CDM Planning Sheet

Upload: ngothien

Post on 22-May-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

”Under the Construction (Design and Management) Regulations 2015 (CDM 2015) a construction phase plan is required for every construction project. This does not need to be complicated. This template will help you think through the relevant safety implications of your project. The list of essential points below will help you to plan and organise the job, and work together with others involved to make sure that the work is carried out without risks to health and safety. It will also help you to comply with CDM 2015.

BBC CDM Planning Sheet

A – General Details

Date 23rd May 2016

Division / Programme

BBC Childrens / Justin’s House: Series 4

Location HQ3 Studios, MediaCityUK, Salford

Name of Set / Area of works

HQ3 Studio Floor & Tech Store, plus Loading Bay @ Studios, MediaCityUKProduction Office: 1st Floor Bridge House, MediaCityUK

Proposed Start Date Lighting Set

Mon 23rd MayTue 24th MayWed 25th MayThu 26th May Overnight Overhead Rig

Fri 27th MaySteelwork/Flat Construction

Sat 28th May Set Specials/LEDs Construction/Dressing

Sun 29th MayRigging Cabling/Under Set Lights/Wires Cut Traps/Dressing

Mon 30th May FIRST REHEARSAL ON SET RehTue 31st May RehWed 1st June Programming/Sound Rig Reh & LightThu 2nd June Camera Rig RX 1 & 2

Fri 3rd JuneRead through 5&6Reh 3 & 4

Estimated Finish Date Mon 1st August Reh

Tue 2nd August RehWed 3rd August RehThu 4th August RX 17 & 18Fri 5th August RX 19 & 20

Sat 6th AugustDerig lights from setStrike moving Lights Overhead

Remove Flats then Steel construction. Load & Clear

Sun 7th AugustMon 8th AugustTue 9th August

CDM Planning Sheet

Page 2: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

B- Key Personnel

Requested byPrincipal Designer ( >1 Contractor)DesignerPrincipal ContractorConstruction ManagerOther

C- Description of proposed construction work required including key dates if known.

Set construction for CBeebies, Justin’s House: Series 4

Set constructed of timber flattage attached to a metal framework, the whole to sit on a raised purpose built/steel deck rostra, metal construction includes a raised rostra/balcony area with ‘in vision’ and ‘out of vision’ treads, and a purpose built audience rostra.

CDM Planning Sheet

Page 3: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

Key datesSET

Thu 26th May Overnight Overhead Rig

Fri 27th MaySteelwork/Flat Construction

Sat 28th May Set Specials/LEDs Construction/Dressing

Sun 29th MayRigging Cabling/Under Set Lights/Wires Cut Traps/Dressing

Mon 30th May FIRST REHEARSAL ON SET RehTue 31st May RehWed 1st June Programming/Sound Rig Reh & LightThu 2nd June  Camera Rig RX 1 & 2

RX DatesRX DateRX 1 & 2 2nd JuneRX 3 & 4 9th June

RX 5 & 616th June

BREAK

RX 7 & 830th June

RX 9 & 10 7th JulyRX 11 & 12 14th JulyRX 13 & 14 21st JulyRX 15 & 16 28th JulyRX 17 & 18

4th August

CDM Planning Sheet

Page 4: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

RX 19 & 20

5th August

STRIKE

Thu4th August RX 17 & 18

Fri5th August RX 19 & 20

Sat6th August

Derig lights from setStrike moving Lights Overhead

Remove Flats then Steel construction. Load & Clear

D -Relevant Health & Safety Considerations; (e.g. Asbestos, Electricity, Stabilisation Method, Working at Height, Manual Handling, Chemicals, Noise, Dust, Services , requirements for Permits etc) [PCI Aide memoire provides further guidance]

Studio Turnaround Manager to brief the crew prior to commencing construction in studio; to discuss work program, introduce key production personnel and provide induction to site; which includes site rules along with fire and emergency rules. Construction crew to conduct a walk round inspection of the work area before commencing construction. Clear lines of communication will be established between Turnaround Manager, Construction Manager, Lighting Director and Crew Supervisor; the teams do work together frequently, so relationships are already established.

Main considerations, all of which are considered with suggested controls in appropriate Risk Assessments: Crews constructing the set in studio, Designer Dressing the set and Lights being

rigged simultaneously - Overhead Rig scheduled at a different time to set construction, crew to be aware of order of works and who to refer issues to. (Method Statement provided by Contractor to be followed by crew – available in Green Room)

Any technical crew new to Studio should complete a Studio induction before commencing any technical work.

Studio Loading Bay is a shared area (unlike the studio and tech store).  There may be other people using and working in the loading bay at the same time as Justin’s House team. The sharing of info about each other’s work and interactions needs to be via the Studio Turnaround Manager.

Set is built over several days – if crew is different ensure they are briefed. Staff wishing to access the grid need to complete a grid induction; with no work on

studio floor during overhead rigging. Danger of tools being dropped from overhead works – care to be taken by crew to

secure tools/lights overhead. Working at Height – 2nd floor of set/Audience Rostra/Lighting Rig – be aware of controls

from general RA. Mobile Elevated Work Platform - Only persons with in date cards may operate MEWPS

on premises (Studio RA). High Staging, items supporting people - Assembly of individual mezzanines – be

aware of Working at Heights controls in place. Heavy Flown Scenery – be aware of controls/Method Statement from Contractor. Electrical Equipment to be fitted and tested by a competent electrician - Gaffer to

oversee electrical works and ensure crew is aware of any dangers. Use of hazardous substances - Substances to be stored correctly as advised/Correct

CDM Planning Sheet

Page 5: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

PSE to be used by Crew. Welding/Steel Works – Contractor crew and Studio crew to be aware of manual

handling controls and safe use of power tools. Angles of Set may put strain on Joints. Large, bulky, difficult to grasp items – manual handling - Crews to move large objects

together, test weight before lifting. Forklift trucks available (RA provided by Studio). Handrail at front of balcony is low - crews to be made aware – refer to Design RA for

more information. Trap Doors & Puppet Runs to be cut/established under stage floor - Ensure other crew

are aware of members under the stage to reduce risk of injury (Planning for these to be cut on Sunday – position supervised by Stage Manager).

Final Site clearance & safety check to be done on completion of works. Set to be signed over to BBC – who will take responsibility for set once construction is complete. Studio Scenic Supervisor to check set each week using guidelines provided by Contractor.

All Risk Assessments are kept on production shared drive and there will be copies available in the Green Room – including – BBC Risk Assessment, Studio Risk Assessment, Lighting Risk Assessment, Design Risk Assessment, Construction Risk Assessment & Method Statement from Contractor.

No-one to enter the studio until Turnaround Manager has agreed it is safe to enter. Minor alterations to the set during production – minor alterations will be conducted by

competent person with consultation from Contractor if advised by Scenic Supervisor.

E – Project Administration

Security: Entering StudioYou are asked to enter the studio block through the Stage Door entrance which is located on the Holiday Inn side of the building nearest to BBC StudioHouse.**On the first day, please collect your passes from Studio reception.**You will be issued with a studio studios access pass with photo ID or guest pass, depending on your working time in the Studio block.Passes are coded and grant access to various parts of the building depending on your job requirements. You must wear your pass at all times when on studio premises.Passes are critical to the safety of the building and therefore your safety too. If you lose or damage your pass you must notify Stage Door Reception immediately. Arrangements will be made for your pass to be cancelled and a new pass issued. Please note that Studio reserve the right to make a charge of £25 for lost or damaged passes.

Please Note: the Loading Bay at the rear of the Studio Block is for deliveries and is therefore not a pedestrian access point.Stage Door is open between 8am and Midnight. Studio reception staff are on duty at Stage Door from 8am to 8pm. Outside of these hours a security guard is on duty.

CDM Planning Sheet

Page 6: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

Fire:

ACTION IF AN INDIVIDUAL DISCOVERS A FIRE: Activate the nearest (safe) alarm call point. Inform the Turnaround Manager of the situation who will then: instruct the Crew to evacuate from the studio floor The normal evacuation protocols should then be followedStudio Manager: Instruct the relevant personnel as below: To turn on ALL houselights; To turn off ALL generic and moving lights and lighting power.Re-entry to the studioEmergency services (or Security, if the Emergency Services are not present – e.g. if there has been a false alarm) give the all clear to re- enter the studio.Production and Crew re-enter the Studio block using their swipe cards.

First Aid: In the event of an emergency, contact security for first aid assistance, police or an ambulance on 0161 855 6400/ext: 6400BBC emergency number is 666 but please use security in the first instance. For information in an emergency: 0800 0688 159Nearest A&E Hospital: (10 mins by car) - Salford Royal NHS Foundation Trust, Stott Lane, M6 8HDTel: 0161 789 7373

CDM Planning Sheet

Page 7: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

Access:

Parking: DRIVINGThe SatNav postcode for MediaCityUK is: M50 2EQ.Salford Quays is less than 4 miles from Manchester City Centre.From Manchester City Centre - The main approach is via Mancunian Way (A57)Continue along to Regents Road (A57)Take the first turning at the large roundabout onto Trafford Road(A5063) and then the first right turning onto BroadwayMediaCityUK is just past the Pie Factory

PARKINGFor loading/Rigging please liaise with Rob Lawson, Turnaround Manager Studio –

07407 731 068

CDM Planning Sheet

Page 8: BBC CDM Planning Sheetdownloads.bbc.co.uk/safety/documents/safety-guides... · Web view[PCI Aide memoire provides further guidance] Studio Turnaround Manager to brief the crew prior

BBC CDM Planning Sheet

Welfare: Toilets: There are toilets on every floor, except the 3rd floor. Nearest toilets to studio are located just outside the studio doors. For disabled toilets, please use general facilities in the building.

Food & Drink: Crew and production to provide own lunch; there are various options available:Costa Coffee, Ground Floor next to Bridge House. Pokusevskis on The Mezzanine and next door to Costa. Penelopes in the Open Centre of Studio and at the Pie Factory, Lowry Shopping Centre Food Hall (Burger King, Subway, Fat Jacks, Harry Ramsdens etc). Free fresh water is available, tap water is drinkable in Studio.

Smoking: is not allowed in any building. If you wish to smoke please do so outside, away from windows and doors. The designated smoking area at MediaCity is at the side of Quay House and the canal side of Bridge House, front entrances should be avoided.

Cash Machines: The nearest cash machines are in the main hall of The Studio block or Booths.

Client – Out of hours

Design Changes

Production Designer

BBC Safety , Safety Adviser

F – Other Considerations

Studio Plan available fromDesigners Drawings available from

A hard copy of all Risk Assessments and Method Statements will be kept in the Green Room off HQ3 Studio Floor.

Use of the form

This document is a simple planning document and will be shared with the contractors and designers and any other crew members who are involved in the construction work.

For small straightforward tasks, contractors should in turn have risk assessments /method statements / safe systems of work in place to allow the work to be undertaken safely.

CDM Planning Sheet