Page 1: NPC Implementation Issues From MTR Aide Memoire

1

FADAMA III

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

N a t i o n a l Fa d a m a C o o r d i n a t i o n O ffi c e

Federal Ministry of Agriculture & Rural Development

MTR Aide Memoire Recommendations and Action Plan

Tayo Adewumi (NPC)

19th April, 2012

by

Page 2: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

2

Component 1:Capacity Buildingo All LDPs with on-going subprojects should be

implemented before new ones are brought up. o Facilitators should be assessed and their number

reduced accordingly.o SFCO should take caution not to just go ahead and

register FCAs/FUGs without assurance of enough financial backing to fully implement the sub-projects

o SFCOs should not initiate new sub-projects until the currently approved ones are fully completed.

KEY COMPONENT BASED RECOMMENDATIONS

Page 3: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

3

o All LFDs should be properly equipped for optimal performance as the project enters its second phase

o SFCO should increased efforts to integrate FUGs and FCAs into the LG structure

COMMUNICATIONoSFCO should dialogue with media executives on

substantial reduction in the cost of airtime for agricultural activities.

KEY COMPONENT BASED RECOMMENDATIONS

Page 4: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

4

Component 2: (Small-Scale Community-owned Infrastructure)

o The envelop for SSCOI be increased to a maximum of $20,000.00 from the

current $10,000.00 while productive assets’ maximum envelop to be

$7,000.00 from $5,000.00 after a price standardization is carried out by each

state.

o A small irrigation(less than 1 hectare) can be changed from its present

classification of SSCOI to PA. However, the proposed change of power tiller to

SSCOI from PA was rejected because it is considered to be under the asset

category.

o A sub-project can be made up of different types of assets. For example, a

market is a single sub-project made up of assets such as market stalls/shops,

borehole/well, VIP toilets and incinerator.

KEY COMPONENT BASED RECOMMENDATIONS

Page 5: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

5

Component 3: (Advisory Services and Input Support)

o Evaluation of proposals should be carried out by a technical

committee at the SFCOs.

o SFCO should review the direction of the Input support to

the adoption of improved technologies

o Advisory services and input support will be stopped for any

group that had benefitted for 2 years

oCentralization of the production of input vouchers will not

be done by the NFCO. Rather, each SFCO should handle

this individually while maintaining quality.

KEY COMPONENT BASED RECOMMENDATIONS

Page 6: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

6

Component 4: (Support to the ADPs, Sponsored Research and On-farm

Demonstrations)o The component is to assist the ADPs in fulfilling their role

of data collection and disaggregating the APS dataset for the Fadama farmers. Other areas of assistance that Fadama will support the ADPs include the dissemination of information to Fadama farmers through access to modern information obtained from the Internet facilities in the ICT clinics in the ADPs.

KEY COMPONENT BASED RECOMMENDATIONS

Page 7: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

7

Component 5: (Asset Acquisition for Individual FUGs/EIGs)

o FUGs should develop plans for the usage of fund in their FUEF account

in order to ensure sustainability and SFCO should be informed of the

status of the account.

o The envelope for SSCOI be increased to a maximum of $20,000.00

from the current $10,000.00 while productive assets’ maximum

envelop to be $7,000.00 from $5,000.00.

o Production, operation and maintenance manual (user manual) should

be made available for the locally fabricated machines acquired by the

beneficiaries.

KEY COMPONENT BASED RECOMMENDATIONS

Page 8: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

8

o In addition, provision should be made for the training of least two

members of the group on the use of the asset acquired and signing a

back- up technical maintenance between the service providers and

the groups

o FUGs should ensure proper branding of all assets at time of

delivery. In addition, the cost of branding the assets should be

added as part of the project cost.

o On the reinvestment made with FUEF, FUGs/FCAs should bring

this to the knowledge of the SFCO with the right business plans

and feasibility reports, to safeguard the investment.

Component 5: (Asset Acquisition for Individual FUGs/EIGs)

Page 9: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

9

Component 6: (Project Management, Monitoring and Evaluation)

o The LFDs should be strengthened in Database Management and record keeping of the project.

o LG and line ministries Engineers should be involved by SFCOs to provide Technical Assistance, comprehensive review of subprojects before funding

o Regular market survey should be conducted by the POs and RFLOs, with reports circulated to the communities,

o Disbursement in tranches should be sustained, and the right specification be developed by the SFCO/expert to guide the groups

KEY COMPONENT BASED RECOMMENDATIONS

Page 10: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

10

Component 6: (Project Management, Monitoring and Evaluation)

o Re-allocation of funds within the components/categories, most especially

to the Capacity Building and Project Management components

o Officer having unretired advances should have his/her salary used in

settling such.

o SFCOs should dedicate a certain percentage of their counterpart fund

contribution to grants and funds rather than spend all on overheads

which are intangible. In addition, the SFCOs are to always seek for ‘no

objection’ in the use of the counterpart fund.

KEY COMPONENT BASED RECOMMENDATIONS

Page 11: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

11

Component 6: (Project Management, Monitoring and Evaluation)

o Environmental education on IPM practices, organic farming, soil testing and

nutrient management should be undertaken to help farmers achieve their

objectives.

o States should embark on implementation of stock routes and watering

points to control and prevent conflicts.

o More funds should be allocated specifically to this category by IDA or ATA of

government for funding SLM projects with immense benefits o the public.

o NFCO should institute control over SFCO allocation drawings to avoid future

over commitment.

o AWPB should be prepared based on available funds.

KEY COMPONENT BASED RECOMMENDATIONS

Page 12: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

12

Capacity Building

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

1. Strengthening the Desk Offices and the Local Government Authorities

SPC Feb. 29,2012 Quality of reporting and record keeping

2. Inclusion of SLM sub projects in LDP and Step down of SLM sensitization

SFCO Feb- March, 2012

LDPs with SLM subprojects and step down conducted

3. Beneficiaries should be given basic training on record keeping, community based procurement and FM during disbursement mini launch

SFCO Immediate Report

Page 13: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

13

Communication

ACTION PLAN

S/N

DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

1. Establishment of Community Radio in the 3 pilot States (Niger, Ogun and FCT)

NFCO Feb- March, 2012

Community Radio established

2. Procurement of Equipment and rehabilitating/construction of FIKS centers in Sokoto, Cross-River, Lagos, and Yobe state.

NFCO/SFCO Feb- March, 2012

FIKS Centres constructed/ Rehabilitated and equipped

3. Reassessment of documentation of innovation and success stories of project implementation

CO/MEO Continuous Documentary produced

Page 14: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

14

Small Scale Community Owned Infrastructure

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

1. Meetings with LG officials in respect of maintenance & sustainability of implemented RI

SFCO Feb- March, 2012

Completed RI included in the LG AWPB

Page 15: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

15

Advisory Services and Input SupportACTION PLAN

S/N

DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

1. Appointment of a specialist at NFCO to coordinate Advisory Services and input support

WB/NFCO Immediately Desk Officer appointed

2. Reputable dealers with adequate experience and proven competence should be registered as service providers;Erring service providers should be sanctioned;NFCO to issue clear guideline on establishment of SP database

SFCOsFCAs/SFCOsNFCO

Feb 29, 2012ImmediateFeb 15, 2012

Updated Service Provider databaseSP assessment reportGuideline

Page 16: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

16

Advisory Services and Input Support

ACTION PLAN

S/N

DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

3. Mainstreaming of Business Development Strategy (BDS) into the implementation of Adv. Service Input Support

TTAO/SFCO/NFCO

Continuous Report of the activity produced

4. Establishment of technical committee to evaluate advisories services proposals

SFCO Continuous Evaluated proposals

5. Conduct of learning events for knowledge and experience sharing for stake holders on A.T.A in respect of advisories services and input support

SFCO March, 2012 Report Produced

Page 17: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

17

Support to the ADPs, Sponsored Research and On-farm Demonstrations

ACTION PLAN

S/N

DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOME

1. Capacity building for EAs/ Facilitators

DTs, DAEs, TTAOs

March- April, 2012

Acquisition of new skills

Page 18: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

18

Asset Acquisition for Individual FUGs/EIGs

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

1. Beneficiary contributions for asset acquisition seem to be out of reach by the poor

WB/NFCO February, 2012

Increased acquisition of productive assets

Page 19: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

19

Project Management, Monitoring and Evaluation

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

1. Ensure prompt payment of counterpart funds by States and LGAs

Fed. Ministry of Finance /WB/NFCO

Feb. – March, 2012

Evidence of payment

2. Re-allocation of funds to States from un-allocated

WB/NFCO February, 2012

Increased funding to affected States

3. High level Advocacy visit to State Government for counterpart fund payment.

WB/ FMF/NFCO

Continuous Improved payment of counterpart fund at all levels

4. Uniform targets for States irrespective of IDA allocation.

NFCO/SFCO February, 2012

Realistic Targets set for states

5. Indiscriminate removal/ transfer of Project staff by States and LGs

WB/NFCO February, 2012

Evidence of due process followed

Page 20: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

20

Project Management, Monitoring and Evaluation

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

6. Reputable dealers with adequate experience and proven competence should be registered as service providers;Erring service providers should be sanctioned;NFCO to issue clear guideline on establishment of SP database

SFCOsFCAs/SFCOsNFCO

Feb 29, 2012ImmediateFeb 15, 2012

Updated Service Provider databaseSP assessment reportGuideline

7. All POs to undergo training on efficient procurement filling and tracking system

NFCO/WB March 26, 2012

Report

Page 21: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

21

Project Management, Monitoring and Evaluation

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

8. Publication of N C B Contract award

NFCO/SFCO March 26, 2012

Newspaper advert

9. To establish proper filing system and develop procurement tracking system. An in-house training is required to be organized for project officers.

WB/NFCO March 2012 Training organized

Page 22: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

22

Project Management, Monitoring and Evaluation

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

10. Environmental audit NFCO/SFCO April-August, 2012

Report Produced

11. Purchase of Soil and water testing kits

NFCO/SFCO March-April, 2012

Evidence of Purchase

12. IPM Training WB/NFCO/SFCO

May- June, 2012

Training Conducted

Page 23: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

23

Project Management, Monitoring and Evaluation

ACTION PLAN

S/N DESCRIPTION OF ACTIVITY

BY WHOM WHEN OUTCOMES

13. Conduct of adaptation study

DPME, M& E Oct –Dec Study report

Page 24: NPC Implementation Issues From MTR Aide Memoire

THIRD NATIONAL FADAMA DEVELOPMENT PROJECT www.fadama.net

24