basin electric power cooperative - cslf · mixed gas condensed process water to water treatment...
TRANSCRIPT
The International Seminar: Perspective for Near-tern CCS Deployment in Brazil
Porto Alegre, BrazilOctober 18, 2007
The International Seminar: Perspective for Near-tern CCS Deployment in Brazil
Porto Alegre, BrazilOctober 18, 2007
Basin Electric Power Cooperative’s Approach to
CO2 Capture, Transport and Sequestration Technologies
Fred Stern – DGC Executive Business/Technology Advisor
Basin Electric Power Cooperative’s Approach to
CO2 Capture, Transport and Sequestration Technologies
Fred Stern – DGC Executive Business/Technology Advisor
BASIN ELECTRICPOWER COOPERATIVE
A Touchstone Energy® Cooperative
Climate ChangeClimate Change
Coal is ‘King’ of Electrical GenerationCoal is ‘King’ of Electrical Generation
• Coal-fired plants account for 50% of US production now
• Projected coal demand increase of 4% per year
• Projected electrical demand increase of 39% by 2030
• By 2030, coal will fuel 57% of US electrical production
• Coal-fired plants account for 50% of US production now
• Projected coal demand increase of 4% per year
• Projected electrical demand increase of 39% by 2030
• By 2030, coal will fuel 57% of US electrical production
BEPC Member System Energy Requirements by ClassBEPC Member System Energy Requirements by Class19
71
1973
1975
1977
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
LossesOther SalesIrrigationOil PipelineBio-DieselEthanolCBMCoalOilLarge CommercialSmall CommercialResidential
ProjectedActual
MillionMWh
Coal’s ImageCoal’s Image
• Viewed as ‘dirty’ in the past
• Now viewed as the # 1 contributor to GHG and global warming
• Regardless of our beliefs, the debate is largely over –the public and policy makers demanding action
• BEPC believes CO2 regulations are imminent
• BEPC believes carbon management techniques are necessary to continue use of coal
• Viewed as ‘dirty’ in the past
• Now viewed as the # 1 contributor to GHG and global warming
• Regardless of our beliefs, the debate is largely over –the public and policy makers demanding action
• BEPC believes CO2 regulations are imminent
• BEPC believes carbon management techniques are necessary to continue use of coal
What is BEPC doing with CO2?What is BEPC doing with CO2?
• BEPC’s subsidiary, Dakota Gasification, began capturing and sequestering CO2 in 2000
• To date, captured 10 million tons and transported for EOR recovery process at Weyburn and Midale Oil Fields in Saskatchewan, Canada
• DGC expects to capture in excess of 3 million tons CO2 per year
• BEPC’s next step – Pursue a demonstration project to capture CO2 at the Antelope Valley Station and sequester the CO2 by leveraging DGC’s pipeline and knowledge
• BEPC’s subsidiary, Dakota Gasification, began capturing and sequestering CO2 in 2000
• To date, captured 10 million tons and transported for EOR recovery process at Weyburn and Midale Oil Fields in Saskatchewan, Canada
• DGC expects to capture in excess of 3 million tons CO2 per year
• BEPC’s next step – Pursue a demonstration project to capture CO2 at the Antelope Valley Station and sequester the CO2 by leveraging DGC’s pipeline and knowledge
CO2 Capture and Sequestrationat
Dakota Gasification Company
CO2 Capture and Sequestrationat
Dakota Gasification Company
49% Reduction in CO2
Emissions Since 1999!
HOW?
49% Reduction in CO2
Emissions Since 1999!
HOW?
CO2 Emissions Reductionat DGC’s Synfuels Plant
CO2 Emissions Reductionat DGC’s Synfuels Plant
2000 20072000 2007
150,000 cars=
49% reduction in CO2 emissions
MIXED GAS CONDENSEDPROCESS
WATER TOWATER
TREATMENT BOILERFEED
WATER
WASTE HEATRECOVERY
HIGH PRESSURESTEAM TO PLANTSTEAM SYSTEM
CO2COMPRESSION
STEAMTO PLANT
STEAMSYSTEM
COWASTE
GAS2
BOILERFEED
WATER
FGD SCRUBBER
WATER TOCOOLING TOWER
TAR OIL
OXYGENPLANT
RAW GAS
SYNTHESIS GAS
COOLEDRAW GAS
NAPHTHA
OXYGEN GRAVITYSEPARATION
CONDENSEDPROCESS
WATER
RAWGAS
LIQUOR
KRYPTON/XENON
LIQUIDNITROGEN
BYPRODUCTPURIFICATION
PHENOL
AMMONIUMSULFATE
CRESYLIC ACID
STACK
AMMONIA
Great Plains Synfuels Plant Process Flow
Great Plains Synfuels Plant Great Plains Synfuels Plant Process FlowProcess Flow
CO2 CompressorsCO2 Compressors
• Manufactured by GHH BORSIG (now MAN Turbomaschinen AG).
• Serial Numbers 1 & 2.
• Three 19,500 hp motors• 55 million scf per day each• 2700 psig discharge pressure
CO2 CompressorsCO2 Compressors
Compression ChallengesCompression Challenges
• Mechanical integrity and balancing
• Materials of construction for seals
• Control system
• Interstage cooling
• Contaminants in gas stream
• Mechanical integrity and balancing
• Materials of construction for seals
• Control system
• Interstage cooling
• Contaminants in gas stream
CO2 PipelineCO2 Pipeline
• 205 miles
• 14” and 12” carbon steel pipe
• MAOP 2700 psig& 2964 psig
• Strategically routed through Williston Basin oil fields
Carbon Dioxide - 153 mmscfdCarbon Dioxide - 153 mmscfd
Used in enhanced oil recovery
Transport ChallengesTransport Challenges
• Permits for pipeline• Selection of lubricants and gaskets• Safety requirements of CO2 transport• Importance of proper routing and pipeline
design
• Permits for pipeline• Selection of lubricants and gaskets• Safety requirements of CO2 transport• Importance of proper routing and pipeline
design
CO2
Stack to StorageIndustrial Emissions to Value Creation
CO2
AVS CO2 Capture Demonstration Project Concept
AVS CO2 Capture Demonstration Project Concept
• Capture about 55 mmscfd of CO2 post combustion
• Treat CO2 at AVS to pipeline quality
• Compress CO2 at AVS or DGC
• Use existing DGC pipeline and operation to transport CO2
• Issued Request for Proposals in June 2007
• Capture about 55 mmscfd of CO2 post combustion
• Treat CO2 at AVS to pipeline quality
• Compress CO2 at AVS or DGC
• Use existing DGC pipeline and operation to transport CO2
• Issued Request for Proposals in June 2007
Capture Technology is Major Hurdle
Capture Technology is Major Hurdle
• Proven capture technology not yet available commercially
• Several companies in various R&D phases
• BEPC seeking to develop partnership or alliance with a promising technology vendor
• Proven capture technology not yet available commercially
• Several companies in various R&D phases
• BEPC seeking to develop partnership or alliance with a promising technology vendor
Technologies to ConsiderTechnologies to Consider
• MEA (amine) absorption
• Chilled ammonia absorption
• Membrane separation
• Oxy-fuel combustion
• Physical adsorption
• Cryogenics
• At this time, MEA and chilled ammonia are only viable choices
• MEA (amine) absorption
• Chilled ammonia absorption
• Membrane separation
• Oxy-fuel combustion
• Physical adsorption
• Cryogenics
• At this time, MEA and chilled ammonia are only viable choices
Transport ChallengesTransport Challenges
• Permits for pipeline• Selection of lubricants and gaskets• Safety requirements regarding to CO2 • Importance of proper routing and pipeline
design• DOT requires monitoring of pipeline
integrity every 5 years (smart pig)
• Permits for pipeline• Selection of lubricants and gaskets• Safety requirements regarding to CO2 • Importance of proper routing and pipeline
design• DOT requires monitoring of pipeline
integrity every 5 years (smart pig)
Vendors Responding to RFPVendors Responding to RFP
• Alstom Environmental – chilled ammonia and amine based
• PowerSpan Corp. – chilled ammonia
• HTC Purenergy – amine based
• CanSolv Techologies – amine based
• Mitsubishi Heavy Ind. – amine based
• Fluor – amine based
• Alstom Environmental – chilled ammonia and amine based
• PowerSpan Corp. – chilled ammonia
• HTC Purenergy – amine based
• CanSolv Techologies – amine based
• Mitsubishi Heavy Ind. – amine based
• Fluor – amine based
ChallengesChallenges
• Additional Sox removal may be required• Process cooling and heating will be very parasitic• Water balance issues• Solvent replacement• Materials of construction• High capital and operating costs• Estimated cost of capture range from $20 to $60
per ton
• Additional Sox removal may be required• Process cooling and heating will be very parasitic• Water balance issues• Solvent replacement• Materials of construction• High capital and operating costs• Estimated cost of capture range from $20 to $60
per ton
Cost and Risk ReductionCost and Risk Reduction
• With DGC pipeline location, ability to sell additional CO2 for EOR to new customers or existing customers is very good
• Seek DOE funding
• Seek support or participation from State of ND and other area lignite users and producers
• Seek to have the project recognized as a PCOR– Phase III project
• With DGC pipeline location, ability to sell additional CO2 for EOR to new customers or existing customers is very good
• Seek DOE funding
• Seek support or participation from State of ND and other area lignite users and producers
• Seek to have the project recognized as a PCOR– Phase III project
Regional Carbon Regional Carbon Sequestration PartnershipsSequestration Partnerships
Plains Carbon Dioxide Reduction (PCOR) Phase III Project
Plains Carbon Dioxide Reduction (PCOR) Phase III Project
• Implementation of large volume sequestration tests to demonstrate the safe, effective, and permanent storage of CO2 in different geological formations in North America that could offset 50% of current CO2 emissions in each region for the next 100 years.
• DOE funded
• Funding of up to $67 million for each region
• Implementation of large volume sequestration tests to demonstrate the safe, effective, and permanent storage of CO2 in different geological formations in North America that could offset 50% of current CO2 emissions in each region for the next 100 years.
• DOE funded
• Funding of up to $67 million for each region
Coal Fields
Evaluated Wyodak–Anderson, Ardley, and Harmon-Hanson coals.
CO2 sequestration capacity estimated to date: >8 billion tons
17 Tcf of methane potential from ECBM in these seams.
Don’t need supercritical CO2, and purity of stream isn’t an issue (significant N may be good).
ND
Estimates based on data provided by states, provinces, and USGS.
Ardley estimates by Bachu, EUB.
Other estimates by Nelson, EERC.
SKAB
BC
MB
MT
SD
NE
MO
MN
WI
Ardley Coal
Harmon-Hanson Coal
Wyodak-Anderson Coal IA
Beaver Lodge, North DakotaBeaver Lodge, North DakotaBeaver Lodge, North Dakota
• CO2 in a deep oil reservoir – CO2 will be injected into an oil-bearing zone at great depth in the Beaver Lodge oil field.
• Minimum of 3000 tons of CO2 will be injected during demo period.
• CO2 in an unminable lignite seam –CO2 will be injected for both CO2sequestration and enhanced coalbed methane production.
• State of North Dakota is providing surface and mineral rights access; drilling scheduled spring 2007.
Lignite for CO2 Sequestration and ECBMLignite for COLignite for CO22 Sequestration and ECBMSequestration and ECBM
Phase III Target FormationsPhase III Target FormationsPhase III Target Formations
• Saline formations are primary target• Oil, gas, and coal are secondary− Must be
regionally significant• Representative of the region’s geology−
Capacity and availability must be high• Competent seals are a must• Structure must be conducive to trapping
• Saline formations are primary target• Oil, gas, and coal are secondary− Must be
regionally significant• Representative of the region’s geology−
Capacity and availability must be high• Competent seals are a must• Structure must be conducive to trapping
Next Steps forAVS CO2 Capture Project
Next Steps forNext Steps forAVS CO2 Capture ProjectAVS CO2 Capture Project
• Complete Review of Six Proposals• Make a ‘Go’ or ‘No Go’ Decision Based
on Economic and Technical Issues• If Project is a ‘Go’, Select Project Partner
in December and Conduct Feasibility and FEED Studies
• Project Could be On-Line in 2011
• Complete Review of Six Proposals• Make a ‘Go’ or ‘No Go’ Decision Based
on Economic and Technical Issues• If Project is a ‘Go’, Select Project Partner
in December and Conduct Feasibility and FEED Studies
• Project Could be On-Line in 2011
SummarySummarySummary
• The CO2 capture train has already left the station
• BEPC believes it is only a matter of time until CO2 regulations are enacted
• CO2 capture and sequestering will be costly and proven capture technology is not available
• BEPC is seeking to demonstrate capture technology in an economic manner
• CO2 capture – not a question of who and what, but rather when and how?
• The CO2 capture train has already left the station
• BEPC believes it is only a matter of time until CO2 regulations are enacted
• CO2 capture and sequestering will be costly and proven capture technology is not available
• BEPC is seeking to demonstrate capture technology in an economic manner
• CO2 capture – not a question of who and what, but rather when and how?
Thank you for your kind attention!
Questions ????
Thank you for your kind attention!
Questions ????