banana project final

Upload: paul-maritim

Post on 05-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/2/2019 Banana Project Final

    1/21

    LAKE VICTORIA ENVIROMENTAL MANAGEMENT

    PROGRAMME (LVEMP II)

    PROJECT TITLE: IMPROVEMENT OF FISH HANDLING

    ENVIRONMENT AT BANANA FISH LANDING SITE

    DURATION: 12 months

    CBO NAME: Banana Beach Management Unit.

    ADDRESS: PO Box 760 -40300 Homa Bay.

    Tel: O723567848/0722116667

    EMAIL: [email protected]

    CONTACT PERSON: Charles Osir/ Washington Osoo

  • 8/2/2019 Banana Project Final

    2/21

    PRIORITY AREA: Control of Soil Erosion and Improving

    Sanitation and Hygiene along the Lake.

    EXECUTIVE SUMMARY

    Environmental degradation has taken a major course in Kanam Location.

    This has been catalyzed by poor farming methods and runoff water

    escalated by the topography. This has lead to soil erosion which has

    polluted the lake because deposits are been carried to lake. Soil erosion has

    led to lake siltation that make lake shore not conducive for fish breeding

    thus decrease in fish stocks. This has made the community around

    economically inactive.

    To address this problem community participation is a paramount approach

    to improve the situation. Through capacity building and awareness creation

    on lake pollution interventions, issues at hand can be streamlined. Control

    of soil erosion reduces lake siltation and prevents the lake from being

    polluted by farm chemical being used by horticulture farmers. Construction

    of environment friendly toilets and fish Banda will improve sanitation and

    hygiene along the lake. Roof top water harvesting will reduce the quantity

    and speed of run off water thus reduces soil erosion. Add something on

    reforestation and building of gabions.

    The expected outcome of this project is realization of environment free from

    pollution especially Lake Victoria. Clean and clear water guarantees good

  • 8/2/2019 Banana Project Final

    3/21

    ACRONYMS

    BMU- Beach Management UnitBBMU- Banana Beach Management UnitHOPANET- HOMA HILLS PARALEGAL NETWORKIFAD- International Fund for Agricultural DevelopmentGOK- GOVERNMENT OF KENYA

    LVFO- Lake Victoria Fisheries OrganizationGEMANET Gender Mainstreaming NetworksCBO- Community Based Organization

  • 8/2/2019 Banana Project Final

    4/21

    TABLE OF CONTENT

    EXECUTIVE SUMMARY ..................................................................................... 2

    ACRONYMS ..................................................................................................... 3

    INTRODUCTION ............................................................................................... 5

    2. BACKGROUND ............................................................................................. 62.1. STATEMENTOFTHEPROBLEM....................................................................................................6

    2.2. CURRENTSITUATION.............................................................................................................7

    2.3. JUSTIFICATION......................................................................................................................7

    3. STAKE HOLDER ANALYSIS ........................................................................... 8

    4. PROBLEM TREE .......................................................................................... 10

    5. OBJECTIVE TREE ........................................................................................ 10

    6. ALTERNATIVE/STRATEGY ANALYSIS ............................................................. 11

    7. OBJECTIVES ............................................................................................... 12

  • 8/2/2019 Banana Project Final

    5/21

    INTRODUCTION

    Banana beach was formed in the year 2001 and registered under Ministry of

    Home Affairs, Heritage and Sports , Department of Social Services in the

    year 2004 Holding a Certificate of Registration number 1284/2004 underSelf Help Project known as Banana Beach Self Help Group. The Banana

    Beach became a Beach Management Unit after qualifying under National

    Beach Management Guidelines in the year 2006 and holds BMUs certificate

    of registration number FISH/ BMU/REG.NO-121/2011.BMUs are community-

    based legally-recognized fisheries management organizations, registered

    with Fisheries Department. BMUs have been formed all around Lake Victoria

    so that fishing communities manage fisheries resources and protectenvironment with government and other stakeholders.

    Banana Beach Management Unit is situated in Homa Bay County, West

    Karachuonyo Division, and Kanam A Location, Kowuor Sub-Location. The

    BMU was formed to address issues of un-employment among the people

    within the locality, Co-Manage fisher resource, improve hygiene and

    sanitation, environmental conservation and awareness on health anddevelopment issues among the catchment area community. To address

    these issues the BMU has undertaken various activities which includes

    C d i M i i d S ill i h l k b i

  • 8/2/2019 Banana Project Final

    6/21

    iv. Southern Nyanza Community Development Organization Project

    (GOK/IFAD)- on training on Horticulture

    v. Homa Hills Community Development Organization- on

    Community managed micro-finance (SILCs methodology),toilet

    construction, financial management training, gender and

    HIV/AIDS awareness campaigns

    vi. World Vision PALA IPA- on Community Home Based Care and

    roof top water harvesting.

    vii. Provincial Administration-Security within the beach and Lake.

    Banana Beach Management Unit is a member of the Beach Management

    Unit network which promotes equity and justice between BMUs. A BMU

    Network is a grouping of all BMUs or lower BMU Networks within a defined

    administrative area formed from Location, division, district, provincial,

    National to regional level. BBMU has also set networks HOPANET (Homa hills

    Paralegal Network), GEMANET (Gender Mainstreaming Networks) and other

    CBOs.

    2. BACKGROUND

    2.1. Statement of the problem.

    Environmental degradation has taken a major course in Kanam Location.

    This has been catalyzed by i) poor farming methods; ii) excessive run off

    water escalated by Homa Hills of which charcoal dealers and subsistence

  • 8/2/2019 Banana Project Final

    7/21

    The effects of lake pollution reduces the economic strength of the

    community. This makes the community poverty level to be high due to

    these human activities.

    2.2. Current situation.

    Homa hills degradation and topography has lead to soil erosion which has

    brought the emergence of gullies and Lake Siltation, soil fertility has

    reduced, hence low crop production. Lake pollution has lead to decline of

    fish stocks and baits, water borne diseases are being experienced due to

    animal and human excretes being deposited in the lake during rainy

    season, due to lack of enough toilets of which contaminates water and the

    same water is used for domestic purposes. Horticulture has encouraged use

    of chemicals along the lake of which when farmers water their plants using

    water pump the same water containing chemicals find its way back to the

    lake. Lack of wood fuel for domestic purposes has also resulted in mass

    destruction of the few available tree cover. Unfinished fish landing Bandaand unfenced beach has lead to low income and health hazard to the BBMU

    members and the community around.

    2.3. Justification.

    The effects of lake pollution have made the living standard of Kanam

    community unbearable hence justifying the importance project. In order to

    address these challenges it is essential to intervene with possible strategiesso as to improve the conditions hence improve the livelihood of the

    members and community. The beach management unit has managed to

  • 8/2/2019 Banana Project Final

    8/21

    All these interventions are geared towards the realization of the Vision 2030

    in attaining better livelihood.

    3. STAKE HOLDER ANALYSIS

    Stakeholder Their interests in theproject

    Importance

    Fishers To increase fish catches 4Agricultural farmers To continue farming 3

    Environmental activists To conserve environment 3Consumers To eat more fish at affordable

    prices4

    Traders To get more profits 4Processing plants To process more fish 4Local authorities To achieve better

    management of the resource3

    Local GovernmentAdministration

    To ensure law and order arefollowed

    3

    Fishing gear manufacturers To sale more fishing gears 4Universities and researchinstitutions

    To understand thecharacteristics of the fishery

    4

    Fisheries officers Sustainable utilization of thefisheries resource

    4

    National Environment

    Management Authority

    Protection and conservation

    of fisheries resources

    4

    Political leaders To maintain their politicalsupport

    3

    NGOs Will oppose the project 2

  • 8/2/2019 Banana Project Final

    9/21

  • 8/2/2019 Banana Project Final

    10/21

    4. PROBLEM TREE

  • 8/2/2019 Banana Project Final

    11/21

    6. ALTERNATIVE/STRATEGY ANALYSIS

    Step 1: Listing of objectives

    1. Constructing gabions and terraces

    2. Planting trees

    3. Training on good farming practices

    4. Awareness creation

    5. Water harvesting

    6. Environmental friendly toilets

    7. Construction of fish landing site

    Step 2: Clustering of Objectives

    Cluster one

    Constructing gabions and terraces

    Planting trees

    Cluster two

  • 8/2/2019 Banana Project Final

    12/21

    project. This will help in comprehensively addressing the environmental

    problems bedeviling the Banana beach community.

    7. OBJECTIVES

    1.1 To control lake pollution in Kanam A by 2012, through

    a) By planting 10,000 seedlings

    b) Constructing gabions

    c) Building stones and Napier grass terraces.

    d) Erecting roof top water harvesting tanks.

    1.2 To construct 20 ecosan toilets in Kanam A community by 2012.

    1.3 To fence, complete fish Banda and erect 2 green houses by 2012.

    8. METHODOLOGY

  • 8/2/2019 Banana Project Final

    13/21

    i. Community participation- BBMU will develop Community Action

    Plans in consultation with the community members, agricultural

    officers, forestry officers, NEMA personnel and stakeholders soas to make the implementation participatory approach.

    ii. Procurement- all procurement will be done as per the agreed

    terms and conditions by all stakeholders.

    iii. Implementation- the process will start by identifying key areas

    to plant trees. Schools and churches compound will be givenfirst priority. The community will take part in building of

    gabions, terraces and good land tilting methods. Agricultural

    officers and ministry of forest will provide technical assistance.

    Objective 2: To construct 20 ecosan toilets in Kanam community by

    2012.

    Procedures- The following activities will take place

    i. Community participation: BBMU incorporation with ministry of public

    health will engage the community in developing community action

    plan.

    ii. Procurement: all procurements will be done according to terms and

    conditions laid down in action plans in consultation with otherstakeholders.

    iii Implementation: the implementation will start by identifying artisans

  • 8/2/2019 Banana Project Final

    14/21

    iii. Implementation: Being a livelihood project, BBMU members and

    community members with artisanal expertise will be part of the

    implementation team; ministry of public works and ministry offisheries will offer technical assistance during implementation.

    MONITORING AND EVALUATION

    Banana beach management unit will use participatory Monitoring and

    Evaluation approach where all stakeholders will be involved. Evaluation will

    be done periodically so as to establish progress of planned targets and goals

    so as to asses effects and impact of resources consumed. The information

    gathered will be used to make informed decision to renew the energy in the

    project momentum with an opportunity to meet the indicators provided in

    logical framework matrix. The reporting tools developed by LVEMP II will be

    periodically shared with District Project Coordination Team (DPCT) and all

    stakeholders.

    10. INSTITUTIONAL CAPACITY

    10.1. Organizational Management capacity

    Banana Beach Management Unit project executive committee comprises of

    development focused members who have shown leadership skills. Three

    leaders i.e. the chairperson, secretary and treasurer have all undergone

    leadership training, financial management training and management offisher resources training. One member holds a diploma in community

    development and project management and has undergone various resource

    mobilization trainings One member is an accountant by profession

  • 8/2/2019 Banana Project Final

    15/21

    10.2. Organizational structure / chart

    Banana Beach Management Unit has a Management Committee, Assembly

    and Sub Committee. BMU committee comprises of nine members and made

    up of chairperson, assistant chairperson, secretary, assistant secretary,

    treasurer and four committee members. The work of the BMU committee is

    to keep all BMU records, draft and implement decision approved by BMUAssembly. The BMU Assembly is the highest decision making organ. The sub

    committees are in charge of implementing activities approved by Assembly

    b h lf f BMU itt

  • 8/2/2019 Banana Project Final

    16/21

    The current and planned collaboration are as follows:

    Ministry of health technical advice in establishing goodhygiene.

    Ministry of agriculture technical advice in adopting best

    farming methods and land use.

    Ministry of fisheries network on management of fisher

    resources.

    SNCDP/ IFAD/GOK assist in developing in irrigation.

    NEMA assist in environmental management along the

    lake.

    World vision training on water harvesting techniques.

    Ministry of public works technical advice during

    completion of construction beach Banda.

    Provincial administration community mobilization and

    linkage with other stakeholder.

    ACCOUNTING CAPACITY

    BBMU holds functional bank account with Co-operative bank of Kenya

    Homa-Bay branch. The CBO has financial records which allow transparency

    and accountability. The signatory to the bank account are the chairperson,

  • 8/2/2019 Banana Project Final

    17/21

    support and linkages with other funding arrangements and

    interventions.

    c) Through capacity building, the knowledge gained by members will be

    transferred to community for continuity in the absences of donor

    funding.

    d) Service fee collected from fishing activities will be pumped back to the

    project to sustain various activities.

    e) Revenue collected from the sale of produce from green house will be

    ploughed back to the project for sustainability.

    EXPECTED OUTPUT/ RESULTS

    Training farmers on good farming methods will improve soil fertility, free

    lakes pollution from agricultural chemicals used in horticulture, and reducelake siltation due run off water from irrigation pumps and rain water all

    these will mean increased farm yields and fish catch in that baits will be now

    available.

    1. Controlled soil erosion will reduce Lake Siltation, improve soil fertility

    hence increase crop production this will translate to improved living

    standard.

    2. Constructed of environmental friendly toilets will reduce water borne

    diseases hence impro ed health of members and comm nit

  • 8/2/2019 Banana Project Final

    18/21

    PROJECT PLANNING MATRIX/LOGICAL FRAMEWORK

    OBJECTIVES OBJECTIVELY VARIFIABLEINDICATORS

    MEANS OF VARIFICATIONS ASSUMPTION/EXTERNAL FACTORS

    Development ObjectiveImproved livelihood of Kanamcommunity

    Impact indicators-Sustainable fish catch-High crop yields-clean and safe water-good hygiene and reducedwaterborne diseases

    -project reports-Interviews and observationvisits

    -Controlled soil erosion-controlled lake pollution-community participation-stakeholders good will.

    Core objectiveControlled lake pollution

    Outcome indicators-improved tree /vegetativecover in the area-Clean and clear lake water-Reduced lake siltation-enhanced fish catch-improved hygiene and

    sanitation-reduced soil erosion

    -Project reports-interviews and observationvisits-healing gullies-clean and clear lake water.

    -Enhanced afforestation- provision of sustainable livelihood-Improved hygiene and sanitation.

    Project out putAfforestation in the areaWater harvesting andinventory system

    Alternative livelihood strategy

    Out put indicators10,000 trees planted within thecommunity-availability 20 erected watertanks-Availability of 20 constructedtoilets-Availability of fenced andcompleted fish Banda-sustainable fish catch-functioning green house

    -project reports-project concept-observation visit-liquidation documents.

    -Planting of 10,000 trees-Erected water tanks-constructed environmental friendlytoilets.-Completed and fenced fish Banda

    Project ActivitiesPlanting of treesBuilding gabionsErecting water tanksTraining farmers on greenhouse use farmingCompletion and fencing of fishBandaConstruction of environmentalfriendly toilets.

    Activity indicators-Liquidation reports anddocuments-Project completion reports

    -Availability of funds-Availability of materials.

    18

  • 8/2/2019 Banana Project Final

    19/21

    11. WORK PLAN AND BUDGET

    19

    No Sub project Main activity(s) particulars uni No of Amo Total Comm LVEMP Responsible

  • 8/2/2019 Banana Project Final

    20/21

    20

    objective (s) ts units untperunit

    estimatecost

    unitycontribution

    persons

    1 Toreforestation

    i)Training offarmers

    Facilitatorstransport

    No 12 3000 36,000

    36,000 BBBMU members,community,Agricultural officers,ministry of forestry,ministry of fisheries,ministry of publicworks (DPCT)

    Note books No 25 30 750 750Pens No 25 15 375 375Flip chart No 10 300 3,000 3,000Marker pen box

    es3 300 900 900

    SUB TOTAL41,025

    41,025

    ii)setting upgreen house

    no 2 25000

    500,000

    500,000

    SUB TOTAL 500,000

    iii)planting of

    tree seedlings

    Assorted

    seedlings

    No 10,00

    0

    30 300,0

    00

    300,000

    Transport Trip 2 30,000

    60,000

    60,000

    labor holes

    10,000

    10 100,000

    100,000

    SUB TOTAL 460,000

    100,000

    360,000

    iv)Buildinggabions andterraces

    Chain links Rolls

    40 5000 200,000

    200,000

    hardcore Ton 50 10000

    500,000

    500,000

    Cider poles No 200 320 64,00

    0

    64,000

    Round poles No 100 150 15,000

    15,000

    u-nail Kgs 30 200 6,000 6,000

    Nails Kgs 20 200 800 800Pangas No 20 300 6,000 6,000Jembes No 20 500 10,00

    010,000

    Wheel barrows No 10 3500 35,000

    35,000

    Spades No 10 600 6,000 6,000

    Transport Trip 3 12000

    36,000

    36,000

    labor No 60 2000 120,000

    120,000

    998,8

  • 8/2/2019 Banana Project Final

    21/21

    Total project cost Ksh4, 838,675. Amount requested for Ksh3, 487,075. Community participation Ksh1, 351,600.

    21