RENEWABLES

BALPARA’S INVOLVEMENT

Design of 66kV line to supply the 52 wind turbines, generating 106.6 megawatts.

THE PROJECTThe Bald Hills Wind Farm is connected to the national electricity grid by a new 27km 66kV powerline constructed on concrete poles.

POWERCORBALD HILLS WINDFARM

Page 3: Balpara Project Highlights 2015

UNDERGROUND RESIDENTIAL DISTRIBUTION

PROJECT SCOPE Balpara successfully provided a turn-key solution on this URD project in the Geelong suburb of Marshall for UP Property. Balpara performed the electrical design, which included NBN requirements, project management, construction and detailing of the as-builts.

URDSTATION ST | MARSHALLUP PROPERTY

Page 4: Balpara Project Highlights 2015

PUBLIC LIGHTING

PROJECT SCOPE Working closely with VicRoads, Balpara successfully completed the Dingley Bypass project in 2015.

Balpara was contracted to perform electrical design, drafting and surveying of the overhead line 22kV-66kV and undergrounding LV infrastructure as well as project management of construction by LendLease on behalf of ZNX.

DINGLEY BYPASSLEIGHTON CONTRACTORS

Page 5: Balpara Project Highlights 2015

VEDN ACCREDITATION

VEDN AUDITING & DETAILINGBalpara continues to be involved in the undergrounding of all the pillars in the

Doncaster Donvale region through the provision of detailing and VEDN accredited auditing services, both civil and electrical.

DONCASTER PILLARSZNX

Page 6: Balpara Project Highlights 2015

BUSHFIRE MITIGATION

PROJECT SCOPE

Balpara provided electrical design and drafting to support Powercor's

bushfire mitigation plan. Our involvement ensured the

delivery of Armor Rods and Dampers to all poles within high

risk fire regions, minimising fire risk and the likelihood of outages.

POWERCORARMOR RODS & DAMPERS

Page 7: Balpara Project Highlights 2015

PUBLIC LIGHTING AS3000

THE PROJECTHobsons Bay City Council requested Balpara to investigate the existing lighting level along Pier Street, Altona and to provide two possible new lighting solutions for both existing and proposed pedestrian crossings, in line with AS 1158.

PIER ST, ALTONAPUBLIC LIGHTINGAS3000

SOLUTIONBalpara’s more expensive solution to add two new poles and replace existing was selected as the higher Lux rating meant that pedestrians were easier to spot by incoming and outgoing busy.

Page 8: Balpara Project Highlights 2015

SURVEYING

PROJECT SCOPE Balpara performs the overhead electrical survey, drafting & detailing services for AusNet’s conductor replacement project which is to replace old steel conductors with new and to replace all copper conductors with aluminium. The total project covers 150km.

AUSNET SERVICESCONDUCTOR REPLACEMENT PROGRAM

Page 9: Balpara Project Highlights 2015

SUBSTATIONS

THE PROJECTBalpara was engaged by Multipipe to GPS detail and draft 66kV related assets on the Richmond Terminal Substation (RTS).The multi-stage project required multiple site visits and substantial detailing, using GPS to ensure accuracy under challenging circumstances. Richmond Terminal Substation is owned by AusNet services and feeds both the CitiPower and United Energy networks.

RICHMONDTERMINAL SUBSTATIONMULTIPIPE

Page 10: Balpara Project Highlights 2015

DETAILING

PROJECT SCOPE Undergrounding of two new transmission

circuits between North Melbourne - Carlton.

Some impressive figures:

length of cable for 1 circuit 5.145 km 3 cables per circuit

total length of 1 circuit 15.435kmgrand total of all circuits 30.87km

The project uses 1,600mm squared 1c 66 kV Cu XLPE Prysmian cables

DALY’S66Kv CBD SECURITY PROJECT