PENDING WORKS AT INDORAMA as on 22.03.2015 INTERFACE PIPING AREA DETAILS OF ACTIVITIES STATUS CONSTRAINTS Completion date 1 BG & PG lines 4 30.03.15 work In progress 7 30.03.15 2 PP area 5 nos of Guide supports are balance for DM water line 1 23.03.15 3 Final painting balance in PE & olefins area Scofolding done & ready for painting; 2 4 Installation of foundation bolts & grouting of NG skid shall be done after increasing the size of base plate hole 1 30.03.15 1" Flare line - Fabrication/ erection balance shall be done after mobilzing gang to Powerplant areato be commenced from 25.03.15 3 29.03.15 3/4" Instrument air line Supporting clamping balance Material to be arranged by Indorama 1 25.03.15 1" steam line Reducer installation & supporting balance Material to be arranged by Indorama 1 26.03.15 6" Flare line Penumatic testing to be done after connecting 1" flare line 1 30.03.15 02 nos strcuturals support to be installed in 6"-FG lin Supports are ready; completed on 24.03.2015 1 25.03.15 5 Cooling tower monkey ladder erection Additional work 1 02.04.15 Guide supports at 1 location balance 1 02.04.15 6 Final allignment balance to be done after replacing inlet valves 1 Piping hydrorest , final painting balalnce Grouting for fire water pumps- 3nos balance In progress 3 25.03.15 Footings & strurctural supports after piping erection in progress 4 30.03.15 Installation of silencer & Exhaust piping Scheme not finalized by Indorama 3 2" & 1/2" diesel line - 100 Mtrs commenced on 23.03.15 4 7 Holding pond area Civil works for valve housing Additional work 2 8 Nitrogen Plant Nitrogen line Tie-in with exisitng line Line ready; waiting for shut-down shut-down planned on 24.03.2015 1 24.03.15 Installation of FT in Instrument air line Material not reced. By Indorama 1 9 Borewell lines 4 10" lines at Borewell 5- 18 mtrs 2 Civil works for footings - 10 nos approx 4 N0. of working days for 01 gang 1.Hydrotest of PG line is balance (30 Mtr) 2.Card board blasting of PG 3. Final painting balance for 3 joints of valve shifting 1. Hydrotest completed - 26.03.2015 2. Cardboadr blasting of PG line shall be done after 14" relocation job 3. painting shall be done after acceptance of RT Painting contractor is not coming to site. Packing plates are balance at few locations in both BG & PG lines shall be commenced on 23.03.2015 completed on 23.03.15 PE plant - Hydrogen lines Painting contractor is not coming to site. NG Skid erection/ Power Plant DM Plant/ Fire water pump valve replacement to be done; valve under procurement Extra work & Shutdown reqd. from Indorama 6" lines with 6" x 10 " reducer - 50 mtrs approx , 50 joints approx To be done after completion of borewell activities

Upload: sivareddy

Post on 16-Nov-2015

216 views

Category:

Documents


2 download

DESCRIPTION

balance works

TRANSCRIPT

Sheet1PENDING WORKS AT INDORAMA as on 22.03.2015INTERFACE PIPINGAREADETAILS OF ACTIVITIESSTATUSCONSTRAINTSN0. of working days for 01 gangCompletion date1BG & PG lines1.Hydrotest of PG line is balance (30 Mtr)2.Card board blasting of PG3. Final painting balance for 3 joints of valve shifting1. Hydrotest completed - 26.03.20152. Cardboadr blasting of PG line shall be done after 14" relocation job3. painting shall be done after acceptance of RTPainting contractor is not coming to site.430.03.15Packing plates are balance at few locations in both BG & PG lineswork In progress 730.03.152PP area5 nos of Guide supports are balance for DM water lineScofolding work for prepartion of access in progressshall be commenced on 23.03.2015 completed on 23.03.15123.03.153PE plant - Hydrogen linesFinal painting balance in PE & olefins areaScofolding done & ready for painting;Painting contractor is not coming to site.24NG Skid erection/ Power PlantInstallation of foundation bolts & grouting of NG skidshall be done after increasing the size of base plate hole130.03.151" Flare line - Fabrication/ erection balanceshall be done after mobilzing gang to Powerplant areato be commenced from 25.03.15329.03.153/4" Instrument air lineSupporting clamping balanceMaterial to be arranged by Indorama125.03.15 1" steam lineReducer installation & supporting balanceMaterial to be arranged by Indorama126.03.156" Flare linePenumatic testing to be done after connecting 1" flare line130.03.1502 nos strcuturals support to be installed in 6"-FG lineSupports are ready; completed on 24.03.2015125.03.155Cooling towermonkey ladder erectionAdditional work102.04.15Guide supports at 1 location balance102.04.156DM Plant/ Fire water pumpFinal allignment balanceto be done after replacing inlet valvesvalve replacement to be done; valve under procurement1Piping hydrorest , final painting balalnceGrouting for fire water pumps- 3nos balanceIn progress325.03.15Footings & strurctural supports after piping erectionin progress430.03.15Installation of silencer & Exhaust pipingScheme not finalized by Indorama32" & 1/2" diesel line - 100 Mtrscommenced on 23.03.15Extra work & Shutdown reqd. from Indorama47Holding pond areaCivil works for valve housingAdditional work28Nitrogen PlantNitrogen line Tie-in with exisitng lineLine ready; waiting for shut-downshut-down planned on 24.03.2015124.03.15
Admin: Admin:Rescheduled to next weekInstallation of FT in Instrument air lineMaterial not reced. By Indorama19Borewell lines6" lines with 6" x 10 " reducer - 50 mtrs approx , 50 joints approxTo be done after completion of borewell activities410" lines at Borewell 5- 18 mtrs2Civil works for footings - 10 nos approx4