Bad Metrics and What YouCan Do About It
Paul Holland Test Consultant and Teacher at Testing Thoughts
©2013 Testing Thoughts 2
My Background
• Independent S/W Testing consultant since Apr 2012• 16+ years testing telecommunications equipment and
reworking test methodologies at Alcatel-Lucent• 10+ years as a test manager• Presenter at STAREast and CAST• Keynote at KWSQA conference in 2012• Facilitator at 25+ peer conferences and workshops• Teacher of S/W testing for the past 5 years• Teacher of Rapid Software Testing
– through Satisfice (James Bach): www.satisfice.com
• Military Helicopter pilot – Canadian Sea Kings
April, 2013
©2013 Testing Thoughts 3
Attributions
• Over the past 10 years I have spoken with many people regarding metrics. I cannot directly attribute any specific aspects of this talk to any individual but all of these people (and more) have influenced my opinions and thoughts on metrics:– Cem Kaner, James Bach, Michael Bolton, Ross
Collard, Doug Hoffman, Scott Barber, John Hazel, Eric Proegler, Dan Downing, Greg McNelly, Ben Yaroch
April, 2013
©2013 Testing Thoughts
Definitions of METRIC
(from http://www.merriam-webster.com, April 2012)
• 1 plural : a part of prosody that deals with metrical structure
• 2 : a standard of measurement <no metric exists that can be
applied directly to happiness — Scientific Monthly>
• 3 : a mathematical function that associates a real nonnegative
number analogous to distance with each pair of elements in a set
such that the number is zero only if the two elements are identical,
the number is the same regardless of the order in which the two
elements are taken, and the number associated with one pair of
elements plus that associated with one member of the pair and a
third element is equal to or greater than the number associated
with the other member of the pair and the third element
April, 2013 4
©2013 Testing Thoughts 5
Sample Metrics
• Number of Test Cases Planned (per release or feature)
• Number of Test Cases Executed vs. Plan
• Number of Bugs Found per Tester
• Number of Bugs Found per Feature
• Number of Bugs Found in the Field
• Number of Open Bugs
• Lab Equipment Usage
April, 2013
©2013 Testing Thoughts 6
Sample Metrics
• Hours between crashes in the Field
• Percentage Behind Plan
• Percentage of Automated Test Cases
• Percentage of Tests Passed vs. Failed (pass rate)
• Number of Test Steps
• Code Coverage / Path Coverage
• Requirements CoverageApril, 2013
©2013 Testing Thoughts 7
Goodhart’s Law
• In 1975, Charles Goodhart, a former advisor to the Bank of England and Emeritus Professor at the London School of Economics stated:
Any observed statistical regularity will tend to collapse once pressure is placed upon it for control purposes
Goodhart, C.A.E. (1975a) ‘Problems of Monetary Management: The UK Experience’ in Papers in Monetary Economics, Volume I, Reserve Bank of Australia, 1975
April, 2013
©2013 Testing Thoughts 8
Goodhart’s Law
• Professor Marilyn Strathern FBA has re-stated Goodhart's Law more succinctly and more generally:
`When a measure becomes a target, it ceases to be a good measure.'
April, 2013
©2013 Testing Thoughts 9
Elements of Bad Metrics
• Measure and/or compare elements that are inconsistent in size or composition– Impossible to effectively use for comparison– How many containers do you need for your
possessions?
– Test Cases and Test Steps• Greatly vary in time required and complexity
– Bugs• Can be different severity, likelihood - i.e.: risk
April, 2013
©2013 Testing Thoughts 10
Elements of Bad Metrics
• Create competition between individuals and/or teams– They typically do not result in friendly competition– Inhibits sharing of information and teamwork– Especially damaging if compensation is impacted
– Number of xxxx per tester – Number of xxxx per feature
April, 2013
©2013 Testing Thoughts 11
Elements of Bad Metrics
• Easy to “game” or circumvent the desired intention– Easy to be improved by undesirable behaviour
– Pass rate (percentage): Execute more simple tests that will pass or break up a long test case into many smaller ones
– Number of bugs raised: Raising two similar bug reports instead of combining them
April, 2013
©2013 Testing Thoughts 12
Elements of Bad Metrics
• Contain misleading information or gives a false sense of completeness– Summarizing a large amount of information into
one or two numbers out of context
– Coverage (Code, Path)• Misleading information based on touching the code
once
– Pass rate and number of test casesApril, 2013
©2013 Testing Thoughts 13
Impact of Using Bad Metrics
– Promotes bad behaviour:• Testers may create more smaller test cases instead of
creating test cases that make sense• Execution of ineffective testing to meet requirements• Artificially creating higher numbers instead of doing
what makes sense• Creation of tools that will mask inefficiencies (e.g.: lab
equipment usage)• Time wasted improving the “numbers” instead of
improving the testing
April, 2013
©2013 Testing Thoughts 14
Impact of Using Bad Metrics
• Gives Executives a false sense of test coverage– All they see is numbers out of context– The larger the numbers the better the testing– The difficulty of good testing is hidden by large “fake”
numbers
• Dangerous message to Executives– Our pass rate is at 96% so our product is in good shape– Code coverage is at 100% - our code is completely
tested– Feature specification coverage is at 100% - Ship it!!!
• What could possibly go wrong?
April, 2013
©2013 Testing Thoughts 15
Sample Metrics
• Number of Test Cases Planned (per release or feature)
• Number of Test Cases Executed vs. Plan
• Number of Bugs Found per Tester
• Number of Bugs Found per Feature
• Number of Bugs Found in the Field – A list of Bugs
• Number of Open Bugs – A list of Open Bugs
• Lab Equipment Usage
April, 2013
©2013 Testing Thoughts 16
Sample Metrics
• Hours between crashes in the Field
• Percentage Behind Plan – depends if plan is flexible
• Percentage of Automated Test Cases
• Percentage of Tests Passed vs. Failed (pass rate)
• Number of Test Steps
• Code Coverage / Path Coverage – depends on usage
• Requirements Coverage – depends on usage
April, 2013
©2013 Testing Thoughts 17
So … Now what?
• I have to stop counting everything. I feel naked and exposed.
• Track expected effort instead of tracking test cases using:– Whiteboard– Excel spreadsheet
April, 2013
©2013 Testing Thoughts 18
Whiteboard
• Used for planning and tracking of test execution• Suitable for use in waterfall or agile (as long as
you have control over your own team’s process)
• Use colours to track:– Features, or– Main Areas, or– Test styles (performance, robustness, system)
April, 2013
©2013 Testing Thoughts 19
Whiteboard
• Divide the board into four areas:– Work to be done– Work in Progress– Cancelled or Work not being done– Completed work
• Red stickies indicate issues (not just bugs)• Create a sticky note for each half day of work (or
mark # of half days expected on the sticky note)• Prioritize stickies daily (or at least twice/wk)• Finish “on-time” with low priority work incomplete
April, 2013
©2013 Testing Thoughts 20
Sticky Notes
• All of these items are optional – add your own elements
Use what makes sense to your situation– Charter Title (or Test Case Title)– Estimated Effort– Feature area– Tester name– Date complete– Effort (# of sessions or half days of work)
• Initially, estimated -> replace with actualApril, 2013
©2013 Testing Thoughts 21
Actual Sample Sticky
Charter Title
Tester
Area
Effort
April, 2013
©2013 Testing Thoughts 22
Whiteboard Example
April, 2013
©2013 Testing Thoughts 23
Reporting
• An Excel Spreadsheet with:– List of Charters– Area– Estimated Effort– Expended Effort– Remaining Effort– Tester(s)– Start Date– Completed Date– Issues– Comments
• Does NOT include pass/fail percentage or number of test cases
April, 2013
©2013 Testing Thoughts 24
Sample Report
April, 2013
Charter AreaEstimated
EffortExpended
EffortRemaining
Effort Tester Date StartedDate
CompletedIssues Found Comments
Investigation for high QLN spikes on EVLTH/W
Performance 0 20 0 acode 12/10/2011 01/14/2012ALU01617032
Lots of investigation. Problem was on 2-3 out of 48 ports which just happened to be 2 of the 6 ports I tested.
ARQ Verification under different RA Modes ARQ 2 2 0 ncowan 12/14/2011 12/15/2011
POTS interference ARQ 2 0 0 --- 01/08/2012 01/08/2012Decided not to test as the H/W team already tested this functionality and time was tight.
Expected throughput testing ARQ 5 5 0 acode 01/10/2012 01/14/2012
INP vs. SHINE ARQ 6 6 0 ncowan 12/01/2011 12/04/2011
INP vs. REIN ARQ 6 7 5 jbright 01/06/2012 01/10/2012
To translate the files properly, had to install Python solution from Antwerp. Some overhead to begin testing (installation, config test) but was fairly quick to execute afterwards
INP vs. REIN + SHINE ARQ 12 12
Traffic delay and jitter from RTX ARQ 2 2 0 ncowan 12/05/2011 12/05/2011
Attainable Throughput ARQ 1 4 0 jbright 01/05/2012 01/08/2012
Took longer because was not behaving as expected and I had to make sure I was testing correctly. My expectations were wrong based on virtual noise not being exact.
©2013 Testing Thoughts 25
Sample Report
April, 2013
ARQ SRA Vectoring Regression H/W Performance0
10
20
30
40
50
60
70
80
90
"Awesome Product" Test Progress as of 02/01/2012
Original Planned Effort
Expended Effort
Total Expected Effort
Feature
Eff
ort
(p
ers
on
ha
lf d
ay
s)
©2013 Testing Thoughts 26April, 2013