bad 11 recycled process waste at wzd. plant ii) haiderpur...
TRANSCRIPT
![Page 1: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/1.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 01.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 45
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8.4
PRODUCTION DETAILS TOTAL PRODUCTION : 948.50 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 94.17
ii) Wazirabad 124 -Do- 123.86
iii) Haiderpur 220 WJC Canal 218.86
iv) Nangloi 40 -Do- 43.61
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.72
vi) Dwarka WJC Canal 51.05
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.98
viii) Sonia Vihar 144 -Do- 142.98
1) Production of Water Treatment Plants 822.42
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.31
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.77
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.08
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 948.50
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.51
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 2: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/2.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 31.05.21----------948.50 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 3: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/3.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 02.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 8
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8.4
PRODUCTION DETAILS TOTAL PRODUCTION : 941.22 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 94.00
ii) Wazirabad 124 -Do- 122.27
iii) Haiderpur 220 WJC Canal 217.92
iv) Nangloi 40 -Do- 40.86
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.54
vi) Dwarka WJC Canal 51.03
vii Bawana WJC Canal 19.02
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.43
viii Sonia Vihar 144 -Do- 142.10
1) Production of Water Treatment Plants 816.17
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
9.37
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.58
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.05
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 941.22
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.26
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.80
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 4: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/4.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 01.06.2021 ----------941.22 MGD
Member (WS)
Copy to: -
12. Pr. Secretary to Lt. Governor
13. P.S. to Chief Minister, Delhi
14. P.S. to Chief Secretary, Delhi
15. Principal Secretary (UD) Govt., of NCT of Delhi
16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
18. CE(WW)
19. CE (East)
20. Dir F & A
21. E.E. (EDP) for uploading on Website
22. Office copy
![Page 5: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/5.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 03.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 53
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.9
PRODUCTION DETAILS TOTAL PRODUCTION : 947.97 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 94.18
ii) Wazirabad 124 -Do- 123.83
iii) Haiderpur 220 WJC Canal 217.83
iv) Nangloi 40 -Do- 44.03
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.25
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.96
viii) Sonia Vihar 144 -Do- 141.68
1) Production of Water Treatment Plants 821.80
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.44
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.53
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.17
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 947.97
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.26
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 6: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/6.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e..02.06.21 ----------947.97 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
![Page 7: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/7.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 04.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 45
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.5
PRODUCTION DETAILS TOTAL PRODUCTION : 942.25 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 93.28
ii) Wazirabad 124 -Do- 118.79
iii) Haiderpur 220 WJC Canal 218.03
iv) Nangloi 40 -Do- 44.07
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.14
vi) Dwarka WJC Canal 51.06
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.04
viii) Sonia Vihar 144 -Do- 141.06
1) Production of Water Treatment Plants 816.49
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.47
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.29
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.76
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95
Total (1+2+3) 942.25
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.11
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.80
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 8: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/8.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 03.06.21 ----------942.25 MGD
Member (WS)
Copy to: -
23. Pr. Secretary to Lt. Governor
24. P.S. to Chief Minister, Delhi
25. P.S. to Chief Secretary, Delhi
26. Principal Secretary (UD) Govt., of NCT of Delhi
27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
29. CE(WW)
30. CE (East)
31. Dir F & A
32. E.E. (EDP) for uploading on Website
33. Office copy
![Page 9: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/9.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 05.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 48
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.9
PRODUCTION DETAILS TOTAL PRODUCTION : 931.38 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.26
ii) Wazirabad 124 -Do- 113.46
iii) Haiderpur 220 WJC Canal 217.00
iv) Nangloi 40 -Do- 42.95
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.64
vi) Dwarka WJC Canal 51.05
vii Bawana WJC Canal 20.01
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.67
viii Sonia Vihar 144 -Do- 141.14
1) Production of Water Treatment Plants 806.18
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
9.70
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.40
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.20
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 931.38
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.90
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.26
![Page 10: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/10.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 04.06.2021 ----------931.38 MGD
Member (WS)
Copy to: -
34. Pr. Secretary to Lt. Governor
35. P.S. to Chief Minister, Delhi
36. P.S. to Chief Secretary, Delhi
37. Principal Secretary (UD) Govt., of NCT of Delhi
38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
40. CE(WW)
41. CE (East)
42. Dir F & A
43. E.E. (EDP) for uploading on Website
44. Office copy
![Page 11: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/11.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 06.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 46
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.3
PRODUCTION DETAILS TOTAL PRODUCTION : 944.28 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 94.51
ii) Wazirabad 124 -Do- 122.11
iii) Haiderpur 220 WJC Canal 216.89
iv) Nangloi 40 -Do- 43.79
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.93
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.74
viii) Sonia Vihar 144 -Do- 141.37
1) Production of Water Treatment Plants 819.38
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
9.16
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.54
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 29.90
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 944.28
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.29
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 12: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/12.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e..05.06.21 ----------944.28 MGD
Member (WS)
Copy to: -
9. Pr. Secretary to Lt. Governor
10. P.S. to Chief Minister, Delhi
11. P.S. to Chief Secretary, Delhi
12. Principal Secretary (UD) Govt., of NCT of Delhi
13. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
14. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
15. CE(WW)
16. CE (East)
![Page 13: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/13.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 07.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 200 6” 55
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.5
PRODUCTION DETAILS TOTAL PRODUCTION : 940.44 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 93.61
ii) Wazirabad 124 -Do- 116.59
iii) Haiderpur 220 WJC Canal 218.02
iv) Nangloi 40 -Do- 44.13
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
20.42
vi) Dwarka WJC Canal 51.06
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.48
viii) Sonia Vihar 144 -Do- 141.42
1) Production of Water Treatment Plants 814.73
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.12
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.59
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.71
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 940.44
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.05
Greater Kailash (N) 4.80 3.35
Deer Park 4.50 4.10
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 14: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/14.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 06.06.21----------940.44 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 15: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/15.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 08.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 100 0.3” 50
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.6
PRODUCTION DETAILS TOTAL PRODUCTION : 939.27 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.12
ii) Wazirabad 124 -Do- 118.95
iii) Haiderpur 220 WJC Canal 217.92
iv) Nangloi 40 -Do- 42.92
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.44
vi) Dwarka WJC Canal 51.02
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.77
viii) Sonia Vihar 144 -Do- 141.30
1) Production of Water Treatment Plants 813.44
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.15
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.58
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.83
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 939.27
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.05
Greater Kailash (N) 4.80 3.35
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 16: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/16.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 07.06.21----------939.27 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 17: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/17.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 09.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 200 6” 52
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.7,5.4
PRODUCTION DETAILS TOTAL PRODUCTION : 919.59 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 67.53
ii) Wazirabad 124 -Do- 121.38
iii) Haiderpur 220 WJC Canal 218.05
iv) Nangloi 40 -Do- 43.65
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.27
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.18
viii) Sonia Vihar 144 -Do- 141.49
1) Production of Water Treatment Plants 793.59
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.17
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.63
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.00
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 919.59
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.35
Greater Kailash (N) 4.80 3.35
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 18: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/18.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 08.06.21----------919.59 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 19: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/19.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 10.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 48
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.8
PRODUCTION DETAILS TOTAL PRODUCTION : 940.24 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 86.86
ii) Wazirabad 124 -Do- 122.59
iii) Haiderpur 220 WJC Canal 218.24
iv) Nangloi 40 -Do- 43.12
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.24
vi) Dwarka WJC Canal 51.05
vii Bawana WJC Canal 20.01
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.86
viii) Sonia Vihar 144 -Do- 141.41
1) Production of Water Treatment Plants 814.38
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.22
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.64
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.86
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 940.24
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.96
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.50
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 20: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/20.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 09.06.21----------940.24 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 21: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/21.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 11.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 52
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7
PRODUCTION DETAILS TOTAL PRODUCTION : 931.34 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 86.82
ii) Wazirabad 124 -Do- 121.96
iii) Haiderpur 220 WJC Canal 218.14
iv) Nangloi 40 -Do- 42.51
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
14.24
vi) Dwarka WJC Canal 51.06
vii Bawana WJC Canal 20.01
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.84
viii Sonia Vihar 144 -Do- 141.65
1) Production of Water Treatment Plants 805.23
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.29
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.72
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.11
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 931.34
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 --
Greater Kailash (N) 4.80 --
Deer Park 4.50 4.20
Janak Puri 3.00 3.40
Kalka Ji 3.65 3.96
![Page 22: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/22.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 10.06.2021 ----------931.34 MGD
Member (WS)
Copy to: -
12. Pr. Secretary to Lt. Governor
13. P.S. to Chief Minister, Delhi
14. P.S. to Chief Secretary, Delhi
15. Principal Secretary (UD) Govt., of NCT of Delhi
16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
18. CE(WW)
19. CE (East)
20. Dir F & A
21. E.E. (EDP) for uploading on Website
22. Office copy
![Page 23: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/23.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 12.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 52
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.6,5.0
PRODUCTION DETAILS TOTAL PRODUCTION : 943.31 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 90.50
ii) Wazirabad 124 -Do- 123.89
iii) Haiderpur 220 WJC Canal 218.14
iv) Nangloi 40 -Do- 43.45
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
20.00
vi) Dwarka WJC Canal 51.09
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 106.92
viii) Sonia Vihar 144 -Do- 141.43
1) Production of Water Treatment Plants 817.36
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.27
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.58
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.95
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 943.31
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.57
![Page 24: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/24.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e..11.06.21 ----------943.31 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
![Page 25: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/25.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 13.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 47
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.6
PRODUCTION DETAILS TOTAL PRODUCTION : 941.67 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 90.40
ii) Wazirabad 124 -Do- 123.94
iii) Haiderpur 220 WJC Canal 218.05
iv) Nangloi 40 -Do- 43.97
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.92
vi) Dwarka WJC Canal 51.07
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 104.52
viii) Sonia Vihar 144 -Do- 141.86
1) Production of Water Treatment Plants 815.73
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.25
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.49
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.94
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95
Total (1+2+3) 941.67
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.70
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 26: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/26.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 12.06.21 ----------941.67 MGD
Member (WS)
Copy to: -
23. Pr. Secretary to Lt. Governor
24. P.S. to Chief Minister, Delhi
25. P.S. to Chief Secretary, Delhi
26. Principal Secretary (UD) Govt., of NCT of Delhi
27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
29. CE(WW)
30. CE (East)
31. Dir F & A
32. E.E. (EDP) for uploading on Website
33. Office copy
![Page 27: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/27.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 14.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 53
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.6,5.3
PRODUCTION DETAILS TOTAL PRODUCTION : 945.29 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 92.11
ii) Wazirabad 124 -Do- 123.92
iii) Haiderpur 220 WJC Canal 218.24
iv) Nangloi 40 -Do- 43.14
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.66
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.72
viii Sonia Vihar 144 -Do- 141.32
1) Production of Water Treatment Plants 820.15
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.22
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
3.92
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.14
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 945.29
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.96
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.70
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 28: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/28.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 13.06.2021 ----------945.29 MGD
Member (WS)
Copy to: -
34. Pr. Secretary to Lt. Governor
35. P.S. to Chief Minister, Delhi
36. P.S. to Chief Secretary, Delhi
37. Principal Secretary (UD) Govt., of NCT of Delhi
38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
40. CE(WW)
41. CE (East)
42. Dir F & A
43. E.E. (EDP) for uploading on Website
44. Office copy
![Page 29: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/29.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 17.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 102
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.8
PRODUCTION DETAILS TOTAL PRODUCTION : 944.78 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 92.82
ii) Wazirabad 124 -Do- 123.93
iii) Haiderpur 220 WJC Canal 218.57
iv) Nangloi 40 -Do- 43.36
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.55
vi) Dwarka WJC Canal 51.03
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.10
viii) Sonia Vihar 144 -Do- 139.50
1) Production of Water Treatment Plants 818.86
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.25
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.57
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.92
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 944.78
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.96
Deer Park 4.50 3.90
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 30: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/30.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 16.06.21----------944.78 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 31: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/31.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 18.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 95
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.9
PRODUCTION DETAILS TOTAL PRODUCTION : 943.24 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.59
ii) Wazirabad 124 -Do- 123.88
iii) Haiderpur 220 WJC Canal 218.91
iv) Nangloi 40 -Do- 43.48
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.97
vi) Dwarka WJC Canal 51.05
vii Bawana WJC Canal 19.50
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.42
viii Sonia Vihar 144 -Do- 139.90
1) Production of Water Treatment Plants 817.70
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.20
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.34
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.54
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 943.24
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.65
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 3.90
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 32: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/32.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 17.06.2021 ----------943.24 MGD
Member (WS)
Copy to: -
12. Pr. Secretary to Lt. Governor
13. P.S. to Chief Minister, Delhi
14. P.S. to Chief Secretary, Delhi
15. Principal Secretary (UD) Govt., of NCT of Delhi
16. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
17. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
18. CE(WW)
19. CE (East)
20. Dir F & A
21. E.E. (EDP) for uploading on Website
22. Office copy
![Page 33: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/33.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 19.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 170
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8.4
PRODUCTION DETAILS TOTAL PRODUCTION : 930.57 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 87.76
ii) Wazirabad 124 -Do- 122.24
iii) Haiderpur 220 WJC Canal 218.27
iv) Nangloi 40 -Do- 44.21
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.11
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.02
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 106.20
viii) Sonia Vihar 144 -Do- 133.25
1) Production of Water Treatment Plants 805.10
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.17
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.10
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.47
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 930.57
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.68
Greater Kailash (N) 4.80 3.35
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 34: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/34.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e..18.06.21 ----------930.57 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
![Page 35: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/35.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 20.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/665.30 900 2’.3” 96
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8.1
PRODUCTION DETAILS TOTAL PRODUCTION : 920.42 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 85.10
ii) Wazirabad 124 -Do- 109.09
iii) Haiderpur 220 WJC Canal 218.13
iv) Nangloi 40 -Do- 44.02
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
20.00
vi) Dwarka WJC Canal 51.02
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 105.88
viii) Sonia Vihar 144 -Do- 139.46
1) Production of Water Treatment Plants 794.96
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.22
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.14
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.46
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95
Total (1+2+3) 920.42
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.68
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.10
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 36: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/36.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 19.06.21 ----------920.42 MGD
Member (WS)
Copy to: -
23. Pr. Secretary to Lt. Governor
24. P.S. to Chief Minister, Delhi
25. P.S. to Chief Secretary, Delhi
26. Principal Secretary (UD) Govt., of NCT of Delhi
27. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
28. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
29. CE(WW)
30. CE (East)
31. Dir F & A
32. E.E. (EDP) for uploading on Website
33. Office copy
![Page 37: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/37.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 21.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 350
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8.4,5.7
PRODUCTION DETAILS TOTAL PRODUCTION : 906.05 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 86.06
ii) Wazirabad 124 -Do- 92.14
iii) Haiderpur 220 WJC Canal 218.70
iv) Nangloi 40 -Do- 43.08
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.02
vi) Dwarka WJC Canal 51.03
vii Bawana WJC Canal 20.02
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.66
viii Sonia Vihar 144 -Do- 139.03
1) Production of Water Treatment Plants 779.74
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.28
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.83
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.31
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 906.05
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.84
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 38: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/38.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 20.06.2021 ----------906.05 MGD
Member (WS)
Copy to: -
34. Pr. Secretary to Lt. Governor
35. P.S. to Chief Minister, Delhi
36. P.S. to Chief Secretary, Delhi
37. Principal Secretary (UD) Govt., of NCT of Delhi
38. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
39. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
40. CE(WW)
41. CE (East)
42. Dir F & A
43. E.E. (EDP) for uploading on Website
44. Office copy
![Page 39: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/39.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 22.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 200 0.6” 92
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.7
PRODUCTION DETAILS TOTAL PRODUCTION : 944.12 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 90.67
ii) Wazirabad 124 -Do- 123.89
iii) Haiderpur 220 WJC Canal 218.70
iv) Nangloi 40 -Do- 43.47
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.98
vi) Dwarka WJC Canal 51.01
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.03
viii) Sonia Vihar 144 -Do- 140.23
1) Production of Water Treatment Plants 817.98
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.29
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.65
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.14
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 944.12
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.20
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.26
![Page 40: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/40.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 24.06.21----------944.12 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 41: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/41.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 23.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 140
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 8..5,5.0
PRODUCTION DETAILS TOTAL PRODUCTION : 946.71 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.58
ii) Wazirabad 124 -Do- 123.89
iii) Haiderpur 220 WJC Canal 218.70
iv) Nangloi 40 -Do- 44.45
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.84
vi) Dwarka WJC Canal 51.02
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.44
viii Sonia Vihar 144 -Do- 140.26
1) Production of Water Treatment Plants 820.18
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.26
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
5.07
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.53
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 946.71
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 --
Greater Kailash (N) 4.80 --
Deer Park 4.50 4.10
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.26
![Page 42: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/42.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 22.06.2021 ----------946.71 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy
![Page 43: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/43.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 24.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.80 78
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.0,4.2
PRODUCTION DETAILS TOTAL PRODUCTION : 940.92 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.24
ii) Wazirabad 124 -Do- 123.90
iii) Haiderpur 220 WJC Canal 218.37
iv) Nangloi 40 -Do- 42.89
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
19.52
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.01
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 107.90
viii) Sonia Vihar 144 -Do- 140.15
1) Production of Water Treatment Plants 815.02
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.28
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.52
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.90
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 940.92
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.14
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 3.84
![Page 44: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/44.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e..23.06.21 ----------940.92 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
![Page 45: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/45.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 25.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.30 200 0’.6” 92
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.7
PRODUCTION DETAILS TOTAL PRODUCTION : 944.12 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 90.67
ii) Wazirabad 124 -Do- 123.89
iii) Haiderpur 220 WJC Canal 218.70
iv) Nangloi 40 -Do- 43.47
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.98
vi) Dwarka WJC Canal 51.01
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.03
viii) Sonia Vihar 144 -Do- 140.23
1) Production of Water Treatment Plants 817.98
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.29
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.65
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.14
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95
Total (1+2+3) 944.12
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.68
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.10
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 46: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/46.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 19.06.21 ----------920.42 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company, 7. Hudson Lane, Civil Lines ,Delhi-110009 8. CE(WW) 9. CE (East) 10. Dir F & A 11. E.E. (EDP) for uploading on Website 12. Office copy
![Page 47: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/47.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 26.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 200 0.6” 64
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.3
PRODUCTION DETAILS TOTAL PRODUCTION : 947.04 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 92.90
ii) Wazirabad 124 -Do- 123.87
iii) Haiderpur 220 WJC Canal 218.59
iv) Nangloi 40 -Do- 43.81
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.85
vi) Dwarka WJC Canal 51.03
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.50
viii Sonia Vihar 144 -Do- 140.29
1) Production of Water Treatment Plants 820.84
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.27
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.83
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 31.20
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 947.04
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.59
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.54
![Page 48: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/48.jpg)
6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas Afected
Note :- Total supply of water in last 24 hours i.e. 25.06.2021 ----------947.04 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor 2. P.S. to Chief Minister, Delhi 3. P.S. to Chief Secretary, Delhi 4. Principal Secretary (UD) Govt., of NCT of Delhi 5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi 6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009 7. CE(WW) 8. CE (East) 9. Dir F & A 10. E.E. (EDP) for uploading on Website 11. Office copy
![Page 49: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/49.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 27.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 72
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.3
PRODUCTION DETAILS TOTAL PRODUCTION : 946.67 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 93.15
ii) Wazirabad 124 -Do- 123.95
iii) Haiderpur 220 WJC Canal 218.46
iv) Nangloi 40 -Do- 43.35
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
21.81
vi) Dwarka WJC Canal 51.02
vii Bawana WJC Canal 20.02
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 109.21
viii) Sonia Vihar 144 -Do- 140.26
1) Production of Water Treatment Plants 821.23
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.28
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.16
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.44
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 946.67
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.59
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.30
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.26
![Page 50: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/50.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 26.06.21----------946.67 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 51: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/51.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 28.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.20 800 2
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 7.0,4.9
PRODUCTION DETAILS TOTAL PRODUCTION : 930.64 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 92.74
ii) Wazirabad 124 -Do- 110.10
iii) Haiderpur 220 WJC Canal 218.49
iv) Nangloi 40 -Do- 43.46
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
20.38
vi) Dwarka WJC Canal 51.05
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 111.33
viii) Sonia Vihar 144 -Do- 140.45
1) Production of Water Treatment Plants 808.00
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.30
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.20
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
1.14
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 27.64
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 930.64
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.05
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.10
Janak Puri 3.00 3.35
Kalka Ji 3.65 4.54
![Page 52: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/52.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 27.06.21----------930.64 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 53: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/53.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 29.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 95
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 6.0,4.0
PRODUCTION DETAILS TOTAL PRODUCTION : 917.98 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 91.62
ii) Wazirabad 124 -Do- 101.84
iii) Haiderpur 220 WJC Canal 217.49
iv) Nangloi 40 -Do- 42.37
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
17.92
vi) Dwarka WJC Canal 51.04
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 109.51
viii) Sonia Vihar 144 -Do- 140.24
1) Production of Water Treatment Plants 792.03
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.32
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.10
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.53
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.95
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 917.98
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 4.05
Greater Kailash (N) 4.80 3.35
Deer Park 4.50 3.90
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.26
![Page 54: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/54.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 28.06.21----------917.98 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy
![Page 55: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/55.jpg)
DELHI JAL BOARD
OFFICE OF MEMBER (WATER SUPPLY)
VARUNALAYA PHASE-II. KAROL BAGH, NEW DELHI
No. DJB/M (WS)/A-97/2017/ Date: 30.06.21
WATER PRODUCTION REPORT
Normal Up Stream Pond
Level At Wazirabad
Today’s Figure of U/S and D/S Wazirabad
Pond Level (in Feet)
Discharge
(Cusec.)
Gate Opening
(Feet)
Raw Water Turbidity
(NTU)
674.50 Feet 674.50/664.40 84
Western Jamuna Canal Level at Haiderpur NORMAL (Ft.) ACTUAL (Ft.)
710.0 5.9,4.9
PRODUCTION DETAILS TOTAL PRODUCTION : 947.70 MGD
Water Treatment Plant Peak Production
Capacity (MGD)
Raw Water Source Today‘s
Production
Remarks
YAMUNA WATER
i) Chandrawal 98 Wazirabad Pond 90.98
ii) Wazirabad 124 -Do- 123.86
iii) Haiderpur 220 WJC Canal 219.23
iv) Nangloi 40 -Do- 45.21
v) Okhla 20 Recycled Process waste
from Chandrawal & R. W.
22.04
vi) Dwarka WJC Canal 51.03
vii Bawana WJC Canal 20.00
GANGA WATER
vii) Bhagirathi 100 Upper Ganga Canal 108.91
viii) Sonia Vihar 144 -Do- 140.54
1) Production of Water Treatment Plants 821.80
RECYCLING /PROCESS WASTE WATER PLANTS
i) Wazir\bad 11 Recycled process waste at
Wzd. Plant
10.27
ii) Haiderpur 16 Recycled process waste at
Wzd. Plant
16.00
iii) Bhagirathi 10 Recycled process waste at
Wzd. Plant
4.63
iv) Chandrawal 08 Recycled process waste at
Wz. Plant
2) Production from Recycling Plants 30.90
GROUND WATER SOURCES
3) Production from Ranney wells & Tube wells 95.00
Total (1+2+3) 947.70
5. MAJOR UGRs’ LEVELS IN METERS.
Location Normal Level (in Meters ) at 6.00 am Today’s Level
Jeetgarh Normal Level (in Meters ) at 6.00 am 3.04
Jhandewalan 4.11 4.14
Greater Kailash (O) 5.12 3.96
Greater Kailash (N) 4.80 3.04
Deer Park 4.50 4.00
Janak Puri 3.00 3.40
Kalka Ji 3.65 4.45
![Page 56: bad 11 Recycled process waste at Wzd. Plant ii) Haiderpur ...delhijalboard.nic.in/sites/default/files/All-PDF/01.06...2021/06/01 · Water Treatment Plant Peak Production Capacity](https://reader035.vdocuments.us/reader035/viewer/2022071608/6146985c7599b83a5f00528a/html5/thumbnails/56.jpg)
m6. TRANSMISSION MAIN
S. No. Shut Down/Pipe Burst Duration of Closure Areas
Afected
Note :- Total supply of water in last 24 hours i.e. 29.06.21----------947.70 MGD
Member (WS)
Copy to: -
1. Pr. Secretary to Lt. Governor
2. P.S. to Chief Minister, Delhi
3. P.S. to Chief Secretary, Delhi
4. Principal Secretary (UD) Govt., of NCT of Delhi
5. C.E.O. BSES, Shakti Sadan, Nehru Place, N Delhi
6. Sr. General Manager, Tata Power Ltd., North and North West Distribution Company,
a. Hudson Lane, Civil Lines ,Delhi-110009
7. CE(WW)
8. CE (East)
9. Dir F & A
10. E.E. (EDP) for uploading on Website
11. Office copy