Page 1: Backbone Improvement Program 5 Million Gallon Tank Workshop

1

*

Backbone Improvement Program 5 Million Gallon Tank Workshop

David Lippman, P.E.

Page 2: Backbone Improvement Program 5 Million Gallon Tank Workshop

2

Las Virgenes Res & Westlake F.P.

MWDSC Connection

Page 3: Backbone Improvement Program 5 Million Gallon Tank Workshop

3

Page 4: Backbone Improvement Program 5 Million Gallon Tank Workshop

4

Page 5: Backbone Improvement Program 5 Million Gallon Tank Workshop

*1963 Initial Backbone System *Calabasas Tank (8 MG), Conduit PS & 20”,24” & 30” Mains

*1971 Equestrian Trails Tank (4.2 MG)

*1972 Las Virgenes Reservoir, Westlake PS & Cornell PS

*1978 LV-2 MWD Connection & 1st Leg of 42” Main *Change from Colorado River Water to State Project Water

*1982 Cornell PS Expansion

*1986 Morrison Tank (3 MG)

*1989 Westlake Filter Plant

*1990 LV-2 Pump Station

*2002 Second Leg of 42” Main

*2012 Agoura Road Transmission Main

5

Page 6: Backbone Improvement Program 5 Million Gallon Tank Workshop

6

70,000

80,000

90,000

100,000

110,000

120,000

130,000

140,000

2010 2015 2020 2025 2030 2035

Po

pu

lati

on

Projected Population

1989 MP 1999 MP 2005 UWMP 2007 MP 2010 UWMP

Page 7: Backbone Improvement Program 5 Million Gallon Tank Workshop

7

-

10,000

20,000

30,000

40,000

50,000

60,000

2010 2015 2020 2025 2030 2035

Acr

e-f

ee

t

Projected Annual Deamand

1989 MP 1999 MP 2005 UWMP 2007 MP 2010 UWMP 2010 UWMP w/ conv

Page 8: Backbone Improvement Program 5 Million Gallon Tank Workshop

8

0

500

1,000

1,500

2,000

2,500

3,000

3,500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Acre

Fee

tMonthly Demands

2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 AVG

0

5

10

15

20

Existing Future

5

Mill

ion

Gallo

ns

Existing Storage Required Storage

Page 9: Backbone Improvement Program 5 Million Gallon Tank Workshop

9

Page 10: Backbone Improvement Program 5 Million Gallon Tank Workshop

2008 2009 2010

Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

10

Approved Master Plan Oct 2007

Adopted MND Oct 2009

Alternative Study and MND Sept ‘08 – Aug ‘09

Presentations at City Council, Committee Meetings & 3-Springs HOA

Page 11: Backbone Improvement Program 5 Million Gallon Tank Workshop

*Program Mitigated Negative Declaration

*Aesthetics

*Biological Resources

*Geology, Soils and Seismicity

*Noise

*Transportation and Traffic

11

Page 12: Backbone Improvement Program 5 Million Gallon Tank Workshop

12

C

A

Page 13: Backbone Improvement Program 5 Million Gallon Tank Workshop

2010 2011 2012

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

13

Transmission Main Design

Awarded Agoura Rd Contract $4.5M

BM 1/10

BM 1/11

BM 8/10

BM 4/11

BM 6/11

BM 12/11

BM 8/11

BM 1/12

Public Workshop July 2011

Page 14: Backbone Improvement Program 5 Million Gallon Tank Workshop

14

Geotechnical Work

Geotechnical Work

Access Road

Blasting Expert Dam Expert

C

A

July 30, 2011 Public Workshop

Visual Simulations

Alternative Route

Street & Storm Drain Integrity

Batch Plant

Valley Fever Concerns

Traffic Volumes Mock Construction Schedule

Additional Visual Simulations

December 13, 2011 Board Meeting

Alternative Routes The Need Traffic Impact Study

Page 15: Backbone Improvement Program 5 Million Gallon Tank Workshop

*March 24, 2012 Public Workshop

*The Need – Dan Ellison, P.E.

*Alternative routes

*Civil Design – John Coffman, P.E.

*Environmental Constraints – Kevin Smith,

*Traffic Impact Study – John Zhao, P.E.

*Public Comments

15