baca, abraham (pm) diaz, donna do, vicky choi, inae ruiz, franklin

15
BACA, ABRAHAM (PM) DIAZ, DONNA DO, VICKY CHOI, INAE RUIZ, FRANKLIN

Upload: gerard-strickland

Post on 31-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

BACA, ABRAHAM (PM) DIAZ, DONNA

DO, VICKYCHOI, INAE

RUIZ, FRANKLIN

MAYENgineeringBACA, ABRAHAM

(PM) DIAZ, DONNA

DO, VICKYCHOI, INAE

RUIZ, FRANKLIN

Overview

• Site Introduction• Development Concept• Entitlements and Permits• Development Features• Infrastructure Elements• Master Schedule• Cost

Site Introduction

•Located in PA 6•1,250 acres •Surrounding Uses

▫Orange County Great Park▫Preservation▫Residential

Site Constraints

•Elevations

Development Concept

•Insert map

Development Concept

•Open Space•Residential

▫SFR (###), Townhomes (###), Apartments (###)

•Commercial

Amphitheater

•Market size: 13,300,000•Seats: 16,000

Hotel and Business Park

•Acres, sustainable features, parking structure

Infrastructure Elements

•Structural Elements•Grading•Traffic and Signaling•Sewer and Drainage•Landscaping and Hardscaping

Traffic Circulation

Entitlements and Permits

•Re-zoning•CEQA Review•Public R/W Encroachment Permits•NPDES•Stormwater and Urban Runoff Permit• LEED Certification

Sustainability

•Bike network•Centralized diverse use locations

▫Elementary school, business park, supermarket

•Neighborhood gardens•LEED Gold

Master Schedule

Cost