attendees (need to compare to sign in roster and check ... sotelo . alderman sterling city council :...
TRANSCRIPT
MEETING MINUTES Date: August 20, 2007 Subject: Presentation of US 30 at Sterling City Council Meeting Project: FAP 309 (US 30)
Section (20-1, 17R, 16, 15, 110)FS Whiteside County Job No. P-92-107-07
NAME ORGANIZATION
Honorable Amy Viering Mayor of Sterling Captain Steve Marschang Sterling Fire Department Ron Coplan City Attorney Jay Wieland City Manager Maria Romborts City Clerk Retha Elston Alderman Sterling City Council Barry Cox Alderman Sterling City Council Lon Sotelo Alderman Sterling City Council Joe Martin Alderman Sterling City Council Wally Adell Alderman Sterling City Council Skip Lee Alderman Sterling City Council Scot Shumard City Staff Tom Slothower Citizen Cindy Von Holten City Staff Dawn Perkins Illinois Department of Transportation – District 2 Becky Marruffo Illinois Department of Transportation – District 2 Gil Janes Howard R. Green Michael Walton Volkert & Associates
On Monday August 20, 2007 at 6:30.p.m. Gil Janes of Howard R. Green, Dawn Perkins and Becky Marruffo from the Illinois Dept. of Transportation and Michael Walton of Volkert and Associates attended the Sterling City Council meeting at the City Hall in Sterling, Illinois. A portion of this meeting was set aside to discuss the US 30 PEI Environmental Impact Study Project between Fulton and Rock Falls in Illinois. Becky Murraffo introduced the project to the council and a brief project overview and status was presented by Gil Janes and Mike Walton in a Power-Point format.
Page 1 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
City of SterlingCity of SterlingCity CouncilCity Council
City HallCity Hall
Monday, August 20, 2007Monday, August 20, 2007
US 30 ProjectUS 30 ProjectThis project proposes 4 lane improvements to This project proposes 4 lane improvements to
US 30 in Whiteside County Illinois, from the US 30 in Whiteside County Illinois, from the junction of IL 136 near Fulton to the junction junction of IL 136 near Fulton to the junction of IL 40 in Rock Falls.of IL 40 in Rock Falls.
Feasibility Study Area
Page 2 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
The US 30 Corridor Feasibility Study The US 30 Corridor Feasibility Study determined there was a need to:determined there was a need to:
Improve Regional Mobility Improve Regional Mobility
Accommodate Land Use Planning GoalsAccommodate Land Use Planning Goals
Address Local System Deficiencies and SafetyAddress Local System Deficiencies and Safety
NEXT STEPNEXT STEPENVIRONMENTAL IMPACT ENVIRONMENTAL IMPACT
STATEMENTSTATEMENTAND PHASE I DESIGN REPORTAND PHASE I DESIGN REPORTUsing Context Sensitive Solutions Using Context Sensitive Solutions
ProcessProcess
US 30 Study Bands
Page 3 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
INITIATEE.I.S
July 2007
CONDUCT PROJECT SCOPING PROCESS
DETERMINE REASONABLE
ALTERNATIVES
EVALUATE REASONABLE
ALTERNATIVESIN-DEPTH
PROVIDE DRAFT E.I.S. FOR PUBLIC
COMMENT
EVALUATE & RESPOND TO
PUBLIC COMMENTS
APPROVAL OFFINAL E.I.S
(PREFERREDALTERNATIVE)
RECORD OF DECISION
Late 2010
PHASE IPHASE IENVIRONMENTAL ENVIRONMENTAL
IMPACT STATEMENT (E.I.S.)IMPACT STATEMENT (E.I.S.)
BEGIN PHASE I
COMPLETEDESIGN REPORT
Project TimelineProject Timeline
First PublicInformation Meeting
CorridorStudy
PHASE IEnvironmental Impact Statement
And Design Report
PHASE IIFinal Design and
Construction Bid DocumentsNot funded
1
Second PublicInformation Meeting PHASE III
ConstructionNot funded
- Study Area reduced to Select Corridors
- Preferred Corridor(s) Selected- Alternative Alignments Developed
- Environmental & Design Report Complete
PHASE IVMaintenance
Upon Project Completion
12
2 4
34
5
5
Open HousePublic Hearing
- Preferred Alignment Selected
Third PublicInformation Meeting
3
6
- Environmental & Design Report Initiated
6
Community Advisory Group Participation
Project Study Group(PSG)is formed
Stakeholders are Identified
CAGs evaluate & refineCorridors based on Environmental
& Engineering Criteria Public Information Meeting #2Present Alternative Corridors
Public Information Meeting #1Present Study Bands
CAGs develop Problem Statement
and define Project Context
PSG develops Preliminary AlternativeCorridors with input from CAGs
PSG develops Purpose & Need Statement from Problem Statement
PSG selects Preferred Corridors
PSG develops Alternative Alignments with Preliminary input from CAGs
Public Information Meeting #3Present Proposed US 30 Alignment
CAGs evaluate & refinealignments based on Environmental
& Engineering CriteriaPublic Hearing
Present Alternative Alignments
PSG selects Preferred Alignment
Complete the Environmental Impact Statement & Design Report
CONTEXT SENSITIVE SOLUTIONSCONTEXT SENSITIVE SOLUTIONSSTAKEHOLDER INVOLVEMENT PROCESSSTAKEHOLDER INVOLVEMENT PROCESS
PSG Selects Community Advisory Group(CAG) Members from Stakeholders
Page 4 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
Other Public Outreach ActivitiesOther Public Outreach Activities::
Stakeholder Meeting and BriefingsStakeholder Meeting and BriefingsPublic Information MeetingsPublic Information MeetingsNew Project Web SiteNew Project Web SiteNew Project HotlineNew Project HotlineProject Newsletters and Fact SheetsProject Newsletters and Fact Sheets
STAKEHOLDER BRIEFING STAKEHOLDER BRIEFING HIGHLIGHTSHIGHLIGHTS
JULY and AUGUST 2007 JULY and AUGUST 2007
MEETING PURPOSEMEETING PURPOSEAUDIENCEAUDIENCEFUTURE MEETINGSFUTURE MEETINGSLEGISLATIVE BRIEFINGSLEGISLATIVE BRIEFINGSINTEREST/ISSUES/CONCERNS INTEREST/ISSUES/CONCERNS
Public Information Meeting Public Information Meeting OVERVIEWOVERVIEW
Morrison, IllinoisMorrison, IllinoisMonday, July, 25, 2007 Monday, July, 25, 2007
ATTENDANCE: 253ATTENDANCE: 253ATTENDEES: ATTENDEES: Business Leaders, Home Owners, Business Leaders, Home Owners,
Farmers, Political Officials, Media, Business Farmers, Political Officials, Media, Business Owners, Farm Bureau, Special Interest Groups, Owners, Farm Bureau, Special Interest Groups, Roadway Commissioners, Chamber / Economic Roadway Commissioners, Chamber / Economic Development Agency RepresentativesDevelopment Agency Representatives
COMMUNITIES: COMMUNITIES: Fulton, Morrison, Rock Falls, Fulton, Morrison, Rock Falls, Sterling, Lyndon, Erie, Galesburg, Mt. Prospect, Sterling, Lyndon, Erie, Galesburg, Mt. Prospect, Clinton, Iowa, Davenport, IowaClinton, Iowa, Davenport, Iowa
Page 5 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
INTEREST/ISSUES/COMMENTS:INTEREST/ISSUES/COMMENTS:What are the property impacts? What are the property impacts? Is my property impacted? Is my property impacted? Where are the alignments?Where are the alignments?What happen to the preferred alignments What happen to the preferred alignments identified in the feasibility study? identified in the feasibility study? How much is this project going to cost us?How much is this project going to cost us?Who is funding this project? Who is funding this project? When will you build the highway?When will you build the highway?Will there be a byWill there be a by--pass in Morrison?pass in Morrison?Who is going to pay me for my property? Who is going to pay me for my property?
YOUR COMMENTS & YOUR COMMENTS & CONCERNSCONCERNS
THANK YOU FOR YOUR THANK YOU FOR YOUR ONGOING SUPPORT !ONGOING SUPPORT !
Page 6 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
Page 7 of 7 Stakeholder Meeting Minutes
Sterling City Council US 30 Phase I EIS
The primary concerns and issues from this group were as follows:
1). Why did the project study area get shortened on the west end of the project?
Our Response: As part of the Corridor Study a traffic analysis was completed. As a result of the
traffic analysis the study team found that projected traffic west of the intersection of IL 136 and US 30 splits almost evenly. The traffic volumes beyond this point reduced the need for an additional lane improvement based on traffic volume.
2). How would it be possible to get a four lane through Morrison?
Our Response: That will be one of the concerns that will have to be discussed by the Community
advisory group once the problem statement is established. IDOT has already had problems on another project in the widening of a portion of US 30 in Morrison so this concern is evident. The placement of a four lane through or around Morrison will has many environmental and design concerns that will have to be evaluated and with a consensus by the CAG the corridor will be selected.
There was very strong support for the project by the City of Sterling. A few of the council members had attended the Public Involvement meeting in July and felt it was well run. The City Council will have representation in the Community Advisory Group and would like to be updated as to the status of the Project as it moves forward.