attachment n materials for environmental and social

117
Project Completion Report Attachments The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy Attachment N Materials for Environmental and Social Considerations Attachment N-1 Screening Formats Attachment N-2 Pilot Project Details for Environmental and Social Considerations Attachment N-3 Project Description Report Attachment N-4 Details of Environmental and Social Considerations in Kenya

Upload: others

Post on 25-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Project Completion Report Attachments

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy

Attachment N Materials for Environmental and Social Considerations

Attachment N-1 Screening Formats Attachment N-2 Pilot Project Details for Environmental and Social Considerations Attachment N-3 Project Description Report Attachment N-4 Details of Environmental and Social Considerations in Kenya

Project Completion Report

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy

Attachment N-1 Screening Formats

Lot 1

Ilkilnyeti Dispensary ..................................................................................................................... N1-2

Iltumtum Primary School .............................................................................................................. N1-11

Meto Dispensary ........................................................................................................................... N1-20

Olemoncho Primary School .......................................................................................................... N1-29

Olkinyei Dispensary ...................................................................................................................... N1-38

Lot 2

Angata Nanyokei Dispensary ........................................................................................................ N1-47

Illaut Primary School..................................................................................................................... N1-57

Latakweny Dispensary .................................................................................................................. N1-67

Marti Primary School .................................................................................................................... N1-77

South Horr Dispensary .................................................................................................................. N1-88

Tuum Primary School ................................................................................................................... N1-98

Attachment N-1

N1-1

Attachment N-1

N1-2

Attachment N-1

N1-3

Attachment N-1

N1-4

Attachment N-1

N1-5

Attachment N-1

N1-6

Attachment N-1

N1-7

Attachment N-1

N1-8

Attachment N-1

N1-9

Attachment N-1

N1-10

Attachment N-1

N1-11

Attachment N-1

N1-12

Attachment N-1

N1-13

Attachment N-1

N1-14

Attachment N-1

N1-15

Attachment N-1

N1-16

Attachment N-1

N1-17

Attachment N-1

N1-18

Attachment N-1

N1-19

Attachment N-1

N1-20

Attachment N-1

N1-21

Attachment N-1

N1-22

Attachment N-1

N1-23

Attachment N-1

N1-24

Attachment N-1

N1-25

Attachment N-1

N1-26

Attachment N-1

N1-27

Attachment N-1

N1-28

Attachment N-1

N1-29

Attachment N-1

N1-30

Attachment N-1

N1-31

Attachment N-1

N1-32

Attachment N-1

N1-33

Attachment N-1

N1-34

Attachment N-1

N1-35

Attachment N-1

N1-36

Attachment N-1

N1-37

Attachment N-1

N1-38

Attachment N-1

N1-39

Attachment N-1

N1-40

Attachment N-1

N1-41

Attachment N-1

N1-42

Attachment N-1

N1-43

Attachment N-1

N1-44

Attachment N-1

N1-45

Attachment N-1

N1-46

Chief Executive

Rural Electrification

34585-00100

Tel: +254-020-4953000 +254-020-4953600

Fax: +254-20-271 0944

Attention

Date: )

Angata Nanyukie, Samburu County

Format

Officer

1

Attachment N-1

N1-47

Check

2-1 Does the n>Y\1?>/--."t sectors?

Yes

dams and reservoirs

1River/erosion control

Power transmission and distribution lines

2-2 Does the

Yes

and

include any of the items?

or

Angata Nanyukie, Samburu County

Samburu

includes.

households

solar

Attachment N-1

N1-48

Angata Nanyukie, Samburu County

the school

? This involves

the

Attachment N-1

N1-49

3.0

Kitchen

130

Room Room

Porch

[Staff Quarter]

Washroom

Room 1

Room 2

1 0

Angata Nanyukic, Samburu County

Room

Porch

Room

1.5 3.

4.0

4.0

Attachment N-1

N1-50

2-5

Angata Nanyukie, Samburu County

consistent with the

Please describe the Hn,, ... "" Act of2006

- Rural Electrification

Rural

-REA

No

T'"'""""" Master ,_, . .,.,.,",...-,,. Plan 2008-201

Vision 2030

2009-2018)

rtlYW'!d'\l"'?>'!l'li- consider alternatives before this 1"t:>r<llt0>C'T"

Please describe of the alternatives

( - would be ,.,..,""'1l'-'""'"'''"' so as to

and affordable "' 1 ""·""~-"'"'"~-' the Vision 2030.

- The second alternative would be to use

as in the Act of

No

with related stakeholders before this

0Local residents

NGO

5

school

Attachment N-1

N1-51

Angata Nanyukie, Samburu County

3

a new one or an one? In case of an one, have you received local residents?

In the case when EIA If yes,

)

process

6

Attachment N-1

N1-52

Angata Nanyukie, Samburu County

6

a certificate to the environment and indicate the title of that certificate.

ce1iified

Title of the certificate :( Not i"or'"''""'rl

done

other than the

1. Ensure that from the Samburu

2.

relevant 3. Ensure that all waste material and debris is ..,._. J, • ....,,,~...,, .. ,

off as per the Environmental and Coordination "-'-'f-.''H~C>l'-JHU 2006.

4. Ensure strict adherence to the of Environmental Coordination and Excessive Vibrations Pollution 2009.

5. Ensure strict adherence to the and Health Act 6. Ensure that construction workers are with adequate

facilities as well as adequate 7. to control of

facilities to the construction workforce.

Note: "you" in the item No. 1 stands for "Rural Electrification Authority".

7 Are any of the

Yes

areas located inside or around the ""'''r'"'"".- site?

:Not identified

mangrove tidal domestic laws or international treaties

salts cumulus or soil erosion areas on a massive scale Remarkable desertification

7

Attachment N-1

N1-53

Angata Nanyukie, Samburu County

Does the have adverse"'""'""''"'''"' on the environment and local communities?

Yes Not identified

Reason:

and does not emit green house gases.

8

Attachment N-1

N1-54

9

Waste

Noise and vibration

' Ground subsidence

!~:Offensive odors

I Biota and C>d'"""''"TC.n'l

Water usage

Accidents

Global """'"'"''>~,...

resettlement

Local economy such as

livelihood

Angata Nanyukie, Samburu County

Social institutions such as

local rlc.,r>"''"''' '"'"" 1/

institutions

social infrastructures and services

poor, of ethnic

Misdistribution of benefit and uaiH<-~F,"'

~Local conflict of interests

:Gender

I rChildren's

i !Cultural h"''''-r,.,,rro

lJ Infectious diseases such as HIV I AIDS etc.

t:Others ( )

9

Attachment N-1

N1-55

Angata Nanyukie, Samburu County

'"'""'"'~--· .. ~,..·~-~ Phase

);> Noise and vibration: there may be minimal noise installation works of the PV as a result of However will have very minimal to be done as per the Environmental Excessive Vibrations

can access with minimal disturbance to -'-'"-'""'""" the time for members of the

is also advised. the PV

emission of green house gases

1 0-1 If environmental and social considerations are information disclosure and meetings with C>LU.l'\.'-'.LlV.''-''-'bJ

for Environmental and Social Considerations?

does the agree on in accordance with JICA Guidelines

and local persons affected

AFFECTED PERSONS 1. Mr.

JICA TEAM 1. Tsutomu Dei-Team 2. Francis Mworia-Assistant

10-2 If no, describe reasons below

[ N/A

Attachment N-1

N1-56

Chief Executive

Rural Electrit1cation

P.O. Box 34585-00100

Tel: +254-020-4953000 +254-020-4953600

Fax: +254-20-271 0944

E-Mail:

Attention

Date: }

laut, Samburu County

of Officer

Attachment N-1

N1-57

laut, Samburu County

Check

Samburu

/U\.,0UV11 2: Outline ofthe '""'r'"::'t'"r

...... ,,,=,,vj- involves electrification of the school and cell .. ,.,, .. , ..... of

converted to electric

2-1 Does the sectors?

"',""'''""'!?''·, dams and reservoirs

River/erosion control

transmission and distribution lines and ~-w·• ,(1 (T{'"

• Ports and harbors

2-2 Does the rt.-r""''~'- include

Yes

of the items?

or

items that the'""""'''"''~-~- includes.

households

2

Attachment N-1

N1-58

an :P Fluorescent :P PV size of 4.2 KW.

the

3

converted to converted

laut, Samburu County

Attachment N-1

N1-59

0

Dorm 1 Storn

18 0

G.:J

Kit.elwn

s

4

laut, Samburu County

---Number of Lamp [Each 5W LED]

+-- Number of power sockets

Security light

P3 No. 1 - 4]

Stairroom

Attachment N-1

N1-60

2-4

2-5

(

nrr"""'~1- consistent

Please describe the

Act of2006 - Rural Electrification vrr,rrr·C>1-nrno.

-Rural

REA

No

Master

Plan 2008-201

before

Vision 2030

2009-201

Please describe outline ofthe alternatives

( - The first would O.ftC'1Y1,("«.lT1A1-> SO as to

the Vision 2030.

- The second alternative would be to use

as in the Act of

No

0Local residents

5

laut, Samburu County

school with

Attachment N-1

N1-61

laut, Samburu County

a new one or an one? In case of an "n-'rr'""<T one, have you received local residents?

are

Others

4 of laws or

Is Environmental for the ,.,.,.r"""''.'' "'~r>n . ..-n •• -.

Yes

'Others:

In the case when EIA If yes,

(

6

are

Environmental Examination '-'"-'""'"'ll'-'CI in the host 0 "''".,...1

'_,..,,.

on

on

on

)

)

Attachment N-1

N1-62

laut, Samburu County

6

certified

to the environment and of that ce1iificate.

done

conditions

other

1. that you obtain from the Samburu Government before 0 " 1'-n,,,"",.' 0 "'''..,..,'"''"'

2. with the relevant of

relevant Authorities. 3. Ensure that all waste material and debris is vv'"'"''"~"'·u,

off as per the Environmental and Coordination 2006.

4. Ensure strict adherence to the of Environmental Coordination and Excessive Vibrations Pollution 2009.

5. Ensure strict adherence to the '-'"''-'UlJU.t.•v••u.•

6. Ensure that construction workers are ",,. . .,-r,, ... " facilities as well as adequate

7. to control of facilities to the construction workforce.

Note: "you" in the item No. 1 stands for "Rural Electrification Authority".

7

Are any of the

Yes

areas located inside or around the "'r'""""'.'' site?

· iN ot identified

considered for national or forests

mangrove tidal

the

domestic laws or international treaties salts cumulus or soil erosion areas on a massive scale

desertification trend areas valuable areas

7

Attachment N-1

N1-63

laut, Samburu County

8

Does the have adverse "~"'""".,.'' on the environment and local communities?

Yes "Not identified

Reason:

Solar PV is a silent and does not green house gases.

8

Attachment N-1

N1-64

9

Waste

Noise and

Ground subsidence

Offensive odors

..._,__" .. '"''-U features

; Bottom sediment and CH''""~":"-'"''""

Water usage

Accidents

Global

laut, Samburu County

and describe their outlines.

resettlement

as

institutions

__ ._._<.(._ .. ,Hi.•"- social infrastructures and services

~H'-<,kh'~H'-' ~U of ethnic

HJU,UVH of benefit and '-4U..LHUCF-,'-'

of interests

i !Children's

1 Cultural '"'"'''''""',...,.""

Infectious diseases such as HIV I AIDS etc.

I 10thers ( )

Attachment N-1

N1-65

""''~ ... .,,._.,.,,,. .... Phase

);> Noise and vibration: there may be minimal noise installation of the PV as a result of However this will have very minimal to be done as per the Environmental Excessive Vibrations

can access with minimal disturbance the time for members of the

is also advised. the PV will

emission of green house gases

Iaut, Samburu County

1 0-1 If environmental and social considerations are does the agree on information disclosure and with stakeholders in accordance with JICA Guidelines for Environmental and Social Considerations?

AFFECTED PERSONS 1. Alex Lesamachale -Head teacher

JICA TEAM 1.

Mworia-Assistant

10-2 If no, describe reasons below

I

team the local persons to be affected

voltaic

N/A

Attachment N-1

N1-66

Chief Executive

Rural Electrification

P.O. Box 34585-00100

Tel: +254-020-4953000 + 254-020-4953600

Fax: +254-20-271 0944

Attention

Date:

Latakweny, Samburu County

of Officer

Attachment N-1

N1-67

Items

Samburu

\HD.C'hru~ 2: Outline ofthe

'"'"''""'''~+ involves electrification of the school and on the of

2-1 Does the

Yes

batteries before

sectors?

dams and reservoirs

River/erosion control

Power transmission and distribution lines

and

: Pmis and harbors

items?

households

Latakweny, Samburu County

to solar energy.

Attachment N-1

N1-68

an > Fluorescent > PV size of 2.4 KW.

the

Latakweny, Samburu County

3

Attachment N-1

N1-69

Latakweny, Samburu County

3.0

4.5

Room No.1 Room No.2 Room No. (') ;:;

5.3 1 1 :1. 6

;::L

s and :h

Room No.3

Room No.4 Room No.6 64

4.9

0

Room No.7 2.7

Attachment N-1

N1-70

2-5

Latakweny, Samburu County

'"'"''''"'·~..-consistent with the

Please describe the

( - Act of 2006

- Rural Electrification

- Rural Electrification Master

-REA Plan 2008-201

No

-n>•r""""'"''"T '-''UlhHU''-'1 alternatives

Vision 2030

2009-2018)

Please describe outline of the alternatives

( - The t1rst alternative would

and affordable the Vision 2030.

- The second alternative would be to

as in the Act of

~.No

1''·r,nr.n"''"'' have'"""""''-'''",...." with related stakeholders before this"'"'""""''"~-.

i=iNo

5

school with

Attachment N-1

N1-71

4

Is Environmental t-e>rn11·re>~ for the rH·r"""''~' ,,~r,n.rri''"

Yes

5

In the case when EIA If yes,

r :Not process

Others: (

6

Latakweny, Samburu County

case of one, you received

Environmental Examination F-.._.,.._.._,.,,,..,._, in the host "~'""..-~'

on

on

on

)

)

Attachment N-1

N1-72

Latakweny, Samburu County

6

rA>rllll'I"'""C' a certificate to the environment and other indicate the title of that certificate.

certified not done

1. Ensure that you obtain the Government before commencement

the Samburu

2. with the relevant of

relevant Authorities. 3. Ensure that all waste YVH>TC>,.,..., VVJ"'"'''''"'''"'· re used and where need

off as per the Environmental and Coordination 2006.

4. Ensure strict adherence to the of Environmental Coordination and Excessive Vibrations Pollution 2009.

5. Ensure adherence to the and 6. Ensure that construction workers are with adequate fJ'-'''-''-'·""H

""'-~'T,,..,, facilities as well as adequate training. 7. to control of

facilities to the construction workforce.

Note: "you" in the item No. 1 stands for "Rural Electrification Authority".

111<=>0T1f>1"> 7

Are any of the

Yes

yes,

areas located inside or around the·~~'""'"~..- site?

i 1Not identified

considered for national or ""'"'"'T"""T"'.r~ forests

mangrove tidal

the

domestic laws or international treaties salts cumulus or soil erosion areas on a massive scale

Remarkable desertification trend areas

or nomads who a

7

Attachment N-1

N1-73

Latakweny, Samburu County

Does the have adverse ir¥11'"\')(''C on the environment and local communities?

Yes ,~:Not identified

Reason:

Solar PV is a silent and does not emit green house gases.

8

Attachment N-1

N1-74

Latakweny, Samburu County

9

Please mark related environmental and social """'"'"'''",.."' and describe their outlines.

Noise and vibration

Ground subsidence

Offensive odors

features

Bottom sediment

Biota and 0 "''""",.""'Y1

Water usage

:Accidents

resettlement

economy such as

livelihood etc.

use and resources

Social institutions such as social T>''>•GT1·'llf'Tll 1co and local \ .. H • ./\ .. dC)JlVU HHCLl'\..ll.L>;

institutions

social infrastructures and services

poor, of ethnic

r ! Misd istribution of benefit and ......... u ..... ,~~

: 1 Local conflict of interests

L :Gender

t=JChildren's

Cultural ""''"'""'F~--; 1 Infectious diseases such as HIV I AIDS etc.

!JOthers (

9

Attachment N-1

N1-75

Outline of related

Phase

)> Noise and vibration: there may be minimal noise installation works of the PV as a result of However this will have very minimal to be done as per the Environmental Excessive Vibrations

mn•:>,.."'•T"•••,...,,,. Phase )> Since PV

sited

n<:>r'rnn," is also advised. the PV

emission of green house gases

Latakweny, Samburu County

10-1 If environmental and social considerations are the ....... ,,,.,.,,,_...,,.,_,-r

information disclosure and meetings with stakeholders in accordance with JICA for Environmental and Social Considerations?

AFFECTED PERSONS 1. Harrison -Nurse in

JICA TEAM 1. 2.

10-2 If no,

[

describe reasons

team and to be affected

N/A

Attachment N-1

N1-76

Marti, Samburu County

Name

Fax: +254-20-27

E-Mail:

Date:

Attachment N-1

N1-77

Marti, Samburu County

Items

solar

2-1 sectors?

waste treatment

or

2-2

Attachment N-1

N1-78

Marti, Samburu County

the

3

Attachment N-1

N1-79

Shower Room 1 4 [I lamp for each]

0

l]

Shower Room S 8 [1 lamp for each]

Marti, Samburu County

[Charging Houses]

Attachment N-1

N1-80

Kitchen

3] 0

5

6.0

0

0

0

0

Marti, Samburu County

5.8

0

0

0

1]

0

Attachment N-1

N1-81

Marti, Samburu County

No

2-5

No

2-6

0Local residents

Attachment N-1

N1-82

4

•Yes 0No

In the case when yes,

7

an

on

on

on

one,

are no

Marti, Samburu County

you

Attachment N-1

N1-83

Title of the ce1iificate :( iNot ''""""'~~.-..

2.

5. 6.

7.

a

Note "you" in the item No. 1 stands for "Rural Electrification Authority".

7 Are any

8

Marti, Samburu County

other

not

Attachment N-1

N1-84

Marti, Samburu County

8

adverse on environment

Yes ~Not H"i~, ..... -t"'T'""r!

is a not green gases.

9

Attachment N-1

N1-85

Marti, Samburu County

mark

Waste

Attachment N-1

N1-86

10

AFFECTED PERSONS 1. 2.

2.

10-2 no,

[

Marti, Samburu County

JICA team to

reasons below

Attachment N-1

N1-87

Samburu

Chief Executive

Rural Electrification

P.O. 34585-00100

Tel: +254-020-4953000 +254-020-4953600

Fax: +254-20-2710944

E-Mail:

Attention

Date: j

South Horr, Samburu County

a Officer

Attachment N-1

N1-88

Check Items

site: South

2-1 Does the '""'"' "'"-~­ sectors?

:Yes

, dams and reservoirs

~River/erosion control

Power transmission and distribution lines

and

1Ports and harbors

sewage and waste treatment

mcmcLge:In,~m and r-~.,..,, .. "''"

Tourism

2-2 Does the '"'"'r""''"''" include any of the 1Yes

items?

Samburu

or

includes.

households

South Horr, Samburu County

Attachment N-1

N1-89

South Horr, Samburu County

the school with

3

Attachment N-1

N1-90

14.0

5.0

South Horr, Samburu County

G.O

Room

>-1j 0 ,.., (")

p-'

~Number oflamp [Each SW LED]

~Number of power sockets

@ Security light

Room

Room

10 5

Attachment N-1

N1-91

2-4 consistent

Please describe the

Act of2006 - Rural Electrification 1-'rr • .,,.,.H.,"'"Yl""

- Rural Electrification Master

No

Vision 2030

2009-2018)

South liorr, Samburu County

nt•r,nAn,:>t"YI" COnsider ... ,1 -rv'v"';~·',iue>."rc.nr,::.c before

Please describe outline alternatives

( - would

and affordable

- The second alternative

as

·No

0Local residents

NGO

....... , ... ,L"~'_."""'" so as to the school

the Vision 2030.

5

Attachment N-1

N1-92

South Horr, Samburu County

a new one or an one? In case of an one, have you received local residents?

Others

4

Is Environmental Environmental Examination """"""''·"'rl for the -n•·r''""'~-r "''~"r"·ri"""''" in the host ""'''n-r,·u

:Yes

:Others:

5

In the case when EIA the host If yes,

process

(

6

Attachment N-1

N1-93

South Horr, Samburu County

to the environment and other

certified not done of the certificate :(

····,Not

1. from the Samburu

2.

relevant Authorities. 3. Ensure that all waste material and debris is ...,VJ"'"''"'"''._..,

off as per the Environmental and Coordination '-.Vj::.,\,HU.L.tVHu 2006,

4. Ensure strict adherence to the of Environmental Coordination and Excessive Vibrations Pollution 2009.

5. Ensure strict adherence to the 6. Ensure that construction workers are '"'"'''"'""'·"

""'·"r'H''' facilities as well as adequate training. 7. to control of

facilities to the construction workforce.

Note: "you" in the item No. 1 stands for "Rural Electrification Authority"

"'""""'"""' 7

Are any ofthe

Yes

areas located inside or around the "'"'r"""''1. site?

Not identified

mangrove tidal

the

Habitat of valuable domestic laws or international treaties salts cumulus or soil erosion areas a massive scale

desertification trend areas historical or cultural valuable areas

of

7

Attachment N-1

N1-94

8

Does the have adverse

Reason:

Solar is a silent

South Horr, Samburu County

on the environment and local communities?

identified

and does not em it green house gases.

8

Attachment N-1

N1-95

9

Waste

Noise and vibration

, Ground subsidence

. Offensive odors

'-''-'VF,,<U~JLUVLU features

Bottom sediment 1Biota

Water usage

. Accidents

Global

South Horr, Samburu County

and describe their outlines.

resettlement

! J Local economy such as

etc.

Social institutions such as social

institutions

'--'"""'".:u.•;;:., social infrastructures and services

poor, of

· Misdistribution of benefit and uu.• ""u''·'-

1 1 Local conflict of interests 1Gender

!Children's r ·cultural

Infectious diseases such as HIV I AIDS etc.

:Others ( )

Attachment N-1

N1-96

South Horr, Samburu County

Outline of related

,....,,,,...,,,. ... ,, ... ,. Phase

Y Noise and vibration: there may be minimal noise installation works the PV as a result of However this have very minimal and construction to be done as per the Environmental .n.u"""'--'h"'H-""'"~ and Coordination

2009.

can access with minimal disturbance to L..IU1H~lHF, the time for members of the

is also advised. the PV will

emission of green house gases

10-1 If environmental social considerations are does the agree on information disclosure and with stakeholders in accordance with JICA Guidelines for Environmental and Social Considerations?

and the local persons to be affected

AFFECTED PERSONS 1. Mike Lenkak -Nurse in 2. Ms Irene-Nurse 3 .

. JICA TEAM 1. Tsutomu Dei-Team

Photo voltaic

1 0-2lf no,

[ N/A

Attachment N-1

N1-97

Chief Executive

Rural Electrification

P.O. 34585-00100

Tel: +254-020-4953000 +254-020-4953600

Fax: +254-20-271 0944

E-Mail:

Attention

Date:

Tuum, Saburu County

Samburu

of a

Attachment N-1

N1-98

Check

1 : Address of site: Tuum

2-1 Does the""'.'''""'"-~" sectors? ;Yes

dams and reservoirs

River/erosion control

i ;Power transmission and distribution lines and,...,..,,..."'"""

sewage and waste treatment

and U10'fJVC><AL

2-2 Does the

':Yes

include any ofthe items?

items that the

2

or

includes.

households

Tuum, Saburu County

to solar energy.

Attachment N-1

N1-99

Tuum, Saburu County

the school with

? This involves l"Ar\10r1ot"\ of the school converted to

Fluorescent will used PV size of 4.92 KW.

the

3

Attachment N-1

N1-100

Tuum, Saburu County

[Office Block]

dormitory]

(1

Attachment N-1

N1-101

2-4

2-5

rn•r,!a.,~T consistent with the

(-

Please describe the

Act of2006

- Rural Electrification

- Rural Electrification Master

REA Plan 2008-201

'No

Vision 2030

2009-2018)

,..,,.r,nr.n""'"i- consider alternatives before this

Please describe outline of the alternatives

( first alternative would be .,..,,...,'".-, 0.,~ so as to

and affordable ""'"'''t-1"''"'1"" the Vision 2030.

second alternative would be to use

as the Act of

'No

0Local residents ,-:NGO

5

oil

Tuum, Saburu County

Attachment N-1

N1-102

Others

4

Is Environmental for the '"""'' "'"''"

r Others:

5

In the case when EIA If yes,

'Not started

Others: (

are

6

Tuum, Saburu County

one, have you received

Environmental Examination in the host

on

on

on

)

)

Attachment N-1

N1-103

Tuum, Saburu County

6

a certificate to the environment and other than the indicate the of that certificate.

certified

Title of the certificate:(

:Not

1. Ensure that

2.

relevant

ce1iificate but not

3. Ensure that all waste material and debris is "''--'"""'"'·"'·~·

done

off as per the and Coordination 1--,'-<>0~CHJ,Uu 2006,

4. Ensure strict adherence to the of Environmental Coordination and Excessive Vibrations Pollution 2009.

5. Ensure strict adherence to the uccu:om:1orw 6. Ensure that construction workers are "'"''''"'"'"'·"'

equipment , sanitary facilities as well as adequate 7. must be to control of

of facilities to the construction workforce.

Note: "you" in the item No. l stands for "Rural Electrification Authority".

7

Are any areas located inside or around the ·~V'·~·"'·~+ site?

Not identified

considered for national or '"'"'''T"'"T""·rl

forests mangrove tidal

)

domestic laws or international treaties salts cumulus or soil erosion areas on a massive scale

Remarkable desertification trend areas valuable areas

or nomads who have

7

Attachment N-1

N1-104

Tuum, Saburu County

Does the have adverse """"'"r"-'' on the environment and local communities?

Yes Not ''-'""''""u'"'''"'

Reason:

Solar PV is a silent does not emit green house gases.

8

Attachment N-1

N1-105

9

Waste

Noise and vibration

Ground subsidence

Offensive odors

Biota and ""'''''L'''('T'"''"'

'Water usage

:Accidents

Global "''~""''Y'\'"'c'

resettlement

,_,,L,V...,,LL, economy such as

etc.

Tuum, Saburu County

and

resources

Social institutions such as social

and local

institutions

'-'""'"-'""'""' social infrastructures services

poor, of

: iMisdistribution of benefit and ._....,,,H..,,)-,~

r: ! Local conflict of interests

:Gender

'JChildren's

Cultural "'""'''1-"''o:"'

l :Infectious diseases such as HIV /AIDS etc.

'10thers (

9

Attachment N-1

N1-106

Outline of

,.___. ...... u._,"'lr,...a .. ""~"''"'" Phase

Y Noise and vibration: there may be minimal noise installation works of the PV as a result of However this will have very minimal to be done as per the Environmental Excessive Vibrations Pollution

o.a~.o·vu•cu. Phase

10

sited

h,l ... rnn.rc is also advised.

the PV emission of green house gases

Tuum, Saburu County

1 0-1 If environmental and social considerations are agree on information disclosure and meetings with stakeholders in '-'-'-''-AJl''-"'-'-11'-''"' with JICA Guidelines for Environmental and Social Considerations?

,:No

AFFECTED PERSONS 1. Gabriel 2. Nkestinten

JICA TEAM 1. Tsutomu Dei-Team Leader 2. Francis Mworia-Assistant

10-2 If no, describe reasons below

[

team and the local persons to

Photo

N/A

10

Attachment N-1

N1-107

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-1

Attachment N-2 Pilot Project Details for the Environmental and Social Considerations

N-2.1 REA and NEMA Letters about Project Description

(1) Letters about Project Description

Figure N-2.1.1 REA letter to NEMA Lot 1 Figure N-2.1.2 Project Description Report for Lot1 Cover page

Figure N-2.1.3 NEMA letter to REA 1/2

Lot 1

Figure N-2.1.4 NEMA letter to REA 2/2

Lot 1

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-2

Figure N-2.1.5 REA letter to NEMA

(Lot 2)

Figure N-2.1.6 Project Description Report for Lot 2 (Cover page)

Figure N-2.1.8 NEMA letter to REA (2/2)

(Lot 2)

Figure N-2.1.7 NEMA letter to REA (1/2)

(Lot 2)

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-3

(2) Official Letters about Size Modifications of Lot-1 and Lot-2

Figure N-2.1.11 NEMA reply to REA

(Lot 1 PV size modification)

Figure N-2.1.9 REA letter to NEMA (1/2)

(Lot 1 PV size modification)

Figure N-2.1.10 REA letter to NEMA (2/2)

(Lot 1 PV size modification)

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-4

Figure N-2.1.12 REA letter to Contractor

(to the Lot 1 Supplier)

Figure N-2.1.13 Contractor reply to REA

(from the Lot 1 Supplier)

Figure N-2.1.14 REA letter to Contractor (1/3)

(to the Lot 2 Supplier)

Figure N-2.1.15 REA letter to Contractor (2/3) (to the Lot 2 Supplier)

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-5

Figure N-2.1.16 REA letter to Contractor (3/3)

(to the Lot 2 Supplier)

Figure N-2.1.18 Contractor reply to REA (2/2) (from the Lot 2 Supplier)

Figure N-2.1.17 Contractor reply to REA (1/2) (from the Lot 2 Supplier)

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-6

N-2.2 Maps of Protected and Conservation Areas and Archaeological, Cultural Sites

(Base Map; KWS 2010) Note1; 1-5 shows locations of the Pilot Project of Lot 1 Note2; N.P.: National Park, N.R.: National Reserve, N.F.: Natural Forest

Source: Kenya State of the Environment and Outlook 2010, 2011 NEMA (amended and modified by the JICA Expert Team)

Figure N-2.2.1 Protected and Conservation Areas showing approximate locations of Lot 1

Ramsar Site

Sibiloi N.P

N3

N2

N1

South Island

Central Island

Mt. Kenya N.P

Tsavo West N.P.

Masay Mara N.R.

❶❷

❸ ❹ ❺

Ilkirinyetti Dispensary

Meto Dispensary

Olkinyei Dispensary

Iltumtum School

Olemoncho School

  N1

  N2

  N3

Lake Turkana N.P.

Mt. Kenya N.P./N.F.

Kenya Lake System

UNESCO Natural Heritage

Amboseli N.P.

Ol Doinyo Orok Mt. F.R

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-7

Note1; 1-29 see Table N-4.2.4 of Attachment N-4, 1-5 shows locations of the Pilot Project of Lot 1 Note2; N.P.: National Park, N.R.: National Reserve, N.F.: Natural Forest

Source: Base Map; National Museums of Kenya (http://www.museums.or.ke/content/view/248/137/) modified by the JICA Expert Team

Figure N-2.2.2 Archaeological, Cultural Sites and Facilities showing approximate locations of Lot 1

Mt. Kenya N.P./N.F

Kenya Lake System in the Great Rift Valley

N

N

L. Turkana N.P

❶❷

❹❺

Ilkirinyetti Dispensary

Meto Dispensary

Olemoncho School

C

C

C

Sacred Mijikenda Kaya Forests

Fort Jesus

Lamu Old Town

UNESCO Natural Heritage UNESCO Cultural Heritage C

N

N

Olkinyei Dispensary

Iltumtum School

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-8

(Base Map: KWS 2010) Note1: 1-6 show locations of the Pilot Project of Lot 2 Note2: N.P.: National Park, N.R.: National Reserve, N.F.: Natural Forest

Source: Kenya State of the Environment and Outlook 2010, 2011 NEMA (amended and modified by JICA Expert Team)

Figure N-2.2.3 Protected and Conservation Areas showing Approximate locations of Lot 2

Ramsar Site

Sibiloi N.P

N3

N2

N1 Central Island

Mt. Kenya N.P

Tsavo West N.P.

Masay Mara N.R.

  N1

  N2

  N3

Lake Turkana N.P.

Mt. Kenya N.P./N.F.

Kenya Lake System

UNESCO Natural Heritage

Amboseli N.P.

Ol Doinyo Orok Mt. F.R

South Island

Angata Nanyukie Dispensary

Marti P. School ❻

Tuum P. School

❶❺ Ilaut P.

School

South Horr Dispensary

Latakweny Dispensary

Project Completion Report Attachment N-2

The Project for Establishment of Rural Nippon Koei / KRI Electrification Model Using Renewable Energy N2-9

Note1: 1-29see Table N-4.2.4 of Attachment N-4 Note2: 1-6 shows locations of the Pilot Project of Lot 2 Note3: N.P.: National Park, N.R.: National Reserve, N.F.: Natural Forest

Source: Base Map; National Museums of Kenya (http://www.museums.or.ke/content/view/248/137/) modified by the JICA Expert Team

Figure N-2.2.4 Archeological, Cultural Sites and Facilities showing approximate locations of Lot 2

Angata Nanyukie Dispensary

Marti P. School

Tuum P. School

❶❺

Ilaut P. School

South Horr Dispensary

❹ Latakweny Dispensary