ATM Situational Awareness

ADS-B Operational Concept

Victor HernandezRO ATM/SAR

Page 2: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Global traffic grow

Global provisions

Regional strategy for ATM situational awareness

ATM requirements

ADS-B Operational Concept

Overview

Page 3: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

3

Traffic Grow

Page 4: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

• Global ATM Operational Concept (Doc 9854)

• Global Planning (Doc 9750)

• Regional Planning (Doc 8733) RPB-ANIP

• National Planning

Global vision

Strategic Planning

Regional action

National action

ANS implementation

Page 5: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ATM System (Doc 9854)

Page 6: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ATM System(Doc 9854)

COMMUNICATION (COM) - NAVIGATION (NAV) - SURVEILLANCE (SUR)

TS

DCBAOM

AUO

SDM CM AO

Cruise Collection

Landing

DepartureSurface departures

RampRamp

Planning

Surface arrival

Page 7: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ATM Automation

• GREPECAS CONCLUSION 12/31:

– REGIONAL STRATEGY FOR THE INTEGRATION OF ATM AUTOMATED SYSTEMS

Page 8: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

PHASE Capabilities

Phase I - Flight data processing System (FDPS) CPL, FLP, RPL

Phase II - ATS Radar Data Processing System /RDPS;monoradar;multiradar;Radar data sharing.

Phase III - Digital automated communications (Automated traffic hand off, AIDC/ CPDLC,etc).

Phase IV - CDM implementation for AOM [Airspace Organization and Management], CM[conflict management], DCB [Demand/Capacity Balancing], AO [AerodromeOperation], TS [Traffic Synchronization], AUO [Airspace User Operation], ASDM[ATM Service Demand Management], AIS, MET, Statistics, etc.

Regional strategy

ATM Situational Awareness 

Page 9: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

9

ADS‐B

Page 10: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

RADAR Coverage CAR/SAM

Page 11: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Annex 11 - Doc 4444

• Radar (PSR, SSR)

• ADS–B

• CPDLC

• Multilateration

ATM surveillance

Page 12: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ADS‐B

Page 13: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

13

ADS‐B implementation

Page 14: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ATM requirements

• a) Conception. Response to necessities and expectations

framework.

• b) Specification. Specify operational requirements

• c) Design. Operational service; system interoperability.

• d) Selection. Services and technologies for implementation.

• e) Planning. Services, installations and capabilities

• f) Operation. Operational implementation.

ADS‐B Operational Concept

Page 15: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Implementation process (Cir 326)

• a) Definition of an airspace concept;

• b) Identification of ADS-B or MLAT performance requirements;

• c) Safety assessment (initial, implementation and operational); and

• d) Preparation for implementation.

15

ADS‐B Operational Concept

Page 16: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

16

ADS‐B Operational Concept

Page 17: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

17

ADS‐B Operational Concept

Page 18: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

18

ADS‐B Operational Concept

Page 19: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

19

ADS‐B Operational Concept

Page 20: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

SEAMLESS OPERATION

TWR  TMA FIR/UIR FIR/UIR APP/TWR

AERODROME   TWR APP EN ROUTE EN ROUTE                         APP/TWR      AEROPUERTO

Page 21: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Based on trajectories

• Airspace redesign and Management

• Airspace capacity

• Aircraft Separation (Doc 4444)

• ATS communication

• ATC emerging techniques and procedures (Training)

21

ADS‐B Operational Concept

Page 22: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Airspace Organization and Management (AOM)

22

ADS‐B Operational Concept

Page 23: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

PBN Airspace Redesign 

ADS‐B Operational Concept

Page 24: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Continuous Descent Operations (CDO’s)

RNP 1

RNP 10-4 (Oceanic)

RNAV 5 (Continental)

RNAV 1

PBN Airspace Concept

RNP 2

ADS‐B Operational Concept

Page 25: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

ATM situational awareness

• ATS provision to air operations

• Ensure flight plan data / tracks according to user requirements

• Priority of global/regional ATS provision (individual

• Coordination of flight plans / tracking through collaborative decision making (CDM) with all stakeholders

25

ADS‐B Operational Concept

Page 26: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

Enhance ATS & Aerodrome capacity

– Improve aerodrome capacity – GATE-TO-GATE:• Required infrastructure - long term • Realistic schedule• Demand and Capacity Balancing (DCB)

– Minimize impact of adverse weather

– Aerodrome network

26

ADS‐B Operational Concept

Page 27: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

“Gate to Gate”Push back, Taxi, Take Off, Climb, Enroute, Descent, Taxi

27

ADS‐B Operational Concept

Page 28: ATM Situational Awareness · 2014. 5. 22. · – Improve aerodrome capacity – GATE-TO-GATE: • Required infrastructure - long term • Realistic schedule • Demand and Capacity

AO — Aaerodrome Operations

• AMAN / D-AMAN

• ATC management to all departures and arrivals

• know position and movement of all vehicles and aircraft operations

• Reduce runway occupancy time (ROT)

• safe operations in all weather conditions