Page 1: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

SHAREHOLDERS

POSCO 52.8 %PIF 38.0 %Others 9.2 %

TOTAL ASSETS

KRW 6.6 trillion

USD 6.0 billion

STAFF STRENGTH

> 5,000

employees

GLOBAL PRESENCE

25 Countries

In 4 continents

At A Glance

Page 2: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~
Page 3: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~
Page 4: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

Main Business in Water & Environment

- 7 -

Advanced Wastewater Treatment

(Sewage & Industrial Wastewater)

Sewarage Pipelines & Maintenance

Reuse of Wastewater

Water & Wastewater Treatment Facilities

Desalination Plant

Reverse Osmosis (RO)

Thermal (MSF, MED)

Pipe Line

Waste Treatment & Incineration Facilities

Water Treatment

Water Supply System

Residential Waste Incineration Plant

(Waste to Energy, SRF System)

Sludge Incineration Plant

(Sewage and Industrial Waste Sludge)

Page 5: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

Waste Water Treatment (1)

- 12 -

Water Treatment Plants

Name

Anyang, Korea Location Ho Chi Minh, Vietnam

250,000㎥/day Capacity 328,000 ㎥/day

CSBR-method(A2O+SBR) Process Conventional Activated Sludge

Apr. 2013 ~ Jan. 2017 Construction Jul. 2015 ~ Jan. 2020

Page 6: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

Waste Water Treatment (2)

- 13 -

Water Treatment Plants

Name

Seoul, Korea Location Incheon, Korea

5,324 Liter/sec (460,000㎥/day) Capacity 1,447 Liter/sec (125,000㎥/day)

A2O BNR Process Bio-SAC BNR

Feb. 2004 ~ Oct. 2007 Construction Aug. 2005 ~ Aug. 2008

Page 7: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

Waste Water Treatment (3)

- 14 -

Water Treatment Plants

Name

Incheon, Korea Location Gumi City, Korea

4,050 Liter/sec (350,000㎥/day) Capacity 3,819 Liter/sec (330,000㎥/day)

MLE Process Bio-SAC BNR

Dec. 2007 ~ Oct. 2010 Construction Aug. 2001 ~ Jul. 2005

Page 8: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

Water Treatment (4)

- 15 -

Water Treatment Plants

Name

Yanbu, KSA Location Yangon, Myanmar

54,050㎥/day Capacity 50,000㎥(Reservoirs), 20,210 ㎥/hr (Pump)

MLE(Modified Ludzack-Ettinger) Process

Jan. 2011 ~ Apr. 2016 Construction Jan. 2018 ~ May. 2020

Page 9: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 16 -

Water & Wastewater Treatment

Bio-SAC BNR Process which is

our own specialized technology

Wide range of water & wastewater

treatment businesses by constant

attempts and innovation

Various experiences in Korea,

Saudi Arabia, UAE, Brazil,

Indonesia , Vietnam, Myanmar and other

countries.

Page 10: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 17 -

KSA Yanbu, Rehabilitation & Expansion of SWTP

Major purpose

Rehabilitation & Expansion of

existing SWTP up to capacity

of 54,050㎥/day (EPC Turn-Key)

Major Facilities

- Rehabilitation : 27,000㎥/day

- Expansion : 27,050㎥/day

* MLE(Modified Ludzack-Ettinger) Process

Client : MARAFIQ

Power and Water Utility Company for

Jubail & Yanbu

Project Period

Jan. 2011 ~ Apr. 2016

Existing Facility

(Rehabilitation)

New Facility

(Expansion)

PJT site view

Bioreactor

Sludge Pump Station

& 2nd Sedimentation

Page 11: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 18 -

Major Experience References (EPC)

Water Treatment & Supply System (Construction)

Projects[Country] Description Complete Role

Greater Yangon Water Supply Project [Myanmar]

Reservors : 50,000㎥Pumping Stations : 20,210 ㎥/hr

May-20 PC

Gwangyang Seawater RODesalination Plant [Korea]

SWRO Capacity: 30,000㎥/day Jul-14 EPC

Brazil CSP EnvironmentalFacilities [Brazil]

Capacity: 74,000㎥/day Jun-16 EPC

Taebak Water DistributionPipelines [Korea]

Distribution Pipeline: 124kmRanging DN15 to DN400

Dec-15 EPC

Abu Dhabi StrategicWater Storage & Supply[UAE]

Transmission Pipeline: 161km426 Storage Well, 4 P/SRanging DN 900 to DN 1200

Mar-16 EPC

Jeonju Water DistributionPipelines [Korea]

Distribution Pipeline: 703kmRanging DN15 to DN700

Dec-16 EPC

Indonesia Water Supply Facility[Indonesia]

Capacity: 42,000㎥/day Apr-13 EPC

Gongchon Water Treatment,Phase 2 [Korea]

Exist Renovation: 250,000㎥/dayExpansion : 163,000㎥/dayTransmission pipeline: 2.3km

Jul-11 EPC

Pohang Water Treatment Facility [Korea]

Capacity: 250,000㎥/day Aug-08 EPC

Page 12: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 19 -

Major Experience References (EPC)

Sewage Treatment Plant (Construction)

Projects[Country] Description Complete Role

Hochiminh City Water

Environment Improvement

[Vietnam]

Capacity : 328,000㎥/dayTreatment Method : Activated Sludge

Jan-20 PC

Anyang Bakdal Advanced STP

[Korea]

Capacity : 250,000㎥/dayTreatment Method : A2O BNR

Feb-17 EPC

Daegu Seobu STP

Phosphorus Treatment

[Korea]

Capacity : 478,000㎥/dayTreatment Method : Chemical

Jun-12 EPC

Jungrang Advanced STP

[Korea]

Capacity : 460,000㎥/dayTreatment Method : A2O BNR

Oct-07 EPC

Ansan Advanced STP

[Korea]

Capacity : 385,000㎥/dayTreatment Method : Symbio

May-09 PC

Gajwa Advanced STP

[Korea]

Capacity : 350,000㎥/dayTreatment Method : MLE

Oct-10 EPC

Gumi Advanced STP

[Korea]

Capacity : 330,000㎥/dayTreatment Method : Bio-SAC BNR

Jul-05 EPC

Suwon Advanced STP

[Korea]

Capacity : 220,000㎥/dayTreatment Method : Tec-BNR

Aug-09 EPC

Page 13: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 20 -

Major Experience References (EPC)

Sewage Treatment Plant (Construction)

Projects[Country] Description Complete Role

Pohang STP, Phase 2

[Korea]

Capacity : 152,000㎥/day

Collecting pipeline: 35.7km

Treatment Method : Bio-SAC BNR

Nov-07 EPC

Hagik STP

[Korea]

Capacity : 125,000㎥/day

Collecting pipeline: 10.875km

Treatment Method : Bio-SAC BNR

Aug-08 EPC

Yanbu STP

[Saudi Arabia]

Expansion : 20,000㎥/day

Rehabilitation : 27,000㎥/day

Treatment Method : MLE

Mar-16 EPC

Gimpo STP

[Korea]

Capacity : 92,600㎥/day

Collecting pipeline : 28.9km

Treatment Method : Bio-SAC BNR

Oct-12 EPC

Gongchon STP

[Korea]

Capacity : 65,000㎥/day

Treatment Method : MBRApr-12 EPC

Sungnam Pangyo STP

[Korea]

Capacity : 47,000㎥/day

Treatment Method : Bio-SAC BNRMay-09 EPC

Page 14: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 21 -

Major Experience References (EPC)

Industrial Wastewater Treatment Plant (Construction)

Projects[Country] Description Complete Role

Brazil CSP EnvironmentalFacilities[Brazil]

Water Supply : 74,000㎥/dayWastewater : 24,000㎥/daySewage : 10,000㎥/day

Aug-15 EPC

Indonesia WastewaterTreatment and Reuse Facility[Indonesia]

Wastewater : 28,000㎥/dayReuse : 7,000㎥/day

Apr-13 EPC

Gyungsan Industrial ComplexWastewater AdvancedTreatment Plant [Korea]

Capacity : 100,000㎥/day Mar-10 EPC

Gwangyang No.4 Wastewater Treatment Plant[Korea]

Capacity : 34,000㎥/day Apr-10 EPC

Munsan WastewaterTreatment Plant [Korea]

Capacity : 10,000㎥/day Mar-08 EPC

Paju LCD Industrial Complex Wastewater Treatment Plant 2nd phase [Korea]

Capacity : 35,000㎥/day Sep-07 EPC

Paju LCD Industrial Complex Wastewater Treatment Plant 1st phase [Korea]

Capacity : 70,000㎥/day Nov-06 EPC

Page 15: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 22 -

Major Experience References (EPC)

Sewerage Pipeline & Drainage (Construction)

Projects[Country] Description Complete Role

Iksan Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 91.9kmDrainage facility: 6,643 units

Aug-14 EPC

Gimpo Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 131kmDrainage facility: 6,254 units

Mar-14 EPC

Mungyeong Sewerage Pipeline BTL [Korea]

Sewerage Pipeline: 134kmDrainage facility: 13,324 units

Nov-12 EPC

Wonju Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 142.8kmDrainage facility: 8,305 units

Oct-12 EPC

Uljin Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 67.6kmDrainage facility: 4,384 units

Mar-12 EPC

Cheongju Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 137kmDrainage facility: 12,706 units

Dec-11 EPC

Paju Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 106kmDrainage facility: 6,216 units

Jul-11 EPC

Seogwipo Sewerage Pipeline BTL[Korea]

Sewerage Pipeline: 100.5KmDrainage facility: 4,884 units

Apr-11 EPC

Jangheung Sewerage Pipeline BTL [Korea]

Sewerage Pipeline: 85kmDrainage facility: 1,900 units

Oct-10 EPC

Page 16: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 23 -

Major Experience References (O&M)

Environmental Facilities Operation & Maintenance

Projects[Country] Description O&M Period Role

Jeonju Daeseong Water Treatment

Plant O&M [Korea] WTP Capacity: 60,000㎥/day

Nov-12 ~ Nov-13

(1 year)O&M

Gwangyang Seawater RO DesalinationPlant O&M [Korea]

SWRO Capacity: 30,000㎥/dayIntake & Pump Station: 70,000㎥/d

Aug-14 ~ Jul-44

(30 years)O&M

Krakatau Wastewater Treatment & Reusing System O&M [Indonesia]

WWTP Capacity: 28,000㎥/dayReusing System: 7,000㎥/day

Sep-13 ~ May-31

(7 years)O&M

Gimpo City Sewerage Facilities O&M

[Korea]

Gimpo STP : 80,000㎥/day

Tongjin STP : 40,000㎥/day

Gochon STP : 10,000㎥/day

Pump Stations: 6 units

Collecting Pipeline : 15.7km

Sunlight Generation : 1 lot

Jul-11 ~ Jul-32

(20 years)O&M

Anyang Sewage Treatment Plant O&M

[Korea]

Seoksu STP: 300,000㎥/day

Bakdal STP: 150,000㎥/day

Dec-14 ~ Nov-17

(3 years)O&M

Cheonan Sewerage Pipeline O&M[Korea]

Sewerage Pipeline: 216km

Drainage facilities: 8,845 units

May-11 ~ May-31

(20 years)O&M

Page 17: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 24 -

Major Experience References (O&M)

Environmental Facilities Operation & Maintenance

Projects[Country] Description O&M Period Role

Gimpo Sewerage Pipeline O&M[Korea]

Sewerage Pipeline: 131km

Drainage facilities: 6,254 units

Mar-14 ~ Mar-34

(20 years)O&M

Paju Sewerage Pipeline, Phase 1 O&M[Korea]

Sewerage Pipeline: 185km

Drainage facilities : 5,412units

Jul-11 ~ Jul-31

(20 years)O&M

Paju Sewerage Pipeline, Phase 2 O&M[Korea]

Sewerage Pipeline : 229km

Manhole Pump : 43 units

Jan-17 ~ Dec-36

(20 years)O&M

Pohang Sewerage Pipeline O&M[Korea]

Sewerage Pipeline: 141km

Pump Station: 3 units

Drainage facilities: 4,950 units

Apr-16 ~ Mar-36

(20 years)O&M

National WWTP Sludge Facilities O&M[Korea]

Incineration Plant: 230 ton/dayMar-14 ~ Mar-29

(15 years)O&M

Yangsan Energy Recovery Plant O&M[Korea]

Recycling Select: 80 ton/day

Incineration Plant: 200 ton/day

Jan-14 ~ Dec-16

(3 years)O&M

Gwangju Solid Refuse Fuel Plant O&M[Korea]

SRF Capacity: 800 ton/dayNov-16 ~ Nov-31

(15 years)O&M

Page 18: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 25 -

PPP(Public Private Partnership) Experiences

Experiences as Lead Developer

Projects[Country] TypeEquity

ShareDescription

Construction

PeriodRole

Sangju Sewerage Pipeline [Korea]

BTL 6.0%Sewerage Pipeline: 98kmDrainage facilities : 5,756units

May-06 ~ Mar-10 EPC

Suwon Sewerage Pipeline [Korea]

BTO 27.5% Capacity : 450ton/day Jun-07 ~ Dec-09 EPC

Seoguipo Sewerage Pipeline [Korea]

BTL 5.1%Sewerage Pipeline : 112kmDrainage facilities : 4,955units

Feb-08 ~ Apr-11 EPC

Chungju Sewerage Pipeline [Korea]

BTL 6.0%Sewerage Pipeline : 120kmDrainage facilities : 12,706units

Dec-08 ~ Dec-11 EPC

Jangrang Sewage TreatmentPlant [Korea]

BTO 25.0%Capacity : 15,000ton/dayMain Trunk Line : 11.6km

Apr-08 ~ Nov-10 EPC

Cheonan Sewerage Pipeline [Korea]

BTL 13.19%Sewerage Pipeline : 194kmDrainage facilities : 15,386units

May 08 ~ May-11 EPC

Paju Sewerage Pipeline [Korea]

BTL 8.83%Sewerage Pipeline :105kmDrainage facilities : 6,216units

Sep-08 ~ Jul-11 EPC

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

Page 19: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 26 -

PPP(Public Private Partnership) Experiences

Experiences as Lead Developer

Projects[Country] TypeEquity

ShareDescription

Construction

PeriodRole

Wonju Sewerage Pipeline [Korea]

BTL 6.34%Sewerage Pipeline : 133kmDrainage facilities : 8,8266units

Apr-09 ~ Oct-12 EPC

Gimpo Sewage TreatmentPlant [Korea]

BTO 29.58%Capacity : 130,000ton/dayMain Trunk Line : 28.7km

Jul-09 ~ Jul-12 EPC

Gimpo Sewerage Pipeline [Korea]

BTL 28.79%Sewerage Pipeline : 131kmDrainage facilities : 6,254units

Sep-10 ~ Mar-14 EPC

Iksan Sewerage Pipeline [Korea]

BTL 23.5%Sewerage Pipeline : 81.8km

Drainage facilities : 6,643unitsFeb-11 ~ Aug-14 EPC

Pohang Sewerage Pipeline, Phase 3 [Korea]

BTL 14.3%Sewerage Pipeline : 47.7km

Drainage facilities : 4,950unitsJun-12 ~ Mar-16 EPC

Paju Sewerage Pipeline, Phase 2 [Korea]

BTL 5.5%Sewerage Pipeline : 128.4km

Drainage facilities : 4,748unitsMay-13 ~ Nov-16 EPC

Gwangju Solid Refuse Fuel[Korea]

BTO 19.0% Capacity : 800ton/day Dec-13 ~ Sep-16 EPC

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

Page 20: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 27 -

PPP(Public Private Partnership) Experiences

Experiences as Partner Developer

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

Projects[Country] TypeEquity

ShareDescription

Construction

PeriodRole

Paju Gumchon Sewage Treatment Plant [Korea]

BTO 40.0%Capacity : 27,000ton/day

Main Trunk Line : 9.98kmMar-03 ~ Mar-05 EPC

Kimhae Sewerage Pipeline [Korea]

BTL 3.6%Sewerage Pipeline : 102km

Drainage facilities : 10,610unitsMay-06 ~ Apr-10 EPC

Kyungju Sewerage Pipeline [Korea]

BTL 8.52%Sewerage Pipeline : 134km

Drainage facilities : 7,241unitsOct-06 ~ May-10 EPC

Jeongup SSewerage Pipeline [Korea]

BTL 19.0%Sewerage Pipeline : 77km

Drainage facilities : 6,922unitsJun-06 ~ Mar-10 EPC

Kangneung Sewerage Pipeline [Korea]

BTL 2.7%Sewerage Pipeline : 78km

Drainage facilities : 4,014unitsSep-07 ~ Aug-10 EPC

Ansung Sewage TreatmentPlant [Korea]

BTO 10.0%Capacity : 18,000ton/day

Main Trunk Line : 189kmMar-08 ~ Mar-14 EPC

Jangheung Sewage TreatmentPlant & Pipeline [Korea]

BTO/

BTL10.32%

Capacity : 15,000ton/day

Sewerage Pipeline : 114km

Drainage facilities : 4,372units

Apr-08 ~ Mar-11 EPC

Page 21: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 28 -

PPP(Public Private Partnership) Experiences

Experiences as Partner Developer

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

Projects[Country] TypeEquity

ShareDescription

Construction

PeriodRole

Uljin Sewerage Pipeline [Korea]

BTL 3.0%Sewerage Pipeline : 68km

Drainage facilities : 4,384unitsJan-09 ~ Mar-12 EPC

Munkyung Sewerage Pipeline [Korea]

BTL 4.17%Sewerage Pipeline : 134km

Drainage facilities : 13,324unitsFeb-09 ~ Nov-12 EPC

Pyungtaek Sewerage Pipeline [Korea]

BTL 6.8%Sewerage Pipeline : 119km

Drainage facilities : 6,931unitsNov-09 ~ Aug-13 EPC

Incheon Sewerage Pipeline [Korea]

BTL 15.84%Sewerage Pipeline : 85km

Drainage facilities : 4,961unitsJan-10 ~ Oct-13 EPC

Tongyoung Sewerage Pipeline [Korea]

BTL 20.4%Sewerage Pipeline : 91km

Drainage facilities : 10,831unitsMay-10 ~ Jun-13 EPC

Gwangju Sewerage Pipeline [Korea]

BTL 18.0%Sewerage Pipeline : 150km

Drainage facilities : 12,811unitsMay-10 ~ May-13 EPC

Cheonan Sewerage Pipeline,Phase 2 [Korea]

BTL 12.8%Sewerage Pipeline : 68km

Drainage facilities : 3,172unitsJul-10 ~ Nov-13 EPC

Page 22: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 29 -

PPP(Public Private Partnership) Experiences

Experiences as Partner Developer

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

Projects[Country] TypeEquity

ShareDescription

Construction

PeriodRole

Chuncheon Sewerage Pipeline [Korea]

BTL 15.4%Sewerage Pipeline : 103km

Drainage facilities : 7,423unitsFeb-11 ~ Feb-15 EPC

Youngju Sewerage Pipeline [Korea]

BTL 11.2%Sewerage Pipeline : 87km

Drainage facilities : 6,730unitsJan-11 ~ Mar-14 EPC

Sihoung Bangsan SewageTreatment Plant [Korea]

BTO 3.24%Capacity : 63,000ton/day

Main Trunk Line : 15.6kmApr-14 ~ Dec-16 EPC

Page 23: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 30 -

Waste to Energy / Waste Treatment

FWW to biogas facility

- Capacity: 30ton/day

- HRT: 20days

- 50m3/ton of FWW

Experiences in Korea, Leading EPC Company in WtE Biz.

Page 24: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 31 -

WtE / Waste treatment Facilities

Resource Recycling Facility - Korea

Yangsan Resource Recycling Facility Name Goyang Resources Recycling Facilities

Yangsan, Korea Location Goyang , Korea

100 ton/day x 2lines & Direct Melting System Capacity 150 ton/day x 2lines ⇒ 5.2MW & Direct Melting System

Oct. 2004 ~ Feb. 2010 Construction May 2006 ~ Dec. 2010

Page 25: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 32 -

WtE / Waste treatment Facilities

WtE (Incineration Plant) - POLAND Sludge Fuelization Facility-KOREA

Krakow Incineration(WtE) Plant Name Suwon Sludge Fuelization Facility

Krakow, Poland Location Suwon, Korea

340 ton/day × 2 Set, 10.7Mw/h Capacity 450 ton/day, Drying & Solidification Technology

Oct. 2012 ~ Jun. 2016 Construction Jun. 2007 ~ Dec. 2009

Page 26: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 33 -

Krakow WtE Project - General

Category Content

Location - Krakow City, Poland

Details

- 220,000t/y (340t/d x 2lines)

- Electricity Generation:

10.74MW

Construction

Period- 1,100days

Client- K.H.K(Krakowski Holding

Komunalny S.A.)

Consortium

Type

- Sole(Shares 100%)

☞ Technology: Stoker type

(Doosan Lentjes/German)

Budget- Poland National Fund

+ EU Fund

Jan. 2015, Under Construction

June 2016, Completion & Taking-Over

Page 27: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 34 -

Krakow WtE Project - Site Layout

Future

Extension

site

Management

Building

Incinerator/

Boiler

Management

Building

- Story : 2F

- Building Area: 852.0m2

(Operation/Office/HR)

Incinerator/Boiler

- Story : 6F

- Building Area: 8,953m2

(Boiler, Turbin/ Generation,

Condensor, Coolling Tower)

Ash Treatment Building

- Story : 2F

- Building Area: 5,705m2

(Flue gas Treatment Facilities,

Bottom Ash Treatment)

SITE

Vistula River

Ash Treatment

Building

Category Contents

Site Area 56,737㎡

Building Wide

Area28.89%

Parking lot 83 lots(Included 3 Handicapped)

Max. Height Incinerator, Boiler: 40M, Stack : 80M

Building TypeCombination of

Steel –Frame and Steel-Concrete

Page 28: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 35 -

Krakow WtE Project - Incineration Type

Incinerator

Combustion

Air to GrateBottom ash

Transferor

Feeder NgOH

Nozzle

Blower

Burner

▶ Principle

- Composition of grate, incinerator which

move forward and backward by oil

pressure equipment

- Incinerator is divided by Dry step,

Combustion Step, After-combustion Step

- Combustion Air is combusted by Heating

air from bottom of grate and radiant heat

from furnace wall.

▶ Advantage

- Ease to burn without pre-treatment even

though the waste is huge

- Ease to recover heat by small variation of

combusting calories

- Stabilization of Technologies through

numerous construction and test-run

experiences

Stoker Type

Page 29: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 36 -

Krakow WtE Project - Programme

Submission of

Building Permit

17/May.

Mechanical

Work Start

Final

Completion

June 2016

Contract

31/Oct. 14/March 1/Apr.

Power

Receiving

22/Mar.

Test Start

06/Nov.

Construction-

Assembly

Work Start

23/Dec.

EIC

Work Start

○ Project Period

Construction Period : October 2012

~ June 2016

○ Main Event

Submission of Application for Building

Permit : May 2013

Beginning : Nov 2013

Test : Apr 2015

Complete : Jun 2016

20132012 2014 20162015

Page 30: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 37 -

Kwinana WtE Project - General

Category Content

Location - Kwinana City, Australia

Details

- 400,000t/y (606t/d x 2lines)

- Electricity Generation:

35 MW

Process Type - Stoker(Martin Grate)

Project

Scheme- BOT(30 years)

Employer - Kwinana WtE Project Co.

Current Status

- ECI(Early Contractor

Involvement) conducted by

POSCO E&C

Page 31: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 38 -

Major Experience References

Waste Treatment/ Waste to Energy (Incineration)

Project Start End Project Overview

Krakow WtE Plant in Poland Jul. 2013 Jun. 2016Scope: Design, Facility supply, Construction, Test-run

Capacity: 340 ton/day x 2EA, 10.74 MWe + 35MWth

Kwinana WtE Plant in Australia Sep.2015 Mar.2016Scope: Basic Engineering(ECI)

Capacity: 606 ton/day x 2EA(Stoker Type), 35MWe

Busan WtE Plant(SRF) Aug. 2010 Mar. 2013Scope : EPC Turn-Key Main Facility

Solid Recovered Fuel Facility (900Ton/day)

Power Generation Facility(25MW)

Pohang WtE Plant(SRF) Dec. 2012 May. 2015Scope : EPC Turn-Key Main Facility

Solid Recovered Fuel Facility (500Ton/day)

Power Generation Facility(12.1MW)

Goyang WtE Plant May 2006 Dec. 2010Scope: Design, Facility supply, Construction, Test-run

Pyrolysis and melting facility: 150 ton/day x 2 units, 5.2MW

Recycling facility: 50 ton/day

Yangsan WtE Plant Oct. 2004 Feb. 2010Scope: Design, Facility supply, Construction, Test-run

Pyrolysis and melting facility: 100ton/day x 2 units

Recycling facility: 80ton/day x 1 unit

Gwangyang WtE Plant Dec. 1993 Jul. 1995Scope: Design, Facility supply, Construction, Test-run

Capacity: 91.2ton/day

SRF power plant using metropolit

an landfill Nov. 2007 Mar. 2010

Scope : EPC Turn-Key Main Facility

Solid Recovered Fuel Facility (1,800Ton/day)

Power Generation Facility(30MW) Pre-treatment: 200t/day

Yangsan Sewage Sludge Treatme

nt facility Feb. 2008 Dec. 2009

Scope: Design, Facility supply, Construction, Test-run

Capacity: 60m³/day x 2 units

Metropolitan Sludge Solidification

facility for reclaimed area Dec. 1996 Oct. 1998

Scope: Design, Facility supply, Construction, Test-run

Capacity: 75ton/day

Page 32: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 39 -

Major Experience References

Waste Treatment/ Waste to Energy (Incineration)

Project Start End Project Overview

Suwon Sewage

treatment facility Jun. 2007 Dec. 2009

Scope: Design, Facility supply, Construction, Test-run

Capacity: 450m³/day

Naepo New Town

Automatic Clean net Oct. 2010 Oct. 2013

Scope: Design, Facility supply, Construction, Test-run Collection sites: 2units

Pipeline: 40.2km

Songdo 5, 7 Section

Automatic Waste collecting facility Aug. 2010 Mar. 2013

Scope: Design, Facility supply, Construction, Test-run Collection sites: 2units

Pipeline: 17.5km

Paju Unjeong Automatic Waste col

lecting facility Sep. 2007 Aug. 2012

Scope: Design, Facility supply, Construction, Test-run Collection sites: 4 units

Inlets: 1,282 units

Incheon Cheongna

Automatic Clean net Apr. 2008 Mar. 2012

Scope: Design, Facility supply, Construction, Test-run Pipeline: 45.7km Colle

ction

Sites: 5 units Inlets: 2,013 units

Yongin Heungdeok

Automatic Clean net Sep. 2006 Mar. 2009

Scope: Design, Facility supply, Construction, Test-run Collection sites: 1 unit

Inlets: 425 units

Page 33: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 9 -

Abu Dhabi Water Storage & Recovery Plant Name Desalination Facility for Power Generation

Liwa, Abu Dhabi Location Ventanas & Antofagasta, Chile

2,700 mil. ton of DSW (Infiltration & storage) Capacity 3,000 m3/day ~ 5,000 m3/day (3 plants)

161km pipeline, 3 well fields, 4 pump stations Remark Under Operation

Water Storage& Recovery -UAE Desalination Facility - CHILE

Water Storage/Supply & Desalination

Page 34: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 10 -

Abu Dhabi Strategic Water Storage & Supply Project

Dubai

Abu Dhabi

Liwa

Mirfa

Major purpose

Infiltration and storage of 2,700

million tons of DSW

in a shallow dune sand aquifer

Major Facilities

- Water Pipe 161 km (D900,D1200)

- 3 well field scheme

- 4 pumps stations

Client : ADWEA

Abu Dhabi Water & Electricity Authority

Project Period

Aug. 2010 ~ Mar. 2016

Page 35: AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline [Korea] BTL 2.7% Sewerage Pipeline : 78km Drainage facilities : 4,014units Sep-07 ~

- 11 -

Desalination Plants

Desal. Plant for Gwangyang Steel Plant

- Capacity : 30,000 m³/d (Korea, SWRO)

- Location : Gwangyang , Korea

- Construction Period: Jan. 2013 ~ Jul. 2014

Desal. Plant for Power Plants

(MED-MVC, MED-TVC)

- Capacity: 3,000 m3/d ~ 5,000 m3/d (3 plants, Chile)

- Client: AES

- Status: Under operation

Desal. Plant for Indonesia

Steel Plant

- Plant for Indonesian Steel Plant

- Status: Plan & Design (2016)