sanitary sewerage sdcsection5
DESCRIPTION
This is standard sanitary sewer details which can be use for consultants and students as their reference.TRANSCRIPT
-
SECTION V
SANITARY SEWER
-
TOC-V.1 of 2
Published: 01/01 Revised:
TABLE OF CONTENTS
STANDARD SANITARY SEWER DETAILS
No. Title
S-1 Repaving Trenches and Payment Quantities
S-1A Trench Details for Flowable Fill
S-1B Temporary Pavement, Trench Details and Crusher Run Stone Payment Quantities
S-2 Trenches Cradle and Encasement
S-3 Building Sewer Layout
S-4 Typical Air Test Detail for Building Sewer
S-5 Standard House Connections
S-6 Type C Connections
S-7 Alternate Type C Connection Precast Wye
S-8 Saddle Installation Detail Mainline Sewer to 4" House Connection
S-9 Standard Cleanout
S-10 Cleancut cover Assembly for All Paved Areas
S-11 Standard Precast manhole
S-12 Shallow Precast Manhole
S-13 Drop Manhole Type A
S-14 Drop Manhole Type B
S-15 Alternate Drop Manhole Precast Base and Collars
S-16 Terminal Manhole
S-17 Standard Heavy Traffic Manhole Frame and Cover
S-18 Standard Watertight Frame and Cover
-
TOC-V.2 of 2
Published: 01/01 Revised:
TABLE OF CONTENTS
STANDARD SANITARY SEWER DETAILS
No. Title
S-19 Concrete collar for Manhole Frame and Cover
S-20 Adjustment Grade Ring
S-21 Standard Manhole Steps
S-22 Flexible Pipe to Manhole Connection
S-23 Waterstop Pipe to Manhole Connection for Steep Grades
S-24 Air Release and Vacuum Valve in Manhole
S-25 New Manhole Over Existing Pipe
S-26 Abandonment of Pipe at Manhole
S-27 Complete Manhole Abandonment
S-28 Pressure Sewer Blocking Details
S-29 Low Pressure Sewer and House Connection Blocking Details for Caps and Plugs
S-30 Anchoring Pressure Sewers (Upper Vertical Bends)
S-31 Air Test Requirements 6" and 8" Sewers with 4" Laterals
S-32 Air Test Requirements 10" and 12" Sewers with 4" Laterals
S-33 Air Test Requirements 15" and 18" Sewers with 4" Laterals
S-34 Air Test Requirements 21" and 24" Sewers with 4" Laterals
S-35 Air Test Requirements 4" through 24" Sewers without Laterals
S-36 Concrete Anchor (When Pipe Slopes Exceed 20)
S-37 Trench Erosion Check (For use in granular soils)
-
V-1 of 39
Published: 01/01 Revised:
-
V-2 of 39
Published: 01/01 Revised:
-
V-3 of 39
Published: 01/01 Revised:
-
V-4 of 39
Published: 01/01 Revised:
-
V-5 of 39
Published: 01/01 Revised:
-
V-6 of 39
Published: 01/01 Revised:
-
V-7 of 39
Published: 01/01 Revised:
-
V-8 of 39
Published: 01/01 Revised:
S 6
-
V-9 of 39
Published: 01/01 Revised:
-
V-10 of 39
Published: 01/01 Revised:
S 8
-
V-11 of 39
Published: 01/01 Revised:
-
V-12 of 39
Published: 01/01 Revised:
-
V-13 of 39
Published: 01/01 Revised:
-
V-14 of 39
Published: 01/01 Revised:
-
V-15 of 39
Published: 01/01 Revised:
S/11
-
V-16 of 39
Published: 01/01 Revised:
-
V-17 of 39
Published: 01/01 Revised:
S 15
-
V-18 of 39
Published: 01/01 Revised:
S 16
S/20
-
V-19 of 39
Published: 01/01 Revised:
-
V-20 of 39
Published: 01/01 Revised:
S 18
-
V-21 of 39
Published: 01/01 Revised:
-
V-22 of 39
Published: 01/01 Revised:
-
V-23 of 39
Published: 01/01 Revised:
-
V-24 of 39
Published: 01/01 Revised:
-
V-25 of 39
Published: 01/01 Revised:
-
V-26 of 39
Published: 01/01 Revised:
-
V-27 of 39
Published: 01/01 Revised:
-
V-28 of 39
Published: 01/01 Revised:
-
V-29 of 39
Published: 01/01 Revised:
-
V-30 of 39
Published: 01/01 Revised:
-
V-31 of 39
Published: 01/01 Revised:
-
V-32 of 39
Published: 01/01 Revised:
-
V-33 of 39
Published: 01/01 Revised:
-
V-34 of 39
Published: 01/01 Revised:
-
V-35 of 39
Published: 01/01 Revised:
-
V-36 of 39
Published: 01/01 Revised:
-
V-37 of 39
Published: 01/01 Revised:
-
V-38 of 39
Published: 01/01 Revised:
-
V-39 of 39
Published: 01/01 Revised:
COVER PAGETABLE OF CONTENTSS-1Repaving Trenches and Payment QuantitiesS-1ATrench Details for Flowable FillS-1BTemporary Pavement, Trench Details and Crusher Run Stone Payment QuantitiesS-2Trenches Cradle and EncasementS-3Building Sewer LayoutS-4Typical Air Test Detail for Building SewerS-5Standard House ConnectionsS-6Type C ConnectionsS-7Alternate Type C Connection Precast WyeS-8Saddle Installation Detail Mainline Sewer to 4" House ConnectionS-9Standard CleanoutS-10Cleancut cover Assembly for All Paved AreasS-11Standard Precast manholeS-12Shallow Precast ManholeS-13Drop Manhole Type AS-14Drop Manhole Type BS-15Alternate Drop Manhole Precast Base and CollarsS-16Terminal ManholeS-17Standard Heavy Traffic Manhole Frame and CoverS-18Standard Watertight Frame and CoverS-19Concrete collar for Manhole Frame and CoverS-20Adjustment Grade RingS-21Standard Manhole StepsS-22Flexible Pipe to Manhole ConnectionS-23Waterstop Pipe to Manhole Connection for Steep GradesS-24Air Release and Vacuum Valve in ManholeS-25New Manhole Over Existing PipeS-26Abandonment of Pipe at ManholeS-27Complete Manhole AbandonmentS-28Pressure Sewer Blocking DetailsS-29Low Pressure Sewer and House Connection Blocking Details for Caps and PlugsS-30Anchoring Pressure Sewers (Upper Vertical Bends)S-31Air Test Requirements 6" and 8" Sewers with 4" LateralsS-32Air Test Requirements 10" and 12" Sewers with 4" LateralsS-33Air Test Requirements 15" and 18" Sewers with 4" LateralsS-34Air Test Requirements 21" and 24" Sewers with 4" LateralsS-35Air Test Requirements 4" through 24" Sewers without LateralsS-36Concrete Anchor (When Pipe Slopes Exceed 20)S-37Trench Erosion Check (For use in granular soils)