]Erica Webb, StanleyWorks

Rajkishore Una, GyanSys Inc.

Managing Customer Projects at StanleyWorks

Page 2: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 2/26

[

2

Agenda

Introduction

About StanleyWorks

About GyanSys

Project Background Project Scope

Design Overview

Integration with Other Modules

Functionality Limitations

Implementation Challenges Business Benefits

Key Learning

Page 3: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 3/26

[

3

Abstract

Description:This presentation describes how Project Systems is currentlyleveraged for managing the Customer Installation Projects at StanleySecurity Solutions, a division of The Stanleyworks. This session

covers the entire implementation and lifecycle of the ProjectSystems module from project initiation to close. It also addresseschallenges faced and lessons learned during the implementation and

ongoing production support of this solution.

K ey Learning Points:* Integration with FI/CO for revenue recognization, settlement, and

overhead allocation* Integration with MM for valuated project stock, externalprocurement, and goods issue* Integration with HR for time entry, approval, and transfer

Page 4: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 4/26

[

4

About Stanleyworks

Stanleyworks S&P 500

$3 billon annual revenue

15,000 employees worldwide 50,000 products

3 Business Divisions

Construction and DYI

Industrial

Security

Page 5: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 5/26

[

5

Stanley Security Solutions - Brands

Page 6: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 6/26

[

6

About GyanSys

Head-quartered in Indianapolis since 2001

Provides cost effective innovative solutions using Onshore,Offshore and Near-shore delivery models

Specializes in PLM, FSCM, CRM, SCM, HCM, SRM and otherbusiness suites on BI & Portal

Extensive experience Project Management, ChangeManagement and Business Process Reengineering

Ongoing Partnership with SAP on Product testing and

Education

Page 7: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 7/26

[

7

Stanleyworks SAP Initiatives

Executing production processes within multiple 4.7 R/3 Modules for Security Solutions business:

MM, SD, FICO, COPA, PS, HR

Currently implementing 3 separate security businessesonto 4.7 platform. Go live in 2008.

Blueprinting ECC 6.0 solution for corporate business line.Go live 2009

International presence in UK on ECC 5.0

Current plans to convert onto 4.7 platform Q3 2009

Page 8: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 8/26

      [             8 

 S A 

P L  a nd  s  c  a  p

 e

Page 9: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 9/26

[

9

Project Functions

Overall Project Lifecycle Flow

Project Structure

Cost planning and budgeting

Plan ResourcesProcurement of Goods andServices

Management of ProjectControls

Time Recording

Project Review (WIPMeeting) and Revenue

RecognitionBilling

Change Order Processing

Period End Close

Project Completion

Page 10: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 10/26

[

10

Initiation to Close Process Flow

Page 11: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 11/26

[

11

Design Overview

Project Structure

Networks Activities (Internal/External/General)

Templates

One Network header

Project Builder for updates

Level 1 WBS element

Billing element

RA key

Settlement Rule

Partner determination

Page 12: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 12/26

[

12

Design Overview

Project Planning

Revenue Planning through Sales Order

Cost Planning through Network activities only

BOM explosion

Capacity Management

Work-force Planning (Out-Of-Scope)

Scheduling (Out-Of -Scope)

Page 13: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 13/26

[

13

Design Overview

Project Budgeting

Availability Control with e-mail notification toProject managers

Tolerance Limit

Overall Budget with release

Segregation of Duties between Planning & Budgeting

Object Currency

Page 14: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 14/26

[

14

Design Overview

Project Versioning

Automatic creation during status change ´RELµ &´TECOµ

Monthly creation of all the projects

CO version was not used due to Structural

maintenance

Simulation version (Out-of-Scope)

Page 15: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 15/26

[

15

Design Overview

Project Status management

User Status with authorization keys

Prohibited system release until budgeted

TECO impact to revenue recognization

Page 16: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 16/26

[

16

Integration with Other Modules

PS integration with SD

Billing Plan in Sales order (Milestones & periodic)

Sales Delivery

Pick & Pack forms

Project revenue from SD billing plan

Resource related billing (Out-of Scope)

Page 17: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 17/26

[

17

Integration with Other Modules

PS integration with MM

Valuated Project Stock 

Material Components in internal network activity

Procurement Strategy Reservation + Requisition

Goods Issue to Project Stock 

Consumption at Network Activity from ProjectStock 

External Processed network activity for Services andnon-stock materials

Page 18: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 18/26

[

18

Integration with Other Modules

PS integration with HR

Employee Mini-master

Weekly Time entry through Kronos

Leveraged standard IDoc for CATSDB update CAT2-Time Entry for Others

Time approval through CAPP

CATS-PS transfer

Info-type 315 for Standard Rate

CATS Classic is also used by CS module for ServiceOrder

Page 19: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 19/26

[

19

Integration with Other Modules

PS integration with CO

Labor Rates through KP26

Costing Sheet at Network Activity

Same rate for Plan & Actual

Overhead rates by Plant

Automatic determination of CO-PA characteristics

in the Settlement Rule to Profitability Segment

Automatic cost transfer from Network Activity tobilling WBS element

Page 20: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 20/26

[

20

Integration with Other Modules

PS integration with FI

Revenue Recognization

Cost Based POC method

Multiple buckets of recognization

Month-end close

Page 21: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 21/26

Page 22: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 22/26

[

22

Implementation Challenges :

Change Management

Employee turnover

Business re-organization and process change

Lack of business support during Post Go-live

Page 23: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 23/26

Page 24: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 24/26

[

24

Key Learning:

Define the internal business process first beforesystem implementation

Dedicated full-time business resource

Manageable scope and team focus

Implement in Phases (Walk before Running !!!!!)

Page 25: ASUG 3504 Stanley

8/4/2019 ASUG 3504 Stanley

http://slidepdf.com/reader/full/asug-3504-stanley 25/26

[

25

Speaker Contact Information

Erica Webb

The Stanleyworks, SAP Project Manager

E-mail: [email protected]

Raj Una

GyanSys Inc., Senior Solution Architect

E-mail: [email protected]

Please visit GyanSys Booth 484 for more details