assembly and test hall
DESCRIPTION
Assembly and test Hall. Trigger support structure. Done for Yale and Grenoble assembly sites. Trigger light guides. delivered. Ready to be glued to scintillators produced by Yale. To be delivered. Test bench electronic setup. x32. PMT. Analog splitter. DFC. EMCal FEE. …. VME. - PowerPoint PPT PresentationTRANSCRIPT
EMCal Meeting Nantes – July 15-17 2008 1 J-F Muraz
Grenoble Status
Assembly and test Hall.
EMCal Meeting Nantes – July 15-17 2008 2 J-F Muraz
Grenoble Status
Trigger support structure.
- Done for Yale and Grenoble assembly sites.
EMCal Meeting Nantes – July 15-17 2008 3 J-F Muraz
Grenoble Status
Trigger light guides.
- delivered.
- Ready to be glued to scintillators produced by Yale
EMCal Meeting Nantes – July 15-17 2008 4 J-F Muraz
Grenoble Status
Test bench electronic setup.
PMT DFC
x32
…
Delay
ADC TDC
VME
NIM
CAMAC
EMCal FEE
…Trigger module
Transl.
CCUSB DAQ/PC
Delay
Analog
splitter
To be delivered
EMCal Meeting Nantes – July 15-17 2008 5 J-F Muraz
Grenoble Status
DAQ.
- DAQ installed by Terry and David last week
EMCal Meeting Nantes – July 15-17 2008 6 J-F Muraz
Grenoble Status
4 SM Platforms:
- Done.
- Successfully load tested and certified.
- Delivery expected next week. (after painting!)
EMCal Meeting Nantes – July 15-17 2008 7 J-F Muraz
Grenoble Status
Strip handling tools.
- By the end of July, I will send to YALE:
- 1 Strip handling tool fully equipped.
- 1 Strip handling tool support frame.
- all trigger scintillator support and positioning structure.
EMCal Meeting Nantes – July 15-17 2008 8 J-F Muraz
Grenoble Status
Strap Foils.
- 3600 precutted (Full EU production : 3 SM)
- 1200 machined and cleaned (1 SM)
Hand precutting station Final cleaning
Wire cutting operation(80 straps stack)