asmf worksharing procedure
TRANSCRIPT
Austrian Agency for Health and Food Safety www.ages.at
ASMF – Worksharing Procedure
AGES Gespräch 8 November 2016 Authorisation of Veterinary Medicinal Products (VMPs): an Update DI Susanne Stotter AGES MEA
frequent ASMF
updates (at NCA request)
high administrative
burden reduced
oversight of the ASMFs
duplicated scientific work
divergent decisions
increased workload (for all parties)
Active Substance Master File Assessment issues identified …
inconsistency in ASMF
assessment
2
one ASMF multiple procedures
multiple Member States
ASMF Assessment Worksharing Procedure pilot phase – key facts
A simple way for Competent Authorities to share assessment reports for the same version of the Active Substance Master File
Development of a procedure for Active Substance Master File Assessment Worksharing
Pilotphase
started 1st
December 2013
initially limited for
12 months
scope intentionally limited to
new ASMFs in DCP/CP
voluntary participati
on
3
reduction of workload
ASMF&MHholder
&CA
improvement oversight of
ASMFs
harmonisation of ASMF
assessment
within existing legislation and
regulatory procedures
no impact on procedure timings
ASMF Assessment Worksharing Procedure identified requirements …
… ability to identify conclusively where the same version of the ASMF is submitted in different procedures in Europe …
• the EU/ASMF numbering system for ASMFs (see Appendix 1)
• the Submission Details Form of CPMP/QWP/227/02 Rev 3/ EMEA/CVMP/134/02 Rev 3 Guideline on Active Substance Master File Procedure (http://www.ema.europa.eu/docs/en_GB/document_library/Scientific_guideline/2012/07/WC500129994.pdf)
• the ASMF-AR repository for NCAs
4
identified requirements …
EU Numbering System for ASMFs (1)
EU ASMF XXXXX YYYY
reference number ASMF
sequential number
independent from ASMF
holder
assigned by ASMF
repository
sequential Assessment
Report number/change
number assigned by ASMF holder
for new regulatory updates
0001 corresponds to the initial assessment of the ASMF
5
identified requirements …
EU Numbering System for ASMFs (2)
• EU/ASMF/XXXXX/0001 - initial ASMF (AP & RP) Applicant’s Part version: ABC/AP/01/2012-01-28 Restricted Part version: ABC/RP/01/2012-01-28 • EU/ASMF/XXXXX/0002 – updated AP Applicant’s Part version: ABC/AP/02/2012-04-10 Restricted Part version: (ABC/RP/01/2012-01-28) • EU/ASMF/ XXXXX /0003 – updated RP Applicant’s Part version: (ABC/AP/02/2012-04-10) Restricted Part version: ABC/RP/02/2012-10-16 • EU/ASMF/ XXXXX /0004 – updated AP & RP Applicant’s Part version: ABC/AP/03/2013-01-14 Restricted Part version: ABC/RP/03/2013-01-14
6
identified requirements …
Submission Letter and Administrative Details for documents relating to an ASMF (ASMF Submission Details Form) … standardisation of administrative information
(revision CHMP/CVMP Guideline on the Active Substance Master File procedure (CHMP/QWP/227/02 Rev 3; EMEA/CVMP/134/02 Rev 3)
o ASMF Submission Details Form (e.g. ASMF holder, manufacturing sites, list of procedures where the ASMF is used)
o The Annex 2 Letter of Access template was amended so that the ASMF holder acknowledges that the EEA National Competent Authorities, the EMA including all CHMP and CVMP Members and their experts, and the Certification of Substances Division of the European Directorate for the Quality of Medicines & Healthcare may share ASMF assessment reports amongst themselves.
o Lastly, at the request of Interested Parties/Industry, a Withdrawal of Access (to the ASMF) Letter was included as Annex 4, marking the end of the regulatory obligations of Applicants/MAHs concerning the ASMF.
7
identified requirements …
Assessment report templates
stand alone common Assessment Report template
easy upload/download from the EU/ASMF
repository
structured according CTD
templates
facilitates easy sharing among CAs
„add-on“ Assessment
Report
use appropriate national
assessmemnt report templates
ASMF in „old“ NtA structure
8
identified requirements …
EU/ASMF Repository for Worksharing Assessment Reports (1)
EU/ASMF repository for worksharing assessment reports https://asmf.cts-mrp.eu/
currently for ASMF
Assessment Reports
for associated administrative information ASMF
holder
manufacturing site
ASMF version
Procedures using ASMF
24 hours access
CHMP/CVMP and their experts NCAs
EDQM
9
identified requirements …
EU/ASMF Repository for Worksharing Assessment Reports (2)
10
identified requirements …
EU/ASMF Repository for Worksharing Assessment reports (3)
ASMF Assessment Worksharing Procedure
pilot phase - principles
12
13
pilot extended for further 12
months
designition of parent RMS
appears working well
reserving EU/ASMF number working
well
„Blockbuster
drugs“ would significantely
increase uptake
mandatory worksharing has been considered
ASMF Assessment Worksharing Procedure pilot phase – lessons learned February 2015
widening of scope has
been considered
cooperation with industry, NCAs, QWP to gain feedback
Lessons learned February 2015
uptake has
increased over the
year
CTS helpdesk provides support
• ASMF - WG agreed to publish a questionnaire to seek feedback on the pilot after two years
• Questionnaires circulated in February to March 2015
• Questionnaires were sent to
- ASMF holders taking part in WS pilot & Interested Parties (AESGP, EFPIA, EGA, EUCOPE, APIC/CEFIC, IFAH, EGGVP)
- National Competent Authorities & EMA
• Responses
- Interested Parties: 28
- Competent Authorities: 21
• ASMF-AR repository was audited
ASMF Assessment Worksharing Procedure pilot phase – results questionnaire May 2015
14
• The EU/ASMF reference number request form and process is working well - 75% numbers are issued within 9 days
- “10 days or longer”: difficult to say whether all were within target
• Majority of Interested Parties had a good/neutral experience in the First Assessment stage
- 15% had a poor experience and 20% experienced difficulties
• 90% of IP would use the worksharing procedure again
• 70% would recommend the procedure to others
• Good outcome, but room for improvement
ASMF Assessment Worksharing Procedure pilot phase – summary results questionnaire May 2015
Industry
15
• The EU/ASMF reference number request form and process is working well - 60% numbers are issued within 9 days
- Again “10 days or longer”: difficult to say whether all were within target
• Some issues with the repository
- New system and database, bugs were encountered
- Recently undergone a major update to fix most of the issues
- Guidance is being developed on how to use the repository and complete the records
- CTS Helpdesk continues to provide support and quickly resolve issues
ASMF Assessment Worksharing Procedure Pilot Phase – summary results questionnaire May 2015
Competent Authorities (1)
16
• Issues were raised over identification of the Parent Procedure and the QA step - Repository update should make identification of Parent Procedure easier
- Unforeseen issue with ASMF used in two Centralised Procedure with same timetable
- Worksharing procedure is being revised
• Standard file nomenclature was considered necessary but was not implemented in practice
• 80% of Competent Authorities did not experience any difficulties with the assessment as a result of the worksharing procedure
• 65% of Competent Authorities were aware of training material/guidance for CA and Industry
- Provided at the beginning of the pilot, but slow uptake prevented implementation
- Needs repeating
ASMF Assessment Worksharing Procedure Pilot Phase – summary results questionnaire May 2015
Competent Authorities (2)
17
update ASMF user guide
development of a guidance how
to use the repository
widening the scope of
the ASMF worksharing to
authorised ASMFs
start the discussion about
stand alone assessment of
ASMFs
Active Substance Master File Assessment way to proceed …
preparation of a second training
session refresher training
18
clarification of selection of parent procedure
next steps in/to the worksharing procedure
revision of procedural guidance
recommended to
adopt the pilot as a formal procedure by
CxMP, CMDx and HMA
improve flexibility
dealing with ASMF
updates