SECTION I IMATERIALS
Par t CSpecifications for Welding Rods, Electrodes, and Filler Metals
ASME BPVC. I I .C -2017
2017 ASME Boiler andPressure Vessel CodeAn International Code
Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME,” ASME logos, or the Certification Mark shall not be used on any item that is not constructed in accordance with all of the applicable requirements of the Code or Standard. Use of ASME’s name, logos, or Certification Mark requires formal ASME certification; if no certification program is available, such ASME markings may not be used. (For Certification and Accreditation Programs, see https://www.asme.org/shop/certification‐accreditation.)
Items produced by parties not formally certified by ASME may not be described, either explicitly or implicitly, as ASME certified or approved in any code forms or other document.
IIMATERIALS
Part C
Specifications for WeldingRods, Electrodes, and FillerMetalsASME Boiler and Pressure Vessel Committeeon Materials
AN INTERNATIONAL CODE
2017 ASME Boiler &Pressure Vessel Code2017 Edition July 1, 2017
Two Park Avenue • New York, NY • 10016 USA
Date of Issuance: July 1, 2017
This international code or standard was developed under procedures accredited as meeting the criteria forAmerican National Standards and it is an American National Standard. The Standards Committee that approvedthe code or standard was balanced to assure that individuals from competent and concerned interests havehad an opportunity to participate. The proposed code or standard was made available for public review and com-ment that provides an opportunity for additional public input from industry, academia, regulatory agencies, andthe public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any
items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liabilityfor infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard areexpressly advised that determination of the validity of any such patent rights, and the risk of infringement of suchrights, is entirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as
government or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the es-
tablished ASME procedures and policies, which precludes the issuance of interpretations by individuals.The endnotes and preamble in this document (if any) are part of this American National Standard.
ASME collective membership mark
Certification Mark
The above ASME symbol is registered in the U.S. Patent Office.
“ASME” is the trademark of The American Society of Mechanical Engineers.
The Specifications published and copyrighted by the American Welding Societyare reproduced with the Society’s permission.
No part of this document may be reproduced in any form, in an electronicretrieval system or otherwise, without the prior written permission of the
publisher.
Library of Congress Catalog Card Number: 56-3934Printed in the United States of America
Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2017.
The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990
Copyright © 2017 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
TABLE OF CONTENTS
List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiStatement of Policy on the Use of the Certification Mark and Code Authorization in Advertising . . . . . . . . . . ixStatement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . . . . . . . . . . . . ixSubmittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . . . . . . . . . . . . xPersonnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiiiAWS Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxiiPreface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxivGuideline on the Approval of New Welding and Brazing Material Classifications Under the ASME Boiler and
Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxvSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxviiList of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxviiiCross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . xxxixSFA-5.01M/SFA-5.01 Welding Consumables — Procurement of Filler Materials and Fluxes . . . . . . . . . . 1SFA-5.02/SFA-5.02M Specification for Filler Metal Standard Sizes, Packaging, and Physical Attributes . 21SFA-5.1/SFA-5.1M Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding . . . . . . 33SFA-5.2/SFA-5.2M Specification for Carbon and Low-Alloy Steel Rods for Oxyfuel Gas Welding . . . . 77SFA-5.3/SFA-5.3M Specification for Aluminum and Aluminum-Alloy Electrodes for Shielded Metal Arc
Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87SFA-5.4/SFA-5.4M Specification for Stainless Steel Electrodes for Shielded Metal Arc Welding . . . . . 101SFA-5.5/SFA-5.5M Specification for Low-Alloy Steel Electrodes for Shielded Metal Arc Welding . . . . 139SFA-5.6/SFA-5.6M Specification for Copper and Copper-Alloy Electrodes for Shielded Metal Arc
Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 193SFA-5.7/SFA-5.7M Specification for Copper and Copper-Alloy Bare Welding Rods and Electrodes . . 213SFA-5.8/SFA-5.8M Specification for Filler Metals for Brazing and Braze Welding . . . . . . . . . . . . . . . . 227SFA-5.9/SFA-5.9M Specification for Bare Stainless Steel Welding Electrodes and Rods . . . . . . . . . . . 269SFA-5.10/SFA-5.10M Specification for Bare Aluminum and Aluminum-Alloy Welding Electrodes and
Rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 297SFA-5.11/SFA-5.11M Specification for Nickel and Nickel-Alloy Welding Electrodes for Shielded Metal
Arc Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 327SFA-5.12/SFA-5.12M Specification for Tungsten and Oxide Dispersed Tungsten Electrodes for Arc
Welding and Cutting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363SFA-5.13 Specification for Surfacing Electrodes for Shielded Metal Arc Welding . . . . . . . . . 375SFA-5.14/SFA-5.14M Specification for Nickel and Nickel-Alloy Bare Welding Electrodes and Rods . . . . 397SFA-5.15 Specification for Welding Electrodes and Rods for Cast Iron . . . . . . . . . . . . . . . . . 423SFA-5.16/SFA-5.16M Specification for Titanium and Titanium-Alloy Welding Electrodes and Rods . . . 441SFA-5.17/SFA-5.17M Specification for Carbon Steel Electrodes and Fluxes for Submerged Arc Welding 451SFA-5.18/SFA-5.18M Specification for Carbon Steel Electrodes and Rods for Gas Shielded Arc Welding 479SFA-5.20/SFA-5.20M Specification for Carbon Steel Electrodes for Flux Cored Arc Welding . . . . . . . . . 505SFA-5.21 Specification for Bare Electrodes and Rods for Surfacing . . . . . . . . . . . . . . . . . . . . 543SFA-5.22/SFA-5.22M Specification for Stainless Steel Flux Cored and Metal Cored Welding Electrodes
and Rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567SFA-5.23/SFA-5.23M Specification for Low-Alloy Steel Electrodes and Fluxes for Submerged Arc
Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 617SFA-5.24/SFA-5.24M Specification for Zirconium and Zirconium-Alloy Welding Electrodes and Rods . 657SFA-5.25/SFA-5.25M Specification for Carbon and Low-Alloy Steel Electrodes and Fluxes for Electroslag
Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 667SFA-5.26/SFA-5.26M Specification for Carbon and Low-Alloy Steel Electrodes for Electrogas Welding 691
iii
SFA-5.28/SFA-5.28M Specification for Low-Alloy Steel Electrodes and Rods for Gas Shielded ArcWelding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 717
SFA-5.29/SFA-5.29M Specification for Low-Alloy Steel Electrodes for Flux Cored Arc Welding . . . . . . . 751SFA-5.30/SFA-5.30M Specification for Consumable Inserts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 791SFA-5.31 Specification for Fluxes for Brazing and Braze Welding . . . . . . . . . . . . . . . . . . . . . 811SFA-5.32/SFA-5.32M Specification for Welding Shielding Gases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 829SFA-5.34/SFA-5.34M Specification for NIckel-Alloy Electrodes for Flux Cored Arc Welding . . . . . . . . . . 843SFA-5.36/SFA-5.36M Specification for Carbon and Low-Alloy Steel Flux Cored Electrodes for Flux Cored
Arc Welding and Metal Cored Electrodes for Gas Metal Arc Welding . . . . . . . . 869
Mandatory Appendix I Standard Units for Use in Equations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 925
iv
ð17ÞLIST OF SECTIONSSECTIONSI Rules for Construction of Power Boilers
II Materials• Part A — Ferrous Material Specifications• Part B — Nonferrous Material Specifications• Part C — Specifications for Welding Rods, Electrodes, and Filler Metals• Part D — Properties (Customary)• Part D — Properties (Metric)
III Rules for Construction of Nuclear Facility Components• Subsection NCA — General Requirements for Division 1 and Division 2• Appendices• Division 1*
– Subsection NB — Class 1 Components– Subsection NC — Class 2 Components– Subsection ND — Class 3 Components– Subsection NE — Class MC Components– Subsection NF — Supports– Subsection NG — Core Support Structures
• Division 2 — Code for Concrete Containments• Division 3 — Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-LevelRadioactive Material
• Division 5 — High Temperature Reactors
IV Rules for Construction of Heating Boilers
V Nondestructive Examination
VI Recommended Rules for the Care and Operation of Heating Boilers
VII Recommended Guidelines for the Care of Power Boilers
VIII Rules for Construction of Pressure Vessels• Division 1• Division 2 — Alternative Rules• Division 3 — Alternative Rules for Construction of High Pressure Vessels
IX Welding, Brazing, and Fusing Qualifications
X Fiber-Reinforced Plastic Pressure Vessels
XI Rules for Inservice Inspection of Nuclear Power Plant Components
XII Rules for Construction and Continued Service of Transport Tanks
* The 2015 Edition of Section III was the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated Tem-perature Service, was published. The requirements located within Subsection NH were moved to Section III, Division 5, Subsection HB, SubpartB for the elevated temperature construction of Class A components.
v
INTERPRETATIONS
Interpretations are issued in real time in ASME’s Interpretations Database at http://go.asme.org/Interpretations. His-torical BPVC interpretations may also be found in the Database.
CODE CASES
The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to theCode and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules formaterials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in theappropriate 2017 Code Cases book: “Boilers and Pressure Vessels” or “Nuclear Components.” Supplements will be sentor made available automatically to the purchasers of the Code Cases books up to the publication of the 2019 Code.
vi
FOREWORD*
In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to for-mulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and PressureVessel Committee was superseded by the following committees:
(a) Committee on Power Boilers (I)(b) Committee on Materials (II)(c) Committee on Construction of Nuclear Facility Components (III)(d) Committee on Heating Boilers (IV)(e) Committee on Nondestructive Examination (V)(f) Committee on Pressure Vessels (VIII)(g) Committee on Welding, Brazing, and Fusing (IX)(h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X)(i) Committee on Nuclear Inservice Inspection (XI)(j) Committee on Transport Tanks (XII)(k) Technical Oversight Management Committee (TOMC)Where reference is made to “the Committee” in this Foreword, each of these committees is included individually and
collectively.The Committee’s function is to establish rules of safety relating only to pressure integrity, which govern the
construction** of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nu-clear components and transport tanks. The Committee also interprets these rules when questions arise regarding theirintent. The technical consistency of the Sections of the Code and coordination of standards development activities of theCommittees is supported and guided by the Technical Oversight Management Committee. This Code does not addressother safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, orthe inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes,standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integ-rity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect thelikelihood and consequences of deterioration in service related to specific service fluids or external operating environ-ments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressurevessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a marginfor deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materialsand evidence of experience have been recognized.
This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction ac-tivities and inservice inspection and testing activities. The Code does not address all aspects of these activities and thoseaspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannotreplace education, experience, and the use of engineering judgment. The phrase engineering judgment refers to technicaljudgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgments mustbe consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirements orspecific prohibitions of the Code.
The Committee recognizes that tools and techniques used for design and analysis change as technology progressesand expects engineers to use good judgment in the application of these tools. The designer is responsible for complyingwith Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Codeneither requires nor prohibits the use of computers for the design or analysis of components constructed to the
* The information contained in this Foreword is not part of this American National Standard (ANS) and has not been processed in accordancewith ANSI's requirements for an ANS. Therefore, this Foreword may contain material that has not been subjected to public review or a con-sensus process. In addition, it does not contain requirements necessary for conformance to the Code.
** Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing,certification, and pressure relief.
vii
requirements of the Code. However, designers and engineers using computer programs for design or analysis are cau-tioned that they are responsible for all technical assumptions inherent in the programs they use and the application ofthese programs to their design.The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any pro-
prietary or specific design, or as limiting in any way the manufacturer’s freedom to choose any method of design or anyform of construction that conforms to the Code rules.The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development,
Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations ofthis Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writingand shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to theBoiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be pre-sented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmationby ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are sub-mitted to the American National Standards Institute (ANSI) and published at http://go.asme.org/BPVCPublicReview toinvite comments from all interested persons. After public review and final approval by ASME, revisions are published atregular intervals in Editions of the Code.The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code.
The scope of each Section has been established to identify the components and parameters considered by the Committeein formulating the Code rules.Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASME
Certificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Commit-tee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark.When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the fem-
inine, masculine, or neuter gender shall be treated as such other gender as appropriate.
viii
STATEMENT OF POLICY ON THE USE OF THE CERTIFICATIONMARK AND CODE AUTHORIZATION IN ADVERTISING
ASME has established procedures to authorize qualified organizations to perform various activities in accordancewith the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognitionof organizations so authorized. An organization holding authorization to perform various activities in accordance withthe requirements of the Code may state this capability in its advertising literature.
Organizations that are authorized to use the Certification Mark for marking items or constructions that have beenconstructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates ofAuthorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users,the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements.
Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of theCertification Mark, Certificates of Authorization, and reference to Code construction. The American Society of MechanicalEngineers does not “approve,” “certify,” “rate,” or “endorse” any item, construction, or activity and there shall be no state-ments or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate ofAuthorization may state in advertising literature that items, constructions, or activities “are built (produced or per-formed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,”or “meet the requirements of the ASME Boiler and Pressure Vessel Code.”An ASME corporate logo shall not be usedby any organization other than ASME.
The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However,facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association ora society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly spe-cified items will carry the Certification Mark. General usage is permitted only when all of a manufacturer’s items areconstructed under the rules.
STATEMENT OF POLICY ON THE USE OF ASME MARKING TOIDENTIFY MANUFACTURED ITEMS
The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclearcomponents. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Itemsconstructed in accordance with all of the applicable rules of the Code are identified with the official Certification Markdescribed in the governing Section of the Code.
Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME” or the Certification Mark shall notbe used on any item that is not constructed in accordance with all of the applicable requirements of the Code.
Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to implythat all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fullycomplying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASMErequirements.
ix
ð17Þ SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER ANDPRESSURE VESSEL STANDARDS COMMITTEES
1 INTRODUCTION
(a) The following information provides guidance to Code users for submitting technical inquiries to the applicableBoiler and Pressure Vessel (BPV) Standards Committee (hereinafter referred to as the Committee). See the guidelineson approval of new materials under the ASME Boiler and Pressure Vessel Code in Section II, Part D for requirements forrequests that involve adding new materials to the Code. See the guidelines on approval of new welding and brazing ma-terials in Section II, Part C for requirements for requests that involve adding new welding and brazing materials (“con-sumables”) to the Code.Technical inquiries can include requests for revisions or additions to the Code requirements, requests for Code Cases,
or requests for Code Interpretations, as described below:(1) Code Revisions. Code revisions are considered to accommodate technological developments, to address admin-
istrative requirements, to incorporate Code Cases, or to clarify Code intent.(2) Code Cases. Code Cases represent alternatives or additions to existing Code requirements. Code Cases are writ-
ten as a Question and Reply, and are usually intended to be incorporated into the Code at a later date. When used, CodeCases prescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned thatnot all regulators, jurisdictions, or Owners automatically accept Code Cases. The most common applications for CodeCases are as follows:
(-a) to permit early implementation of an approved Code revision based on an urgent need(-b) to permit use of a new material for Code construction(-c) to gain experience with new materials or alternative requirements prior to incorporation directly into the
Code(3) Code Interpretations(-a) Code Interpretations provide clarification of the meaning of existing requirements in the Code and are pre-
sented in Inquiry and Reply format. Interpretations do not introduce new requirements.(-b) If existing Code text does not fully convey the meaning that was intended, or conveys conflicting require-
ments, and revision of the requirements is required to support the Interpretation, an Intent Interpretation will be issuedin parallel with a revision to the Code.(b) Code requirements, Code Cases, and Code Interpretations established by the Committee are not to be considered
as approving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way thefreedom of manufacturers, constructors, or Owners to choose any method of design or any form of construction thatconforms to the Code requirements.(c) Inquiries that do not comply with the following guidance or that do not provide sufficient information for the Com-
mittee’s full understanding may result in the request being returned to the Inquirer with no action.
2 INQUIRY FORMAT
Submittals to the Committee should include the following information:(a) Purpose. Specify one of the following:
(1) request for revision of present Code requirements(2) request for new or additional Code requirements(3) request for Code Case(4) request for Code Interpretation
(b) Background. The Inquirer should provide the information needed for the Committee’s understanding of the In-quiry, being sure to include reference to the applicable Code Section, Division, Edition, Addenda (if applicable), para-graphs, figures, and tables. Preferably, the Inquirer should provide a copy of, or relevant extracts from, the specificreferenced portions of the Code.
x
(c) Presentations. The Inquirer may desire to attend or be asked to attend a meeting of the Committee to make a for-mal presentation or to answer questions from the Committee members with regard to the Inquiry. Attendance at a BPVStandards Committee meeting shall be at the expense of the Inquirer. The Inquirer’s attendance or lack of attendance ata meeting will not be used by the Committee as a basis for acceptance or rejection of the Inquiry by the Committee. How-ever, if the Inquirer’s request is unclear, attendance by the Inquirer or a representative may be necessary for the Com-mittee to understand the request sufficiently to be able to provide an Interpretation. If the Inquirer desires to make apresentation at a Committee meeting, the Inquirer should provide advance notice to the Committee Secretary, to ensuretime will be allotted for the presentation in the meeting agenda. The Inquirer should consider the need for additionalaudiovisual equipment that might not otherwise be provided by the Committee. With sufficient advance notice to theCommittee Secretary, such equipment may be made available.
3 CODE REVISIONS OR ADDITIONS
Requests for Code revisions or additions should include the following information:(a) Requested Revisions or Additions. For requested revisions, the Inquirer should identify those requirements of the
Code that they believe should be revised, and should submit a copy of, or relevant extracts from, the appropriate require-ments as they appear in the Code, marked up with the requested revision. For requested additions to the Code, the In-quirer should provide the recommended wording and should clearly indicate where they believe the additions should belocated in the Code requirements.
(b) Statement of Need. The Inquirer should provide a brief explanation of the need for the revision or addition.(c) Background Information. The Inquirer should provide background information to support the revision or addition,
including any data or changes in technology that form the basis for the request, that will allow the Committee to ade-quately evaluate the requested revision or addition. Sketches, tables, figures, and graphs should be submitted, as appro-priate. The Inquirer should identify any pertinent portions of the Code that would be affected by the revision or additionand any portions of the Code that reference the requested revised or added paragraphs.
4 CODE CASES
Requests for Code Cases should be accompanied by a statement of need and background information similar to thatdescribed in 3(b) and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project un-derway or imminent, new procedure) should be described. In addition, it is important that the request is in connectionwith equipment that will bear the Certification Mark, with the exception of Section XI applications. The proposed CodeCase should identify the Code Section and Division, and should be written as a Question and a Reply, in the same formatas existing Code Cases. Requests for Code Cases should also indicate the applicable Code Editions and Addenda (if ap-plicable) to which the requested Code Case applies.
5 CODE INTERPRETATIONS
(a) Requests for Code Interpretations should be accompanied by the following information:(1) Inquiry. The Inquirer should propose a condensed and precise Inquiry, omitting superfluous background infor-
mation and, when possible, composing the Inquiry in such a way that a “yes” or a “no” Reply, with brief limitations orconditions, if needed, can be provided by the Committee. The proposed question should be technically and editoriallycorrect.
(2) Reply. The Inquirer should propose a Reply that clearly and concisely answers the proposed Inquiry question.Preferably, the Reply should be “yes” or “no,” with brief limitations or conditions, if needed.
(3) Background Information. The Inquirer should provide any need or background information, such as described in3(b) and 3(c), respectively, for Code revisions or additions, that will assist the Committee in understanding the proposedInquiry and Reply.
If the Inquirer believes a revision of the Code requirements would be helpful to support the Interpretation, the In-quirer may propose such a revision for consideration by the Committee. In most cases, such a proposal is not necessary.
(b) Requests for Code Interpretations should be limited to an Interpretation of a particular requirement in the Code orin a Code Case. Except with regard to interpreting a specific Code requirement, the Committee is not permitted to con-sider consulting-type requests such as the following:
(1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to de-termine compliance with Code requirements
xi
(2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, materialselection, designs, calculations, fabrication, inspection, pressure testing, or installation
(3) a request seeking the rationale for Code requirements
6 SUBMITTALS
(a) Submittal. Requests for Code Interpretation should preferably be submitted through the online Interpretation Sub-mittal Form. The form is accessible at http://go.asme.org/InterpretationRequest. Upon submittal of the form, the In-quirer will receive an automatic e-mail confirming receipt. If the Inquirer is unable to use the online form, theInquirer may mail the request to the following address:
SecretaryASME Boiler and Pressure Vessel CommitteeTwo Park AvenueNew York, NY 10016-5990
All other Inquiries should be mailed to the Secretary of the BPV Committee at the address above. Inquiries are unlikelyto receive a response if they are not written in clear, legible English. They must also include the name of the Inquirer andthe company they represent or are employed by, if applicable, and the Inquirer’s address, telephone number, fax num-ber, and e-mail address, if available.(b) Response. The Secretary of the appropriate Committee will provide a written response, via letter or e-mail, as ap-
propriate, to the Inquirer, upon completion of the requested action by the Committee. Inquirers may track the status oftheir Interpretation Request at http://go.asme.org/Interpretations.
xii
ð17ÞPERSONNELASME Boiler and Pressure Vessel Standards Committees,
Subgroups, and Working GroupsJanuary 1, 2017
TECHNICAL OVERSIGHT MANAGEMENT COMMITTEE (TOMC)
T. P. Pastor, ChairS. C. Roberts, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. W. BarnesR. J. BasileT. L. BedeauxD. L. BergerD. A. CanonicoA. ChaudouetD. B. DeMichaelR. P. DeublerP. D. EdwardsJ. G. FeldsteinR. E. GimpleT. E. HansenG. W. Hembree
J. F. HenryR. S. Hill IIIG. G. KarcherW. M. LundyG. C. ParkM. D. RanaR. F. Reedy, Sr.B. W. RobertsF. J. Schaaf, Jr.B. F. ShelleyW. J. SperkoD. SrnicR. W. SwayneC. WithersJ. E. Batey, Contributing Member
HONORARY MEMBERS (MAIN COMMITTEE)
F. P. BartonT. M. CullenG. E. FeigelO. F. HeddenM. H. JawadA. J. Justin
W. G. KnechtJ. LeCoffT. G. McCartyG. C. MillmanR. A. MoenR. F. Reedy, Sr.
ADMINISTRATIVE COMMITTEE
T. P. Pastor, ChairS. C. Roberts, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. W. BarnesT. L. BedeauxD. L. BergerG. W. Hembree
J. F. Henry
R. S. Hill III
G. C. Park
M. D. Rana
B. F. Shelley
W. J. Sperko
MARINE CONFERENCE GROUP
H. N. Patel, ChairJ. S. Brzuszkiewicz, Staff SecretaryJ. G. Hungerbuhler, Jr.
G. PallichadathN. ProkopukJ. D. Reynolds
CONFERENCE COMMITTEE
D. A. Douin — Ohio, SecretaryM. J. Adams — Ontario, CanadaJ. T. Amato — MinnesotaW. Anderson — MississippiR. D. Austin — ArizonaR. J. Brockman — MissouriJ. H. Burpee — MaineM. Byrum — AlabamaC. B. Cantrell — NebraskaS. Chapman — TennesseeD. C. Cook — CaliforniaB. J. Crawford — GeorgiaE. L. Creaser — New Brunswick,Canada
J. J. Dacanay — HawaiiC. Dautrich — North CarolinaR. Delury — Manitoba, CanadaP. L. Dodge— Nova Scotia, CanadaD. Eastman — Newfoundland andLabrador, Canada
J. J. Esch — DelawareA. G. Frazier — FloridaT. J. Granneman II — OklahomaD. R. Hannon — ArkansasE. G. Hilton — VirginiaC. Jackson — City of Detroit,Michigan
M. L. Jordan — KentuckyE. Kawa, Jr. — MassachusettsA. Khssassi — Quebec, CanadaJ. Klug — City of Milwaukee,Wisconsin
K. J. Kraft — MarylandK. S. Lane — AlaskaL. C. Leet — City of Seattle,Washington
J. LeSage, Jr. — LouisianaA. M. Lorimor — South DakotaM. Mailman — NorthwestTerritories, Canada
D. E. Mallory — New HampshireW. McGivney — City of New York,New York
S. V. Nelson — ColoradoA. K. Oda — WashingtonM. Poehlmann — Alberta, CanadaJ. F. Porcella — West VirginiaC. F. Reyes — City of Los Angeles,California
M. J. Ryan — City of Chicago,Illinois
D. Sandfoss — NevadaM. H. Sansone — New YorkA. S. Scholl — British Columbia,Canada
T. S. Seime — North DakotaC. S. Selinger — Saskatchewan,Canada
J. E. Sharier — OhioN. Smith — PennsylvaniaR. Spiker — North CarolinaD. J. Stenrose — MichiganR. J. Stimson II — KansasR. K. Sturm — UtahS. R. Townsend — Prince EdwardIsland, Canada
R. D. Troutt — TexasM. C. Vogel — IllinoisT. Waldbillig — WisconsinM. Washington — New Jersey
INTERNATIONAL INTEREST REVIEW GROUP
V. FelixY.-G. KimS. H. LeongW. LinO. F. Manafa
C. MinuT. S. G. NarayannenY.-W. ParkA. R. R. NogalesP. Williamson
xiii
COMMITTEE ON POWER BOILERS (BPV I)
D. L. Berger, ChairR. E. McLaughlin, Vice ChairU. D’Urso, Staff SecretaryJ. L. ArnoldD. A. CanonicoK. K. ColemanP. D. EdwardsJ. G. FeldsteinG. W. GalanesT. E. HansenJ. F. HenryJ. S. HunterG. B. KomoraW. L. LowryF. MassiL. MoedingerP. A. Molvie
Y. OishiE. M. OrtmanJ. T. PillowM. SlaterJ. M. TanzoshD. E. TompkinsD. E. TuttleJ. VattappillyR. V. WielgoszinskiF. ZellerY. Li, DelegateH. Michael, DelegateB. W. Roberts, ContributingMember
D. N. French, Honorary MemberT. C. McGough, Honorary MemberR. L. Williams, Honorary Member
Subgroup on Design (BPV I)
J. Vattappilly, ChairD. I. Anderson, SecretaryD. DeweesH. A. Fonzi, Jr.J. P. GlaspieG. B. Komora
P. A. MolvieL. S. TsaiM. WadkinsonC. F. Jeerings, Contributing MemberS. V. Torkildson, ContributingMember
Subgroup on Fabrication and Examination (BPV I)
J. L. Arnold, ChairP. BeckerD. L. BergerS. FincherG. W. GalanesP. F. GilstonJ. Hainsworth
T. E. HansenC. T. McDarisR. E. McLaughlinR. J. NewellY. OishiJ. T. PillowR. V. Wielgoszinski
Subgroup on General Requirements and Piping (BPV I)
E. M. Ortman, ChairD. Tompkins, Vice ChairF. Massi, SecretaryP. BeckerD. L. BergerP. D. EdwardsG. W. GalanesT. E. HansenM. LemmonsW. L. Lowry
R. E. McLaughlinB. J. MollitorJ. T. PillowD. E. TuttleM. WadkinsonR. V. WielgoszinskiC. F. Jeerings, Contributing MemberS. V. Torkildson, ContributingMember
R. Uebel, Contributing Member
Subgroup on Locomotive Boilers (BPV I)
L. Moedinger, ChairS. M. Butler, SecretaryP. BoschanJ. R. BraunR. C. Franzen, Jr.G. W. GalanesD. W. Griner
S. D. Jackson
M. A. Janssen
S. A. Lee
G. M. Ray
R. B. Stone
M. W. Westland
Subgroup on Materials (BPV I)
G. W. Galanes, ChairJ. F. Henry, Vice ChairM. Lewis, SecretaryS. H. BowesD. A. CanonicoK. K. ColemanK. L. HayesJ. S. HunterO. X. Li
F. Masuyama
D. W. Rahoi
J. M. Tanzosh
J. Vattappilly
F. Zeller
M. Gold, Contributing Member
B. W. Roberts, ContributingMember
Subgroup on Solar Boilers (BPV I)
E. M. Ortman, ChairR. E. Hearne, SecretaryH. A. Fonzi, Jr.G. W. GalanesJ. S. Hunter
P. JenningsD. J. KozaF. MassiS. V. Torkildson, ContributingMember
Germany International Working Group (BPV I)
H. Michael, ChairH. P. Schmitz, SecretaryM. BremickerP. ChavdarovB. DaumeJ. FleischfresserE. HelmholdtR. KauerS. Krebs
T. LudwigR. A. MeyersF. MiunskeP. PaluszkiewiczH. SchroederA. SpangenbergM. SykoraJ. Henrichsmeyer, ContributingMember
India International Working Group (BPV I)
U. Revisanakaran, ChairA. J. Patil, Vice ChairH. Dalal, SecretaryK. AsokkumarM. R. KalahasthiI. KalyanasundaramA. R. Patil
G. V. S. Rao
M. G. Rao
N. Satheesan
G. U. Shanker
D. Shrivastava
S. Venkataramana
Task Group on Modernization of BPVC Section I
D. I. Anderson, ChairU. D’Urso, Staff SecretaryJ. L. ArnoldD. DeweesG. W. GalanesJ. P. GlaspieT. E. HansenJ. F. Henry
R. E. McLaughlin
P. A. Molvie
E. M. Ortman
J. T. Pillow
B. W. Roberts
D. E. Tuttle
J. Vattappilly
xiv
COMMITTEE ON MATERIALS (BPV II)
J. F. Henry, ChairJ. F. Grubb, Vice ChairC. E. O’Brien, Staff SecretaryF. AbeA. AppletonJ. CameronD. A. CanonicoA. ChaudouetD. B. DenisJ. R. FouldsD. W. GandyM. H. GilkeyJ. A. HallK. M. HottleM. IshikawaO. X. LiF. MasuyamaR. K. NanstadK. E. OrieD. W. RahoiE. ShapiroM. J. SlaterR. C. SutherlinR. W. Swindeman
J. M. TanzoshR. G. YoungF. ZellerO. Oldani, DelegateH. D. Bushfield, ContributingMember
M. Gold, Contributing MemberW. Hoffelner, Contributing MemberM. Katcher, Contributing MemberM. L. Nayyar, Contributing MemberE. G. Nisbett, Contributing MemberD. T. Peters, Contributing MemberB. W. Roberts, ContributingMember
E. Thomas, Contributing MemberE. Upitis, Contributing MemberT. M. Cullen, Honorary MemberW. D. Edsall, Honorary MemberG. C. Hsu, Honorary MemberR. A. Moen, Honorary MemberC. E. Spaeder, Jr., HonoraryMember
A. W. Zeuthen, Honorary Member
Executive Committee (BPV II)
J. F. Henry, ChairC. E. O’Brien, Staff SecretaryA. AppletonA. ChaudouetJ. R. FouldsM. Gold
J. F. GrubbR. W. MikitkaB. W. RobertsM. J. SlaterR. C. SutherlinR. W. Swindeman
Subgroup on External Pressure (BPV II)
R. W. Mikitka, ChairD. L. Kurle, Vice ChairJ. A. A. Morrow, SecretaryL. F. CampbellH. ChenD. S. GriffinJ. F. GrubbS. Guzey
J. R. Harris III
M. H. Jawad
C. R. Thomas
M. Wadkinson
M. Katcher, Contributing Member
C. H. Sturgeon, ContributingMember
Subgroup on Ferrous Specifications (BPV II)
A. Appleton, ChairK. M. Hottle, Vice ChairP. Wittenbach, SecretaryH. ChenB. M. DingmanM. J. DosdourianO. ElkadimJ. D. FritzM. GoldT. GrahamJ. M. GrockiJ. F. GrubbJ. Gundlach
C. HydeD. S. JanikowskiL. J. LavezziS. G. LeeW. C. MackA. S. MelilliK. E. OrieJ. ShickE. UpitisJ. D. WilsonR. ZawieruchaE. G. Nisbett, Contributing Member
Subgroup on International Material Specifications (BPV II)
A. Chaudouet, ChairA. R. Nywening, Vice ChairT. F. Miskell, SecretaryD. A. CanonicoH. ChenA. F. GarbolevskyD. O. Henry
M. IshikawaO. X. LiW. M. LundyE. UpitisF. ZellerO. Oldani, DelegateH. Lorenz, Contributing Member
Subgroup on Nonferrous Alloys (BPV II)
R. C. Sutherlin, ChairM. H. Gilkey, Vice ChairJ. CallandD. B. DenisJ. F. GrubbT. HartmanA. HeinoM. KatcherJ. A. McMasterL. Paul
D. W. Rahoi
W. Ren
J. Robertson
E. Shapiro
M. H. Skillingberg
J. Weritz
R. Wright
S. Yem
D. T. Peters, Contributing Member
Subgroup on Physical Properties (BPV II)
J. F. Grubb, ChairD. B. Denis, Vice ChairE. Shapiro
H. D. Bushfield, ContributingMember
Subgroup on Strength, Ferrous Alloys (BPV II)
M. J. Slater, ChairS. W. Knowles, SecretaryF. AbeD. A. CanonicoA. Di RienzoJ. R. FouldsJ. A. HallJ. F. HenryK. KimuraF. MasuyamaT. Ono
M. OrtolaniD. W. RahoiM. S. SheltonR. W. SwindemanJ. M. TanzoshR. G. YoungF. ZellerM. Gold, Contributing MemberM. Nair, Contributing MemberB. W. Roberts, ContributingMember
Subgroup on Strength of Weldments (BPV II & BPV IX)
W. F. Newell, Jr., ChairS. H. BowesK. K. ColemanM. DenaultP. D. FlennerJ. R. FouldsD. W. GandyM. GhahremaniK. L. Hayes
J. F. HenryE. LieblJ. PensoD. W. RahoiB. W. RobertsW. J. SperkoJ. P. Swezy, Jr.J. M. TanzoshM. Gold, Contributing Member
Working Group on Materials Database (BPV II)
R. W. Swindeman, ChairC. E. O’Brien, Staff SecretaryF. AbeJ. R. FouldsJ. F. HenryM. J. SlaterR. C. SutherlinD. Andrei, Contributing Member
J. L. Arnold, Contributing MemberJ. Grimes, Contributing MemberW. Hoffelner, Contributing MemberT. Lazar, Contributing MemberD. T. Peters, Contributing MemberW. Ren, Contributing MemberB. W. Roberts, ContributingMember
xv
Working Group on Creep Strength Enhanced Ferritic Steels (BPV II)
J. F. Henry, ChairJ. A. Siefert, SecretaryF. AbeS. H. BowesD. A. CanonicoK. K. ColemanP. D. FlennerJ. R. FouldsG. W. GalanesM. GoldF. MasuyamaT. Melfi
W. F. Newell, Jr.M. OrtolaniJ. ParkerW. J. SperkoR. W. SwindemanJ. M. TanzoshR. H. WorthingtonR. G. YoungF. ZellerG. Cumino, Contributing MemberB. W. Roberts, ContributingMember
Working Group on Data Analysis (BPV II)
J. F. Grubb, ChairF. AbeJ. R. FouldsM. GoldJ. F. HenryM. KatcherF. Masuyama
W. Ren
M. Subanovic
M. J. Swindeman
R. W. Swindeman
B. W. Roberts, ContributingMember
China International Working Group (BPV II)
B. Shou, ChairA. T. Xu, SecretaryW. FangQ. C. FengS. HuoF. KongH. LiJ. LiS. LiZ. RongcanS. TanC. WangJ. WangQ.-J. Wang
X. WangF. YangG. YangH.-C. YangR. YeL. YinD. ZhangH. ZhangX.-H. ZhangYingkai ZhangYong ZhangQ. ZhaoS. ZhaoJ. Zou
COMMITTEE ON CONSTRUCTION OF NUCLEAR FACILITYCOMPONENTS (BPV III)
R. S. Hill III, ChairR. B. Keating, Vice ChairJ. C. Minichiello, Vice ChairA. Byk, Staff SecretaryT. M. AdamsA. AppletonR. W. BarnesW. H. BorterC. W. BrunyT. D. BurchellR. P. DeublerA. C. EberhardtR. M. JesseeR. I. JetterC. C. KimG. H. KooV. KostarevK. A. ManolyD. E. MatthewsR. P. McIntyreM. N. Mitchell
M. MorishitaD. K. MortonT. NagataR. F. Reedy, Sr.I. SaitoS. ShamC. T. SmithW. K. Sowder, Jr.W. J. SperkoJ. P. TuckerK. R. WichmanC. S. WithersY. H. Choi, DelegateT. Ius, DelegateH.-T. Wang, DelegateM. Zhou, Contributing MemberE. B. Branch, Honorary MemberG. D. Cooper, Honorary MemberD. F. Landers, Honorary MemberR. A. Moen, Honorary MemberC. J. Pieper, Honorary Member
Executive Committee (BPV III)
R. S. Hill III, ChairA. Byk, Staff SecretaryT. M. AdamsC. W. BrunyP. R. DonavinR. M. JesseeR. B. KeatingR. P. McIntyre
J. C. Minichiello
M. Morishita
D. K. Morton
J. A. Munshi
C. A. Sanna
S. Sham
W. K. Sowder, Jr.
Subcommittee on Design (BPV III)
P. R. Donavin, ChairD. E. Matthews, Vice ChairG. L. Hollinger, SecretaryT. M. AdamsR. L. BrattonC. W. BrunyR. P. DeublerR. I. JetterC. JonkerR. B. KeatingK. A. ManolyR. J. Masterson
M. N. Mitchell
W. J. O’Donnell, Sr.E. L. Pleins
S. Sham
J. P. Tucker
W. F. Weitze
K. Wright
T. Yamazaki
J. Yang
R. S. Hill III, Contributing Member
M. H. Jawad, Contributing Member
Subgroup on Component Design (SC-D) (BPV III)
T. M. Adams, ChairR. B. Keating, Vice ChairS. Pellet, SecretaryG. A. AntakiS. AsadaJ. F. BallC. BasavarajuR. P. DeublerP. HirschbergO.-S. KimR. KleinH. KobayashiK. A. ManolyR. J. MastersonD. E. MatthewsJ. C. MinichielloD. K. Morton
T. M. MustoT. NagataA. N. NguyenE. L. PleinsI. SaitoG. C. SlagisJ. R. StinsonG. Z. TokarskiJ. P. TuckerP. VockC. WilsonJ. YangC. W. Bruny, Contributing MemberA. A. Dermenjian, ContributingMember
K. R. Wichman, Honorary Member
Working Group on Core Support Structures (SG-CD) (BPV III)
J. Yang, ChairJ. F. Kielb, SecretaryL. C. HartlessD. KeckT. LiszkaiH. S. Mehta
M. NakajimaM. D. SnyderA. TsirigotisR. VollmerR. Z. ZieglerJ. T. Land, Contributing Member
Working Group on Design of Division 3 Containment Systems(SG-CD) (BPV III)
D. K. Morton, ChairD. J. AmmermanG. BjorkmanV. BrozS. HorowitzD. W. LewisJ. C. Minichiello
E. L. Pleins
C. J. Temus
X. Zhai
I. D. McInnes, Contributing Member
H. P. Shrivastava, ContributingMember
xvi
Working Group on HDPE Design of Components (SG-CD) (BPV III)
T. M. Musto, ChairJ. Ossmann, SecretaryT. M. AdamsT. A. BaconM. BrandesD. BurwellS. ChoiJ. R. Hebeisen
P. KrishnaswamyK. A. ManolyM. MartinJ. C. MinichielloD. P. MunsonF. J. Schaaf, Jr.R. StakenborghsH. E. Svetlik
Working Group on Piping (SG-CD) (BPV III)
G. A. Antaki, ChairG. Z. Tokarski, SecretaryT. M. AdamsT. A. BaconC. BasavarajuJ. CatalanoF. ClaeysC. M. FaidyR. G. GiladaN. M. GrahamM. A. GrayR. J. GurdalR. W. HauptA. HiranoP. HirschbergM. KassarJ. Kawahata
R. B. KeatingV. KostarevD. LiebT. B. LittletonY. LiuJ. F. McCabeJ. C. MinichielloI.-K. NamM. S. SillsG. C. SlagisN. C. SutherlandC.-I. WuA. N. Nguyen, Contributing MemberN. J. Shah, Contributing MemberE. A. Wais, Contributing MemberE. C. Rodabaugh, HonoraryMember
Working Group on Pressure Relief (SG-CD) (BPV III)
J. F. Ball, ChairK. R. MayD. Miller
A. L. SzeglinD. G. ThibaultI. H. Tseng
Working Group on Pumps (SG-CD) (BPV III)
R. Klein, ChairD. Chowdhury, SecretaryP. W. BehnkeR. E. Cornman, Jr.X. DiM. D. EftychiouA. FraserC. GabhartR. Ghanbari
M. Higuchi
R. Ladefian
W. Lienau
K. J. Noel
R. A. Patrick
J. Sulley
R. Udo
A. G. Washburn
Working Group on Supports (SG-CD) (BPV III)
J. R. Stinson, ChairU. S. Bandyopadhyay, SecretaryK. AvrithiT. H. BakerF. J. BirchR. P. DeublerN. M. GrahamR. J. Masterson
S. Pellet
I. Saito
H. P. Srivastava
C. Stirzel
G. Z. Tokarski
P. Wiseman
C.-I. Wu
Working Group on Valves (SG-CD) (BPV III)
P. Vock, ChairS. Jones, SecretaryM. C. BuckleyR. FarrellG. A. JollyJ. KleinT. Lippucci
C. A. MizerJ. O’CallaghanH. O’BrienK. E. Reid IIJ. SulleyI. H. TsengJ. P. Tucker
Working Group on Vessels (SG-CD) (BPV III)
D. E. Matthews, ChairC. Wilson, SecretaryC. BasavarajuJ. V. Gregg, Jr.M. KassarR. B. KeatingD. KeckJ. KimO.-S. KimT. MitsuhashiM. Nair
T. J. Schriefer
M. C. Scott
P. K. Shah
J. Shupert
C. Turylo
D. Vlaicu
W. F. Weitze
T. Yamazaki
R. Z. Ziegler
A. Kalnins, Contributing Member
Subgroup on Design Methods (SC-D) (BPV III)
C. W. Bruny, ChairS. McKillop, SecretaryK. AvrithiW. CulpP. R. DonavinJ. V. Gregg, Jr.H. T. Harrison IIIK. HsuC. JonkerM. Kassar
D. Keck
M. N. Mitchell
W. J. O’Donnell, Sr.P. J. O’ReganW. D. Reinhardt
P. Smith
S. D. Snow
W. F. Weitze
K. Wright
Working Group on Design Methodology (SG-DM) (BPV III)
S. D. Snow, ChairC. F. Heberling II, SecretaryK. AvrithiC. BasavarajuD. L. CaldwellD. DeweesC. M. FaidyR. FarrellH. T. Harrison IIIP. HirschbergM. KassarR. B. KeatingJ. KimH. KobayashiT. Liszkai
J. F. McCabeS. McKillopS. RanganathW. D. ReinhardtD. H. RoartyP. K. ShahR. VollmerS. WangW. F. WeitzeJ. WenT. M. WigerK. WrightJ. YangR. D. Blevins, Contributing MemberM. R. Breach, Contributing Member
Working Group on Environmental Effects (SG-DM) (BPV III)
C. Jonker, ChairB. D. Frew, SecretaryW. CulpP. J. Dobson
J. KimJ. E. NestellM. OsterfossT. J. Schriefer
xvii
Working Group on Environmental Fatigue Evaluation Methods(SG-DM) (BPV III)
K. Wright, ChairM. A. Gray, Vice ChairW. F. Weitze, SecretaryT. M. AdamsS. AsadaK. AvrithiR. C. CipollaT. M. DamianiC. M. FaidyT. D. Gilman
S. R. GosselinY. HeP. HirschbergH. S. MehtaT. MetaisJ.-S. ParkD. H. RoartyI. SaitoD. VlaicuR. Z. Ziegler
Working Group on Fatigue Strength (SG-DM) (BPV III)
P. R. Donavin, ChairM. S. Shelton, SecretaryT. M. DamianiD. DeweesC. M. FaidyS. R. GosselinR. J. GurdalC. F. Heberling IIC. E. HinnantP. HirschbergK. Hsu
S. H. Kleinsmith
S. Majumdar
S. N. Malik
S. Mohanty
D. H. Roarty
A. Tsirigotis
K. Wright
H. H. Ziada
W. J. O'Donnell, Sr., ContributingMember
Working Group on Graphite and Composites Design(SG-DM) (BPV III)
M. N. Mitchell, ChairM. W. Davies, Vice ChairT. D. Burchell, SecretaryA. AppletonS. R. CadellS.-H. ChiW. J. Geringer
S. T. GonczyM. G. JenkinsY. KatohJ. OssmannM. RoemmlerS. YuG. L. Zeng
Working Group on Probabilistic Methods in Design(SG-DM) (BPV III)
M. Golliet, ChairT. AsayamaK. AvrithiD. O. HenryR. S. Hill III
M. MorishitaP. J. O'ReganN. A. PalmI. Saito
Special Working Group on Computational Modeling for ExplicitDynamics (SG-DM) (BPV III)
G. Bjorkman, ChairD. J. Ammerman, Vice ChairV. Broz, SecretaryM. R. BreachJ. M. JordanS. KuehnerD. Molitoris
W. D. Reinhardt
P. Y.-K. Shih
S. D. Snow
C.-F. Tso
M. C. Yaksh
U. Zencker
Subgroup on Elevated Temperature Design (SC-D) (BPV III)
S. Sham, ChairT. AsayamaC. Becht IVF. W. BrustP. CarterB. F. HantzA. B. HullM. H. JawadR. I. Jetter
G. H. KooS. MajumdarJ. E. NestellW. J. O'Donnell, Sr.R. W. SwindemanD. S. Griffin, Contributing MemberW. J. Koves, Contributing MemberD. L. Marriott, ContributingMember
Working Group on Allowable Stress Criteria (SG-ETD) (BPV III)
R. W. Swindeman, ChairR. Wright, SecretaryJ. R. FouldsC. J. JohnsK. KimuraT. LeM. Li
D. MaitraS. N. MalikJ. E. NestellW. RenB. W. RobertsM. SenguptaS. Sham
Working Group on Analysis Methods (SG-ETD) (BPV III)
P. Carter, ChairM. J. Swindeman, SecretaryM. R. BreachM. E. CohenR. I. Jetter
T. KrishnamurthyT. LeS. ShamD. K. Williams
Working Group on Creep-Fatigue and Negligible Creep (SG-ETD)(BPV III)
T. Asayama, ChairF. W. BrustP. CarterR. I. JetterG. H. Koo
T. LeB.-L. LyowS. N. MalikH. QianS. Sham
Working Group on Elevated Temperature Construction (SG-ETD)(BPV III)
M. H. Jawad, ChairA. Mann, SecretaryD. I. AndersonR. G. BrownD. DeweesB. F. HantzR. I. JetterS. KrishnamurthyT. Le
M. N. Mitchell
B. J. Mollitor
C. Nadarajah
P. Prueter
M. J. Swindeman
J. P. Glaspie, Contributing Member
D. L. Marriott, ContributingMember
Working Group on High Temperature Flaw Evaluation (SG-ETD)(BPV III)
F. W. Brust, ChairN. BroomP. CarterT. LeS. N. Malik
H. QianD. L. RudlandP. J. RushD.-J. ShimS. X. Xu
xviii
Special Working Group on Inelastic Analysis Methods (SG-ETD)(BPV III)
S. Sham, ChairS. X. Xu, SecretaryR. W. BarnesJ. A. BlancoB. R. Ganta
T. HassanG. H. KooB.-L. LyowM. J. SwindemanG. L. Zeng
Subgroup on General Requirements (BPV III)
R. P. McIntyre, ChairL. M. Plante, SecretaryV. ApostolescuA. AppletonS. BellJ. R. BerryJ. DeKleineJ. V. GardinerJ. W. HighlandsE. V. ImbroK. A. KavanaghY.-S. Kim
E. C. RenaudJ. RogersD. J. RoszmanC. T. SmithW. K. Sowder, Jr.R. SpuhlG. E. SzabaturaD. M. VickeryC. S. WithersH. Michael, DelegateG. L. Hollinger, ContributingMember
Working Group on Duties and Responsibilities (SG-GR) (BPV III)
J. V. Gardiner, ChairG. L. Hollinger, SecretaryD. ArrigoS. BellJ. R. BerryP. J. CocoM. CusickJ. DeKleineN. DeSantis
Y. Diaz-Castillo
K. A. Kavanagh
J. M. Lyons
L. M. Plante
D. J. Roszman
B. S. Sandhu
E. M. Steuck
J. L. Williams
Working Group on Quality Assurance, Certification, and Stamping(SG-GR) (BPV III)
C. T. Smith, ChairC. S. Withers, SecretaryV. ApostolescuA. AppletonO. ElkadimS. M. GoodwinJ. GrimmJ. W. HighlandsY.-S. KimB. McGloneR. P. McIntyre
D. T. MeischR. B. PatelE. C. RenaudT. RezkJ. RogersW. K. Sowder, Jr.R. SpuhlJ. F. StrunkG. E. SzabaturaD. M. VickeryC. A. Spletter, Contributing Member
Special Working Group on General Requirements Consolidation(SG-GR) (BPV III)
J. V. Gardiner, ChairC. T. Smith, Vice ChairS. BellM. CusickY. Diaz-CastilloJ. GrimmJ. M. LyonsB. McGloneR. PatelE. C. RenaudT. Rezk
J. Rogers
D. J. Roszman
B. S. Sandhu
G. J. Solovey
R. Spuhl
G. E. Szabatura
J. L. Williams
C. S. Withers
S. F. Harrison, ContributingMember
Subgroup on Materials, Fabrication, and Examination (BPV III)
R. M. Jessee, ChairB. D. Frew, Vice ChairS. Hunter, SecretaryW. H. BorterT. D. BurchellG. R. CannellP. J. CocoM. W. DaviesR. H. DavisD. B. DenisG. B. GeorgievS. E. GingrichM. GollietJ. GrimmL. S. Harbison
J. Johnston, Jr.C. C. KimM. LashleyT. MelfiH. MurakamiJ. OssmannJ. E. O’SullivanM. C. ScottW. J. SperkoJ. R. StinsonJ. F. StrunkR. WrightS. YeeH. Michael, DelegateR. W. Barnes, Contributing Member
Working Group on Graphite and Composite Materials (SG-MFE)(BPV III)
T. D. Burchell, ChairM. W. Davies, Vice ChairM. N. Mitchell, SecretaryA. AppletonR. L. BrattonS. R. CadellS.-H. ChiA. CovacS. W. DomsS. F. Duffy
W. J. GeringerS. T. GonzcyM. G. JenkinsY. KatohJ. OssmannM. RoemmlerN. SalstromT. ShibataS. YuG. L. Zeng
Working Group on HDPE Materials (SG-MFE) (BPV III)
M. Golliet, ChairM. A. Martin, SecretaryW. H. BorterG. BrouetteM. C. BuckleyJ. HakiiJ. Johnston, Jr.P. Krishnaswamy
D. P. Munson
T. M. Musto
S. Patterson
S. Schuessler
R. Stakenborghs
M. Troughton
B. Hauger, Contributing Member
Joint ACI-ASME Committee on Concrete Components for NuclearService (BPV III)
J. A. Munshi, ChairJ. McLean, Vice ChairA. Byk, Staff SecretaryK. Verderber, Staff SecretaryC. J. BangL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanC. JonesO. JovallN.-H. Lee
N. OrbovicC. T. SmithJ. F. StrunkT. TonyanS. WangT. J. Ahl, Contributing MemberJ. F. Artuso, Contributing MemberJ.-B. Domage, Contributing MemberJ. Gutierrez, Contributing MemberT. Kang, Contributing MemberT. Muraki, Contributing MemberB. B. Scott, Contributing MemberM. R. Senecal, ContributingMember
xix
Working Group on Design (BPV III-2)
N.-H. Lee, ChairM. AllamS. BaeL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanC. JonesO. Jovall
J. A. MunshiT. MurakiS. WangM. Diaz, Contributing MemberS. Diaz, Contributing MemberA. Istar, Contributing MemberB. R. Laskewitz, ContributingMember
B. B. Scott, Contributing MemberZ. Shang, Contributing MemberM. Sircar, Contributing Member
Working Group on Materials, Fabrication, and Examination(BPV III-2)
P. S. Ghosal, ChairT. Tonyan, Vice ChairM. AllamC. J. BangJ.-B. DomageA. C. EberhardtC. JonesT. Kang
N. LeeC. T. SmithJ. F. StrunkD. UfukJ. F. Artuso, Contributing MemberJ. Gutierrez, Contributing MemberB. B. Scott, Contributing MemberZ. Shang, Contributing Member
Special Working Group on Modernization (BPV III-2)
J. McLean, ChairN. Orbovic, Vice ChairA. AdediranO. JovallC. T. SmithM. A. Ugalde
S. Wang
S. Diaz, Contributing Member
J.-B. Domage, Contributing Member
F. Lin, Contributing Member
N. Stoeva, Contributing Member
Subgroup on Containment Systems for Spent Nuclear Fuel andHigh-Level Radioactive Material (BPV III)
D. K. Morton, ChairD. J. Ammerman, Vice ChairG. R. Cannell, SecretaryG. BjorkmanV. BrozS. HorowitzD. W. LewisE. L. PleinsR. H. SmithG. J. Solovey
C. J. TemusW. H. Borter, Contributing MemberR. S. Hill III, Contributing MemberP. E. McConnell, ContributingMember
A. B. Meichler, ContributingMember
T. Saegusa, Contributing MemberN. M. Simpson, ContributingMember
Subgroup on Fusion Energy Devices (BPV III)
W. K. Sowder, Jr., ChairD. Andrei, Staff SecretaryD. J. Roszman, SecretaryL. C. CadwalladerB. R. DoshiM. HiguchiG. HoltmeierM. KalseyK. A. KavanaghK. KimI. KimihiroS. Lee
G. LiX. LiP. MokariaT. R. MuldoonM. PortonF. J. Schaaf, Jr.P. SmithY. SongM. TrosenC. WaldonI. J. ZatzR. W. Barnes, Contributing Member
Working Group on General Requirements (BPV III-4)
D. J. Roszman, Chair W. K. Sowder, Jr.
Working Group on In-Vessel Components (BPV III-4)
M. Kalsey, Chair Y. Carin
Working Group on Magnets (BPV III-4)
S. Lee, Chair K. Kim, Vice Chair
Working Group on Materials (BPV III-4)
M. Porton, Chair P. Mummery
Working Group on Vacuum Vessels (BPV III-4)
I. Kimihiro, ChairL. C. Cadwallader
B. R. Doshi
Subgroup on High Temperature Reactors (BPV III)
M. Morishita, ChairR. I. Jetter, Vice ChairS. Sham, SecretaryN. BroomT. D. BurchellM. W. DaviesS. Downey
G. H. Koo
D. K. Morton
J. E. Nestell
G. L. Zeng
X. Li, Contributing Member
L. Shi, Contributing Member
Working Group on High Temperature Gas-Cooled Reactors(BPV III-5)
J. E. Nestell, ChairM. Sengupta, SecretaryN. BroomT. D. BurchellM. W. DaviesR. S. Hill IIIE. V. ImbroR. I. JetterY. W. Kim
T. LeT. R. LupoldS. N. MalikD. L. MarriottD. K. MortonS. ShamG. L. ZengX. Li, Contributing MemberL. Shi, Contributing Member
Working Group on High Temperature Liquid-Cooled Reactors(BPV III-5)
S. Sham, ChairT. Asayama, SecretaryM. ArcaroR. W. BarnesP. CarterM. E. CohenA. B. Hull
R. I. JetterG. H. KooT. LeS. MajumdarM. MorishitaJ. E. NestellG. Wu, Contributing Member
xx
Argentina International Working Group (BPV III)
O. Martinez, Staff SecretaryA. AcroglianoW. AgreloG. O. AnteriM. AnticoliC. A. ArayaJ. P. BalbianiA. A. BetervideD. O. BordatoG. BourguigneM. L. CappellaA. ClausR. G. CoccoA. ColeffA. J. Dall’OstoL. M. De BarberisD. P. DelfinoD. N. Dell’ErbaF. G. DiezA. DominguezS. A. EcheverriaJ. FernándezE. P. Fresquet
M. M. GamizoA. GomezI. M. GuerreiroI. A. KnorrM. F. LiendoL. R. MiñoJ. MonteR. L. MorardA. E. PastorE. PizzichiniA. PolitiJ. L. RacamatoH. C. SanziG. J. ScianG. G. SebastianM. E. SzarkoP. N. ToranoA. TurrinO. A. VerasteguiM. D. ViglianoP. YamamotoM. Zunino
China International Working Group (BPV III)
J. Yan, ChairW. Tang, Vice ChairC. A. Sanna, Staff SecretaryY. He, SecretaryL. GuoY. JingD. KangY. LiB. LiangH. LinS. LiuW. LiuJ. MaK. MaoW. Pei
G. SunZ. SunG. TangL. TingY. TuY. WangH. WuX. WuS. XueZ. YinG. ZhangW. ZhangW. ZhaoY. ZhongZ. Zhong
Germany International Working Group (BPV III)
C. Huttner, ChairH.-R. Bath, SecretaryB. ArndtM. BauerG. DaumR. DoringL. GerstnerG. HaenleK.-H. HerterR. E. HueggenbergE. IacopettaU. JendrichD. KoelblG. Kramarz
C. KrumbW. MayingerD. MoehringD. OstermannG. RoosJ. RudolphC. A. SannaH. SchauR. TrieglaffP. VöllmeckeJ. WendtF. WilleM. WinterN. Wirtz
India International Working Group (BPV III)
B. Basu, ChairG. Mathivanan, Vice ChairC. A. Sanna, Staff SecretaryS. B. Parkash, SecretaryA. D. BagdareV. Bhasin
S. KovalaiD. KulkarniM. PonnusamyR. N. SenK. R. ShahA. Sundararajan
Korea International Working Group (BPV III)
G. H. Koo, ChairS. S. Hwang, Vice ChairO.-S. Kim, SecretaryH. S. ByunG.-S. ChoiS. ChoiJ. Y. HongN.-S. HuhJ.-K. HwangC. JangI. I. JeongH. J. KimJ. KimJ.-S. KimK. KimM.-W. KimY.-B. KimY.-S. Kim
D. KwonB. LeeD. LeeSanghoon LeeSangil LeeS.-G. LeeH. LimI.-K. NamB. NohC.-K. OhC. ParkH. ParkJ.-S. ParkT. ShinS. SongJ. S. YangO. Yoo
Special Working Group on Editing and Review (BPV III)
D. E. Matthews, ChairR. L. BrattonR. P. DeublerA. C. EberhardtJ. C. Minichiello
D. K. MortonL. M. PlanteR. F. Reedy, Sr.C. Wilson
Special Working Group on HDPE Stakeholders (BPV III)
D. Burwell, ChairS. Patterson, SecretaryT. M. AdamsM. BrandesS. BruceS. ChoiC. M. FaidyM. GollietJ. GrimesR. M. JesseeJ. Johnston, Jr.
D. Keller
M. Lashley
K. A. Manoly
D. P. Munson
T. M. Musto
J. E. O’SullivanV. Rohatgi
F. J. Schaaf, Jr.
R. Stakenborghs
M. Troughton
Special Working Group on Honors and Awards (BPV III)
R. M. Jessee, ChairA. AppletonR. W. Barnes
D. E. MatthewsJ. C. Minichiello
xxi
Special Working Group on Industry Experience for New Plants(BPV III & BPV XI)
J. T. Lindberg, ChairE. L. Pleins, ChairJ. Ossmann, SecretaryT. L. ChanH. L. GustinP. J. HennesseyD. O. HenryJ. HoncharikE. V. ImbroC. G. Kim
O.-S. Kim
Y.-S. Kim
K. Matsunaga
D. E. Matthews
R. E. McLaughlin
D. W. Sandusky
T. Tsuruta
R. M. Wilson
S. M. Yee
Special Working Group on International Meetings (BPV III)
C. T. Smith, ChairA. Byk, Staff SecretaryT. D. BurchellS. W. CameronR. L. Crane
R. S. Hill IIIM. N. MitchellR. F. Reedy, Sr.C. A. Sanna
Special Working Group on New Plant Construction Issues (BPV III)
E. L. Pleins, ChairM. C. Scott, SecretaryA. BykA. CardilloP. J. CocoJ. HoncharikE. V. ImbroO.-S Kim
M. Kris
J. C. Minichiello
D. W. Sandusky
R. R. Stevenson
R. Troficanto
M. L. Wilson
J. Yan
Special Working Group on Regulatory Interface (BPV III)
E. V. Imbro, ChairP. Malouines, SecretaryS. BellA. CardilloP. J. CocoJ. GrimmJ. Honcharik
K. Matsunaga
D. E. Matthews
B. McGlone
A. T. Roberts III
R. R. Stevenson
M. L. Wilson
COMMITTEE ON HEATING BOILERS (BPV IV)
J. A. Hall, ChairT. L. Bedeaux, Vice ChairG. Moino, Staff SecretaryB. CalderonJ. CallandJ. P. ChicoineJ. M. DownsB. J. IskeJ. KlugP. A. Molvie
G. ScribnerR. D. TrouttM. WadkinsonR. V. WielgoszinskiH. Michael, DelegateD. Picart, DelegateA. Heino, Contributing MemberS. V. Voorhees, ContributingMember
J. L. Kleiss, Alternate
Subgroup on Care and Operation of Heating Boilers (BPV IV)
M. Wadkinson, ChairT. L. BedeauxJ. CallandJ. M. Downs
J. A. HallP. A. MolvieC. Lasarte, Contributing Member
Subgroup on Cast Boilers (BPV IV)
J. P. Chicoine, ChairT. L. Bedeaux, Vice ChairJ. M. Downs
J. A. HallJ. L. Kleiss
Subgroup on Materials (BPV IV)
M. Wadkinson, ChairJ. CallandJ. M. Downs
J. A. HallA. HeinoB. J. Iske
Subgroup on Water Heaters (BPV IV)
J. Calland, ChairL. BadziagowskiJ. P. ChicoineC. DinicB. J. Iske
R. E. OlsonM. A. TaylorT. E. TrantR. D. Troutt
Subgroup on Welded Boilers (BPV IV)
P. A. Molvie, ChairL. BadziagowskiT. L. BedeauxB. CalderonJ. CallandC. Dinic
J. L. KleissR. E. OlsonG. ScribnerR. D. TrouttM. WadkinsonR. V. Wielgoszinski
COMMITTEE ON NONDESTRUCTIVE EXAMINATION (BPV V)
G. W. Hembree, ChairF. B. Kovacs, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryS. J. AkrinJ. E. BateyP. L. BrownM. A. BurnsB. CaccamiseC. EmslanderN. Y. FaranssoN. A. FinneyA. F. GarbolevskyJ. F. HalleyJ. W. HoufS. A. Johnson
R. W. KruzicC. MayA. B. NagelT. L. PlasekF. J. SattlerP. B. ShawG. M. Gatti, DelegateX. Guiping, DelegateA. S. Birks, Contributing MemberJ. Bennett, AlternateH. C. Graber, Honorary MemberO. F. Hedden, Honorary MemberJ. R. MacKay, Honorary MemberT. G. McCarty, Honorary Member
Executive Committee (BPV V)
F. B. Kovacs, ChairG. W. Hembree, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryJ. E. BateyB. Caccamise
N. Y. FaranssoN. A. FinneyS. A. JohnsonA. B. Nagel
Subgroup on General Requirements/Personnel Qualifications andInquiries (BPV V)
C. Emslander, ChairJ. W. Houf, Vice ChairS. J. AkrinJ. E. BateyN. CarterN. Y. FaranssoN. A. FinneyG. W. Hembree
S. A. Johnson
F. B. Kovacs
D. I. Morris
A. B. Nagel
A. S. Birks, Contributing Member
J. P. Swezy, Jr., ContributingMember
xxii
Special Working Group on NDE Resource Support (SG-GR/PQ & I)(BPV V)
N. A. Finney, ChairD. AdkinsJ. AndersonD. BajulaJ. BennettC. T. BrownT. ClausingJ. L. GarnerK. Hayes
R. KelsoC. MagruderJ. W. Mefford, Jr.K. PageD. TompkinsD. Van AllenT. VidimosR. WardM. Wolf
Subgroup on Surface Examination Methods (BPV V)
S. A. Johnson, ChairJ. Halley, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseN. CarterN. Y. FaranssoN. FarenbaughN. A. Finney
G. W. HembreeR. W. KruzicB. D. LaiteC. MayL. E. MullinsA. B. NagelF. J. SattlerP. B. ShawG. M. Gatti, DelegateA. S. Birks, Contributing Member
Subgroup on Volumetric Methods (BPV V)
A. B. Nagel, ChairN. A. Finney, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseJ. M. DavisN. Y. FaranssoA. F. GarbolevskyJ. F. HalleyR. W. Hardy
G. W. Hembree
S. A. Johnson
F. B. Kovacs
R. W. Kruzic
C. May
L. E. Mullins
T. L. Plasek
F. J. Sattler
C. Vorwald
G. M. Gatti, Delegate
Working Group on Acoustic Emissions (SG-VM) (BPV V)
N. Y. Faransso, ChairJ. E. Batey, Vice Chair
S. R. DoctorR. K. Miller
Working Group on Radiography (SG-VM) (BPV V)
B. Caccamise, ChairF. B. Kovacs, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownC. EmslanderN. Y. FaranssoA. F. GarbolevskyR. W. Hardy
G. W. HembreeS. A. JohnsonR. W. KruzicB. D. LaiteC. MayR. J. MillsA. B. NagelT. L. PlasekB. White
Working Group on Ultrasonics (SG-VM) (BPV V)
N. A. Finney, ChairJ. F. Halley, Vice ChairB. CaccamiseJ. M. DavisC. EmslanderN. Y. FaranssoP. T. HayesS. A. Johnson
R. W. Kruzic
B. D. Laite
C. May
L. E. Mullins
A. B. Nagel
F. J. Sattler
C. Vorwald
Working Group on GuidedWave Ultrasonic Testing (SG-VM) (BPV V)
N. Y. Faransso, ChairJ. E. Batey, Vice ChairD. AlleyneN. AmirJ. F. Halley
S. A. JohnsonG. M. LightP. MudgeM. J. QuarryJ. Vanvelsor
Italy International Working Group (BPV V)
P. L. Dinelli, ChairA. Veroni, SecretaryR. BertolottiF. BrescianiG. CamposN. CaputoM. ColomboF. FerrareseE. Ferrari
M. A. Grimoldi
G. Luoni
O. Oldani
P. Pedersoli
A. Tintori
M. Zambon
G. Gobbi, Contributing Member
G. Pontiggia, Contributing Member
COMMITTEE ON PRESSURE VESSELS (BPV VIII)
R. J. Basile, ChairS. C. Roberts, Vice ChairE. Lawson, Staff SecretaryS. J. Rossi, Staff SecretaryG. Aurioles, Sr.J. CameronA. ChaudouetD. B. DeMichaelJ. P. GlaspieJ. F. GrubbL. E. Hayden, Jr.G. G. KarcherD. L. KurleK. T. LauM. D. LowerR. MahadeenR. W. MikitkaU. R. MillerB. R. MorelockT. P. PastorD. T. PetersM. J. PischkeM. D. Rana
G. B. Rawls, Jr.F. L. RichterC. D. RoderyE. SoltowJ. C. SowinskiD. B. StewartD. A. SwansonJ. P. Swezy, Jr.S. TeradaE. UpitisR. Duan, DelegateP. A. McGowan, DelegateH. Michael, DelegateK. Oyamada, DelegateM. E. Papponetti, DelegateX. Tang, DelegateM. Gold, Contributing MemberW. S. Jacobs, Contributing MemberK. Mokhtarian, ContributingMember
C. C. Neely, Contributing MemberK. K. Tam, Honorary Member
Subgroup on Design (BPV VIII)
D. A. Swanson, ChairJ. C. Sowinski, Vice ChairM. Faulkner, SecretaryG. Aurioles, Sr.S. R. BabkaO. A. BarskyR. J. BasileM. R. BreachF. L. BrownD. ChandiramaniB. F. HantzC. E. HinnantC. S. HinsonM. H. JawadD. L. KurleM. D. LowerR. W. MikitkaU. R. MillerT. P. Pastor
M. D. RanaG. B. Rawls, Jr.S. C. RobertsC. D. RoderyT. G. SeippD. SrnicS. TeradaJ. VattappillyR. A. WhippleK. XuK. Oyamada, DelegateM. E. Papponetti, DelegateW. S. Jacobs, Contributing MemberP. K. Lam, Contributing MemberK. Mokhtarian, ContributingMember
S. C. Shah, Contributing MemberK. K. Tam, Contributing Member
xxiii
Working Group on Design-By-Analysis (BPV VIII)
B. F. Hantz, ChairT. W. Norton, SecretaryR. G. BrownD. DeweesR. D. DixonZ. GuC. F. Heberling IIC. E. HinnantR. JainM. H. Jawad
S. KrishnamurthyA. MannG. A. MillerC. NadarajahP. PrueterM. D. RanaT. G. SeippM. A. ShahS. TeradaD. Arnett, Contributing Member
Subgroup on Fabrication and Examination (BPV VIII)
J. P. Swezy, Jr., ChairD. I. Morris, Vice ChairE. A. Whittle, Vice ChairB. R. Morelock, SecretaryN. CarterS. FlynnS. HeaterO. MuletM. J. PischkeM. J. RiceC. D. Rodery
B. F. Shelley
P. L. Sturgill
E. Upitis
K. Oyamada, Delegate
W. J. Bees, Contributing Member
L. F. Campbell, ContributingMember
W. S. Jacobs, Contributing Member
J. Lee, Contributing Member
R. Uebel, Contributing Member
Subgroup on General Requirements (BPV VIII)
M. D. Lower, ChairJ. P. Glaspie, Vice ChairF. L. Richter, SecretaryR. J. BasileD. T. DavisD. B. DeMichaelM. FaulknerF. HamtakL. E. Hayden, Jr.
K. T. LauT. P. PastorS. C. RobertsJ. C. SowinskiP. SperanzaD. B. StewartD. A. SwansonR. UebelC. C. Neely, Contributing Member
Task Group on Subsea Applications (BPV VIII)
R. Cordes, ChairL. P. AntalffyR. C. BielP. BunchJ. EllensS. HarbertX. KaculiK. Karpanan
F. Kirkemo
C. Lan
N. McKie
S. K. Parimi
M. Sarzynski
Y. Wada
D. T. Peters, Contributing Member
Task Group on UG-20(f) (BPV VIII)
S. Krishnamurthy, ChairT. AndersonK. BagnoliR. P. DeublerB. F. Hantz
B. R. MacejkoJ. PensoM. PragerM. D. Rana
Task Group on U-2(g) (BPV VIII)
G. Aurioles, Sr.S. R. BabkaR. J. BasileD. K. ChandiramaniR. MahadeenU. R. MillerT. W. NortonT. P. Pastor
R. F. Reedy, Sr.S. C. RobertsM. A. ShahD. SrnicD. A. SwansonJ. P. Swezy, Jr.R. UebelK. K. Tam, Contributing Member
Subgroup on Heat Transfer Equipment (BPV VIII)
G. Aurioles, Sr., ChairS. R. Babka, Vice ChairP. Matkovics, SecretaryD. AngstadtM. BahadoriJ. H. BarbeeO. A. BarskyL. BowerA. ChaudouetM. D. ClarkS. JeyakumarG. G. KarcherD. L. KurleR. MahadeenS. Mayeux
U. R. MillerD. SrnicA. M. VoytkoR. P. WibergI. G. Campbell, ContributingMember
I. Garcia, Contributing MemberJ. Mauritz, Contributing MemberT. W. Norton, Contributing MemberF. Osweiller, Contributing MemberJ. Pasek, Contributing MemberR. Tiwari, Contributing MemberS. Yokell, Contributing MemberS. M. Caldwell, Honorary Member
Task Group on Plate Heat Exchangers (BPV VIII)
P. Matkovics, ChairS. R. BabkaK. DevlinS. FlynnJ. F. GrubbF. Hamtak
R. MahadeenD. I. MorrisM. J. PischkeC. M. RomeroE. SoltowD. Srnic
Subgroup on High Pressure Vessels (BPV VIII)
D. T. Peters, ChairG. M. Mital, Vice ChairA. P. Maslowski, Staff SecretaryL. P. AntalffyR. C. BielP. N. ChakuR. CordesR. D. DixonL. FridlundR. T. HallmanA. H. HonzaJ. A. KappJ. KeltjensA. K. KhareN. McKieS. C. MordreG. T. Nelson
E. A. RodriguezE. D. RollK. C. Simpson, Jr.J. R. SimsD. L. StangF. W. TatarS. TeradaJ. L. TraudR. WinkK.-J. YoungR. M. Hoshman, ContributingMember
D. J. Burns, Honorary MemberD. M. Fryer, Honorary MemberG. J. Mraz, Honorary MemberE. H. Perez, Honorary Member
xxiv
Subgroup on Materials (BPV VIII)
J. Cameron, ChairP. G. Wittenbach, Vice ChairK. Xu, SecretaryA. Di RienzoJ. D. FritzJ. F. GrubbM. KowalczykW. M. LundyJ. Penso
D. W. RahoiR. C. SutherlinE. UpitisG. S. Dixit, Contributing MemberM. Gold, Contributing MemberM. Katcher, Contributing MemberJ. A. McMaster, ContributingMember
E. G. Nisbett, Contributing Member
Subgroup on Toughness (BPV II & BPV VIII)
D. L. Kurle, ChairK. Xu, Vice ChairN. CarterW. S. JacobsK. E. OrieM. D. RanaF. L. RichterK. SubramanianD. A. Swanson
J. P. Swezy, Jr.
S. Terada
E. Upitis
J. Vattappilly
K. Oyamada, Delegate
K. Mokhtarian, ContributingMember
C. C. Neely, Contributing Member
Subgroup on Graphite Pressure Equipment (BPV VIII)
A. Viet, ChairG. C. BechererF. L. Brown
C. W. CaryE. SoltowA. A. Stupica
China International Working Group (BPV VIII)
X. Chen, ChairB. Shou, Vice ChairZ. Fan, SecretaryY. ChenZ. ChenJ. CuiR. DuanW. GuoB. HanJ. HuQ. HuH. Hui
D. LuoY. LuoC. MiaoX. QianB. WangF. XuF. XuanK. ZhangY. ZhangS. ZhaoJ. ZhengG. Zhu
Germany International Working Group (BPV VIII)
P. Chavdarov, ChairA. Spangenberg, Vice ChairH. P. Schmitz, SecretaryB. DaumeA. EmrichJ. FleischfresserA. GastbergR. HelmholdtR. Kauer
D. Koelbl
S. Krebs
T. Ludwig
R. A. Meyers
H. Michael
P. Paluszkiewicz
H. Schroeder
M. Sykora
Italy International Working Group (BPV VIII)
G. Pontiggia, ChairA. Veroni, SecretaryB. G. AlboraliP. AngeliniR. BoattiA. CamanniP. ContiP. L. DinelliF. Finco
M. GuglielmettiP. MantovaniM. MassobrioL. MoracchioliC. SangalettiS. SartiA. TeliI. VenierG. Gobbi, Contributing Member
Special Working Group on Bolted Flanged Joints (BPV VIII)
R. W. Mikitka, ChairW. BrownH. ChenW. J. Koves
J. R. PayneG. B. Rawls, Jr.M. S. Shelton
Working Group on Design (BPV VIII Div. 3)
E. D. Roll, ChairC. Becht VR. C. BielR. CordesR. D. DixonL. FridlundR. T. HallmanK. KarpananJ. KeltjensN. McKieG. M. MitalS. C. MordreG. T. NelsonD. T. Peters
K. C. SimpsonJ. R. SimsD. L. StangK. SubramanianS. TeradaJ. L. TraudR. WinkY. XuF. Kirkemo, Contributing MemberD. J. Burns, Honorary MemberD. M. Fryer, Honorary MemberG. J. Mraz, Honorary MemberE. H. Perez, Honorary Member
Working Group on Materials (BPV VIII Div. 3)
F. W. Tatar, ChairL. P. AntalffyP. N. Chaku
J. A. KappA. K. Khare
Task Group on Impulsively Loaded Vessels (BPV VIII)
E. A. Rodriguez, ChairG. A. AntakiJ. K. AsahinaD. D. BarkerA. M. ClaytonJ. E. Didlake, Jr.T. A. DuffeyB. L. HaroldsenK. HayashiD. HildingK. W. KingR. Kitamura
R. A. LeishearP. O. LeslieF. OhlsonC. RomeroN. RushtonJ. H. StoflethQ. Dong, Contributing MemberH.-P. Schildberg, ContributingMember
J. E. Shepherd, ContributingMember
M. Yip, Contributing Member
xxv
Subgroup on Interpretations (BPV VIII)
U. R. Miller, ChairE. Lawson, Staff SecretaryG. Aurioles, Sr.R. J. BasileJ. CameronR. D. DixonM. KowalczykD. L. KurleM. D. LowerR. MahadeenG. M. Mital
D. I. MorrisD. T. PetersS. C. RobertsC. D. RoderyD. B. StewartP. L. SturgillD. A. SwansonJ. P. Swezy, Jr.J. VattappillyP. G. WittenbachT. P. Pastor, Contributing Member
COMMITTEE ON WELDING, BRAZING, AND FUSING (BPV IX)
D. A. Bowers, ChairM. J. Pischke, Vice ChairS. J. Rossi, Staff SecretaryM. BernasekM. A. BoringJ. G. FeldsteinP. D. FlennerS. E. GingrichK. L. HayesR. M. JesseeJ. S. LeeW. M. LundyT. MelfiW. F. Newell, Jr.D. K. PeetzE. G. ReicheltM. J. RiceM. B. Sims
W. J. SperkoM. J. StankoP. L. SturgillJ. P. Swezy, Jr.P. L. Van FossonE. W. WoelfelA. Roza, DelegateM. Consonni, Contributing MemberS. A. Jones, Contributing MemberA. S. Olivares, ContributingMember
S. Raghunathan, ContributingMember
R. K. Brown, Jr., Honorary MemberM. L. Carpenter, Honorary MemberB. R. Newmark, Honorary MemberS. D. Reynolds, Jr., HonoraryMember
Subgroup on Brazing (BPV IX)
M. J. Pischke, ChairE. W. BeckmanL. F. CampbellM. L. Carpenter
A. F. GarbolevskyN. MohrA. R. NyweningJ. P. Swezy, Jr.
Subgroup on General Requirements (BPV IX)
P. L. Sturgill, ChairE. W. BeckmanJ. P. BellD. A. BowersG. ChandlerP. R. EvansS. FlynnP. GilstonF. HamtakA. Howard
R. M. JesseeD. MobleyD. K. PeetzJ. PillowH. B. PorterJ. P. Swezy, Jr.K. R. WillensE. W. WoelfelE. Molina, DelegateB. R. Newmark, Honorary Member
Subgroup on Materials (BPV IX)
M. Bernasek, ChairT. AndersonJ. L. ArnoldE. CutlipS. S. FioreS. E. GingrichL. S. HarbisonR. M. JesseeT. Melfi
M. J. Pischke
A. Roza
C. E. Sainz
W. J. Sperko
M. J. Stanko
P. L. Sturgill
J. Warren
C. Zanfir
Subgroup on Plastic Fusing (BPV IX)
E. W. Woelfel, ChairD. BurwellM. GhahremaniK. L. HayesR. M. JesseeJ. Johnston, Jr.
J. E. O’SullivanE. G. ReicheltM. J. RiceS. SchuesslerM. TroughtonJ. Wright
Subgroup on Welding Qualifications (BPV IX)
M. J. Rice, ChairJ. S. Lee, Vice ChairM. BernasekM. A. BoringD. A. BowersR. B. CorbitP. D. FlennerL. S. HarbisonK. L. HayesW. M. LundyT. MelfiW. F. Newell, Jr.B. R. NewtonS. Raghunathan
E. G. ReicheltM. B. SimsW. J. SperkoS. A. SpragueP. L. SturgillJ. P. Swezy, Jr.P. L. Van FossonT. C. WiesnerA. D. WilsonD. Chandiramani, ContributingMember
M. Consonni, Contributing MemberM. Degan, Contributing Member
Italy International Working Group (BPV IX)
A. Camanni, ChairA. Veroni, SecretaryP. AngeliniR. BoattiP. L. DinelliF. FerrareseA. GhidiniE. LazzariL. Lotti
N. Maestri
M. Mandina
M. Massobrio
L. Moracchioli
G. Pontiggia
S. Verderame
A. Volpi
G. Gobbi, Contributing Member
COMMITTEE ON FIBER-REINFORCED PLASTIC PRESSURE VESSELS(BPV X)
D. Eisberg, ChairB. F. Shelley, Vice ChairP. D. Stumpf, Staff SecretaryA. L. BeckwithD. BentleyF. L. BrownJ. L. BustillosB. R. ColleyT. W. CowleyI. L. DinovoM. R. GormanB. HebbM. J. Hendrix
D. H. HodgkinsonL. E. HuntD. L. KeelerB. M. LinnemannD. H. McCauleyN. L. NewhouseD. J. PainterA. A. PollockG. RamirezJ. R. RichterD. O. Yancey, Jr.P. H. Ziehl
xxvi
COMMITTEE ON NUCLEAR INSERVICE INSPECTION (BPV XI)
G. C. Park, ChairS. D. Kulat, Vice ChairR. W. Swayne, Vice ChairL. Powers, Staff SecretaryV. L. ArmentroutJ. F. BallW. H. BamfordS. B. BrownT. L. ChanR. C. CipollaD. R. CordesD. D. DavisR. L. DyleE. V. Farrell, Jr.M. J. FerlisiP. D. FisherE. B. GerlachT. J. GriesbachJ. HakiiD. O. HenryW. C. HolstonD. W. LamondD. R. LeeG. A. LofthusE. J. MaloneyG. Navratil
S. A. NormanJ. E. O’SullivanR. K. RhyneA. T. Roberts IIID. A. ScarthF. J. Schaaf, Jr.J. C. Spanner, Jr.D. J. TillyD. E. WaskeyJ. G. WeicksH. D. Chung, DelegateC. Ye, DelegateR. E. Gimple, Contributing MemberR. D. Kerr, Contributing MemberB. R. Newton, Contributing MemberR. A. West, Contributing MemberR. A. Yonekawa, ContributingMember
M. L. Benson, AlternateJ. T. Lindberg, AlternateR. O. McGill, AlternateC. J. Wirtz, AlternateC. D. Cowfer, Honorary MemberF. E. Gregor, Honorary MemberO. F. Hedden, Honorary MemberP. C. Riccardella, Honorary Member
Executive Committee (BPV XI)
S. D. Kulat, ChairG. C. Park, Vice ChairL. Powers, Staff SecretaryW. H. BamfordR. L. DyleM. J. FerlisiE. B. Gerlach
W. C. HolstonD. W. LamondJ. T. LindbergR. K. RhyneJ. C. Spanner, Jr.R. W. SwayneM. L. Benson, Alternate
Argentina International Working Group (BPV XI)
O. Martinez, Staff SecretaryD. A. CipollaA. ClausD. CostaD. P. DelfinoD. N. Dell’ErbaA. DominguezS. A. EcheverriaE. P. FresquetM. M. GamizoI. M. GuerreiroM. F. LiendoF. Llorente
R. J. LopezM. MagliocchiL. R. MiñoJ. MonteM. D. PeredaA. PolitiC. G. RealF. M. SchroeterG. J. ScianM. J. SolariP. N. ToranoO. A. VerasteguiP. Yamamoto
China International Working Group (BPV XI)
J. H. Liu, ChairY. Nie, Vice ChairC. Ye, Vice ChairM. W. Zhou, SecretaryJ. F. CaiD. X. ChenH. ChenH. D. ChenY. B. GuoY. HouD. M. KangS. W. LiX. Y. LiangS. X. LinL. Q. Liu
Y. LiuW. N. PeiC. L. PengG. X. TangQ. WangQ. W. WangZ. S. WangL. WeiF. XuZ. Y. XuQ. YinK. ZhangX. L. ZhangY. ZhangZ. M. Zhong
Germany International Working Group (BPV XI)
H.-R. BathR. DoringB. ErhardM. HagenbruchB. HoffmannE. Iacopetta
U. Jendrich
H. Schau
H.-J. Scholtka
X. Schuler
J. Wendt
Special Working Group on Editing and Review (BPV XI)
R. W. Swayne, ChairC. E. MoyerK. R. Rao
J. E. StaffieraD. J. TillyC. J. Wirtz
Task Group on Inspectability (BPV XI)
J. T. Lindberg, ChairM. J. Ferlisi, SecretaryW. H. BamfordA. CardilloD. R. CordesD. O. HenryE. HenryJ. HoncharikJ. HowardR. KleinC. Latiolais
D. Lieb
G. A. Lofthus
D. E. Matthews
P. J. O’ReganJ. Ossmann
R. Rishel
S. A. Sabo
P. Sullivan
C. Thomas
J. Tucker
Task Group on ISI of Spent Nuclear Fuel Storage and TransportationContainment Systems (BPV XI)
K. Hunter, ChairA. Alleshwaram, SecretaryD. J. AmmermanW. H. BorterJ. BroussardS. BrownC. R. BryanT. CarraherD. DunnN. FalesR. C. FolleyB. GuthermanS. HorowitzM. W. JosephH. JungM. Liu
R. M. MeyerB. L. MontgomeryM. MoranT. NuofferM. OrihuelaR. PaceE. L. PleinsR. SindelarH. SmithJ. C. Spanner, Jr.C. J. TemusG. WhiteX. J. ZhaiP.-S. Lam, AlternateJ. Wise, Alternate
xxvii
Subgroup on Evaluation Standards (SG-ES) (BPV XI)
W. H. Bamford, ChairN. A. Palm, SecretaryH. D. ChungR. C. CipollaR. L. DyleC. M. FaidyB. R. GantaT. J. GriesbachK. HasegawaK. HojoD. N. HopkinsK. KoyamaD. R. Lee
Y. S. LiR. O. McGillH. S. MehtaK. MiyazakiR. PaceJ. C. PoehlerS. RanganathD. A. ScarthT. V. VoK. R. WichmanS. X. XuM. L. Benson, AlternateT. Hardin, Alternate
Task Group on Evaluation of Beyond Design Basis Events (SG-ES)(BPV XI)
R. Pace, ChairK. E. Woods, SecretaryG. A. AntakiP. R. DonavinR. G. GiladaT. J. GriesbachH. L. GustinM. HayashiK. Hojo
S. A. Kleinsmith
H. S. Mehta
D. V. Sommerville
T. V. Vo
K. R. Wichman
G. M. Wilkowski
S. X. Xu
T. Weaver, Contributing Member
Working Group on Flaw Evaluation (SG-ES) (BPV XI)
R. C. Cipolla, ChairS. X. Xu, SecretaryW. H. BamfordM. L. BensonB. BezensekM. BrumovskyH. D. ChungT. E. DemersC. M. FaidyB. R. GantaR. G. GiladaH. L. GustinF. D. HayesP. H. HoangK. HojoD. N. HopkinsY. KimK. KoyamaV. Lacroix
D. R. LeeY. S. LiM. LiuH. S. MehtaG. A. A. MiessiK. MiyazakiR. K. QashuS. RanganathP. J. RushD. A. ScarthW. L. ServerD.-J. ShimA. UdyawarT. V. VoB. WasilukK. R. WichmanG. M. WilkowskiD. L. Rudland, Alternate
Task Group on Crack Growth Reference Curves (BPV XI)
D. A. Scarth, ChairH. I. Gustin, SecretaryW. H. BamfordM. L. BensonF. W. BrustR. C. CipollaR. L. DyleK. Hasegawa
D. N. HopkinsK. KashimaK. KoyamaD. R. LeeH. S. MehtaK. MiyazakiS. RanganathT. V. Vo
Task Group on Evaluation Procedures for Degraded Buried Pipe(WG-PFE) (BPV XI)
R. O. McGill, ChairS. X. Xu, SecretaryG. A. AntakiR. C. CipollaK. HasegawaK. M. Hoffman
G. A. A. MiessiM. MoenssensD. P. MunsonR. PaceP. J. RushD. A. Scarth
Working Group on Operating Plant Criteria (SG-ES) (BPV XI)
N. A. Palm, ChairA. E. Freed, SecretaryV. Marthandam, SecretaryK. R. BakerW. H. BamfordM. BrumovskyT. L. DicksonR. L. DyleS. R. GosselinT. J. GriesbachM. HayashiS. A. KleinsmithH. KobayashiH. S. Mehta
A. D. OdellR. PaceJ. C. PoehlerS. RanganathW. L. ServerD. V. SommervilleC. A. TomesA. UdyawarT. V. VoD. P. WeaklandK. E. WoodsH. Q. XuT. Hardin, Alternate
Working Group on Pipe Flaw Evaluation (SG-ES) (BPV XI)
D. A. Scarth, ChairG. M. Wilkowski, SecretaryK. AzumaW. H. BamfordM. L. BensonM. BrumovskyF. W. BrustH. D. ChungR. C. CipollaN. G. CofieJ. M. DavisT. E. DemersC. M. FaidyB. R. GantaS. R. GosselinC. E. Guzman-LeongK. HasegawaP. H. HoangK. HojoD. N. Hopkins
E. J. HoustonR. JanowiakS. KalyanamK. KashimaV. LacroixY. S. LiR. O. McGillH. S. MehtaG. A. A. MiessiK. MiyazakiS. H. PelletH. RathbunP. J. RushD.-J. ShimA. UdyawarT. V. VoB. WasilukS. X. XuA. Alleshwaram, Alternate
Subgroup on Nondestructive Examination (SG-NDE) (BPV XI)
J. C. Spanner, Jr., ChairD. R. Cordes, SecretaryT. L. ChanS. E. CumblidgeF. E. DohmenK. J. HackerJ. HarrisonD. O. Henry
J. T. LindbergG. A. LofthusG. R. PerkinsS. A. SaboF. J. Schaaf, Jr.R. V. SwainC. J. WirtzC. A. Nove, Alternate
xxviii
Working Group on Personnel Qualification and Surface Visual andEddy Current Examination (SG-NDE) (BPV XI)
J. T. Lindberg, ChairJ. E. Aycock, SecretaryC. Brown, SecretaryS. E. CumblidgeA. DiazN. Farenbaugh
D. O. HenryJ. W. HoufC. ShinskyJ. C. Spanner, Jr.J. T. TimmC. J. Wirtz
Working Group on Procedure Qualification and VolumetricExamination (SG-NDE) (BPV XI)
G. A. Lofthus, ChairJ. Harrison, SecretaryG. R. Perkins, SecretaryM. T. AndersonM. BrileyA. BushmireD. R. CordesM. DennisS. R. Doctor
F. E. DohmenK. J. HackerD. A. KullC. A. NoveD. NowakowskiS. A. SaboR. V. SwainS. J. ToddD. K. Zimmerman
Subgroup on Repair/Replacement Activities (SG-RRA) (BPV XI)
E. B. Gerlach, ChairE. V. Farrell, Jr., SecretaryJ. F. BallS. B. BrownR. ClowP. D. FisherK. J. KarwoskiS. L. McCrackenB. R. Newton
J. E. O’Sullivan
S. Schuessler
R. R. Stevenson
R. W. Swayne
D. J. Tilly
D. E. Waskey
J. G. Weicks
P. Raynaud, Alternate
Working Group on Welding and Special Repair Processes (SG-RRA)(BPV XI)
D. E. Waskey, ChairD. J. Tilly, SecretaryD. BarborakS. J. FindlanP. D. FisherM. L. HallK. J. KarwoskiC. C. Kim
M. Kris
S. L. McCracken
D. B. Meredith
B. R. Newton
J. E. O’Sullivan
D. Segletes
J. G. Weicks
Working Group on Nonmetals Repair/Replacement Activities(SG-RRA) (BPV XI)
J. E. O'Sullivan, ChairS. Schuessler, SecretaryJ. Johnston, Jr.M. LashleyM. P. Marohl
T. M. MustoS. PattersonA. PridmoreP. RaynaudF. J. Schaaf, Jr.
Task Group on Repair by Carbon Fiber Composites(WGN-MRR) (BPV XI)
J. E. O'Sullivan, ChairB. DavenportM. GollietL. S. GordonM. P. MarohlN. MeyerR. P. OjdrovicD. PegueroA. Pridmore
P. RaynaudC. W. RowleyV. RoyJ. SealeyN. StoevaM. F. UddinJ. WenT. Jimenez, AlternateG. M. Lupia, Alternate
Working Group on Design and Programs (SG-RRA) (BPV XI)
S. B. Brown, ChairA. B. Meichler, SecretaryO. BhattyR. ClowR. R. CroftE. V. Farrell, Jr.E. B. Gerlach
H. Malikowski
M. A. Pyne
P. Raynaud
R. R. Stevenson
R. W. Swayne
R. Turner
Subgroup on Water-Cooled Systems (SG-WCS) (BPV XI)
D. W. Lamond, ChairG Navratil, SecretaryJ. M. AgoldV. L. ArmentroutJ. M. BoughmanS. B. BrownS. T. ChesworthD. D. DavisH. Q. DoM. J. Ferlisi
K. W. Hall
P. J. Hennessey
K. Hoffman
S. D. Kulat
T. Nomura
T. Nuoffer
G. C. Park
H. M. Stephens, Jr.
M. J. Homiack, Alternate
Task Group on High Strength Nickel Alloys Issues (SG-WCS) (BPV XI)
R. L. Dyle, ChairB. L. Montgomery, SecretaryW. H. BamfordP. R. DonavinK. HoffmanK. KoyamaC. Lohse
H. MalikowskiS. E. MarletteG. C. ParkG. R. PolingJ. M. ShupingJ. C. Spanner, Jr.D. P. Weakland
Working Group on Containment (SG-WCS) (BPV XI)
H. M. Stephens, Jr., ChairS. G. Brown, SecretaryP. S. GhosalH. T. HillR. D. HoughB. Lehman
J. McIntyre
J. A. Munshi
M. Sircar
S. Walden, Alternate
T. J. Herrity, Alternate
Working Group on Inspection of Systems and Components(SG-WCS) (BPV XI)
M. J. Ferlisi, ChairN. Granback, SecretaryJ. M. AgoldR. W. BlydeC. Cueto-FelguerosoH. Q. DoK. W. HallK. M. Hoffman
S. D. Kulat
A. Lee
G. J. Navratil
T. Nomura
J. C. Nygaard
R. Rishel
J. C. Younger
xxix
Working Group on Pressure Testing (SG-WCS) (BPV XI)
J. M. Boughman, ChairS. A. Norman, SecretaryT. AnselmiY.-K. ChungM. J. Homiack
A. E. KeyserD. W. LamondJ. K. McClanahanB. L. MontgomeryC. Thomas
Task Group on Buried Components Inspection and Testing(WG-PT) (BPV XI)
D. W. Lamond, ChairJ. M. Boughman, SecretaryM. Moenssens, SecretaryT. Anselmi
B. DavenportA. HiserJ. Ossmann
Working Group on Risk-Informed Activities (SG-WCS) (BPV XI)
M. A. Pyne, ChairS. T. Chesworth, SecretaryJ. M. AgoldC. Cueto-FelguerosoR. HaesslerJ. HakiiK. W. HallM. J. HomiackS. D. Kulat
D. W. Lamond
R. K. Mattu
A. McNeill III
G. J. Navratil
P. J. O’Regan
N. A. Palm
D. Vetter
J. C. Younger
Working Group on General Requirements (BPV XI)
R. K. Rhyne, ChairC. E. Moyer, SecretaryJ. F. BallT. L. Chan
P. J. HennesseyE. J. MaloneyR. K. MattuT. Nuoffer
Special Working Group on Reliability and Integrity ManagementProgram (BPV XI)
F. J. Schaaf, Jr., ChairA. T. Roberts III, SecretaryN. BroomS. R. DoctorS. DowneyJ. D. FletcherJ. T. FongT. GrahamN. GranbackJ. Grimm
D. M. Jones
A. L. Krinzman
D. R. Lee
R. K. Miller
M. N. Mitchell
R. Morrill
T. Roney
R. W. Swayne
S. Takaya
JSME/ASME Joint Task Group for System-Based Code (SWG-RIM)(BPV XI)
T. Asayama, ChairS. R. DoctorK. DozakiS. R. GosselinM. HayashiD. M. JonesY. KamishimaA. L. Krinzman
D. R. Lee
H. Machida
M. Morishita
A. T. Roberts III
F. J. Schaaf, Jr.
S. Takaya
D. Watanabe
COMMITTEE ON TRANSPORT TANKS (BPV XII)
M. D. Rana, ChairN. J. Paulick, Vice ChairR. Lucas, Staff SecretaryA. N. AntoniouP. ChilukuriW. L. GarfieldG. G. Karcher
M. PittsT. A. RogersS. StaniszewskiA. P. VargheseJ. A. Byers, Contributing MemberR. Meyers, Contributing MemberM. R. Ward, Contributing Member
Executive Committee (BPV XII)
N. J. Paulick, ChairR. Lucas, Staff SecretaryM. Pitts
M. D. RanaS. StaniszewskiA. P. Varghese
Subgroup on Design and Materials (BPV XII)
A. P. Varghese, ChairR. C. Sallash, SecretaryD. K. ChandiramaniP. ChilukuriY. DoronR. D. HayworthG. G. KarcherS. L. McWilliamsN. J. PaulickM. D. Rana
T. A. Rogers
S. Staniszewski
K. Xu
A. T. Duggleby, ContributingMember
T. J. Hitchcock, ContributingMember
M. R. Ward, Contributing Member
J. Zheng, Contributing Member
Subgroup on Fabrication, Inspection, and Continued Service(BPV XII)
M. Pitts, ChairP. Chilukuri, SecretaryR. D. HayworthK. ManskerG. McRaeO. MuletT. A. RogersM. RudekR. C. Sallash
L. SelenskyS. StaniszewskiS. E. Benet, Contributing MemberJ. A. Byers, Contributing MemberA. S. Olivares, ContributingMember
L. H. Strouse, Contributing MemberS. V. Voorhees, ContributingMember
Subgroup on General Requirements (BPV XII)
S. Staniszewski, ChairB. F. Pittel, SecretaryA. N. AntoniouY. DoronJ. L. FreilerW. L. GarfieldO. MuletM. PittsT. RummelR. C. SallashL. Selensky
P. Chilukuri, Contributing MemberK. L. Gilmore, Contributing MemberT. J. Hitchcock, ContributingMember
G. McRae, Contributing MemberS. L. McWilliams, ContributingMember
T. A. Rogers, Contributing MemberD. G. Shelton, Contributing MemberL. H. Strouse, Contributing MemberM. R. Ward, Contributing Member
xxx
Subgroup on Nonmandatory Appendices (BPV XII)
N. J. Paulick, ChairS. Staniszewski, SecretaryP. ChilukuriR. D. HayworthK. ManskerS. L. McWilliamsN. J. PaulickM. PittsT. A. RogersR. C. Sallash
D. G. Shelton
S. E. Benet, Contributing Member
D. D. Brusewitz, ContributingMember
T. J. Hitchcock, ContributingMember
A. P. Varghese, ContributingMember
M. R. Ward, Contributing Member
COMMITTEE ON OVERPRESSURE PROTECTION (BPV XIII)
D. B. DeMichael, ChairC. E. O’Brien, Staff SecretaryJ. F. BallJ. BurgessS. CammeresiJ. A. CoxR. D. DanzyJ. P. Glaspie
S. F. HarrisonW. F. HartD. MillerB. K. NutterT. PatelM. PoehlmannZ. WangJ. A. West
COMMITTEE ON BOILER AND PRESSURE VESSEL CONFORMITYASSESSMENT (CBPVCA)
P. D. Edwards, ChairL. E. McDonald, Vice ChairK. I. Baron, Staff SecretaryM. Vazquez, Staff SecretaryJ. P. ChicoineD. C. CookT. E. HansenK. T. LauD. MillerB. R. MorelockJ. D. O’LearyG. ScribnerB. C. TurczynskiD. E. TuttleR. UebelE. A. WhittleR. V. Wielgoszinski
D. Cheetham, Contributing MemberT. P. Beirne, AlternateJ. B. Carr, AlternateJ. W. Dickson, AlternateJ. M. Downs, AlternateB. J. Hackett, AlternateB. L. Krasiun, AlternateD. W. Linaweaver, AlternateP. F. Martin, AlternateI. Powell, AlternateR. Rockwood, AlternateL. Skarin, AlternateR. D. Troutt, AlternateS. V. Voorhees, AlternateP. Williams, AlternateA. J. Spencer, Honorary Member
COMMITTEE ON NUCLEAR CERTIFICATION (CNC)
R. R. Stevenson, ChairJ. DeKleine, Vice ChairE. Suarez, Staff SecretaryG. GobbiS. M. GoodwinJ. W. HighlandsK. A. HuberJ. C. KraneM. A. LockwoodR. P. McIntyreL. M. PlanteH. B. PrasseT. E. QuakaC. T. SmithC. TuryloD. M. VickeryE. A. WhittleC. S. Withers
S. F. Harrison, ContributingMember
S. Andrews, AlternateD. Arrigo, AlternateJ. Ball, AlternateP. J. Coco, AlternateP. D. Edwards, AlternateD. P. Gobbi, AlternateK. M. Hottle, AlternateK. A. Kavanagh, AlternateP. Krane, AlternateD. Nenstiel, AlternateM. Paris, AlternateG. Szabatura, AlternateA. Torosyan, AlternateS. V. Voorhees, AlternateS. Yang, Alternate
Subcommittee on Safety Valve Requirements (SC-SVR)
D. B. DeMichael, ChairC. E. O’Brien, Staff SecretaryJ. F. BallJ. BurgessS. CammeresiJ. A. CoxR. D. DanzyJ. P. GlaspieS. F. Harrison
W. F. Hart
D. Miller
B. K. Nutter
T. Patel
M. Poehlmann
Z. Wang
J. A. West
S. R. Irvin, Sr., Alternate
Subgroup on Design (SC-SVR)
D. Miller, ChairC. E. BeairB. JoergensenB. J. Mollitor
T. PatelJ. A. WestR. D. Danzy, Contributing Member
Subgroup on General Requirements (SC-SVR)
J. F. Ball, ChairG. BrazierJ. BurgessD. B. DeMichaelS. T. French
J. P. GlaspieB. F. PittelM. PoehlmannD. E. TuttleJ. White
Subgroup on Testing (SC-SVR)
W. F. Hart, ChairT. P. BeirneJ. E. BrittJ. BuehrerS. CammeresiJ. A. CoxJ. W. Dickson
A. DonaldsonG. D. GoodsonB. K. NutterC. SharpeZ. WangA. WilsonS. R. Irvin, Sr., Alternate
U.S. Technical Advisory Group ISO/TC 185 Safety Relief Valves
T. J. Bevilacqua, ChairC. E. O’Brien, Staff SecretaryJ. F. BallG. BrazierD. B. DeMichael
D. MillerB. K. NutterT. PatelJ. A. West
xxxi
ð17Þ AWS PERSONNELOfficers of AWS Committees
(Cooperating in the Development of the Specifications Herein)
As of February 3, 2017
A5 COMMITTEE ON FILLER METALS AND ALLIED MATERIALS
T. Melfi, ChairR. V. Decker, 1st Vice ChairM. F. Sinfield, 2nd Vice ChairR. K. Gupta, SecretaryT. AndersonA. BoulianneJ. C. BundyJ. L. CaronG. L. ChouinardD. D. CrockettT. J. EckardtD. M. FedorJ. G. FeldsteinD. A. FinkR. J. FoxG. L. FrankeR. D. FuchsS. D. KiserP. J. KonkolD. J. KoteckiL. G. Kvidahl
J. S. LeeJ. R. LoganC. McEvoyM. T. MerloK. M. Merlo-JosephB. MosierT. C. MyersB. A. PletcherJ. D. PrasterK. C. PrudenK. RoossinckK. SampathJ. D. SchaeferF. A. SchweighardtW. S. SeveranceD. SinghR. C. SutherlinR. A. SwainH. D. WehrJ. Zhang
A5X EXECUTIVE SUBCOMMITTEE
T. Melfi, ChairR. V. Decker, 1st Vice ChairM. F. Sinfield, 2nd Vice ChairR. K. Gupta, SecretaryJ. J. DeLoach, Jr.J. G. Feldstein
D. A. FinkR. D. FuchsD. J. KoteckiJ. S. LeeR. A. SwainH. D. Wehr
A5A SUBCOMMITTEE ON CARBON AND LOW ALLOY STEELELECTRODES AND RODS FOR SHIELDED METAL ARC AND OXYFUEL
GAS WELDING
G. L. Franke, ChairR. A. Swain, Vice ChairR. K. Gupta, SecretaryD. D. CrockettR. V. DeckerK. K. GuptaM. James
S. J. Knostman
D. J. Kotecki
A. Y. Lau
T. C. Myers
K. Sampath
M. S. Sierdzinski
A5B SUBCOMMITTEE ON CARBON AND LOW ALLOY STEELELECTRODES AND FLUXES FOR SUBMERGED ARC WELDING
T. Melfi, ChairR. K. Gupta, SecretaryH. BeckR. J. FoxS. FrancisR. D. FuchsD. J. KoteckiM. T. Merlo
D. W. Meyer
T. C. Myers
P. J. Nicklas
J. Procario
A. K. Singh
R. D. Strugar
R. A. Swain
A5C SUBCOMMITTEE ON ALUMINUM ALLOY FILLER METALS
T. Anderson, ChairP. Berube, Vice ChairR. K. Gupta, SecretaryB. C. BoehringerW. D. EnglandG. F. Hofmann
D. J. KoteckiJ. MardenS. E. PollardW. J. SperkoL. T. VernamJ. Zhang
A5D SUBCOMMITTEE ON STAINLESS STEEL FILLER METALS
D. J. Kotecki, ChairF. B. Lake, Vice ChairR. K. Gupta, SecretaryR. V. DeckerM. DenaultT. J. EckardtJ. G. FeldsteinR. D. FuchsT. R. HartmanM. James
S. J. Knostman
W. P. Koegel
G. A. Kurisky
M. T. Merlo
S. J. Merrick
R. A. Swain
G. P. Villemez
H. D. Wehr
J. M. Zawodny
A5E SUBCOMMITTEE ON NICKEL AND NICKEL ALLOY FILLERMETALS
R. D. Fuchs, ChairS. D. Kiser, Vice ChairR. K. Gupta, SecretaryJ. CaronG. S. ClarkM. DenaultT. R. HartmanD. D. KiilunenD. J. Kotecki
G. A. Kurisky
F. B. Lake
J. S. Lee
J. R. Logan
B. A. Pletcher
R. A. Swain
H. D. Wehr
M. Yamakami
A5F SUBCOMMITTEE ON COPPER AND COPPER ALLOY FILLERMETALS
K. Roossinck, ChairR. K. Gupta, SecretaryP. W. Fischer
J. TurriffH. D. Wehr
xxxii
A5G SUBCOMMITTEE ON HARD SURFACING FILLER METALS
G. L. Chouinard, ChairR. K. Gupta, SecretaryT. A. BarnhartF. BroshjeitD. D. Crockett
J. DezelleW. E. LayoP. F. MendezJ. G. PostleV. B. Rajan
A5H SUBCOMMITTEE ON FILLERMETALS AND FLUXES FOR BRAZING
R. M. Henson, ChairC. F. Darling, Vice ChairJ. Douglass, SecretaryR. K. Gupta, Co-SecretaryD. E. BudingerW. M. CoughlanR. P. DettyW. J. EngeronM. T. GrahamT. P. HirtheJ. LongabuccoR. P. McKinney
W. Miglietti
T. Oyama
M. J. Pohlman
T. C. Profughi
S. S. Rajan
J. P. Sands
M. E. Scruggs
A. E. Shapiro
C. M. Volpe
R. R. Xu
H. Zhao
A5I SUBCOMMITTEE ON TUNGSTEN ELECTRODES
W. S. Severance, ChairR. K. Gupta, SecretaryS. G. CaldwellS. S. DelmoreA. Endemann
S. FyffeP. M. GallagherM. E. GedgaudasR. A. SwainL. T. Van Boxtel
A5J SUBCOMMITTEE ON ELECTRODES AND RODS FOR WELDINGCAST IRON
S. D. Kiser, ChairR. K. Gupta, SecretaryR. A. Bishel
R. A. BusheyT. J. EckardtC. F. Zeiger
A5K SUBCOMMITTEE ON TITANIUM AND ZIRCONIUM FILLERMETALS
R. C. Sutherlin, ChairS. Borrero, SecretaryV. Perez, Co-SecretaryS. S. Delmore
B. KruegerK. T. TranG. E. Trepus
A5L SUBCOMMITTEE ON MAGNESIUM ALLOY FILLER METALS
R. K. Gupta, SecretaryA. P. Gerlich
W. R. Waterfield
A5M SUBCOMMITTEE ON CARBON AND LOW ALLOY STEELELECTRODES FOR FLUX CORED ARC WELDING
D. D. Crockett, ChairM. T. Merlo, Vice ChairR. K. Gupta, SecretaryM. R. BrinkmanJ. C. BundyJ. J. DeLoach, Jr.G. L. FrankeD. J. KoteckiL. L. Kuiper
A. Y. Lau
B. J. Malinowski
K. M. Merlo-Joseph
T. C. Myers
J. S. Ogborn
B. A. Pletcher
M. F. Sinfield
R. A. Swain
A5N SUBCOMMITTEE ON CONSUMABLE INSERTS
H. D. Wehr, ChairW. J. Sperko, Vice ChairR. K. Gupta, Secretary
J. J. DeLoach, Jr.W. F. Newell, Jr.C. D. Sierra
A5O SUBCOMMITTEE ON CARBON AND LOW ALLOY STEELELECTRODES AND RODS FOR GAS SHIELDED ARC WELDING
J. C. Bundy, ChairM. T. Merlo, Vice ChairR. K. Gupta, SecretaryD. D. CrockettR. V. DeckerR. J. FoxP. J. Konkol
D. J. KoteckiL. L. KuiperT. C. MyersV. B. RajanK. SampathR. D. StrugarD. A. Wright
A5P SUBCOMMITTEE ON CARBON AND LOW ALLOY STEELELECTRODES FOR ELECTROSLAG AND ELECTROGAS WELDING
J. S. Lee, ChairR. K. Gupta, SecretaryD. R. BajekJ. H. Devletian
D. A. FinkD. J. KoteckiB. A. PletcherR. B. Turpin
A5S SUBCOMMITTEE ON GASES FOR GAS SHIELDED ARC WELDINGAND CUTTING
F. A. Schweighardt, ChairJ. M. Zawodny, Vice ChairR. K. Gupta, SecretaryE. Colvin
B. C. GeorgeD. B. LeturnoM. M. Skiles
A5T SUBCOMMITTEE ON FILLER METAL PROCUREMENTGUIDELINES
T. Melfi, ChairH. D. Wehr, Vice ChairR. K. Gupta, SecretaryT. A. DavenportR. V. DeckerD. A. FinkS. J. Knostman
D. J. Kotecki
J. S. Lee
M. T. Merlo
P. K. Salvesen
K. Sampath
R. A. Swain
A5W SUBCOMMITTEE ON MOISTURE AND HYDROGEN
D. M. Fedor, ChairJ. M. Blackburn, Vice ChairR. K. Gupta, SecretaryJ. D. FarrenD. A. FinkR. J. FoxG. L. Franke
J. L. KalpJ. KeeganD. J. KoteckiJ. S. LeeK. M. Merlo-JosephM. S. SierdzinskiM. F. Sinfield
xxxiii
ð17Þ PREFACE
On January 3, 1919, ASME participated with several other organizations in a meeting to discuss the continuation ofwartime research in welding. Out of that meeting, the American Welding Society was established and since that timethere has been a constant and interwoven record of development by the American Welding Society and The AmericanSociety of Mechanical Engineers of the techniques of welding. Through all of these great years of growth, many of theleaders in the field of engineering had the common interest of pressure equipment design and manufacture and the de-velopment of welding as a powerful tool in that manufacture. The evolution of this cooperative effort is contained inProfessor A. M. Greene’s “History of the ASME Boiler Code,” which was published as a series of articles in MechanicalEngineering from July 1952 through August 1953 and is now available from ASME in a special bound edition. The fol-lowing quotation from this history based on the minutes of the Committee notes the cooperative nature of the work donein the area of welding.“During 1919, a number of cases involving welding were referred by the Boiler Code Committee to the Subcommittee on
Welding.“As the National Welding Council was to be discontinued, a new organization was to be formed to be known as the Amer-
ican Welding Society with which the American Bureau of Welding was to be affiliated. This was to be a body representingthe entire industry and would eliminate commercial aspects, undertake research and standardization, and act as a judicialbody providing a medium for advancing the science and art of welding.”In 1935 the AWS-ASTM Joint Committee on Filler Metal was organized to provide standard specifications for welding
rods, electrodes, filler metals, and fluxes for this developing U.S. industry.In 1969 these two sponsors agreed to dissolve this joint activity and to permit the American Welding Society to as-
sume sole responsibility for the family of welding rods, electrodes, filler metal, and flux specifications then in being.In 1992, the ASME Board of Pressure Technology Codes and Standards endorsed the use of materials produced to
other than AWS specifications. It is the intent of ASME to follow its procedures and practices currently in use to imple-ment the adoption of material specifications of AWS and other recognized national or international organizations.Section II, Part C contains material specifications, most of which are identical to corresponding specifications pub-
lished by AWS and other recognized national or international organizations. All adopted specifications are either repro-duced in the Code, where permission to do so has been obtained from the originating organization, or so referenced, andinformation about how to obtain them from the originating organization is provided. The ASME Committee reviews allmaterial specifications submitted to it and if it is felt that there is any need to adapt them for Code purposes, revisionsare made to them. However, there is constant liaison between ASME and AWS and other recognized national or inter-national organizations, and there will be continuing effort to see that the specifications as produced by AWS and otherrecognized national or international organizations and those printed in the ASME Code are identical.To assure that there will be a clear understanding on the part of the users of Section II, ASME publishes both the iden-
tical specifications and those amended for Code usage every 2 years.The ASME Boiler and Pressure Vessel Code has been adopted into law by 50 states and many municipalities in the
United States and by all of the Canadian provinces.
xxxiv
GUIDELINE ON THE APPROVAL OF NEWWELDING AND BRAZINGMATERIAL CLASSIFICATIONS UNDER THE ASME BOILER AND
PRESSURE VESSEL CODE
Code Policy. It is the policy of the ASME Boiler and Pressure Vessel Committee to adopt for inclusion in Section II, PartC, only such specifications as have been adopted by the American Welding Society (AWS), and by other recognized na-tional or international organizations.
It is expected that requests for Code approval will normally be for welding and brazing materials (hereafter termed“consumables”) for which there is a recognized national or international specification. For consumables made to a re-cognized national or international specification other than those of the AWS, the inquirer shall give notice to the stan-dards developing organization that a request has been made to ASME for adoption of their specification under the ASMECode, and shall request that the organization to grant ASME permission to reprint the standard. For other consumables,a request shall be made to the AWS, or a recognized national or international organization, to develop a specification thatcan be presented to the Code Committee.
It is the policy of the ASME Boiler and Pressure Vessel Committee to consider requests to adopt new consumables foruse by boiler, pressure vessel, or nuclear power plant component Manufacturers or end users. Further, such requestsshould be for consumables for which there is a reasonable expectation of use in a boiler, pressure vessel, or nuclearpower plant component constructed to the rules of one of the Sections of this Code.
Application. The inquirer shall identify to the Committee all product forms, size ranges, and specifications for whichincorporation is desired, and state whether or not the consumable is covered by patents, whether or not it is licensed,and if licensed, any limitations on its manufacture.
Weldability/Brazability. The inquirer shall furnish complete data on procedure qualification tests made in accor-dance with the requirements of Section IX. Such tests shall be made over the full range of base metal thickness in whichthe consumable is to be used. Pertinent information on deposited metal, such as effects from postweld heat treatment,susceptibility to air hardening, effects of joining processes, expected notch toughness values, and the amount of experi-ence in use of the consumable shall be given.
Physical Changes. For new consumables, it is important to know the structural stability characteristics and the de-gree of retention of properties with exposure at temperature. The influence of welding or brazing and thermal treatmentoperations on the mechanical properties, ductility, and microstructure of the deposited metal are important, particularlywhere degradation in properties may occur. Where particular temperature ranges of exposure or heat treatment, cool-ing rates, combinations of mechanical working and thermal treatments, fabrication practices, exposure to particular en-vironments, etc., cause significant changes in the mechanical properties, microstructure, resistance to brittle fracture,etc., it is of prime importance to call attention to those conditions that should be avoided in service or in manufactureof parts or vessels using the consumable.
Requests for Additional Data. The Committee may request additional data, including data on properties or depos-ited metal behavior not explicitly treated in the construction Code in which adoption is desired.
Code Case. The Code Committee will consider the issuance of an ASME Code Case, to be effective for a period of threeyears, permitting the treatment of a new welding or brazing material under an existing ASME Section IX grouping forqualification purposes, provided that the following conditions are met:
(a) The inquirer provides evidence that a request for coverage of the consumable in a specification has been made tothe AWS or a recognized national or international organization;
(b) the consumable is commercially available and can be purchased within the proposed specification requirements;(c) the inquirer shows that there will be a reasonable demand for the consumable by industry and that there exists an
urgency for approval by means of a Code Case;(d) the request for approval of the consumable shall clearly describe it in specification form, including applicable items
as scope, process, manufacture, conditions for delivery, heat treatment, chemical and tensile requirements, testing spe-cifications and requirements, workmanship, finish, marking, inspection, and rejection;
(e) all other requirements identified previously under Code Policy and Application apply; and(f) the inquirer shall furnish the Code Committee with all the data specified in this Guideline.
xxxv
Requirements for Requests for ASME Acceptance of Welding and Brazing Material Specifications to Recog-nized National or International Standards Other Than the AWS. The Committee will consider only requests in ac-cordance with the Boiler and Pressure Vessel Committee Operating and Administrative Procedures, OP-8.6 (Englishlanguage: U.S. or SI/metric units). The Committee will consider accepting specifications of recognized national or inter-national organizations in accordance with OP-8.6 such as, but not limited to, AWS, CSA, CEN, DIN, and JIS. Consumablespecifications of other than national or international organizations, such as those of consumable producers and suppli-ers, will not be considered for acceptance.Requirements for Recognized National or International Specifications. Acceptable consumable specifications will
be identified by date or edition. Approved edition(s) will be stated in the subtitle of the ASME specification. Minimumrequirements that must be contained in a consumable specification for which acceptance is being requested include suchitems as name of national or international organization, scope, reference documents, process, manufacture, conditionsfor delivery, heat treatment, chemical and tensile requirements, testing specifications and requirements, workmanship,finish, marking, inspection, and rejection.Publication of Recognized National or International Specifications. Specifications for which ASME has not been
given permission to publish by the originating organization will be referenced on a cover sheet in appropriate Appen-dices in Section II, Part C, along with information xxix on where to obtain a copy of those documents. Documents that arereferenced in non-AWS consumable specifications will not be published by ASME. However, information on where toobtain a copy of those documents will be maintained in Section II, Part C. Additions and exceptions to the consumablespecification will be noted in the subtitle of the specification.NewWelding and Brazing Materials Checklist. To assist inquirers desiring Code coverage for new consumables, or
extending coverage of existing consumables, the Committee has developed the following checklist of items that ought tobe addressed by each inquiry. The Committee reserves the right to request additional data and application informationwhen considering new consumables.(a) Has a qualified inquirer request been provided?(b) Has a request for either revision to existing Code requirements or for a Code Case been defined?(c) Has a letter to the AWS been submitted requesting coverage of the new consumable in a specification, and has a
copy been submitted to the Committee? Alternatively, is this consumable already covered by a specification issued by arecognized national or international organization, and has an English language version been provided?(d) Has the Construction Code and Division coverage been identified?(e) Have mechanical property data been submitted (ultimate tensile strength, yield strength, reduction of area, and
elongation) for each intended joining process?(f) Have toughness considerations required by the Construction Code been defined and has appropriate data been
submitted?(g) Have joining requirements been defined and has procedure qualification test data been submitted?(h) Has influence of fabrication practices on deposited metal properties been defined?
xxxvi
SUMMARY OF CHANGES
Errata to the BPV Code may be posted on the ASME Web site to provide corrections to incorrectly published items, or tocorrect typographical or grammatical errors in the BPV Code. Such Errata shall be used on the date posted.
Information regarding Special Notices and Errata is published by ASME at http://go.asme.org/BPVCerrata.
Changes given below are identified on the pages by a margin note, (17), placed next to the affected area.
The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” followingthis Summary of Changes.
Page Location Change (Record Number)
v List of Sections Updated
x Submittal of TechnicalInquiries to the Boilerand Pressure VesselStandards Committees
Revised in its entirety (13-2222)
xiii Personnel Updated
xxxii AWS Personnel Updated
xxxiv Preface Penultimate paragraph editorially revised
505 SFA-5.20/SFA-5.20M Revised in its entirety (15-2697)
717 SFA-5.28/SFA-5.28M Revised in its entirety (15-2698)
869 SFA-5.36/SFA-5.36M Revised in its entirety (16-1896)
xxxvii
LIST OF CHANGES IN RECORD NUMBER ORDER
Record Number Change
13-2222 Revised the front guidance on interpretations in its entirety.15-2697 Adopted AWS A5.20/A5.20M:2005 (R2015), “Specification for Carbon Steel Electrodes for Flux
Cored Arc Welding” as SFA-5.20/SFA-5.20M.15-2698 Adopted AWS A5.28/A5.28M:2005 (R2015), “Specification for Low-Alloy Steel Electrodes and
Rods for Gas Shielded Arc Welding” as SFA-5.28/SFA-5.28M.16-1896 Adopted AWS A5.36/A5.36M:2016, “Specification for Carbon and Low-Alloy Steel Flux Cored
Electrodes for Flux Cored Arc Welding and Metal Cored Electrodes for Gas Metal Arc Welding”as SFA-5.36/SFA-5.36M.
xxxviii
CROSS-REFERENCING AND STYLISTIC CHANGES IN THE BOILERAND PRESSURE VESSEL CODE
There have been structural and stylistic changes to BPVC, starting with the 2011 Addenda, that should be noted to aidnavigating the contents. The following is an overview of the changes:
Subparagraph Breakdowns/Nested Lists Hierarchy
• First-level breakdowns are designated as (a), (b), (c), etc., as in the past.• Second-level breakdowns are designated as (1), (2), (3), etc., as in the past.• Third-level breakdowns are now designated as (-a), (-b), (-c), etc.• Fourth-level breakdowns are now designated as (-1), (-2), (-3), etc.• Fifth-level breakdowns are now designated as (+a), (+b), (+c), etc.• Sixth-level breakdowns are now designated as (+1), (+2), etc.
Footnotes
With the exception of those included in the front matter (roman-numbered pages), all footnotes are treated as end-notes. The endnotes are referenced in numeric order and appear at the end of each BPVC section/subsection.
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees has been moved to the frontmatter. This information now appears in all Boiler Code Sections (except for Code Case books).
Cross-References
It is our intention to establish cross-reference link functionality in the current edition and moving forward. To facil-itate this, cross-reference style has changed. Cross-references within a subsection or subarticle will not include the des-ignator/identifier of that subsection/subarticle. Examples follow:
• (Sub-)Paragraph Cross-References. The cross-references to subparagraph breakdowns will follow the hierarchy ofthe designators under which the breakdown appears.– If subparagraph (-a) appears in X.1(c)(1) and is referenced in X.1(c)(1), it will be referenced as (-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(c)(2), it will be referenced as (1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(e)(1), it will be referenced as (c)(1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.2(c)(2), it will be referenced as X.1(c)(1)(-a).
• Equation Cross-References. The cross-references to equations will follow the same logic. For example, if eq. (1) ap-pears in X.1(a)(1) but is referenced in X.1(b), it will be referenced as eq. (a)(1)(1). If eq. (1) appears in X.1(a)(1) butis referenced in a different subsection/subarticle/paragraph, it will be referenced as eq. X.1(a)(1)(1).
xxxix
INTENTIONALLY LEFT BLANK
WELDING CONSUMABLES — PROCUREMENT OFFILLER MATERIALS AND FLUXES
SFA-5.01M/SFA-5.01
(Identical with AWS Specification A5.01M/A5.01:2013 (ISO 14344:2010 MOD). In case of dispute,the original AWS text applies.)
ASME BPVC.II.C-2017 SFA-5.01M/SFA-5.01
1
ASME BPVC.II.C-2017SFA-5.01M/SFA-5.01
2
Welding Consumables—Procurementof Filler Materials and Fluxes
1 Scope
This standard identifies various information necessary for communication between a purchaser and asupplier of welding consumables. This standard, together with an AWS, ISO, or other recognized weldingconsumable standard, provides a method for preparing those specific details needed for welding consumableprocurement which consist of the following:
a) the welding consumable classification (selected from the pertinent AWS, ISO, or other applicablewelding consumable standard);
b) the lot class (selected from Clause 4 of this standard);
c) the testing schedule (selected from Clause 5 of this standard).
Selection of the specific welding consumable classification, lot class and testing schedule will depend uponthe requirements of the application for which the welding consumable is being procured.
2 Normative References
The following normative documents contain provisions which, through references in this text, constituteprovisions of this standard. For dated references, subsequent amendments to, or revisions of, any of thesepublications do not apply. However, parties to agreements based on this standard are encouraged toinvestigate the possibility of applying the most recent editions of the normative documents indicated below.For undated references, the latest editions of the normative documents referred to apply. Members of ISOand IEC maintain registers of currently valid International Standards.
2.1 The following AWS standards1 are referenced in the mandatory section of this document.
AWS A3.0 M/A3.0, Standard Welding Terms and Definitions, Including Terms for Adhesive Bonding, Brazing,Soldering, Thermal Cutting, and Thermal Spraying
AWS A5.02/A5.02M, Specification for Filler Metal Standard Sizes, Packaging, and Physical Attributes
2.2 The following ASTM standard2 is referenced in the mandatory section of this document:
ASTM E29, Standard Practice for Using Significant Digits in Test Data to Determine Conformance withSpecifications
2.3 The following ISO standard3 is referenced in the mandatory section of this document.
ISO 544, Welding Consumables — Technical Delivery Conditions for Welding Filler Materials — Type ofProduct, Dimensions, Tolerances and Markings
1 AWS standards are published by the American Welding Society, 8669 NW 36 St, # 130, Miami, FL 33166.2 ASTM standards are published by ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428.3 ISO standards are published by the International Organization for Standardization, 1 rue de Varembé, Case postale 56,CH-1211 Geneva 20, Switzerland.