Page 1: ASME Boiler & Pressure Vessel Code

Overview of Process PlantPiping System Design

Participant’s Guide

Page 2: ASME Boiler & Pressure Vessel Code

CONTACT INFORMATION

ASME Headquarters1-800-THE-ASME

ASME Professional Development1-800-THE-ASME

Eastern Regional Office Southern Regional Office8996 Burke Lake Road – Suite L102 1950 Stemmons Freeway – Suite 5037CBurke, VA 22015-1607 Dallas, TX 75207-3109703-978-5000 214-746-4900800-221-5536 800-445-2388703-978-1157 (FAX) 214-746-4902 (FAX)

Midwest Regional Office Western Regional Office17 North Elmhurst Avenue – Suite 108 119-C Paul DriveMt. Prospect, IL 60056-2406 San Rafael, CA 94903-2022847-392-8876 415-499-1148800-628-6437 800-624-9002847-392-8801 (FAX) 415-499-1338 (FAX)

Northeast Regional Office326 Clock Tower CommonsRoute 22Brewster, NY 10509-9241914-279-6200800-628-5981914-279-7765 (FAX)

International Regional Office1-800-THE-ASME

You can also find information onthese courses and all of ASME,including ASME ProfessionalDevelopment, the Vice President ofProfessional Development, and othercontacts at the ASME Web site……

http://www.asme.org

Page 3: ASME Boiler & Pressure Vessel Code

Overview of Process PlantPiping System Design

By:

Vincent A. CarucciCarmagen Engineering, Inc.

Copyright © 2000 by

All Rights Reserved

Page 4: ASME Boiler & Pressure Vessel Code

TABLE OF CONTENTS

PART 1: PARTICIPANT NOTES ..............................................................................3

PART 2: BACKGROUND MATERIAL .................................................................................... 73

I. Introduction ....................................................................................................................... 73II. General ............................................................................................................................. 73

A. What is a piping system .......................................................................................... 73B. Scope of ASME B31.3............................................................................................. 73

III. Material selection considerations...................................................................................... 75A. Strength................................................................................................................... 75B. Corrosion Resistance.............................................................................................. 77C. Material Fracture Toughness .................................................................................. 77D. Fabricability ............................................................................................................. 78E. Availability and Cost ................................................................................................ 78

IV. Piping Components........................................................................................................... 79A. Fittings, Flanges, and Gaskets................................................................................ 79B. Flange Rating .......................................................................................................... 85Sample Problem 1 - Determine Flange Rating ................................................................. 88Solution ............................................................................................................................. 88

V. Valves ............................................................................................................................... 89A. Valve Functions....................................................................................................... 89B. Primary Valve Types ............................................................................................... 90C. Valve Selection Process ......................................................................................... 98Exercise 1 – Determine Required Flange Rating ............................................................. 99

VI. Design ............................................................................................................................. 100A. Design Conditions ................................................................................................. 100B. Loads and Stresses............................................................................................... 101C. Pressure Design of Components .......................................................................... 105Sample Problem 2 - Determine Pipe wall thickness ....................................................... 110Sample Problem 3 .......................................................................................................... 116Exercise 2: Determine Required Pipe Wall Thickness .................................................. 121

VII. System Design ................................................................................................................ 122A. Layout Considerations .......................................................................................... 122B. Pipe Supports and Restraints ............................................................................... 123C. Piping Flexibility..................................................................................................... 129D. Required Design Information for Piping Stress Analysis ...................................... 132E. Criteria for Allowable Equipment Nozzle Loads.................................................... 132F. When Should A Computer Analysis Be Used ....................................................... 134G. Design Considerations for Piping System Stress Analysis ................................... 134

VIII. Fabrication, Assembly, and Erection .............................................................................. 140A. Welding and Heat Treatment ................................................................................ 140B. Assembly and Erection.......................................................................................... 144

IX. Quality Control ................................................................................................................ 151A. Inspection .............................................................................................................. 151B. Testing................................................................................................................... 154

X. Other Considerations ...................................................................................................... 156A. Nonmetallic Piping................................................................................................. 156B. Category M Fluid Service...................................................................................... 157C. High Pressure Piping............................................................................................. 158

XI. Summary......................................................................................................................... 160

Page 5: ASME Boiler & Pressure Vessel Code

3

Part 1:Participant Notes

Page 6: ASME Boiler & Pressure Vessel Code

4

1

OVERVIEW OF PROCESS PLANT PIPING

SYSTEM DESIGNBy: Vincent A. Carucci

Carmagen Engineering, Inc.

Notes:

2

Piping SystemPiping system: conveys fluid between locations Piping system includes:• Pipe• Fittings (e.g. elbows, reducers, branch

connections, etc.)• Flanges, gaskets, bolting• Valves• Pipe supports

Notes:

Page 7: ASME Boiler & Pressure Vessel Code

5

3

ASME B31.3

– Design– Materials– Fabrication

– Petroleum refineries– Chemical plants– Pharmaceutical plants– Textile plants

– Paper plants– Semiconductor

plants– Cryogenic plants

– Erection– Inspection– Testing

• Provides requirements for:

• For process plants including

Notes:

4

Scope of ASME B31.3• Piping and piping components, all fluid

services:– Raw, intermediate, and finished chemicals– Petroleum products– Gas, steam, air, and water– Fluidized solids– Refrigerants– Cryogenic fluids

• Interconnections within packaged equipment• Scope exclusions specified

Notes:

Page 8: ASME Boiler & Pressure Vessel Code

6

5

Strength• Yield and Tensile Strength• Creep Strength• Fatigue Strength• Alloy Content• Material Grain size• Steel Production Process

Notes:

6

Stress - Strain DiagramS

AB

C

E

Notes:

Page 9: ASME Boiler & Pressure Vessel Code

7

7

Corrosion Resistance• Deterioration of metal by chemical or

electrochemical action• Most important factor to consider• Corrosion allowance added thickness• Alloying increases corrosion resistance

Notes:

8

Piping System CorrosionGeneral orUniform

Corrosion

Uniform metal loss. May be combined with erosion ifhigh-velocity fluids, or moving fluids containingabrasives.

PittingCorrosion

Localized metal loss randomly located on materialsurface. Occurs most often in stagnant areas or areas oflow-flow velocity.

GalvanicCorrosion

Occurs when two dissimilar metals contact each other incorrosive electrolytic environment. Anodic metal developsdeep pits or grooves as current flows from it to cathodicmetal.

Crevice Corrosion Localized corrosion similar to pitting. Occurs at placessuch as gaskets, lap joints, and bolts where creviceexists.

ConcentrationCell Corrosion

Occurs when different concentration of either a corrosivefluid or dissolved oxygen contacts areas of same metal.Usually associated with stagnant fluid.

GraphiticCorrosion

Occurs in cast iron exposed to salt water or weak acids.Reduces iron in cast iron, and leaves graphite in place.Result is extremely soft material with no metal loss.

Notes:

Page 10: ASME Boiler & Pressure Vessel Code

8

9

Material Toughness

• Energy necessary to initiate and propagate a crack

• Decreases as temperature decreases• Factors affecting fracture toughness

include:– Chemical composition or alloying elements– Heat treatment– Grain size

Notes:

10

Fabricability• Ease of construction• Material must be weldable• Common shapes and forms include:

– Seamless pipe– Plate welded pipe– Wrought or forged elbows, tees, reducers,

crosses– Forged flanges, couplings, valves– Cast valves

Notes:

Page 11: ASME Boiler & Pressure Vessel Code

9

11

Availability and Cost

• Consider economics• Compare acceptable options based on:

– Availability– Relative cost

Notes:

12

Pipe Fittings

• Produce change in geometry– Modify flow direction– Bring pipes together– Alter pipe diameter– Terminate pipe

Notes:

Page 12: ASME Boiler & Pressure Vessel Code

10

13

Elbow and Return

Figure 4.1

90° 45°

180° Return

Notes:

14

Tee

Figure 4.2

Reducing Outlet Tee Cross Tee

Notes:

Page 13: ASME Boiler & Pressure Vessel Code

11

15

Reducer

Figure 4.3

Concentric Eccentric

Notes:

16

Welding Outlet Fitting

Figure 4.4

Notes:

Page 14: ASME Boiler & Pressure Vessel Code

12

17

Cap

Figure 4.5

Notes:

18

Lap-joint Stub End

Figure 4.6

Note square corner

R

R

Enlarged Section of Lap

Notes:

Page 15: ASME Boiler & Pressure Vessel Code

13

19

Typical Flange Assembly

Figure 4.7

Flange

Bolting

Gasket

Notes:

20

Types of FlangeAttachment and Facing

Flange Attachment Types Flange Facing Types

Threaded Flanges Flat Faced

Socket-Welded Flanges

Blind Flanges Raised Face

Slip-On Flanges

Lapped Flanges Ring Joint

Weld Neck Flanges

Table 4.1

Notes:

Page 16: ASME Boiler & Pressure Vessel Code

14

21

Flange Facing Types

Figure 4.8

Notes:

22

Gaskets• Resilient material• Inserted between flanges• Compressed by bolts to create seal• Commonly used types

– Sheet– Spiral wound– Solid metal ring

Notes:

Page 17: ASME Boiler & Pressure Vessel Code

15

23

Flange Rating Class• Based on ASME B16.5• Acceptable pressure/temperature

combinations• Seven classes (150, 300, 400, 600, 900,

1,500, 2,500)• Flange strength increases with class

number• Material and design temperature

combinations without pressure indicated not acceptable

Notes:

24

Material Specification List

Table 4.2

Notes:

Page 18: ASME Boiler & Pressure Vessel Code

16

25

Pressure - Temperature Ratings

Table 4.3

MaterialGroup No. 1.8 1.9 1.10

Classes 150 300 400 150 300 400 150 300 400Temp., °F-20 to 100 235 620 825 290 750 1000 290 750 1000

200 220 570 765 260 750 1000 260 750 1000300 215 555 745 230 720 965 230 730 970400 200 555 740 200 695 885 200 705 940500 170 555 740 170 695 805 170 665 885600 140 555 740 140 605 785 140 605 805650 125 555 740 125 590 785 125 590 785700 110 545 725 110 570 710 110 570 755750 95 515 685 95 530 675 95 530 710800 80 510 675 80 510 650 80 510 675850 65 485 650 65 485 600 65 485 650900 50 450 600 50 450 425 50 450 600950 35 320 425 35 320 290 35 375 5051000 20 215 290 20 215 190 20 260 345

Notes:

26

Sample Problem 1Flange Rating

New piping system to be installed at existing plant.Determine required flange class.• Pipe Material:• Design Temperature: 700°F• Design Pressure: 500 psig

Mo21Cr4

11 −−−−

Notes:

Page 19: ASME Boiler & Pressure Vessel Code

17

27

Sample Problem 1 Solution• Determine Material Group Number (Fig. 4.2)

Group Number = 1.9• Find allowable design pressure at

intersection of design temperature and Group No. Check Class 150.– Allowable pressure = 110 psig < design pressure– Move to next higher class and repeat steps

• For Class 300, allowable pressure = 570 psig• Required flange Class: 300

Notes:

28

Valves• Functions

– Block flow– Throttle flow– Prevent flow reversal

Notes:

Page 20: ASME Boiler & Pressure Vessel Code

18

29

Full Port Gate Valve1. Handwheel Nut2. Handwheel3. Stem Nut4. Yoke5. Yoke Bolting6. Stem7. Gland Flange8. Gland9. Gland Bolts or

Gland Eye-bolts and nuts10. Gland Lug Bolts and Nuts11. Stem Packing12. Plug13. Lantern Ring14. Backseat Bushing15. Bonnet16. Bonnet Gasket17. Bonnet Bolts and Nuts18. Gate19. Seat Ring20. Body21. One-Piece Gland (Alternate)22. Valve Port

Figure 5.1

Notes:

30

Globe Valve• Most economic for throttling flow• Can be hand-controlled• Provides “tight” shutoff• Not suitable for scraping or rodding• Too costly for on/off block operations

Notes:

Page 21: ASME Boiler & Pressure Vessel Code

19

31

Check Valve

• Prevents flow reversal• Does not completely shut off reverse flow• Available in all sizes, ratings, materials• Valve type selection determined by

– Size limitations– Cost– Availability– Service

Notes:

32

Swing Check Valve

Figure 5.2

Cap

Hinge

DiscBody

Pin

SeatRing

FlowDirection

Notes:

Page 22: ASME Boiler & Pressure Vessel Code

20

33

Ball Check Valve

Figure 5.3

Notes:

34

Lift Check Valve

Figure 5.4

SeatRing

Piston

FlowDirection

Notes:

Page 23: ASME Boiler & Pressure Vessel Code

21

35

Wafer Check Valve

Figure 5.5

Notes:

36

Ball ValveNo. Part Names1 Body2 Body Cap3 Ball4 Body Seal Gasket5 Seat6 Stem7 Gland Flange8 Stem Packing9 Gland Follower10 Thrust Bearing11 Thrust Washer12 Indicator Stop13 Snap Ring14 Gland Bolt15 Stem Bearing16 Body Stud Bolt & Nuts17 Gland Cover18 Gland Cover Bolts19 Handle

Figure 5.6

Notes:

Page 24: ASME Boiler & Pressure Vessel Code

22

37

Plug Valve

Figure 5.7

Wedge

Molded-In Resilient Seal

Sealing Slip

Notes:

38

Valve Selection Process

General procedure for valve selection.1. Identify design information including

pressure and temperature, valve function, material, etc.

2. Identify potentially appropriate valve types and components based on application and function (i.e., block, throttle, or reverse flow prevention).

Notes:

Page 25: ASME Boiler & Pressure Vessel Code

23

39

Valve Selection Process, cont’d

3. Determine valve application requirements (i.e., design or service limitations).

4. Finalize valve selection. Check factors to consider if two or more valves are suitable.

5. Provide full technical description specifying type, material, flange rating, etc.

Notes:

40

Exercise 1 - Determine Required Flange Rating

• Pipe:• Flanges: A-182 Gr. F11• Design Temperature: 900°F• Design Pressure: 375 psig

Mo21Cr4

11 −−−−

Notes:

Page 26: ASME Boiler & Pressure Vessel Code

24

41

Exercise 1 - Solution1. Identify material specification of flange

A-182 Gr, F112. Determine Material Group No. (Table 4.2)

Group 1.93. Determine class using Table 4.3 with design

temperature and Material Group No. – The lowest Class for design pressure of 375

psig is Class 300. – Class 300 has 450 psig maximum pressure

at 900°F

Notes:

42

Design Conditions• General

– Normal operating conditions– Design conditions

• Design pressure and temperature– Identify connected equipment and associated

design conditions– Consider contingent conditions– Consider flow direction– Verify conditions with process engineer

Notes:

Page 27: ASME Boiler & Pressure Vessel Code

25

43

Loading ConditionsPrincipal pipe load types• Sustained loads

– Act on system all or most of time– Consist of pressure and total weight load

• Thermal expansion loads– Caused by thermal displacements– Result from restrained movement

• Occasional loads– Act for short portion of operating time– Seismic and/or dynamic loading

Notes:

44

Stresses Produced ByInternal Pressure

Sl

tP

Sc

Sc

Sl

t

P

=

=

=

=

Longitudinal Stress

Circumferential (Hoop) Stress

Wall Thickness

Internal Pressure

Figure 6.1

Notes:

Page 28: ASME Boiler & Pressure Vessel Code

26

45

Stress Categorization• Primary Stresses

– Direct– Shear– Bending

• Secondary stresses– Act across pipe wall thickness– Cause local yielding and minor distortions– Not a source of direct failure

Notes:

46

Stress Categorization, cont’d• Peak stresses

– More localized– Rapidly decrease within short distance of

origin– Occur where stress concentrations and

fatigue failure might occur– Significance equivalent to secondary stresses– Do not cause significant distortion

Notes:

Page 29: ASME Boiler & Pressure Vessel Code

27

47

Allowable StressesFunction of

– Material properties– Temperature– Safety factors

Established to avoid:– General collapse or excessive distortion from

sustained loads– Localized fatigue failure from thermal

expansion loads– Collapse or distortion from occasional loads

Notes:

48

B31.3 AllowableStresses in Tension

Table 6.1

Basic Allowable Stress S, ksi. At Metal Temperature, °°°°F.

MaterialSpec. No/Grade

100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

Carbon Steel A 106 B 20.0 20.0 20.0 20.0 18.9 17.3 16.5 10.8 6.5 2.5 1.0

C - ½Mo A 335 P1 18.3 18.3 17.5 16.9 16.3 15.7 15.1 13.5 12.7 4. 2.4

1¼ - ½Mo A 335 P11 20.0 18.7 18.0 17.5 17.2 16.7 15.6 15.0 12.8 6.3 2.8 1.2

18Cr - 8Ni pipe A 312 TP304 20.0 20.0 20.0 18.7 17.5 16.4 16.0 15.2 14.6 13.8 9.7 6.0 3.7 2.3 1.4

16Cr - 12Ni-2Mopipe

A 312 TP316 20.0 20.0 20.0 19.3 17.9 17.0 16.3 15.9 15.5 15.3 12.4 7.4 4.1 2.3 1.3

Notes:

Page 30: ASME Boiler & Pressure Vessel Code

28

49

Pipe Thickness RequiredFor Internal Pressure

•P = Design pressure, psigD = Pipe outside diameter, in.S = Allowable stress in tension, psiE = Longitudinal-joint quality factorY = Wall thickness correction factor ••

)PYSE(2PDt

++++====

CAttm ++++====

875.0tt m

nom ====

Notes:

50 Table 6.2

Spec.No.

Class (or Type) Description Ej

Carbon Steel

API5L

. . .

. . .

. . .

Seamless pipeElectric resistance welded pipe

Electric fusion welded pipe, double butt, straight orspiral seam

Furnace butt welded

1.000.850.95

A 53 Type SType EType F

Seamless pipeElectric resistance welded pipe

Furnace butt welded pipe

1.000.850.60

A 106 . . . Seamless pipe 1.00

Low and Intermediate Alloy Steel

A 333 . . .. . .

Seamless pipeElectric resistance welded pipe

1.000.85

A 335 . . . Seamless pipe 1.00

Stainless Steel

A 312 . . .. . .. . .

Seamless pipeElectric fusion welded pipe, double butt seamElectric fusion welded pipe, single butt seam

1.000.850.80

A 358 1, 3, 452

Electric fusion welded pipe, 100% radiographedElectric fusion welded pipe, spot radiographedElectric fusion welded pipe, double butt seam

1.000.900.85

Nickel and Nickel Alloy

B 161 . . . Seamless pipe and tube 1.00

B 514 . . . Welded pipe 0.80

B 675 All Welded pipe 0.80

Notes:

Page 31: ASME Boiler & Pressure Vessel Code

29

51

Table 6.3

Temperature, °°°°F

Materials 900 & lower 950 1000 1050 1100 1150 & up

FerriticSteels

0.4 0.5 0.7 0.7 0.7 0.7

AusteniticSteels

0.4 0.4 0.4 0.4 0.5 0.7

OtherDuctileMetals

0.4 0.4 0.4 0.4 0.4 0.4

Cast iron 0.0 . . . . . . . . . . . . . . .

Notes:

52

Curved and Mitered Pipe

• Curved pipe– Elbows or bends– Same thickness as straight pipe

• Mitered bend– Straight pipe sections welded together– Often used in large diameter pipe– May require larger thickness

• Function of number of welds, conditions, size

Notes:

Page 32: ASME Boiler & Pressure Vessel Code

30

53

Sample Problem 2 -Determine Pipe Wall ThicknessDesign temperature: 650°F

Design pressure: 1,380 psig.

Pipe outside diameter: 14 in.

Material: ASTM A335, Gr. P11 ( ), seamless

Corrosion allowance: 0.0625 in.

Mo21Cr4

11 −−−−

Notes:

54

Sample Problem 2 - Solution

)PYSE(2PDt

++++====

(((( )))) (((( ))))[[[[ ]]]]

in.577.0t

4.0380,11200,16214380,1t

====

××××++++××××××××====

Notes:

Page 33: ASME Boiler & Pressure Vessel Code

31

55

Sample Problem 2 -Solution, cont’d

tm = t + c = 0.577 + 0.0625 = 0.6395 in.

.in731.0875.0

6395.0tnom ========

Notes:

56

Welded Branch Connection

Figure 6.2

DbTb

cNom.Thk.

Nom.Thk.

Dh

Th

th

Tr

c

tb

MillTol.

MillTol.

d1

d2 d2

L4

β

ReinforcementZone LimitsReinforcement

Zone Limits

A1

A3

A4A

4

A2 A2

A3

Pipe C

Notes:

Page 34: ASME Boiler & Pressure Vessel Code

32

57

Reinforcement Area

d1 = Effective length removed from run pipe, in.Db = Branch outside diameter, in.Tb = Minimum branch thickness, in.c = Corrosion allowance, in.β = Acute angle between branch and header

ββββ−−−−−−−−====

sin)cT(2Dd bb

1

Notes:

58

Required Reinforcement Area

Required reinforcement area, A1:

Where: th = Minimum required header thickness, in.

)sin2(dtA 1h1 ββββ−−−−====

Notes:

Page 35: ASME Boiler & Pressure Vessel Code

33

59

Reinforcement Pad• Provides additional reinforcement• Usually more economical than increasing

wall thickness• Selection variables

– Material– Outside diameter– Wall thickness

rbp

4 Tsin

)DD(A ����

������������

����

ββββ−−−−

====

Notes:

60

Sample Problem 3

• Pipe material: Seamless, A 106/Gr. B for branch and header, S = 16,500 psi

• Design conditions: 550 psig @ 700°F• c = 0.0625 in.• Mill tolerance: 12.5%

Notes:

Page 36: ASME Boiler & Pressure Vessel Code

34

61

Sample Problem 3, cont’d• Nominal Pipe Header: 0.562 in.

Thicknesses: Branch: 0.375 in.

• Required Pipe Header: 0.395 in.Thicknesses: Branch: 0.263 in.

• Branch connection at 90° angle

Notes:

62

Sample Problem 3 - Solution

ββββ−−−−−−−−====

sin)cT(2Dd bb

1

(((( )))) .in469.1590sin

0625.0875.0375.0216d1 ====°°°°

−−−−××××−−−−====

21

1h1

in.11.6)90sin2(469.15395.0A

β)sin2(dtA

====°°°°−−−−××××====

−−−−====

Notes:

Page 37: ASME Boiler & Pressure Vessel Code

35

63

Sample Problem 3 -Solution, cont’d

• Calculate excess area available in header, A2.

d2 = d1 = 15.469 in. < Dh = 24 in.

A2 = (2 × 15.469 - 15.469) (0.875 × 0.562 -0.395 - 0.0625)

A2 = 0.53 in.2

(((( ))))(((( ))))ctTdd2A hh122 −−−−−−−−−−−−====

Notes:

64

Sample Problem 3 -Solution, cont’d

• Calculate excess area available in branch, • A3.

(((( ))))βsin

ctTL2A bb43

−−−−−−−−====

.in664.0)0625.0375.0875.0(5.2L4 ====−−−−××××====

(((( )))) 23 .in003.0

90 sin0625.0263.0375.0875.0664.02A ====

°°°°−−−−−−−−××××××××====

Notes:

Page 38: ASME Boiler & Pressure Vessel Code

36

65

Sample Problem 3 -Solution, cont’d

• Calculate other excess area available, A4.A4 = 0.

• Total Available Area:

AT = A2 + A3 + A4

AT = 0.53 + 0.003 + 0 = 0.533 in.2 available reinforcement.

AT < A1

∴ Pad needed

Notes:

66

Sample Problem 3 -Solution, cont’d

• Reinforcement pad: A106, Gr. B, 0.562 in. thick • Recalculate Available ReinforcementL41 = 2.5 (Th - c) = 2.5 (0.875 × 0.562 - 0.0625) =

1.073 in.L42 = 2.5 (Tb - c) + Tr

= 2.5 (0.875 × 0.375 - 0.0625) + 0.562 (0.875) = 1.16 in

Notes:

Page 39: ASME Boiler & Pressure Vessel Code

37

67

Sample Problem 3 -Solution, cont’d

Therefore, L4 = 1.073 in.

2432T

223

in.535.00005.053.0AAAA)calculatedpreviously in. 0.003 the (vs. in.005.0A

====++++++++====++++++++====

====

o3 90sin)0625.0263.0375.0875.0(073.12A −−−−−−−−××××××××====

βsinc)t(TL2A bb4

3−−−−−−−−====

Notes:

68

Sample Problem 3 -Solution, cont’d

• Calculate additional reinforcement required andpad dimensions:

A4 = 6.11 - 0.535 = 5.575 in.2

Pad diameter, Dp is:

Tr = 0.562 (0.875) = 0.492 in.

Since 2d2 > Dp, pad diameter is acceptable

3.2716492.0575.5

sinD

TAD b

r

4p =+=

β+=

Notes:

Page 40: ASME Boiler & Pressure Vessel Code

38

69

Exercise 2 - Determine Required Pipe Wall Thickness• Design Temperature: 260°F• Design Pressure: 150 psig• Pipe OD: 30 in.• Pipe material: A 106, Gr. B seamless• Corrosion allowance: 0.125• Mill tolerance: 12.5%• Thickness for internal pressure and

nominal thickness?

Notes:

70

Exercise 2 - Solution• From Tables 6.1, 6.2, and 6.3 obtain values:

– S = 20,000 psi– E = 1.0– Y = 0.4

• Thickness calculation:

t = 0.112 in.(((( )))) (((( ))))[[[[ ]]]]04.01500.1000,202

30150)PYSE(2

PDt××××++++××××

××××====++++

====

Notes:

Page 41: ASME Boiler & Pressure Vessel Code

39

71

Exercise 2 - Solution, cont’d

• Corrosion allowance calculation:

• Mill tolerance calculation:

.in237.0t125.0112.0CAttm

====++++====++++====

.in271.0t875.0237.0

875.0tt

nom

mnom

====

========

Notes:

72

Layout Considerations• Operational

– Operating and control points easily reached• Maintenance

– Ample clearance for maintenance equipment– Room for equipment removal– Sufficient space for access to supports

• Safety– Consider personnel safety– Access to fire fighting equipment

Notes:

Page 42: ASME Boiler & Pressure Vessel Code

40

73

Pipe Supports and Restraints• Supports

– Absorb system weight– Reduce:

+ longitudinal pipe stress+ pipe sag+ end point reaction loads

• Restraints– Control or direct thermal movement due to:

+ thermal expansion+ imposed loads

Notes:

74

Support and Restraint Selection Factors

• Weight load• Available attachment clearance• Availability of structural steel• Direction of loads and/or movement• Design temperature• Vertical thermal movement at supports

Notes:

Page 43: ASME Boiler & Pressure Vessel Code

41

75

Rigid Supports

Shoe Saddle Base AdjustableSupport

Dummy Support Trunnion

Figure 7.1

Notes:

76

Hangers

Figure 7.2

Notes:

Page 44: ASME Boiler & Pressure Vessel Code

42

77

Flexible Supports

Figure 7.3

Load and DeflectionScale

Typical Variable-LoadSpring Support

Small Change inEffective Lever Arm

Large Change inEffective Lever Arm

RelativelyConstantLoad

Typical Constant-LoadSpring Support Mechanism

Notes:

78

Restraints• Control, limit, redirect thermal movement

– Reduce thermal stress– Reduce loads on equipment connections

• Absorb imposed loads– Wind– Earthquake– Slug flow– Water hammer– Flow induced-vibration

Notes:

Page 45: ASME Boiler & Pressure Vessel Code

43

79

Restraints, cont’d• Restraint Selection

– Direction of pipe movement– Location of restraint point– Magnitude of load

Notes:

80

Anchors and Guides• Anchor

– Full fixation – Permits very limited (if any) translation or

rotation

• Guide– Permits movement along pipe axis– Prevents lateral movement – May permit pipe rotation

Notes:

Page 46: ASME Boiler & Pressure Vessel Code

44

81

Restraints - Anchors

Figure 7.4

Anchor Anchor Partial Anchor

Notes:

82

Restraints - Guides

Figure 7.5

Guide Guide

Vertical Guide

x

Guide

Notes:

Page 47: ASME Boiler & Pressure Vessel Code

45

83

Piping Flexibility• Inadequate flexibility

– Leaky flanges– Fatigue failure– Excessive maintenance– Operations problems– Damaged equipment

• System must accommodate thermal movement

Notes:

84

Flexibility Analysis• Considers layout, support, restraint• Ensures thermal stresses and reaction

loads are within allowable limits• Anticipates stresses due to:

– Elevated design temperatures+ Increases pipe thermal stress and reaction

loads+ Reduces material strength

– Pipe movement– Supports and restraints

Notes:

Page 48: ASME Boiler & Pressure Vessel Code

46

85

Flexibility Analysis, cont’d• Evaluates loads imposed on equipment• Determines imposed loads on piping

system and associated structures• Loads compared to industry standards

– Based on tables– Calculated

Notes:

86

Design Factors• Layout• Component

design details• Fluid service• Connected

equipment type• Operating

scenarios

• Pipe diameter, thickness

• Design temperature and pressure

• End-point movements• Existing structural

steel locations• Special design

considerations

Notes:

Page 49: ASME Boiler & Pressure Vessel Code

47

87

Equipment Nozzle Load Standards and Parameters

Equipment Item Industry StandardParameters Used To Determine

Acceptable Loads

Centrifugal Pumps API 610 Nozzle size

CentrifugalCompressors

API 617, 1.85 times

NEMA SM-23allowable

Nozzle size, material

Air-Cooled HeatExchangers

API 661 Nozzle size

Pressure Vessels, Shell-and-Tube HeatExchanger Nozzles

ASME Code SectionVIII, WRC 107,WRC 297

Nozzle size, thickness,reinforcement details,vessel/exchanger diameter,and wall thickness. Stressanalysis required.

Tank Nozzles API 650 Nozzle size, tank diameter,height, shell thickness, nozzleelevation.

Steam Turbines NEMA SM-23 Nozzle size

Table 7.1

Notes:

88

Computer Analysis• Used to perform detailed piping stress

analysis• Can perform numerous analyses• Accurately completes unique and difficult

functions– Time-history analyses– Seismic and wind motion– Support motion– Finite element analysis– Animation effects

Notes:

Page 50: ASME Boiler & Pressure Vessel Code

48

89

Computer Analysis GuidelinesType Of Piping Pipe Size, NPS

Maximum DifferentialFlexibility Temp.

General piping ≥ 4

≥ 8

≥ 12

≥ 20

≥ 400°F

≥ 300°F

≥ 200°F

any

For rotating equipment ≥ 3 Any

For air-fin heat exchangers ≥ 4 Any

For tankage ≥ 12 Any

Table 7.2

Notes:

90

Piping Flexibility Temperature• Analysis based on largest temperature

difference imposed by normal and abnormal operating conditions

• Results give:– Largest pipe stress range– Largest reaction loads on connections,

supports, and restraints• Extent of analysis depends on situation

Notes:

Page 51: ASME Boiler & Pressure Vessel Code

49

91

Normal Temperature Conditions To Consider

StableOperation

Temperature range expected for most of time plant isin operation. Margin above operating temperature(i.e., use of design temperature rather than operatingtemperature) allows for process flexibility.

Startup andShutdown

Determine if heating or cooling cycles pose flexibilityproblems. For example, if tower is heated whileattached piping remains cold, piping flexibility shouldbe checked.

Regenerationand Decoking

Piping

Design for normal operation, regeneration, ordecoking, and switching from one service to theother. An example is furnace decoking.

SparedEquipment

Requires multiple analyses to evaluate expectedtemperature variations, for no flow in some of piping,and for switching from one piece of equipment toanother. Common example is piping for two or morepumps with one or more spares.

Table 7.3

Notes:

92

Abnormal Temperature Conditions To Consider

Loss of CoolingMedium Flow

Temperature changes due to loss of cooling mediumflow should be considered. Includes pipe that isnormally at ambient temperature but can be blockedin, while subject to solar radiation.

Steamout for Airor Gas Freeing

Most on-site equipment and lines, and many off-sitelines, are freed of gas or air by using steam. For 125psig steam, 300°F is typically used for metaltemperature. Piping connected to equipment whichwill be steamed out, especially piping connected toupper parts of towers, should be checked for tower at300°F and piping at ambient plus 50°F. This maygovern flexibility of lines connected to towers thatoperate at less than 300°F or that have a smallertemperature variation from top to bottom.

No Process FlowWhile Heating

Continues

If process flow can be stopped while heat is still beingapplied, flexibility should be checked for maximummetal temperature. Such situations can occur withsteam tracing and steam jacketing.

Table 7.4

Notes:

Page 52: ASME Boiler & Pressure Vessel Code

50

93

Extent of Analysis• Extent depends on situation

• Analyze right combination of conditions

• Not necessary to include system sections that are irrelevant to analysis results

Notes:

94

Modifying System Design• Provide more offsets or bends• Use more expansion loops• Install expansion joints• Locate restraints to:

– Minimize thermal and friction loads– Redirect thermal expansion

• Use spring supports to reduce large vertical thermal loads

• Use Teflon bearing pads to reduce friction loads

Notes:

Page 53: ASME Boiler & Pressure Vessel Code

51

95

System Design Considerations• Pump systems

– Operating vs. spared pumps

• Heat traced piping systems– Heat tracing

+ Reduces liquid viscosity+ Prevents condensate accumulation

– Tracing on with process off

Notes:

96

System Design Considerations, cont’d

• Atmospheric storage tank– Movement at nozzles– Tank settlement

• Friction loads at supports and restraints– Can act as anchors or restraints– May cause high pipe stresses or reaction loads

• Air-cooled heat exchangers– Consider header box and bundle movement

Notes:

Page 54: ASME Boiler & Pressure Vessel Code

52

97

Tank Nozzle

Figure 7.6

NOZZLE SHELL

BOTTOM

Notes:

98

Welding• Welding is primary way of joining pipe• Provides safety and reliability• Qualified welding procedure and welders• Butt welds used for:

– Pipe ends – Butt-weld-type flanges or fittings to pipe ends– Edges of formed plate

Notes:

Page 55: ASME Boiler & Pressure Vessel Code

53

99

Butt-Welded Joint DesignsEqual Thickness

Figure 8.1

(a) Standard End Preparationof Pipe

(b) Standard End Preparationof Butt-Welding Fittings andOptional End Preparation of

Pipe 7/8 in. and Thinner(c) Suggested End Preparation,

Pipe and Fittings Over 7/8 in.Thickness

Notes:

100

Butt-Welded Joint DesignsUnequal Thickness

Figure 8.2

(b)

(d)

(c)3/32 in. max.

(a)

Notes:

Page 56: ASME Boiler & Pressure Vessel Code

54

101

Fillet Welds

Figure 8.3

Notes:

102

Weld Preparation• Welder and equipment must be qualified• Internal and external surfaces must be

clean and free of paint, oil, rust, scale, etc.• Ends must be:

– Suitably shaped for material, wall thickness, welding process

– Smooth with no slag from oxygen or arc cutting

Notes:

Page 57: ASME Boiler & Pressure Vessel Code

55

103

Preheating• Minimizes detrimental effects of:

– High temperature– Severe thermal gradients

• Benefits include:– Dries metal and removes surface moisture– Reduces temperature difference between

base metal and weld– Helps maintain molten weld pool– Helps drive off absorbed gases

Notes:

104

Postweld Heat Treatment (PWHT)

• Primarily for stress relief– Only reason considered in B31.3

• Averts or relieves detrimental effects– Residual stresses

+ Shrinkage during cooldown+ Bending or forming processes

– High temperature– Severe thermal gradients

Notes:

Page 58: ASME Boiler & Pressure Vessel Code

56

105

Postweld Heat Treatment (PWHT), cont’d

• Other reasons for PWHT to be specified by user– Process considerations– Restore corrosion resistance of normal

grades of stainless steel– Prevent caustic embrittlement of carbon steel– Reduce weld hardness

Notes:

106

Storage and Handling• Store piping on mounds or sleepers• Stacking not too high• Store fittings and valves in shipping crates

or on racks• End protectors firmly attached• Lift lined and coated pipes and fittings with

fabric or rubber covered slings and padding

Notes:

Page 59: ASME Boiler & Pressure Vessel Code

57

107

Pipe Fitup and Tolerances• Good fitup essential

– Sound weld– Minimize loads

• Dimensional tolerances• Flange tolerances

Notes:

108

Pipe AlignmentLoad Sensitive Equipment

• Special care and tighter tolerances needed• Piping should start at nozzle flange

– Initial section loosely bolted– Gaskets used during fabrication to be replaced

• Succeeding pipe sections bolted on• Field welds to join piping located near

machine

Notes:

Page 60: ASME Boiler & Pressure Vessel Code

58

109

Load Sensitive Equipment, cont’d

• Spring supports locked in cold position during installation and adjusted in locked position later

• Final bolt tensioning follows initial alignment of nozzle flanges

• Final nozzle alignment and component flange boltup should be completed after replacing any sections removed

Notes:

110

Load Sensitive Equipment, cont’d

• More stringent limits for piping > NPS 3• Prevent ingress of debris during

construction

Notes:

Page 61: ASME Boiler & Pressure Vessel Code

59

111

Flange Joint Assembly• Primary factors

– Selection– Design– Preparation– Inspection– Installation

• Identify and control causes of leakage

Notes:

112

Flange Preparation, Inspection, and Installation

• Redo damaged surfaces• Clean faces• Align flanges• Lubricate threads and nuts• Place gasket properly• Use proper flange boltup procedure

Notes:

Page 62: ASME Boiler & Pressure Vessel Code

60

113

“Criss-Cross”Bolt-tightening Sequence

Figure 8.4

Notes:

114

Causes of Flange Leakage• Uneven bolt stress• Improper flange alignment• Improper gasket centering• Dirty or damaged flange faces• Excessive loads at flange locations• Thermal shock• Improper gasket size or material• Improper flange facing

Notes:

Page 63: ASME Boiler & Pressure Vessel Code

61

115

Inspection• Defect identification• Weld inspection

– Technique– Weld type– Anticipated type of defect– Location of weld– Pipe material

Notes:

116

Typical Weld ImperfectionsLack of Fusion Between Weld Bead and Base Metal

a) Side Wall Lack of Fusion b) Lack of Fusion BetweenAdjacent Passes

Incomplete Filling at Root on One Side Only

c) Incomplete Penetration Dueto Internal Misalignment

Incomplete Filling at Root

d) Incomplete Penetration ofWeld Groove

External Undercut

Internal UndercutRoot Bead Fused to Both InsideSurfaces but Center of Root Slightly

Below Inside Surface of Pipe (NotIncomplete Penetration)

e) Concave Root Surface(Suck-Up)

f) Undercut

g) Excess External Reinforcement

Figure 9.1

Notes:

Page 64: ASME Boiler & Pressure Vessel Code

62

117

Weld Inspection GuidelinesType of Inspection Situation/Weld Type Defect

Visual All welds. • Minor structural welds.

• Cracks.

• Slag inclusions.

Radiography • Butt welds.

• Girth welds.

• Miter groove welds.

• Gas pockets.

• Slag inclusions.

• Incomplete penetration.

Magnetic Particle • Ferromagneticmaterials.

• For flaws up to 6 mm(1/4 in.) beneath thesurface.

• Cracks.

• Porosity.

• Lack of fusion.

Liquid Penetrant • Ferrous andnonferrous materials.

• Intermediate weldpasses.

• Weld root pass.

• Simple andinexpensive.

• Cracks.

• Seams.

• Porosity.

• Folds.

• Inclusions.

• Shrinkage.

• Surface defects.

Ultrasonic Confirms high weldquality in pressure-containing joints.

• Laminations.

• Slag inclusions in thickplates.

• Subsurface flaws.

Table 9.1

Notes:

118

Testing• Pressure test system to demonstrate

integrity

• Hydrostatic test unless pneumatic approved for special cases

• Hydrostatic test pressure– ≥ 1½ times design pressure

Notes:

Page 65: ASME Boiler & Pressure Vessel Code

63

119

Testing, cont’d– For design temperature > test temperature:

ST/S must be ≤ 6.5PT = Minimum hydrostatic test pressure, psigP = Internal design pressure, psigST = Allowable stress at test temperature, psiS = Allowable stress at design temperature, psi

SSP5.1P T

T ====

Notes:

120

Testing, cont’d• Pneumatic test at 1.1P• Instrument take-off piping and sampling

piping strength tested with connected equipment

Notes:

Page 66: ASME Boiler & Pressure Vessel Code

64

121

Nonmetallic Piping• Thermoplastic Piping

– Can be repeatedly softened and hardened by increasing and decreasing temperature

• Reinforced Thermosetting Resin Piping (RTR)– Fabricated from resin which can be treated to

become infusible or insoluble

Notes:

122

Nonmetallic Piping, cont’d• No allowances for pressure or temperature

variations above design conditions• Most severe coincident pressure and

temperature conditions determine design conditions

Notes:

Page 67: ASME Boiler & Pressure Vessel Code

65

123

Nonmetallic Piping, cont’d• Designed to prevent movement from

causing:– Failure at supports– Leakage at joints– Detrimental stresses or distortions

• Stress-strain relationship inapplicable

Notes:

124

Nonmetallic Piping, cont’d• Flexibility and support requirement same

as for piping in normal fluid service. In addition:– Piping must be supported, guided, anchored

to prevent damage.– Point loads and narrow contact areas avoided– Padding placed between piping and supports– Valves and load transmitting equipment

supported independently to prevent excessive loads.

Notes:

Page 68: ASME Boiler & Pressure Vessel Code

66

125

Nonmetallic Piping, cont’d• Thermoplastics not used in flammable

service, and safeguarded in most fluid services.

• Joined by bonding

Notes:

126

Category M Fluid ServiceCategory M Fluid

• Significant potential for personnel exposure

• Single exposure to small quantity can cause irreversible harm to breathing or skin.

Notes:

Page 69: ASME Boiler & Pressure Vessel Code

67

127

Category M Fluid Service, cont’d• Requirements same as for piping in

normal fluid service. In addition:– Design, layout, and operation conducted with

minimal impact and shock loads.

– Detrimental vibration, pulsation, resonance effects to be avoided or minimized.

– No pressure-temperature variation allowances.

Notes:

128

Category M Fluid Service, cont’d– Most severe coincident pressure-temperature

conditions determine design temperature and pressure.

– All fabrication and joints visually examined.

– Sensitive leak test required in addition to other required testing.

Notes:

Page 70: ASME Boiler & Pressure Vessel Code

68

129

Category M Fluid Service, cont’d• Following may not be used

– Miter bends not designated as fittings, fabricated laps, nonmetallic fabricated branch connections.

– Nonmetallic valves and specialty components.– Threaded nonmetallic flanges.– Expanded, threaded, caulked joints.

Notes:

130

High Pressure Piping• Ambient effects on design conditions

– Pressure reduction based on cooling of gas or vapor

– Increased pressure due to heating of a static fluid

– Moisture condensation

Notes:

Page 71: ASME Boiler & Pressure Vessel Code

69

131

High Pressure Piping, cont’d

• Other considerations– Dynamic effects– Weight effects– Thermal expansion and contraction effects– Support, anchor, and terminal movement

Notes:

132

High Pressure Piping, cont’d

• Testing – Each system hydrostatically or pneumatically

leak tested– Each weld and piping component tested– Post installation pressure test at 110% of

design pressure if pre-installation test was performed

• Examination– Generally more extensive than normal fluid

service

Notes:

Page 72: ASME Boiler & Pressure Vessel Code

70

133

Summary• Process plant piping much more than just

pipe• ASME B31.3 covers process plant piping• Covers design, materials, fabrication,

erection, inspection, and testing• Course provided overview of requirements

Notes:

Page 73: ASME Boiler & Pressure Vessel Code

71

Part 2:Background Material

Page 74: ASME Boiler & Pressure Vessel Code

72

OVERVIEW OF PROCESS PLANT PIPING SYSTEM DESIGN

Carmagen Engineering, Inc.

Page 75: ASME Boiler & Pressure Vessel Code

73

I. INTRODUCTION

This course provides an overview of process plant piping system design. Itdiscusses requirements contained in ASME B31.3, Process Piping, plusadditional requirements and guidelines based on common industry practice. Theinformation contained in this course is readily applicable to on-the-jobapplications, and prepares participants to take more extensive courses ifappropriate.

II. GENERAL

A. What is a piping system

A piping system conveys fluid from one location to another. Withina process plant, the locations are typically one or more equipmentitems (e.g., pumps, pressure vessels, heat exchangers, processheaters, etc.), or individual process plants that are within theboundary of a process facility.

A piping system consists of:

• Pipe sections

• Fittings (e.g., elbows, reducers, branch connections, etc.)

• Flanges, gaskets, and bolting

• Valves

• Pipe supports and restraints

Each individual component plus the overall system must bedesigned for the specified design conditions.

B. Scope of ASME B31.3

ASME B31.3 specifies the design, materials, fabrication, erection,inspection, and testing requirements for process plant pipingsystems. Process plants include petroleum refineries; chemical,pharmaceutical, textile, paper, semiconductor, and cryogenicplants; and related process plants and terminals.

Page 76: ASME Boiler & Pressure Vessel Code

74

ASME B31.3 applies to piping and piping components that are usedfor all fluid services, not just hydrocarbon services. These includethe following:

• Raw, intermediate, and finished chemicals.

• Petroleum products.

• Gas, steam, air, and water.

• Fluidized solids.

• Refrigerants.

• Cryogenic fluids.

The scope also includes piping that interconnects pieces or stageswithin a packaged-equipment assembly.

The following are excluded from the scope of ASME B31.3:

• Piping systems for internal gauge pressures at or above zerobut less than 15 psi, provided that the fluid is nonflammable,nontoxic, and not damaging to human tissue, and its designtemperature is from -20°F through 366°F.

• Power boilers that are designed in accordance with the ASMEBoiler and Pressure Vessel Code Section I and external boilerpiping that must conform to ASME B31.1.

• Tubes, tube headers, crossovers, and manifolds that arelocated inside a fired heater enclosure.

• Pressure vessels, heat exchangers, pumps, compressors, andother fluid-handling or processing equipment. This includesboth internal piping and connections for external piping.

Page 77: ASME Boiler & Pressure Vessel Code

75

III. MATERIAL SELECTION CONSIDERATIONS

Piping system material selection considerations are discussed below.

A. Strength

A material's strength is defined by its yield, tensile, creep, andfatigue strengths. Alloy content, material grain size, and the steelproduction process are factors that affect material strength.

1.0 Yield and Tensile Strength

A stress-strain diagram that is produced from a standardtensile test (Figure 3.1) illustrates the yield and tensilestrengths. As the stress in a material increases, itsdeformation also increases. The yield strength is the stressthat is required to produce permanent deformation in thematerial (Point A in Figure 3.1).

If the stress is further increased, the permanent deformationcontinues to increase until the material fails. The maximumstress that the material attains is the tensile strength (Point Bin Figure 3.1). If a large amount of strain occurs in goingfrom Point A to Point C, the rupture point, the material is saidto be ductile. Steel is an example of a ductile material. If thestrain in going from Point A to Point C is small, the materialis brittle. Gray cast iron is an example of a brittle material.

SA

BC

E

Typical Stress-Strain Diagram for SteelFigure 3.1

Page 78: ASME Boiler & Pressure Vessel Code

76

2.0 Creep Strength

Below about 750°F for a given stress, the strain in mostmaterials remains constant with time. Above thistemperature, even with constant stress, the strain in thematerial will increase with time. This behavior is known ascreep. The creep strength, like the yield and tensilestrengths, varies with temperature. For a particulartemperature, the creep strength of a material is the minimumstress that will rupture the material during a specified periodof time.

The temperature at which creep strength begins to be afactor is a function of material chemistry. For alloy materials(i.e., not carbon steel) creep strength becomes aconsideration at temperatures higher than 750°F.

3.0 Fatigue Strength

The term “fatigue” refers to the situation where a specimenbreaks under a load that it has previously withstood for alength of time, or breaks during a load cycle that it haspreviously withstood several times. The first type of fatigueis called “static,” and the second type is called “cyclic.”Examples of static fatigue are: creep fracture and stresscorrosion cracking. Static fatigue will not be discussedfurther in this course.

One analogy to cyclic fatigue is the bending of a paper clip.The initial bending beyond a certain point causes the paperclip to yield (i.e., permanently deform) but not break. Theclip could be bent back and forth several more times and stillnot break. However after a sufficient number of bending(i.e., load) cycles, the paper clip will break under thisrepetitive loading. Purely elastic deformation (i.e., withoutyielding) cannot cause a cyclic fatigue failure.

The fatigue strength of a material under cyclic loading canthen be defined as the ability to withstand repetitive loadingwithout failure. The number of cycles to failure of a materialdecreases as the stress resulting from the applied loadincreases.

Page 79: ASME Boiler & Pressure Vessel Code

77

B. Corrosion Resistance

Corrosion of materials involves deterioration of the metal bychemical or electrochemical attack. Corrosion resistance is usuallythe single most important factor that influences pipe materialselection. Table 3.1 summarizes the typical types of piping systemcorrosion.

General or UniformCorrosion

Characterized by uniform metal loss over entire surface of material.May be combined with erosion if material is exposed to high-velocityfluids, or moving fluids that contain abrasive materials.

PittingCorrosion

Form of localized metal loss randomly located on material surface.Occurs most often in stagnant areas or areas of low-flow velocity.

Galvanic Corrosion Occurs when two dissimilar metals contact each other in corrosiveelectrolytic environment. The anodic metal develops deep pits orgrooves as a current flows from it to the cathodic metal.

Crevice Corrosion Localized corrosion similar to pitting. Occurs at places such asgaskets, lap joints, and bolts, where a crevice can exist.

Concentration CellCorrosion

Occurs when different concentration of either corrosive fluid ordissolved oxygen contacts areas of same metal. Usually associatedwith stagnant fluid.

Graphitic Corrosion Occurs in cast iron exposed to salt water or weak acids. Reducesiron in the cast iron and leaves the graphite in place. Result isextremely soft material with no metal loss.

Typical Types of Piping System CorrosionTable 3.1

For process plant piping systems in corrosive service, corrosionprotection is usually achieved by using alloys that resist corrosion.The most common alloys used for this purpose are chromium andnickel. Low-alloy steels with a chromium content of 1¼% to 9%and stainless steels are used in corrosive environments.

C. Material Fracture Toughness

One way to characterize the fracture behavior of a material is theamount of energy necessary to initiate and propagate a crack at agiven temperature. This is the material's fracture toughness, which

Page 80: ASME Boiler & Pressure Vessel Code

78

decreases as the temperature decreases. Tough materials requirea relatively large amount of energy to initiate and propagate acrack. The impact energy required to fracture a material sample ata given temperature can be measured by standard Charpy V-notchtests.

Various factors other than temperature affect the fracturetoughness of a material. These include the following:

• Chemical composition or alloying elements.

• Heat treatment.

• Grain size.

The major chemical elements that affect a material's fracturetoughness are carbon, manganese, nickel, oxygen, sulfur, andmolybdenum. High carbon content, or excessive amounts ofoxygen, sulfur, or molybdenum, hurts fracture toughness. Theaddition of manganese or nickel improves fracture toughness.

D. Fabricability

A material must be available in the shapes or forms that arerequired, and it typically must be weldable. In piping systems,some common shapes and forms include the following:

• Seamless pipe.

• Plate that is used for welded pipe.

• Wrought or forged elbows, tees, reducers, and crosses.

• Forged flanges, couplings, and valves.

• Cast valves.

E. Availability and Cost

The last factors that affect piping material selection are availabilityand cost. Where there is more than one technically acceptablematerial, the final selection must consider what is readily availableand what are the relative costs of the acceptable options. Forexample, the use of carbon steel with a large corrosion allowancecould be more expensive than using a low-alloy material with asmaller corrosion allowance.

Page 81: ASME Boiler & Pressure Vessel Code

79

IV. PIPING COMPONENTS

A. Fittings, Flanges, and Gaskets

1.0 Pipe Fittings

Fittings are used to make some change in the geometry of apiping system. This change could include:

• Modifying the flow direction.

• Bringing two or more pipes together.

• Altering the pipe diameter.

• Terminating a pipe.

The most common types of fittings are elbows, tees,reducers, welding outlets, pipe caps, and lap joint stub ends.These are illustrated in Figures 4.1 through 4.6. Fittings maybe attached to pipe by threading, socket welding, or buttwelding.

An elbow or return (Figure 4.1) changes the direction of apipe run. Standard elbows change the direction by either45° or 90°. Returns change the direction by 180°.

90° 45°

180° Return

Elbow and ReturnFigure 4.1

Page 82: ASME Boiler & Pressure Vessel Code

80

A tee (Figure 4.2) provides for the intersection of threesections of pipe.

• A straight tee has equal diameters for both the run andbranch pipe connections.

• A reducing-outlet tee has a branch diameter which issmaller in size than the run diameter.

• A cross permits the intersection of four sections of pipeand is rarely seen in process plants.

TeeFigure 4.2

A reducer (illustrated in Figure 4.3) changes the diameter ina straight section of pipe. The centerlines of the large andsmall diameter ends coincide in a concentric reducer,whereas they are offset in an eccentric type.

Concentric Eccentric

ReducerFigure 4.3

A welding outlet fitting, or integrally reinforced branchconnection (Figure 4.4) has all the reinforcement required tostrengthen the opening contained within the fitting itself.

Page 83: ASME Boiler & Pressure Vessel Code

81

Typical Integrally Reinforced Branch ConnectionFigure 4.4

A pipe cap (Figure 4.5) closes off the end of a pipe section.The wall thickness of a butt-welded pipe cap will typically beidentical to that of the adjacent pipe section.

CapFigure 4.5

A lap-joint stub end (Figure 4.6) is used in conjunction withlap-joint flanges.

Note square corner

R

R

Enlarged Section of Lap

Lap-Joint Stub EndFigure 4.6

Page 84: ASME Boiler & Pressure Vessel Code

82

2.0 Flanges

A flange connects a pipe section to a piece of equipment,valve, or another pipe such that relatively simpledisassembly is possible. Disassembly may be required formaintenance, inspection, or operational reasons. Figure 4.7shows a typical flange assembly. Flanges are normally usedfor pipe sizes above NPS 1½.

Flange

Bolting

Gasket

Typical Flange AssemblyFigure 4.7

A flange type is specified by stating the type of attachmentand the type of face. The type of attachment defines howthe flange is connected to a pipe section or piece of

Page 85: ASME Boiler & Pressure Vessel Code

83

equipment (e.g., welded). The type of flange face or facingdefines the geometry of the flange surface that contacts thegasket. Table 4.1 summarizes the types of flangeattachments and faces. Figure 4.8 illustrates flange facingtypes.

Flange Attachment Types Flange Facing Types

Threaded Flanges Flat Faced

Socket-Welded Flanges

Blind Flanges Raised Face

Slip-On Flanges

Lapped Flanges Ring Joint

Weld Neck Flanges

Types of Flange Attachment and FacingTable 4.1

Page 86: ASME Boiler & Pressure Vessel Code

84

Flange Facing TypesFigure 4.8

Page 87: ASME Boiler & Pressure Vessel Code

85

3.0 Gaskets

A gasket is a resilient material that is inserted between theflanges and seated against the portion of the flanges calledthe “face” or “facing”. The gasket provides the seal betweenthe fluid in the pipe and the outside, and thus preventsleakage. Bolts compress the gasket to achieve the seal andhold the flanges together against pressure and otherloadings.

The three gasket types typically used in pipe flanges forprocess plant applications are:

• Sheet.

• Spiral wound.

• Solid metal ring.

B. Flange Rating

ASME B16.5, Pipe Flanges and Flanged Fittings, provides steelflange dimensional details for standard pipe sizes through NPS 24.Specification of an ASME B16.5 flange involves selection of thecorrect material and flange "Class." The paragraphs that followdiscuss the flange class specification process in general terms.

Flange material specifications are listed in Table 1A in ASME B16.5(excerpted in Table 4.2). The material specifications are groupedwithin Material Group Numbers. For example, if the piping isfabricated from carbon steel, the ASTM A105 material specificationis often used. ASTM A105 material is in Material Group No. 1.1.Refer to ASME B16.5 for additional acceptable materialspecifications and corresponding Material Group Numbers.

Page 88: ASME Boiler & Pressure Vessel Code

86

ASME B16.5, Table 1A, Material Specification List (Excerpt)Table 4.2

After the Material Group has been determined, the next step is toselect the appropriate Class. The Class is determined by usingpressure/temperature rating tables, the Material Group, designmetal temperature, and design pressure. Selecting the Class setsall the detailed dimensions for flanges and flanged fittings. Theobjective is to select the lowest Class that is appropriate for thespecified design conditions.

Table 2 of ASME B16.5 provides the information that is necessaryto select the appropriate flange Class for the specified designconditions. ASME B16.5 has seven classes: Class 150, 300, 400,600, 900, 1,500, and 2,500. Each Class specifies the designpressure and temperature combinations that are acceptable for aflange with that designation. As the number of the Class increases,the strength of the flange increases for a given Material Group. Ahigher flange Class can withstand higher pressure and temperaturecombinations. Table 4.3 is an excerpt from Table 2 of ASME B16.5and shows some of the temperature and pressure ratings forseveral Material Groups. Material and design temperaturecombinations that do not have a pressure indicated are notacceptable.

Specifying the flange size, material, and class completes most ofwhat is necessary for selecting an ASME B16.5 flange. The flangetype, facing, bolting material, and gasket type and material must be

Page 89: ASME Boiler & Pressure Vessel Code

87

added to complete the flange selection process. Discussion ofthese other factors is beyond the scope of this course.

Material GroupNo. 1.8 1.9 1.10

Classes 150 300 400 150 300 400 150 300 400Temp., °F-20 to 100 235 620 825 290 750 1000 290 750 1000

200 220 570 765 260 750 1000 260 750 1000300 215 555 745 230 720 965 230 730 970400 200 555 740 200 695 885 200 705 940500 170 555 740 170 695 805 170 665 885600 140 555 740 140 605 785 140 605 805650 125 555 740 125 590 785 125 590 785700 110 545 725 110 570 710 110 570 755750 95 515 685 95 530 675 95 530 710800 80 510 675 80 510 650 80 510 675850 65 485 650 65 485 600 65 485 650900 50 450 600 50 450 425 50 450 600950 35 320 425 35 320 290 35 375 505

1000 20 215 290 20 215 190 20 260 345

ASME B16.5, Pressure-Temperature Ratings (Excerpt)Table 4.3

Page 90: ASME Boiler & Pressure Vessel Code

88

SAMPLE PROBLEM 1 - DETERMINE FLANGE RATING

A new piping system will be installed at an existing plant. It is necessary todetermine the ASME class that is required for the flanges. The following designinformation is provided:

• Pipe Material: 1¼ Cr – ½ Mo.

• Design Temperature: 700°F.

• Design Pressure: 500 psig.

SOLUTION

Determine the Material Group Number for the flanges by referring to ASME Table1A (excerpted in Table 4.2). Find the 1¼ Cr – ½ Mo material in the NominalDesignation Steel column. The material specification for forged flanges would beA182 Gr. F11, and the corresponding material Group Number is 1.9.

Refer to Table 2 for Class 150 (excerpted in Table 4.3). Read the allowabledesign pressure at the intersection of the 700°F design temperature and MaterialGroup 1.9. This is only 110 psig and is not enough for this service.

Now check Class 300 and do the same thing. The allowable pressure in thiscase is 570 psig, which is acceptable.

The required flange Class is 300.

Page 91: ASME Boiler & Pressure Vessel Code

89

V. VALVES

A. Valve Functions

The possible valve functions must be known before being able toselect the appropriate valve type for a particular application. Fluidflows through a pipe, and valves are used to control the flow. Avalve may be used to block flow, throttle flow, or prevent flowreversal.

1.0 Blocking Flow

The block-flow function provides completely on or completelyoff flow control of a fluid, generally without throttling orvariable control capability. It might be necessary to blockflow to take equipment out of service for maintenance whilethe rest of the unit remains in operation, or to separate twoportions of a single system to accommodate variousoperating scenarios.

2.0 Throttling Flow

Throttling may increase or decrease the amount of fluidflowing in the system and can also help control pressurewithin the system. It might be necessary to throttle flow toregulate the filling rate of a pressure vessel, or to control unitoperating pressure levels.

3.0 Preventing Flow Reversal

It might be necessary to automatically prevent fluid fromreversing its direction during sudden pressure changes orsystem upsets. Preventing reverse flow might be necessaryto avoid damage to a pump or a compressor, or toautomatically prevent backflow into the upstream part of thesystem due to process reasons.

Page 92: ASME Boiler & Pressure Vessel Code

90

B. Primary Valve Types

1.0 Gate Valve

Most valves in process plants function as block valves.About 75% of all valves in process plants are gate valves.The gate valve is an optimum engineering and economicchoice for on or off service. The gate valve is not suitable tothrottle flow because it will pass the maximum possible flowwhile it is only partially open. Figure 5.1 illustrates a typicalfull-port gate valve.

Page 93: ASME Boiler & Pressure Vessel Code

91

1. Handwheel Nut2. Handwheel3. Stem Nut4. Yoke5. Yoke Bolting6. Stem7. Gland Flange8. Gland9. Gland Bolts or

Gland-Eye Boltsand Nuts

10. Gland Lug Boltsand Nuts

11. Stem Packing12. Plug13. Lantern Ring14. Backseat Bushing15. Bonnet16. Bonnet Gasket17. Bonnet Bolts and

Nuts18. Gate19. Seat Ring20. Body21. One-Piece Gland

(Alternate)22. Valve Port

Full-Port Gate ValveFigure 5.1

2.0 Globe Valve

The globe valve is the type most commonly used to throttleflow in a process plant. In the smaller sizes, they are

Page 94: ASME Boiler & Pressure Vessel Code

92

typically used as hand-control valves. In larger sizes,applications are limited primarily to bypasses at control valvestations. They provide relatively tight shutoff in control valvebypasses during normal operations; they serve as temporaryflow controllers when control valves must be taken out ofservice.

Because all globe valve patterns involve a change in flowdirection, they are not suitable for piping systems thatrequire scraping or rodding. Globe valves are rarely used forstrictly on/off block valve operations because conventionalgate valves adequately serve that function at a lower costand a much lower pressure drop.

3.0 Check Valve

Check valves prevent flow reversal. Typical check valveapplications are in pump and compressor discharge pipingand other systems that require protection against backflow.Valves which contain a disc or discs that swing out of theflow passage area usually create a lower pressure drop inthe system than those which contain a ball or pistonelement. These latter elements remain in the flowstreamand the port configurations frequently include an angularchange in flow direction. For all process designs, theintended purpose of check valves is to prevent gross flowreversal, not to effect complete leakage-free, pressure-tightshutoff of reverse flow.

The selection of a particular check valve type generallydepends on size, cost, availability, and service. Ball and liftcheck valves are usually the choice for sizes NPS 2 andsmaller, while swing check and plate check valves are usedin the larger sizes.

3.1 Swing Check Valve

The main components of a swing check valve (Figure5.2) are the body, disc, cap, seat ring, disc hinge, andpin. The disc is hinged at the top and closes againsta seat in the valve body opening. It swings freely inan arc from the fully closed position to one thatprovides unobstructed flow. The valve is kept openby the flow, and disc seating is accomplished bygravity and/or flow reversal.

Page 95: ASME Boiler & Pressure Vessel Code

93

Cap

Hinge

DiscBody

Pin

SeatRing

FlowDirection

Swing Check ValveFigure 5.2

3.2 Ball Check Valve

The ball check valve utilizes a ball to prevent flowreversal (Figure 5.3). The basic types are thestraight-through- and globe-type (90° change indirection, similar to a typical globe valve body). Ballcheck valves are available in sizes NPS ½ through 2in all ratings and materials used in process plants.Their low cost usually makes them the first choice forvalves sized NPS 2 and smaller, provided thepressure drop is not a concern.

Page 96: ASME Boiler & Pressure Vessel Code

94

Ball Check ValveFigure 5.3

3.3 Lift Check Valve

A lift check valve (Figure 5.4) usually depends ongravity for operation. Under forward flow, a piston ordisc is lifted off the seat by the fluid while beingretained in the valve by guides. On reverse flow, thepiston or disc is forced against the seat to blockfurther flow. Some lift check valves utilize springloading to assure positive seating.

Lift check valves employing the disc- or piston-typemechanism are available in sizes from NPS ½through 2 in all ratings and materials used in processplants. They are most commonly used in the higherASME B16.5 ratings (Class 300 and greater), andwhere tighter shutoff is required. Valves of this typeshould only be used in clean services.

Page 97: ASME Boiler & Pressure Vessel Code

95

SeatRing

PistonFlow

Direction

Lift Check ValveFigure 5.4

3.4 Wafer Check Valve

The wafer body or flangeless valve is a valve bodywithout flanges (Figure 5.5). Valves of this type areplaced between pipe flanges and held in place by thecompressive force between the flanges andtransmitted through the gaskets. The lug-wafer (orsingle-flanged) valve is also shown in Figure 5.5.Valves of this type are mounted between pipe flangesand are held in place by cap screws, machine bolts,or stud bolts which thread into the valve body.

Page 98: ASME Boiler & Pressure Vessel Code

96

Figure 5.5

3.5 Ball Valve

Ball valves (Figure 5.6) usually function as blockvalves. Ball valves are well suited for conditionswhere quick on/off and/or bubble-tight shut-off isrequired. The pressure/temperature ratings for ballvalve soft seats above ambient temperatures areusually lower than the ASME ratings for steel valves.This is because of the lower physical properties of thesoft-seat materials. Soft-sealed ball valves are notnormally used for throttling service because the soft-seats are subject to erosion or distortion/displacementcaused by fluid flow when the valve is in the partiallyopen position.

Page 99: ASME Boiler & Pressure Vessel Code

97

No. Part Names1 Body2 Body Cap3 Ball4 Body Seal Gasket5 Seat6 Stem7 Gland Flange8 Stem Packing9 Gland Follower10 Thrust Bearing11 Thrust Washer12 Indicator Stop13 Snap Ring14 Gland Bolt15 Stem Bearing16 Body Stud Bolt & Nuts17 Gland Cover18 Gland Cover Bolts19 Handle

Ball ValveFigure 5.6

3.6 Plug Valve

Plug valves (Figure 5.7) usually function as blockvalves. They are well suited for conditions wherequick on/off and/or bubble-tight shutoff is required.The soft-seal-types may have lowertemperature/pressure ratings than the ASME ratingsfor steel valves because of the lesser physicalproperties of the soft-seat materials. Soft-seal plugvalves are not normally used for throttling servicesince the soft seals are subject to erosion ordistortion/displacement caused by fluid flow when thevalve is partially open.

Page 100: ASME Boiler & Pressure Vessel Code

98

Wedge

Molded-In Resilient Seal

Sealing Slip

Plug ValveFigure 5.7

C. Valve Selection Process

The steps that follow provide a general procedure for selectingvalves and valve components.

1. Identify the necessary design information. This includes designpressure and temperature, valve function, material, etc.

2. Identify potentially appropriate valve types (i.e., ball, butterfly,check, etc.) and components based on application and function(i.e., block, throttle, or reverse flow prevention).

3. Determine valve application requirements (i.e., design or servicelimitations).

4. Finalize valve selection. Check which factors need consideration iftwo or more valves are suitable.

5. Provide a full technical description. This is done by specifying thevalve type, material, flange rating, etc.

Page 101: ASME Boiler & Pressure Vessel Code

99

Exercise 1 – Determine Required Flange Rating

For the piping system described below, determine the required flange rating (orClass) in accordance with ASME B16.5.

Pipe: 1¼ Cr – ½ Mo

Flanges: A - 182 Gr. F11

Design Temperature: 900°F

Design Pressure: 375 psig

Page 102: ASME Boiler & Pressure Vessel Code

100

VI. DESIGN

A. Design Conditions

1.0 General

Normal operating conditions are those expected to occurduring normal operation, excluding failure of any operatingdevice, operator error, and the occasional, short-termvariations stated in the applicable code. Startup andcontrolled shutdown of plants and similar foreseeableevents are included within normal operation.

Design conditions are those which govern the design andselection of piping components, and are based on the mostsevere conditions expected to occur in service. A suitablemargin is used between the normal operating and designconditions to account for normal operating variations.ASME B31.3 does not specify what margins should be usedbetween operating and design conditions; suitable marginsare determined by the user based on his experience.

2.0 Determining Design Pressure and Temperature

The design pressure and temperature are used to calculatethe required thickness of pipe and other design details. Thedesign temperature is used to determine the material basicallowable stress and other design requirements. The valuesfor design pressure and temperature are based on processrequirements.

Piping system design conditions generally are determinedbased on the design conditions of the equipment to whichthe piping is attached. Determining the piping designconditions consists of:

1. Identifying the equipment to which the piping system isattached.

2. Determining the design pressure and design temperaturefor the equipment.

Page 103: ASME Boiler & Pressure Vessel Code

101

3. Considering contingent design conditions, such as upsetsnot protected by pressure-relieving devices.

4. Considering the direction of flow between the equipment.

5. Verifying the values with the process engineer.

B. Loads and Stresses

1.0 Classification of Loading Conditions

Pipe loads are classified into three principal types: sustainedloads, thermal expansion loads, and occasional loads.

Sustained loads are those that act on the piping systemduring all or most of its operating time. Sustained loadsconsist of two main categories: pressure and weight. Thepressure load (caused by the design pressure) usually refersto internal pressure, although some piping systems may alsobe designed for external pressure. Design pressure isdefined as the maximum sustained pressure that a pipingsystem must contain without exceeding its allowable stresslimits. Design pressure is normally the governing factor indetermining the minimum required pipe wall thickness.

As shown in Figure 6.1, internal pressure produces bothcircumferential (i.e., hoop) stress and longitudinal stress inthe pipe wall.

Page 104: ASME Boiler & Pressure Vessel Code

102

Sl

tP

Sc

Sc

Sl

t

P

=

=

=

=

Longitudinal Stress

Circumferential (Hoop) Stress

Wall Thickness

Internal Pressure

Stresses Produced By Internal PressureFigure 6.1

The weight refers to the total design weight load. The totalweight load includes the weight of the pipe, the fluid in thepipe, fittings, insulation, internal lining, valves, valveoperators, flanges, supports and any other concentratedloads. The weight loads produce a longitudinal stress in thepipe wall.

A piping system will expand or contract due to changes in itsoperating temperature. Thermal expansion loads arecreated when the free expansion and contraction of thepiping is prevented at its end points by connectedequipment, or prevented at intermediate points by supportsand/or restraints that are installed. The resulting loadscause thermal stresses in the pipe. Increasing the restraintin a system increases the loading and results in higherthermal expansion stresses. Another cause of pipe thermalloads can be from the thermal expansion of equipment at

Page 105: ASME Boiler & Pressure Vessel Code

103

pipe-to-equipment nozzle attachment points, causingdisplacements in the piping system.

The third type of loading comes from occasional loads.Occasional loads act during a small percentage of thesystem’s operating time. Occasional loads involve seismicand/or dynamic loading. The degree of seismic loading thatmust be considered varies with geographic location and isdefined by a seismic zone (Ref. ANSI/ASCE 7). Dynamicloads may be caused by safety-relief valve discharges, valveoperation (both opening and closing), steam/water hammer,surge due to pump start-up and shutdown, and wind loads.

2.0 Stress Categorization

To evaluate the stresses in a piping system, it is necessaryto distinguish among primary, secondary, and peak stresses.

• Primary stresses are the direct, shear, or bendingstresses generated by the loading.

• Secondary stresses are those acting across the pipe wallthickness due to a differential radial deflection of the pipewall. Secondary stresses cause local yielding and minordistortions. Secondary stresses, unlike primary stresses,are not a source of direct failure from a single loadapplication.

• Peak stresses are more localized stresses which dieaway rapidly within a short distance from their origin.Peak stresses occur in areas such as welds, fittings,branch connections, and other piping components wherestress concentrations and possible fatigue failure mightoccur. Peak stresses are considered equivalent insignificance to secondary stresses, but they do not causeany significant distortion.

3.0 Allowable Stresses

The basic allowable stress is a function of materialproperties, temperature, and safety factors. The basicallowable stress provides an upper limit for the actualstresses.

Page 106: ASME Boiler & Pressure Vessel Code

104

• Allowable stresses for sustained loads are established toprevent general collapse or excessive distortion of thepiping system.

• Allowable stresses for thermal expansion loads areestablished to prevent a localized fatigue failure.

• Allowable stresses for occasional loads are establishedto prevent wind and earthquake type loads fromcollapsing or distorting the piping system.

Actual stresses are calculated for the following load cases:

• Sustained loads

• Occasional loads

• Stress range due to differential thermal expansion

The piping system is designed such that the calculatedstresses are no larger than the appropriate allowablestresses.

Table 6.1 (excerpted from ASME B31.3 Table A-1) listsbasic allowable stresses in tension versus temperature forseveral materials.

Page 107: ASME Boiler & Pressure Vessel Code

105

Basic Allowable Stress S, ksi. At Metal Temperature, °°°°F.

Material Spec. No/Grade 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

Carbon Steel A 106 B 20.0 20.0 20.0 20.0 18.9 17.3 16.5 10.8 6.5 2.5 1.0

C - ½Mo A 335 P1 18.3 18.3 17.5 16.9 16.3 15.7 15.1 13.5 12.7 4. 2.4

1¼ - ½Mo A 335 P11 20.0 18.7 18.0 17.5 17.2 16.7 15.6 15.0 12.8 6.3 2.8 1.2

18Cr - 8Ni pipe A 312 TP304 20.0 20.0 20.0 18.7 17.5 16.4 16.0 15.2 14.6 13.8 9.7 6.0 3.7 2.3 1.4

16Cr - 12Ni-2Mopipe

A 312 TP316 20.0 20.0 20.0 19.3 17.9 17.0 16.3 15.9 15.5 15.3 12.4 7.4 4.1 2.3 1.3

ASME B31.3, Table A-1 (Excerpt),Basic Allowable Stresses in Tension for Metal

Table 6.1

C. Pressure Design of Components

1.0 General

Two different types of pressure may be imposed on a pipingsystem: external or internal. Most piping systems need onlybe designed for internal pressure. Some piping systemsmay be subject to a negative pressure or vacuum conditionduring operation (e.g., process vacuum conditions, steam-out, underwater lines, etc.) and must be designed forexternal pressure. This section only discusses the internalpressure design of straight sections of pipe. Refer to ASMEB31.3 for design requirements for external pressure.

2.0 Required Wall Thickness for Internal Pressure ofStraight Pipe

The required wall thickness for internal pressure iscalculated using the following equation:

)PYSE(2PDt

+=

Where:

t = Required thickness for internal pressure, in.

P = Internal design pressure, psig

Page 108: ASME Boiler & Pressure Vessel Code

106

S = Allowable stress in tension (Table 6.1), psi

E = Longitudinal-joint quality factor (Table 6.2)

Y = Wall thickness correction factor (Table 6.3)

The longitudinal-joint quality factor is based on:

• Whether the pipe is seamless or has a weldedlongitudinal seam

• The pipe material and welding process (if welded pipe)

The wall thickness correction factor is based on the type ofsteel and the design temperature.

Page 109: ASME Boiler & Pressure Vessel Code

107

Spec.No.

Class (or Type) Description Ej

Carbon Steel

API5L

. . .

. . .

. . .

Seamless pipeElectric resistance welded pipe

Electric fusion welded pipe, double butt, straight orspiral seam

Furnace butt welded

1.000.850.95

A 53 Type SType EType F

Seamless pipeElectric resistance welded pipe

Furnace butt welded pipe

1.000.850.60

A 106 . . . Seamless pipe 1.00

Low and Intermediate Alloy Steel

A 333 . . .. . .

Seamless pipeElectric resistance welded pipe

1.000.85

A 335 . . . Seamless pipe 1.00

Stainless Steel

A 312 . . .. . .. . .

Seamless pipeElectric fusion welded pipe, double butt seamElectric fusion welded pipe, single butt seam

1.000.850.80

A 358 1, 3, 452

Electric fusion welded pipe, 100% radiographedElectric fusion welded pipe, spot radiographedElectric fusion welded pipe, double butt seam

1.000.900.85

Nickel and Nickel Alloy

B 161 . . . Seamless pipe and tube 1.00

B 514 . . . Welded pipe 0.80

B 675 All Welded pipe 0.80

ASME B31.3, Table A-1B (Excerpt),Basic Quality Factors for Longitudinal Weld Joints, Ej

Table 6.2

Page 110: ASME Boiler & Pressure Vessel Code

108

Temperature, °°°°F

Materials 900 & lower 950 1000 1050 1100 1150 & up

FerriticSteels

0.4 0.5 0.7 0.7 0.7 0.7

AusteniticSteels

0.4 0.4 0.4 0.4 0.5 0.7

OtherDuctileMetals

0.4 0.4 0.4 0.4 0.4 0.4

Cast iron 0.0 . . . . . . . . . . . . . . .

ASME B31.3, Table 304.1.1 (Excerpt),Values of Coefficient Y

Table 6.3

Two additional thickness allowances must be considered todetermine the final required pipe wall thickness: corrosionallowance and mill tolerance.

Corrosion allowance (CA) is an additional thickness that isadded to account for wall thinning and wear that can occur inservice. The corrosion allowance is based on experienceand data for the particular pipe material and fluid service.Thus:

tm = t + CA

Where:

tm = Total minimum required wall thickness, in.

Mill tolerance accounts for the difference between the actualmanufactured pipe wall thickness and the “nominal” wallthickness specified in the relevant pipe dimensionalstandard. The typical pipe mill tolerance is 12.5%. Thismeans that the as-supplied pipe wall thickness can be up to12.5% thinner than the nominal thickness and still meet itsspecification requirements. Use the following equation todetermine the minimum required nominal thickness to order:

Page 111: ASME Boiler & Pressure Vessel Code

109

875.0tt m

nom =

Where:

tnom = Minimum required nominal pipe wall thickness, in.

Each pipe size has several standard nominal thicknessesthat are available. The nominal pipe thickness that isspecified for a system must be selected from those readilyavailable and be at least equal to tnom.

3.0 Curved and Mitered Pipe Segments

The minimum required thickness of curved pipe (elbows orbends) is the same as that required for straight pipesections. A mitered bed is fabricated by welding straightpipe sections together to produce the direction change. Amitered bend is generally less expensive than a wroughtelbow for large pipe sizes (over ~ NPS 24). The minimumrequired thickness for a miter may be greater that that of theconnected straight pipe sections, depending on the numberof miter welds, design conditions, size, etc. Refer to ASMEB31.3 for thickness calculation requirements.

Page 112: ASME Boiler & Pressure Vessel Code

110

SAMPLE PROBLEM 2 - DETERMINE PIPE WALL THICKNESS

A piping system must be modified to add a new, spare heat exchanger. Youhave been assigned the responsibility to determine the required wall thicknessfor the pipe from the heat exchanger to several pumps. The piping system willhave a design temperature of 650°F. The design pressure is 1,380 psig. Thepipe outside diameter is 14 in. The material is ASTM A335, Gr. P11 (1¼ Cr – ½Mo), seamless. Corrosion allowance is 0.0625 in.

What is the minimum required thickness for this pipe?

SOLUTION

The following equation applies:

( )PYSE2PDt

+=

Based on the given information:

P = 1,380 psig.

D = 14 in.

For the A335, Gr. P 11 material:

S = 16,150 psi. [Table A-1 of ASME B31.3 at 650°F

E = 1.0 [Table A-1B of ASME B31.3]

Y = 0.4 [Table 304.1.1 of ASME B31.3, since thematerial is ferritic and the temperature is below900oF.

Since all the required parameters have now been determined, the requiredinternal pressure thickness may be calculated as follows:

Page 113: ASME Boiler & Pressure Vessel Code

111

( ) ( )[ ].in 577.0t

4.0380,11150,16214380,1t

=×+×

×=

In this case, a 0.0625 in. corrosion allowance has been specified.

Therefore:

tm = t + c = 0.577 + 0.0625

tm = 0.6395 in.

.in0.7310.875

0.6395tnom ==

4.0 Branch Reinforcement Requirements

A pipe with a branch connection is weakened by the requiredopening. Unless the wall thickness of the pipe is sufficientlygreater than that required to sustain the pressure, additionalreinforcement must be provided.

ASME B31.3 contain rules for determining the requiredreinforcement for both welded and extruded outlet-typebranch connections. Branch connections can also be madeusing forged or wrought fittings (i.e., tees, laterals, crosses,couplings, or half-couplings), or an integrally reinforcedbranch connection. Reinforcement calculations are notrequired for forged or wrought type branch connectionsbecause they have adequate inherent reinforcement andhave been designed and tested to meet ASME B31.3requirements. This section discusses only branchconnections that are fabricated by welding a branch pipe tothe run pipe.

Page 114: ASME Boiler & Pressure Vessel Code

112

4.1 Area Removed By Branch Connection

A volume of metal is removed from a pipe wall when ahole is cut in it for a branch connection. However, asimplification is made when evaluating branchreinforcement requirements.

An imaginary plane is passed through the branch andrun pipes, and the intersection is viewed in cross-section. The removed volume of pipe wall is thenlooked at as an area (see Figure 6.2).

DbTb

c Nom.Thk.

Nom.Thk.

Dh

Th

th

Tr

c

tbMillTol.

MillTol.

d1

d2 d2

L4

β

ReinforcementZone LimitsReinforcement

Zone Limits

A1

A3

A4A4

A2 A2

A3

Pipe C

Welded Branch ConnectionFigure 6.2

4.2 Limits of Reinforcement Zone

The reinforcing zone is the region where credit maybe taken for any reinforcement that is present. Thebranch connection must have adequate reinforcementto compensate for the weakening caused by cutting ahole in the run pipe. This reinforcement:

Page 115: ASME Boiler & Pressure Vessel Code

113

• Must be located reasonably close to the openingto provide any practical benefit.

• May be located in the branch pipe, the run pipe, orboth.

Additional material located outside of this zone is noteffective for reinforcement.

4.3 Branch Connection Reinforcement

Branch connection reinforcement located within thereinforcement zone may come from one or more ofthe following sources.

• Excess thickness available in the branch orheader pipe.

• Additional reinforcement added in the form of apad, ring, saddle, or weld metal.

If excess thicknesses in the branch and header pipesdo not provide enough reinforcement, additional metalmay be added.

4.4 Reinforcement Area

The required reinforcement area is based on themetal area removed. This is calculated using:

β−−

=sin

)cT(2Dd bb

1

Where:

d1 = Effective length removed from the run pipe,in.

Db = Branch outside diameter, in.Tb = Minimum branch thickness, in.c = Corrosion allowance, in.

β = Acute angle between branch and header

Page 116: ASME Boiler & Pressure Vessel Code

114

The required reinforcement area, A1, is thencalculated using :

)sin2(dtA 1h1 β−=

Where:

th = Minimum required header thickness, in.

4.5 Reinforcement Pad

Additional branch reinforcement is needed when therequired area exceeds the available area, and may beprovided by locally increasing the thickness of eitherthe header or branch pipe. However, it is usuallymore economical to provide a reinforcement pad tosupply the additional reinforcement.

There are three variables to select in designing thereinforcement pad:

• Material

• Outside diameter

• Wall thickness

To calculate the area of the reinforcement pad, A4, thefollowing equation is used:

rbp

4 Tsin

)DD(A

����

β−

=

Where:

D01p = Outside diameter of the pad, in.

Db = Outside diameter of the branch, in.

Tr = Pad thickness, in.

β = The acute angle between the branch andheader pipes.

Page 117: ASME Boiler & Pressure Vessel Code

115

The pad must be large enough to provide theadditional reinforcement needed and be within thereinforcement zone. The pad material is generallyequivalent to that of the pipe.

The following Sample Problem illustrates the branchreinforcement calculation procedure.

Page 118: ASME Boiler & Pressure Vessel Code

116

SAMPLE PROBLEM 3

A new steam turbine is being installed within a process plant. This will require anew NPS 16 steam supply line to be connected to an existing NPS 24 distributionheader. The following design information has been determined:

• Pipe material - Seamless, A 106/Gr. B for both the branch and header.

• Design temperature - 700°F

• Design pressure - 550 psig

• Allowable stress - 16,500 psi.

• Corrosion allowance - 0.0625 in.

• Mill tolerance - 12.5%

• Nominal Pipe - Header: 0.562 in.Thicknesses Branch: 0.375 in.

• Required Pipe - Header: 0.395 in.Thicknesses for Pressure Branch: 0.263 in.

• The branch connection is made on top of the header at a 90° angle, and doesnot penetrate a header weld.

Determine if additional reinforcement is required for this branch connection. If itis, size the reinforcing pad, neglecting the area of any welds. Assume that thepad material is equal to the header material, and that its thickness equals theheader thickness.

SOLUTION

See Figure 6.2 for the relevant nomenclature.

• The required thicknesses for pressure were given.

• Next, the value for the effective length removed from the run pipe, d1, must becalculated. This equals the corroded inside diameter of the branchconnection after accounting for mill tolerance (i.e., the actual pipe wallthickness may be up to 12.5% less than the nominal thickness).

β−−

=sin

)cT(2Dd bb

1

Page 119: ASME Boiler & Pressure Vessel Code

117

( )

in.15.469d90sin

0.06250.8750.375216d

1

1

−×−=

• Now the required reinforcement area, A1, may be calculated.

2in.6.11A

)sin90(215.469 0.395A

sinβi(2dtA

1

1

1h1

=

°−×=

−=

The available reinforcement areas in the header and branch pipe are nowcalculated. This is determined using any “excess” thickness available in theheader and branch that is not necessary to withstand the pressure (or other)loads. Disregard any contribution from nozzle attachment welds since this isminimal.

• Calculate the excess area available in the header, A2.

( ) ( )ctTd2dA hh122 −−−=

First determine d2 which is the greater of d1, or,

( ) ( )2

dcTcT 1

hb +−+−, but less than the header diameter, Dh

( ) ( ) in.8.432

15.4690.06250.5620.8750.06250.3750.875 =+−×+−×

∴ d2 = d1 = 15.469 in., which is less than the header diameter of 24 in.

A2 = (2 x 15.469 - 15.469) (0.875 x 0.562 - 0.395 - 0.0625)

A2 = 0.53 in.2

• Calculate the excess area available in the branch, A3.

Page 120: ASME Boiler & Pressure Vessel Code

118

( )βsin

ctT2LA bb43

−−=

First determine L4.

( ) ( ) .smaller is whichever,TcT2.5 or cT2.5L rbh4 +−−=

Since Tr = 0 (i.e., no reinforcing pad initially) and Th is greater than Tb, L4 isbased on the second equation.

L4 = 2.5 (0.875 x 0.375 - 0.0625)

L4 = 0.664 in.

( )

23

3

in. 0.003A

90 sin0.06250.2630.3750.8750.6642A

=

°−−××=

• Calculate other excess area that may be available, A4.

There is no reinforcing pad and the area contribution from the branch weld isbeing disregarded. Therefore, A4 = 0.

• Total Available Area:

The total available reinforcement area, AT, is calculated by adding thecontributions from each source.

AT = A2 + A3 + A4

AT = 0.53 + 0.003 + 0

AT = 0.533 in.2 available reinforcement.

The available total reinforcement of 0.533 in.2 is obviously much less than therequired reinforcement area of 6.11 in.2. Therefore, a reinforcing pad isrequired. The reinforcement pad will now be sized.

Page 121: ASME Boiler & Pressure Vessel Code

119

A106, Gr. B material will be used for the reinforcement pad. Its thickness isset to be equal to the header nominal thickness of 0.562 in.

• Recalculate Available Reinforcement:

Now that a reinforcing pad is being used, the available reinforcement in thebranch must be recalculated since the height of the reinforcement zone in thebranch pipe will change slightly.

L41= 2.5 (Th - c)

L41= 2.5 (0.875 × 0.562 - 0.0625)

L41= 1.073 in.

L42= 2.5 (Tb - c) + Tr

L42= 2.5 (0.875 × 0.375 - 0.0625) + 0.562 (0.875)

L42= 1.16 in.

Therefore, L4 = 1.073 in.

β sinc)t(T2L

A bb43

−−=

o3 90 sin0.0625)0.2630.375(0.8751.0732A −−××=

entreinforcemavailablein.0.535A

00.0050.53AAAAA

)calculated previously in. 0.003 the (vs. in. 0.005A

2T

T

432T

223

=

++=++=

=

• Calculate additional reinforcement required and the pad dimensions:

The required reinforcement area is 6.11in.2, and the available area is 0.535in.2. Therefore, the additional reinforcement area to be provided in the pad,A4, is:

Page 122: ASME Boiler & Pressure Vessel Code

120

A4 = 6.11 - 0.535

A4 = 5.575 in.2

• Determine the diameter of the pad, Dp.

Tr = 0.562 (0.875) = 0.492 in.

Db = 16 in.

in. 27.3D

160.4925.575D

βsinD

TA

D

p

p

b

r

4p

=

+=

+=

The pad diameter must be at least 27.3 in. to provide adequatereinforcement. Since 2d2 = 30.938 in., this pad diameter is within thereinforcement zone along the header and is acceptable.

The following approach of calculating the required pad width, Lr, may be usedas an alternative to calculating the pad diameter.

in. 5.66L0.492

5.575 0.5L

T A0.5L

r

r

r

4r

=

×=

=

Page 123: ASME Boiler & Pressure Vessel Code

121

EXERCISE 2: DETERMINE REQUIRED PIPE WALLTHICKNESS

A new project is being considered to transport 48° API crude oil in a carbon steelpipe between two areas within a tank farm. The fluid being transported will havea design temperature of 260°F. The system design pressure is 150 psig, thepipe outside diameter is 30 in., and the pipe being used is A 106, Gr. B seamlesspipe. A corrosion allowance of 1/8 in. has been specified for the pipe. All pipingwithin the tank farm is designed in accordance with ASME B31.3. Assume thereis a 12.5% mill tolerance.

a. What is the thickness required for internal pressure?

b. What is the minimum required nominal wall thickness?

Use Table 6.1 along with Tables 6.2 and 6.3 for the necessary information.

Page 124: ASME Boiler & Pressure Vessel Code

122

VII. SYSTEM DESIGN

A. Layout Considerations

Operational, maintenance, and safety considerations influence thelayout of a piping system. These factors must be recognized whendesigning the layout and spacing of piping and equipment. Thissection discusses how these factors influence piping layout.

1.0 Operations Requirements

Operating and control points (e.g., valves, flanges,instruments, sample points, drains, and vents) should belocated so that they can be used safely and easily. Forexample, valves must be located so that they can bereached.

There must be enough clearance above and below the pipeto perform basic operations on valves and flanges.

There must also be enough lateral space to access valves,sample points, vessel flanges, and other equipment that mayrequire operator attention.

2.0 Maintenance Requirements

The piping system must be laid out so that its componentscan be inspected, repaired, or replaced with minimumdifficulty. There must be ample clearance for maintenanceequipment (e.g., cranes) and for vehicles (e.g., trucks).Access must be provided so supports can be maintained.There must be enough space to access and remove largepieces of equipment if they require maintenance.

• Access near rotating equipment is important becausecranes must reach the equipment when removal orrealignment is required.

• Heat exchanger bundles must be pulled out for cleaning.

• Large valves must be removed to repair or replace theirseats.

Page 125: ASME Boiler & Pressure Vessel Code

123

• Rotating equipment requires frequent monitoring andmaintenance.

3.0 Safety Considerations

Piping layout must consider the safety of personnel near thepipe. This specifically includes access for fire fightingequipment and fire prevention. Fire fighting equipmentneeds clearance to access major pieces of equipment (e.g.,heat exchangers, vessels, and tankage). Pipeways must berouted and designed to provide the necessary clearances.There must be enough space beneath pipeways for peopleto walk and work. Firewater piping must be routed so that itwould not be damaged by piping containing hazardous fluidsthat could rupture.

B. Pipe Supports and Restraints

A piping system needs supports and restraints because of thevarious loads that are imposed upon it. Supports absorb systemweight and reduce longitudinal pipe stress, pipe sag, and end pointreaction loads. Restraints control or direct the thermal movementof a piping system. The control of thermal movement may benecessary either to keep pipe thermal expansion stresses withinallowable limits, or to limit the loads that are imposed on connectedequipment.

Selection of a specific type of support or restraint to use in aparticular situation depends on such factors as:

• Load to be supported or absorbed.

• Clearance available for attachment to pipe.

• Availability of nearby structural steel that is already there.

• Direction of loads to be absorbed or movement to berestrained.

• Design temperature.

• Need to permit vertical thermal movement at a support.

Page 126: ASME Boiler & Pressure Vessel Code

124

1.0 Rigid Supports

Rigid supports are used in situations where weight support isneeded and no provision to permit vertical thermaldisplacement is required. A rigid support always will preventvertical movement downward, will sometimes preventvertical thermal movement upward, and will permit lateralmovement and rotation. See Figure 7.1.

Shoe Saddle Base AdjustableSupport

Dummy Support Trunnion

Rigid SupportsFigure 7.1

Hangers are a type of rigid support. They support pipe fromstructural steel or other facilities that are located above the pipeand carry piping weight loads in tension. Pipe hangers are typically

Page 127: ASME Boiler & Pressure Vessel Code

125

one or more structural steel rods bolted to a pipe attachment and tothe overhead member. A hanger rod is designed to move freelyboth parallel and perpendicular to the pipe axis, and not restrictthermal expansion in these directions. A hanger will preventmovement both down and up. See Figure 7.2.

HangersFigure 7.2

2.0 Flexible Supports

Flexible or resilient supports allow the piping system to movein all three directions while still supporting the requiredweight load. Weight is supported by the use of a coil springhaving an appropriate stiffness to carry the applied weight

Page 128: ASME Boiler & Pressure Vessel Code

126

load. Since the spring is resilient, it permits vertical thermalmovement while still carrying the weight. This type ofsupport is used in situations where support must be providedat a particular location, and vertical thermal expansion mustalso be permitted.

There are two basic types of flexible supports: variable loadand constant-load-type. In the variable-load type flexiblesupport, the amount of vertical load exerted by the supportchanges as a result of the pipe thermal movement (whichcompresses or extends the spring). The amount of verticalload exerted by a constant-load type support does notchange throughout its movement range. See Figure 7.3.

Load and DeflectionScale

Typical Variable-LoadSpring Support

Small Change inEffective Lever Arm

Large Change inEffective Lever Arm

RelativelyConstantLoad

Typical Constant-LoadSpring Support Mechanism

Flexible SupportsFigure 7.3

3.0 Typical Restraints and Anchors

3.1 Restraints

Restraints have two primary purposes in a pipingsystem.

Page 129: ASME Boiler & Pressure Vessel Code

127

• Restraints control, limit, or redirect the unrestrictedthermal movement of a pipe. They are used toeither reduce the thermal stress in the pipe or theloads exerted by the pipe on equipmentconnections.

• Restraints absorb loads imposed on the pipe byother conditions such as wind, earthquake, slugflow, water hammer, or flow-induced vibration.Excessive loads could result in high pipe stress orequipment reaction loads, or cause flangeleakage.

There are several different types of restraints thatmay be used. The selection of which type to use andits specific design details depends primarily on thedirection of pipe movement that must be restrained,the location of the restraint point, and the magnitudeof the load that must be absorbed. It is also possibleto restrain more than one direction at one location in apiping system, or to combine a restraint with asupport.

3.2 Anchors

An anchor is a special type of restraint that stopsmovement in all three directions. Anchors provide fullfixation of the pipe, permitting very limited, if any,translation or rotation. An anchor is used in situationswhere it is necessary to totally isolate one section of apiping system from another from the standpoint ofload and deflection. A total anchor that eliminates alltranslation and rotation at one location is not used ascommonly as one or more restraints that act at asingle location. A directional anchor which restrainsthe line only in its axial direction is more commonlyused. Figure 7.4 provides several examples ofanchors.

Page 130: ASME Boiler & Pressure Vessel Code

128

Anchor Anchor Partial Anchor

Restraints/AnchorsFigure 7.4

3.3 Guides

A guide is a particular type of restraint that permitsmovement along the pipe axis while preventing lateralmovement. Depending on the particular guide detailsemployed, pipe rotation may or may not be restricted.Common situations where guides are used are in longpipe runs on a pipe rack to control thermal movementand prevent buckling, and in straight pipe runs downthe side of a tower to prevent wind-inducedmovement and control thermal expansion. SeeFigure 7.5.

Page 131: ASME Boiler & Pressure Vessel Code

129

Guide Guide

Vertical Guide

x

Guide

Examples of GuidesFigure 7.5

C. Piping Flexibility

Piping must have sufficient flexibility to accommodate thermalexpansion (or contraction) effects. Piping systems must bedesigned to ensure that they do not fail because of thermalstresses or produce excessive forces and moments at connectedequipment. If a system does not provide adequate flexibility, theresults can be leaky flanges, fatigue failure of the pipe, excessivemaintenance, operations problems, and damaged equipment.

Page 132: ASME Boiler & Pressure Vessel Code

130

A structure that is subject to a change in temperature will change indimensions. If these thermal movements are allowed to occurwithout any restraint whatsoever, no pipe stresses or reaction loadsresult. However, in real systems, stresses are developed in thepipe and moments and forces are imposed on the connectedequipment and at supports and restraints installed in the system.The basic problem is to determine the internal pipe stresses andthe external loads, and then decide if they are acceptable. Athermal flexibility analysis is done to ensure that the piping systemis laid out, supported, and restrained such that the thermal stressesin the pipe and the loads on the end points are within allowablelimits.

1.0 Rationale for Piping Flexibility and Support Design

Support and flexibility design is a combination of art andscience with multiple factors to consider and usually morethan one way to design the system. It requires knowledge ofhow the operating and design conditions of a piping systeminfluence its overall design, and the supports and restraintsrequired for the system.

A piping system can be described as an irregular structuralframe in space because of its relatively slender proportionswhen compared to structural steel systems. Elevated designtemperatures or various operating scenarios may causesufficient pipe thermal stress or reduce material strengthsuch that supplementary structural assistance to support thepiping system is required. It is also often necessary to limitthe pipe movement at specific locations to protect sensitiveequipment, control vibration, or to resist external forces (e.g.,wind, earthquake, or shock loading).

Attention must also be paid to pipe support/restraint designdetails to ensure that localized stresses in the pipe wall arekept within allowable limits. In those situations, designdetails that spread the applied load over a wider portion ofthe pipe surface are used.

Planning for pipe supports and restraints should be donesimultaneously with establishing possible layoutconfigurations to achieve the most cost-effective design.

Page 133: ASME Boiler & Pressure Vessel Code

131

2.0 Approaches to Design

Due to the complexity of the piping flexibility and supportdesign process, there is no single procedure or designmethod applicable for all situations. The following is oneway to approach the problem.

• Examine the layout and operation of the piping system toidentify:

- Layout geometry.

- Pipe diameter and thickness, and locations of anychanges in these parameters.

- Piping component design details such as branchconnection details and type of elbows used (i.e., longradius or short radius).

- Design temperature and pressure.

- Fluid service, including its potential danger.

- End-point movements.

- Type of connected equipment (i.e., rotating or fixed).

- Locations of existing structural steel.

- Relevant operating scenarios.

- Special design considerations (e.g., wind, vibration-prone services, orientation of loads).

• Determine the potential effects of those conditions (e.g.,thermal movements, loads, and stresses).

• Determine the types of support or restraint required andtheir approximate locations.

• Determine if the situation warrants a detailed computeranalysis.

• If required, identify which conditions apply for theanalysis and utilize an appropriate computer program.

• Interpret the results of the analysis.

Page 134: ASME Boiler & Pressure Vessel Code

132

D. Required Design Information for Piping Stress Analysis

Detailed piping stress analysis is done using a computer programsuch as Caesar II, Simflex, or Triflex. Such programs have thecapability to consider any combination of pipe geometry, support,restraint, and load conditions. However, several things must beconsidered:

• Applicable design conditions and operating scenarios for thepiping system.

• Allowable stresses from ASME B31.3.

• Load limitations, if any, on connected equipment.

• Extent of analysis required to identify most severe case.

Design conditions that must be known to perform a detailed pipestress analysis are listed below:

• Layout geometry of the piping system.

• Pipe diameter and wall thickness.

• Design temperature and pressure.

• Fluid service, including whether it is dangerous.

• End-point movements.

• Type of connected equipment.

• Structural steel located in the vicinity.

• Special design considerations and load cases.

Another consideration is the number of cycles that the system willundergo during its design life. This influences piping flexibilitydesign because the allowable flexibility stress is based on fatiguefailure. All ASME B31.3 piping systems are designed for aminimum of 7000 cycles. Systems that will undergo more than7000 operating cycles during their design life are designed using areduced allowable stress basis.

E. Criteria for Allowable Equipment Nozzle Loads

A poorly designed piping system can cause damage to theequipment it is connected to, whether the equipment is a rotating

Page 135: ASME Boiler & Pressure Vessel Code

133

type (e.g., pump or compressor) or stationary type (e.g., pressurevessel or heat exchanger). Rotating equipment is the moresensitive with respect to imposed piping loads because of themoving parts and small clearances involved in its design.Excessive piping loads imposed on rotating equipment can causedamage, poor operation, and/or maintenance problems at levelswell below those that would cause pipe or equipment stressconcerns.

Loads that are imposed by the piping system on connectedequipment are determined from the results of the piping flexibilityanalysis. These loads are then compared to allowable valuesbased on industry standards for particular types of equipment todetermine if they are acceptable. The allowable values cansometimes be read from a table contained in the applicable industrystandard. Other times, the allowable loads or the equipmentstresses that they cause must be calculated. Equipment vendorswill sometimes have allowable load criteria that must beconsidered. Table 7.1 summarizes industry standards that apply toequipment nozzle load evaluations, and the parameters that areused to determine the allowable loads.

Equipment Item Industry StandardParameters Used

To DetermineAcceptable Loads

Centrifugal Pumps API-610 Nozzle size

Centrifugal Compressors API-617, 1.85 timesNEMA SM-23 allowable

Nozzle size, material

Air-Cooled Heat Exchangers API-661 Nozzle size

Pressure Vessels, Shell-and-Tube Heat ExchangerNozzles

ASME Code SectionVIII, WRC-107,WRC-297

Nozzle size, thickness, reinforcementdetails, vessel/exchanger diameter,and wall thickness. Stress analysisrequired.

Tank Nozzles API-650 Nozzle size, tank diameter, height,shell thickness, nozzle elevation.

Steam Turbines NEMA SM-23 Nozzle size

Equipment Nozzle Load Standards and ParametersTable 7.1

Page 136: ASME Boiler & Pressure Vessel Code

134

F. When Should A Computer Analysis Be Used

Computer programs can perform numerous analyses with manydifferent combinations of design conditions and system geometries.They can perform many functions that would be difficult for a pipinganalyst to do “by hand.” Computers can also perform uniquefunctions that would be difficult or impossible to do by hand or othermethods with sufficient accuracy. Even though hand calculationscan be used in many situations, a computer program can often beused to finalize and optimize the final design.

A computer analysis should also be used when there are severaloperating combinations to be considered and other methods wouldbe inadequate or too time consuming, when greater accuracy isrequired due to the nature of the system, and for complicated pipingsystems. Computer programs are also very useful for analyzing thestresses and loads at piping components such as valves, branches,and bends. A piping system designer should remember that acomputer program only gives quantitative guidelines, to which theymust apply common sense and judgement.

The guidelines listed in Table 7.2 may be used to help determinewhen a computer analysis should be performed:

Type Of Piping Pipe Size, NPS Maximum DifferentialFlexibility Temp.

General piping ≥ 4≥ 8≥ 12≥ 20

≥ 400°F≥ 300°F≥ 200°F

anyFor rotating equipment ≥ 3 AnyFor air-fin heat exchangers ≥ 4 AnyFor tankage ≥ 12 Any

Computer Analysis GuidelinesTable 7.2

G. Design Considerations for Piping System Stress Analysis

The following paragraphs discuss several design considerations inpiping system stress analysis.

Page 137: ASME Boiler & Pressure Vessel Code

135

1.0 Piping Flexibility Temperature

Flexibility analysis should be made for the largesttemperature difference that may be imposed on the pipe bynormal and abnormal operating conditions. This results inthe largest pipe stress range to be considered in fatiguefailure evaluation, and the largest reaction loads imposed onequipment end connections, supports, and restraints.Tables 7.3 and 7.4 provide guidelines to determine thetemperatures to consider in a flexibility analysis. Note thatmore than one of these items might require consideration ina particular system and lead to the need for multiplecomputer calculations to identify the case that governs thesystem design.

StableOperation

Gives the temperature range expected for most of the time a plant is inoperation. Some margin above equipment operating temperature (i.e.,use of the design temperature rather than operating temperature)allows for process flexibility.

Startup andShutdown

Must be examined to determine if the heating or cooling cycles poseflexibility problems. For example, if a tower is heated while someattached piping remains cold, the piping flexibility should be checkedfor that case.

Regenerationand Decoking

Piping

Must be designed for normal operation, regeneration, or decoking, andswitching from one service to the other. An example is the decoking offurnaces.

SparedEquipment

Requires multiple analyses to determine if the piping is adequate forthe expected variations of temperature, for no flow in some of thepiping, and for switching from one piece of equipment to another. Acommon example is the piping for two or more pumps with one or morespares.

Normal Temperature Conditions To ConsiderTable 7.3

Page 138: ASME Boiler & Pressure Vessel Code

136

Loss of CoolingMedium Flow

Temperature changes due to a loss of cooling medium flowshould be considered. This includes pipe that is normally atambient temperature but can be blocked in, while subject tosolar radiation.

Steamout for Airor Gas Freeing

Most on-site equipment and lines, and many off-site lines, arefreed of gas or air by the use of steam. For 125 psig steam,300°F is typically used for the metal temperature. Pipingconnected to equipment which will be steamed out, especiallypiping connected to the upper parts of towers, should bechecked for the tower at 300°F and the piping at ambient plus50°F. This situation may govern the flexibility of lines connectedto towers that operate at less than 300°F or that have a smallertemperature variation from top to bottom.

No Process FlowWhile Heating

Continues

If process flow can be stopped while heat is still being applied,the piping flexibility should be checked for the maximum metaltemperature. Such situations can occur with steam tracing andsteam jacketing.

Abnormal Temperature Conditions To ConsiderTable 7.4

Metal temperatures that govern the flexibility design of a pipingsystem are not necessarily the ones associated with the mostsevere coincident pressure and temperature which govern the wallthickness of the pipe. Piping flexibility depends only on thetemperature. Therefore, a condition of high temperature and lowpressure may govern the piping flexibility design while the wallthickness is based on a higher pressure but a lower temperature.

Pipe thermal movement is caused by a temperature change fromthe piping installation temperature (i.e., the ambient temperature).Piping analysis computer programs typically include a “default”ambient temperature (commonly 70°F). Then, all thermalmovements and resulting thermal stresses are calculated based onthe difference between the specified pipe design temperature andthe default ambient temperature. A realistic ambient installationtemperature (typically lower than 70°F) must be used for thespecific plant site to accurately calculate the maximum thermalstress range and reaction loads.

Page 139: ASME Boiler & Pressure Vessel Code

137

2.0 Extent of Analysis

The extent of a piping system analysis depends on thesituation. The overall purpose of the analysis is to provideenough flexibility for the system. The engineer must analyzethe right combination of operating conditions to determinewhere, and if, additional flexibility is needed to reduce pipestresses or loads at end points. The engineer must alsodecide if it is desirable and acceptable to not include portionsof a large, complex system in the analysis to simplify themodeling. For example, including an NPS 4 branch run inthe model of a NPS 24 main system may not be necessary.Judicious installation of anchors or other restraints in a largesystem could also help simplify the modeling by separatingthe system into sections.

Use the following steps to develop the piping design:

• Define line size, wall thickness, material, number oftemperature cycles, layout, maximum differentialtemperature, and any alternative operating scenarios.

• Determine conditions of end-point restraint andmovements.

• Locate intermediate points of restraint and define anylimitations that they impose on piping movement.

• Select a suitable analysis method and calculate the loadsand stresses.

• Compare the results with the allowable stress range forthermal expansion stresses, the allowable stress atdesign temperature for weight-plus-pressure stresses,and the applicable load criteria for connected equipment.

3.0 Modifying System Design

The initial piping system layout may not be satisfactory forthermal flexibility stresses or loads on connected equipment.The following guidelines may help the situation.

• Provide more offsets or bends, or use more expansionloops within the same space. These make the systemmore flexible and reduce the thermal stresses.

Page 140: ASME Boiler & Pressure Vessel Code

138

• Install expansion joints. However, this approach shouldbe the exception rather than the rule. Expansion jointsrepresent a "weak link" in a piping system. They mayaffect the life of the system since they are moresusceptible to damage than pipe, and can createmaintenance and operational problems. Thus, the use ofexpansion joints should only be considered as a lastresort. One situation where expansion joints must beused is where pressure drop or other processrequirements dictate the use of relatively straight piperuns (e.g., fluidized solids transfer lines).

• Strategically locate restraints to minimize thermal andfriction loads at equipment. Restraints could also beused to direct pipe thermal expansion into a section ofthe system that has more inherent flexibility to absorb it.

• Use spring supports if large vertical thermal movementsare expected, or if thermal expansion causes pipe to liftoff fixed supports. Avoid fixed supports that result inlarge thermal stresses.

• Use Teflon bearing pads at supports for large-diameterpipe or other large weight loads if friction loads areexcessive on equipment connections or structuralmembers.

4.0 System Design Considerations

Each type of piping system has particular factors that mustbe considered when performing a detailed analysis. Forexample:

• Pump systems will often be installed with spared pumps.Thus, various scenarios of operating vs. spared pump(s)must be considered since portions of the system near thepumps will be hot while other portions are cold.

• Piping systems are sometimes heat traced. This mightbe done either to reduce liquid viscosity to allow thenecessary flow, or to prevent condensate accumulation.The condition with the process flow off while the heattracing remains on must also be considered since thepipe metal temperature for this case may be higher thanthe normal design temperature.

• Piping systems connected to atmospheric storage tanksmust be designed considering movement that occurs at

Page 141: ASME Boiler & Pressure Vessel Code

139

the tank nozzle. When the tank is filled with liquid, theshell will bulge outward and the nozzle will rotate downdue to this shell bulging (see Figure 7.7). Over a periodof time, the tank may also settle down into its foundationwith respect to the pipe. Because of these expected tankmovements, it is often necessary to use a flexible-typepipe support located near the tank nozzle to ensure thatthe tank nozzle is not overloaded.

Tank NozzleFigure 7.7

• It may be necessary to consider pipe frictional effects atsupport points. If large enough, friction loads can restrictpipe movement and cause unexpectedly high pipestresses or end point reaction loads. Typical situationswhere it may be necessary to consider friction loads arefor long horizontal pipe runs, or where large concentratedweight loads are supported near equipment nozzles.

• The most common configuration for air-cooled heatexchanger piping uses short, straight sections of pipe toconnect the manifold to the exchanger nozzles. Themanifold is located directly above or below the exchangerheader box. The heat exchanger tube bundle is allowedto move laterally to accommodate the thermal expansionof the pipe manifold. The flexibility analysis shouldinclude the restraining effect of friction from movement ofthe exchanger bundle, which will resist lateral movementof the bundle.

NOZZLE SHELL

BOTTOM

Page 142: ASME Boiler & Pressure Vessel Code

140

VIII. FABRICATION, ASSEMBLY, AND ERECTION

Individual sections of pipe must be fabricated into convenient sections (i.e., spoolpieces). Individual spool pieces are then assembled and erected in the field.

A. Welding and Heat Treatment

Welding is one of the primary ways of joining pipe. Welded jointsrepresent the ultimate in safety and reliability. All design codes callfor welding to be carried out using a qualified procedure andwelders. Included in the welding procedure are: base-metalspecification, electrode type and material, joint preparation (i.e.,geometry), weld position (e.g., vertical, overhead, etc.), weldingprocess (including whether it is manual or automatic), techniques,electrical details, preheat and interpass temperatures, and post-weld heat treatment (PWHT) requirements.

1.0 Butt-Welds

Butt-welds are made between two components whose edgesare in close proximity. Butt-welded joints in piping systemsare primarily of the single-V configuration and are weldedfrom the pipe outside surface. The joint preparation and theprocedure that is used ensure that there is complete fusionbetween the edges of the components being joined. Jointdesigns shown in Figure 8.1 are typically used for ends ofequal thickness. The transition between ends of unequalthickness may be accomplished by taper grinding the thickerpipe to match the thinner, or by using weld metal to providea smooth transition as shown in Figure 8.2. Butt-welds arealways used to weld pipe ends together, to weld butt-weld-type flanges or fittings to pipe ends, or to weld the edges offormed plate together when plate is used to manufacturepipe.

Page 143: ASME Boiler & Pressure Vessel Code

141

(a) Standard End Preparationof Pipe

(b) Standard End Preparationof Butt-Welding Fittings andOptional End Preparation of

Pipe 7/8 in. and Thinner(c) Suggested End Preparation,

Pipe and Fittings Over 7/8 in.Thickness

Butt-Welded Joint DesignsEqual Thickness

Figure 8.1

(b)

(d)

(c)3/32 in. max.

(a)

Butt-Welded Joint DesignUnequal Thickness

Figure 8.2

2.0 Fillet Weld

The fillet weld generally requires no special joint preparation.It is an angular weld bead that joins components normallypositioned at a 90° angle to each other. The size of a filletweld is stated as a leg length of the largest inscribed rightisosceles triangle. In piping systems, fillet welds are onlyused for slip-on flanges, socket welds, and for welding

Page 144: ASME Boiler & Pressure Vessel Code

142

attachments to piping components (e.g., reinforcing pads,supports, etc.). See Figure 8.3.

Fillet WeldsFigure 8.3

Page 145: ASME Boiler & Pressure Vessel Code

143

3.0 Welding Preparation Steps

The following outlines the overall steps that are required forwelding.

• The individuals and equipment executing the weldingprocedure must be confirmed to be qualified to produceacceptable results.

• Internal and external surfaces to be welded shall beclean and free from paint, oil, rust, scale, or othermaterial that would be detrimental to either the weld orbase metal when heat is applied.

• The ends of the components to be welded must be set tothe correct geometric shape suitable for the materials,wall thickness, and welding process involved.

4.0 Preheating

Preheating is used, along with heat treatment, to minimizethe detrimental effects of high temperature and severethermal gradients that are inherent in welding. The followingidentifies the benefits of preheating:

• Dries the metal and removes surface moisture whichcould result in weld porosity.

• Reduces the temperature difference between the basemetal and the weld to reduce the cooling rate of theweldment. This lowers the weld hardness and reducescooling/shrinkage stresses.

• Helps maintain the weld pool molten longer to permitmaximum separation of impurities.

• Helps drive off absorbed gases (e.g., hydrogen) whichcould contribute to weld porosity.

5.0 Postweld Heat Treatment (PWHT)

PWHT averts or relieves the detrimental effects of hightemperature and severe temperature gradients that areinherent in welding, and relieves residual stresses that arecreated by bending and forming. Specific heat treatmenttemperature and procedure requirements are specified in

Page 146: ASME Boiler & Pressure Vessel Code

144

ASME B31.3 based on the pipe material and wall thicknessbeing joined.

The following summarizes the principal reasons for PWHT:

• Stress relief is the most common reason for specifyingPWHT. This is the only consideration for the PWHTrequirements specified in ASME B31.3. Other reasons forPWHT (e.g., due to process considerations) must bespecified by the user or contractor. Residual stresses willremain in the pipe and result from shrinkage as the weldand adjacent pipe metal cool down from elevated weldingtemperatures. Residual stresses will also remain afterbending or forming processes. If these residual stressesare too high, they can lead to premature failure of thepipe.

• After welding the normal grades of stainless steels (i.e.,those that are not stabilized with alloy additions), thematerial must be heat treated to restore its maximumcorrosion resistance.

• PWHT is required to prevent caustic embrittlement ofwelded carbon steel pipe that handles alkaline solutions.Caustic embrittlement is a form of stress corrosion wherethe residual stresses due to welding are sufficient tocause failure.

• PWHT is sometimes necessary to reduce weld hardnessin certain materials. Minimizing weld hardness reducesthe tendency to crack, especially in certain processenvironments (e.g., wet H2S).

B. Assembly and Erection

Additional piping fabrication requirements must be considered.Several of these are discussed below.

1.0 Storage and Handling

Improper handling and storage of pipe materials and weldingfiller metals can cause damage and result in poorconstruction quality and failures during operation.

Page 147: ASME Boiler & Pressure Vessel Code

145

• Pipe should not be stored directly on the ground to helpprevent rainwater accumulation around the pipe, whichcould result in corrosion.

• Pipe should not be stacked so high that pipes or theircoatings may be damaged.

• Fittings and valves should be stored in shipping crates oron racks to provide protection until used.

• End protectors should be firmly attached to preventdamage to weld bevels, flange faces, threads, or socket-weld ends.

• Lined and coated pipes and fittings should be lifted withwide fabric or rubber-covered slings and padding toprevent damage.

2.0 Pipe Fitup and Tolerances

Good joint fitup is essential to making a sound weld andminimizing the loads imposed on the piping system andconnected equipment. Depending on the welding processused, a slight mismatch may be permissible.

• Pipe fitup for welded joints shall be as required by thewelding procedure.

• The tolerance for axial dimensions, face-to-face, center-to-face, and location of attachments should be ±1/8 in.maximum.

• Flattening of bends, measured as the difference betweenthe largest and smallest outside diameter at any cross-section, should not exceed 5% of the nominal diameter ofthe pipe (3% at the ends).

• Lateral translation of branches and connections fromcenterline of run should not exceed ±1/16 in.

• Flange bolt holes shall straddle the centerlines. Rotationof flanges, measured as the offset between elevation ofbolt holes on opposite sides of a flange centerline, shouldnot exceed ±1/16 in.

• The tilt of flanges measured at the periphery across anydiameter should not exceed 1/32 in. from the squareposition. Use of a 1/64 in. tolerance is often necessaryfor flanges at load-sensitive equipment.

Page 148: ASME Boiler & Pressure Vessel Code

146

3.0 Alignment of Pipe Attached to Load-SensitiveEquipment

Special care must be taken for load-sensitive equipment,especially rotating equipment. Specifically, in attaching pipeto rotating equipment, the installation should avoid puttingexcessive forces and moments on the machinery nozzleswhich could result in misalignment.

• Installation of piping that is connected to rotatingequipment should preferably start at the machine nozzleflange. This will reduce the possibility of having a largemismatch between the pipe and machine flanges if pipeinstallation is begun from the opposite end of the system.

• Bolt on succeeding pipe sections as appropriate up to thefirst support. Adjust this support as required to justcontact the pipe at its bearing point. Proceed to anyother adjacent supports which should be similarlyadjusted.

• One or more field welds are typically used to join thepiping nearest to the machine with the rest of the system.The number and location of these field welds aredetermined such that they will permit final positionadjustments to achieve acceptable flange alignment atthe machine nozzle.

• Spring supports should be locked in their cold positionduring pipe installation.

• All spring supports will be adjusted in the locked positionjust until they contact their respective support points. Ifspring-support adjustment is insufficient, modifications toassociated structural members or shimming will berequired.

• Final bolt tensioning of component flanges close to themachinery should be done after initial alignment of nozzleflanges.

• Piping that requires any sections to be removed forflushing after completing field welds should have finalnozzle alignment and component flange boltupcompleted after replacing flushed sections.

• For piping over NPS 3 connected to machinery, flangealignment must be within more stringent limits than is

Page 149: ASME Boiler & Pressure Vessel Code

147

specified for general piping systems. More stringentlimits are required to minimize the loads that are imposedby flange boltup.

• Precautions should be taken to prevent ingress of debrisinto machine internals during construction of connectingpipework.

4.0 Flange Joint Assembly

Flange joint assembly procedures directly affect the ability ofthe flange to be leak-tight in service. In many low-pressure,low-temperature, and/or nonflammable services, many rulesof good flanged joint design and makeup can and have beenviolated with no adverse consequences. However, it isdangerous to break these rules in critical, high-temperatureservices since the results can be serious leakage problemswith consequent fires. The primary factors for successfullymaking up a flanged joint and controlling leakage are thefollowing:

• Proper selection and design of the flanged joint.

• Proper preparation, inspection, and installation of theflanged joint.

• Identifying and controlling the causes of leakage.

Flanged joint assembly and leakage control are discussedbelow.

5.0 Flange Preparation, Inspection, and Installation

The following discusses the primary steps that are requiredto achieve a properly assembled flanged joint.

• Redo Damaged Surfaces. Warped or badly corrodedflanges should be replaced or refaced. Reface flangeswith tool marks or scratches across the gasket seatingsurface.

• Clean Faces. All gasket and flange surfaces should beclean. Remove all burrs, rust, and dirt from flange faceswith scrapers or wire brushes.

Page 150: ASME Boiler & Pressure Vessel Code

148

• Align flanges. Flanges at rest should be within thealignment tolerances previously discussed, with theflanges practically mating before the bolts are installed.

Bringing the flanges into alignment should not leave anyresidual stresses in the piping system. Residual stressescould lead to flange leakage in service or overloadproblems in systems that are connected to load-sensitiveequipment. This becomes more important withincreasing pipe diameter, as the residual stress increaseswith increasing diameter for the same amount ofmisalignment.

• Lubricate Threads and Nuts. Lubricate the bolt threadsand the nut faces where they will contact the flange.Lubrication helps increase the amount of bolt load thatgoes into tightening the flange rather than intoovercoming friction.

• Place Gasket Properly. The gasket must be centered onthe flange faces to achieve a reliable joint, but holding thegasket in place can be a problem. If something must beused to hold the gasket, a high-temperature grease maybe used sparingly in systems that operate at less than200°F. No grease, paste, or adhesive should be used tohold gaskets for systems operating at 200°F or more.The high temperature causes these materials to burn off,which could damage the gasket and cause leakage.

Thin cellophane tape may be used on the outside edgesof a gasket, but never on the seating surfaces. Tape onthe seating surfaces will deform the gasket during jointassembly, burn out at operating temperature, and thusprovide a leakage path. Centering rings on spiral-woundgaskets help by allowing the gasket to be supported inthe proper position by a few bolts while the other boltsare inserted. Sheet gaskets should be cut so that theiroutside diameter corresponds to the bolt position, againto help centering.

• Use Proper Flange Boltup Procedure. Flanges may bemade up using a wrench and hammer, an impact wrench,a torque wrench, or a stud tensioner. The most importantaspects of a proper boltup procedure, regardless ofmethod, are to:

Page 151: ASME Boiler & Pressure Vessel Code

149

- Use a "criss-cross" pattern bolt-tightening sequence,as is used when bolting a wheel onto a car. Thisapproach helps to achieve a uniform bolt load aroundthe flange. See Figure 8.4.

- Use at least three rounds of tightening around theflange, increasing the applied load in each round,with two rounds at the maximum load. Thisapproach helps achieve uniform bolt load around theflange circumference.

- For the most critical high-temperature or high-pressure flanges, use a method that permitsmeasuring the applied load (i.e., torque wrench orstud tensioner). In this way, there is greaterassurance that uniform bolt load is achieved. Forsuch applications, a maximum stud stress duringboltup of 40-50,000 psi is the normal target.

6.0 Causes of Flange Leakage

Most of the primary causes of flange leakage are directlyrelated to poor inspection or installation. These aresummarized below:

• Uneven Bolt Stress. An incorrect boltup procedure orlimited working space near one side of a flange can leavesome bolts loose while others crush the gasket. This isespecially troublesome in high-temperature services,when the heavily loaded bolts relax during operation.

• Improper Flange Alignment. Improper flange alignment,especially nonparallel faces, causes uneven gasketcompression, local crushing, and subsequent leakage.

• Improper Gasket Centering. If a gasket is off-center, itwill be unevenly compressed and more prone to leakage.

• Dirty or Damaged Flange Faces. Dirt, scale, scratches,protrusions, or weld spatter on gasket seating surfacesprovide leakage paths or can cause uneven gasketcompression that results in leakage.

• Excessive Loads in the Piping System at FlangeLocations. Excessive piping system forces and momentsat flanges can distort them and cause leaks. Commoncauses of this are inadequate flexibility, using excessive

Page 152: ASME Boiler & Pressure Vessel Code

150

force to align flanges, and improper location of supportsor restraints.

• Thermal Shock. Rapid temperature fluctuations cancause flanges to deform temporarily and leak.

• Improper Gasket Size or Material. Using the wronggasket size or material can cause leakage.

• Improper Flange Facing. A rougher flange-surface finishthan specified for spiral-wound gaskets can result inleakage.

Typical "Criss-Cross" Bolt-Tightening SequenceFigure 8.4

Page 153: ASME Boiler & Pressure Vessel Code

151

IX. QUALITY CONTROL

A. Inspection

Prior to initial operation, each piping installation, including individualcomponents and overall workmanship, shall be examined. Thefollowing requirements are based on ASME B31.3.

Defects must be identified before a piping system can be tested orgo into operation. Defect identification is especially important inwelded areas. A good weld starts with a proper design and isexecuted using a qualified procedure and welder. However, thequality that is achieved in a particular instance may not beacceptable for a variety of reasons. The method of weldexamination needed to ensure that welds of acceptable quality areachieved must be specified. Not all welds are inspected in thesame manner. Determining the proper type of weld inspection is afunction of technique, weld type, anticipated type of defect, locationof weld, and pipe material.

The following are common weld defects (illustrated in Figure 9.1):

• Lack of fusion between adjacent weld passes.

• Lack of fusion between weld bead and base metal.

• Incomplete penetration due to internal misalignment.

• Incomplete penetration of weld groove.

• Concave root surface.

• Undercut.

• Excess external reinforcement.

• Cracks.

Table 9.1 summarizes the primary weld inspection methods, wherethey are typically used, and the types of defects they can locate.

Page 154: ASME Boiler & Pressure Vessel Code

152

Typical Weld ImperfectionsFigure 9.1

Page 155: ASME Boiler & Pressure Vessel Code

153

Type of Inspection Situation/Weld Type Defect

Visual All welds • Minor structural welds

• Cracks

• Slag inclusions

Radiography • Butt welds

• Girth welds

• Miter groove welds

• Gas pockets

• Slag inclusions

• Incomplete penetration

Magnetic Particle • Ferromagnetic materials

• For flaws up to ¼ in.beneath the surface

• Cracks

• Porosity

• Lack of fusion

Liquid Penetrant • Ferrous and nonferrousmaterials

• Intermediate weld passes

• Weld root pass

• Simple and inexpensive

• Cracks

• Seams

• Porosity

• Folds

• Inclusions

• Shrinkage

• Surface defects

Ultrasonic Confirms high weld quality inpressure-containing joints

• Laminations

• Slag inclusions in thick plates

• Subsurface flaws

Guidelines for Weld InspectionTable 9.1

The following inspection guidelines also apply:

• ASME B31.3 specifies weld examination requirements andacceptance criteria based on fluid service category (i.e.,Normal, Severe Cyclic Conditions, and Category D fluidservices).

• For P-Nos. 3, 4, and 5 materials, examination shall beperformed after heat treatment. Thus, any defects caused byheat treatment will be present.

• For a welded branch connection, the examination of and anynecessary repairs to the pressure-containing weld shall becompleted before any reinforcing pad or saddle is added.Thus, the reinforcement will not prevent inspection and repair.

Page 156: ASME Boiler & Pressure Vessel Code

154

• At least 5% of all fabrication shall be visually examined.

• 100% of fabrication for longitudinal welds, except incomponents made in accordance with a listed specification,shall be visually inspected.

• Random visual examination of the assembly of threaded,bolted, and other joints.

• Random visual examination during the erection of piping.

• Not less than 5% of circumferential butt- and miter-groovewelds shall be examined fully by random radiography orrandom ultrasonic examination.

• Not less than 5% of all brazed joints shall be examined, by in-process examination.

• Piping in severe cyclical service requires additionalexamination.

B. Testing

The piping system must be pressure tested after it has beencompletely fabricated, erected, and inspected. The pressure testdemonstrates the mechanical integrity of the system before it isplaced into operation. The following highlights several testrequirements.

• A hydrostatic test must be used unless otherwise approved forspecial situations.

• The hydrostatic test pressure at any point in a metallic pipingsystem shall be as follows:

a) Not less than 1½ times the design pressure.

b) For design temperatures that are above the testtemperature, the minimum test pressure shall be calculatedas follows, except that the value of ST/S shall not exceed6.5:

SPS5.1P T

T =

Page 157: ASME Boiler & Pressure Vessel Code

155

Where:

PT = Minimum hydrostatic test pressure, psig

P = Internal design pressure, psig

ST = Allowable stress at test temperature,psi

S = Allowable stress at design temperature,psi

c) If the test pressure as defined above would produce astress in excess of the yield strength at testtemperature, the test pressure may be reduced to themaximum pressure that will not exceed the yieldstrength at test temperature.

• Pneumatic strength tests, when approved, shall be conducted at110% of the design pressure.

• Instrument take-off piping and sampling system piping, up tothe first block valve, shall be strength tested with the piping orequipment to which it is connected.

Page 158: ASME Boiler & Pressure Vessel Code

156

X. OTHER CONSIDERATIONS

A. Nonmetallic Piping

The following highlights several aspects of nonmetallic pipingdesign. Refer to ASME B31.3 for additional details.

Examples of nonmetallic piping include:

• Thermoplastic Piping. Piping fabricated from a plastic whichis capable of being repeatedly softened by an increase oftemperature and hardened by a decrease of temperature.

• Reinforced Thermosetting Resin Piping (RTR). Pipingfabricated from a resin capable of being changed into asubstantially infusible or insoluble product when cured at roomtemperature, or by application of heat, or by chemical means.

Some differences in the design of nonmetallic piping vs. metallicpiping in normal fluid service include:

• Allowances for variations of pressure or temperature, or both,above design conditions are not permitted. The most severeconditions of coincident pressure and temperature will be usedto determine design conditions.

• Piping systems shall be designed to prevent thermal expansionor contraction, pressure expansion, or movement of pipingsupports and terminals from causing:

- Failure of piping supports from overstrain or fatigue.

- Leakage at joints.

- Detrimental stresses or distortions in connected equipment.

• The stress-strain behavior of most nonmetals differsconsiderably from that of metals. Therefore, the assumptionsthat stresses throughout the piping system can be predictedfrom strains, or that displacement strains will produceproportional stress because of fully elastic behavior of the pipingmaterials, are generally not valid.

• In addition to the requirements of flexibility and support formetallic piping in normal fluid service:

Page 159: ASME Boiler & Pressure Vessel Code

157

- Nonmetallic piping shall be supported, guided, andanchored to prevent damage to the piping.

- Point loads and narrow areas of contact between piping andsupports shall be avoided.

- Suitable padding shall be placed between piping andsupports where piping damage may occur.

- Valves and equipment that would transmit excessive loadsto the piping shall be independently supported.

• Thermoplastics shall not be used in flammable fluid serviceabove ground and shall be safeguarded when used in most fluidservices.

• Nonmetallic piping is joined by bonding. Bonding can beachieved through many methods including adhesive, wrapping,heat fusion, hot gas welding, and solvent cementing.

B. Category M Fluid Service

The following highlights several aspects of Category M fluidservice. Refer to ASME B31.3 for additional details.

Category M defines a fluid service in which the potential forpersonnel exposure is judged to be significant, and a singleexposure to a very small quantity of the toxic fluid can causeirreversible harm to breathing or points of bodily contact. Thefollowing highlights several provisions, in addition to those specifiedfor normal fluid service, that apply to Category M Fluid Service.

• Design, layout, and operation of piping shall be conducted tominimize impact and shock loads.

• Conditions which could lead to detrimental vibration, pulsation,or resonance effects should be avoided or minimized.

• No allowances may be made for pressure-temperaturevariations. The coincident pressure-temperature conditionsrequiring the greatest wall thickness or the highest componentrating will determine design temperature and pressure.

• All fabrication, as well as all threaded, bolted, and othermechanical joints, shall be visually examined.

• A sensitive leak test in addition to the required leak test mustbe included.

Page 160: ASME Boiler & Pressure Vessel Code

158

• The following may not be used:

- Miter bends not designated as fittings, fabricated laps, andnonmetallic fabricated branch connections

- Nonmetallic valves and specialty components

- Threaded nonmetallic flanges

- Expanded, threaded, and caulked joints

C. High Pressure Piping

The following highlights several aspects of high pressure pipingdesign. Refer to ASME B31.3 for additional details.

Design Conditions and Criteria

Piping is generally considered to be high pressure if it has apressure over that allowed by Class 2500 for the specificdesign temperature and Material Group. However, there areno specific pressure limitations for the application of therules for high pressure piping.

In most cases, the design pressure of each component in ahigh pressure piping system must be at least equal to thepressure at the most severe condition of coincident internalor external pressure and temperature expected duringservice. The design temperature of each component in apiping system is the temperature at which, under thecoincident pressure, the greatest thickness or highestcomponent rating is required.

Consideration must be given to the ambient effects on apiping system.

• The cooling of a gas or vapor may reduce the pressuresufficiently to create a vacuum.

• The heating of a static fluid in a piping component causesa pressure increase.

• Moisture condensation can result in atmospheric icingwhen piping system design minimum temperature is lessthan 32°F.

Page 161: ASME Boiler & Pressure Vessel Code

159

In any case, the design must allow the system to eitherwithstand or provide some type of relief from the ambienteffects.

Other effects to consider include:

• Dynamic Effects (e.g., impact, wind, earthquake,vibration, discharge reactions).

• Weight Effects (e.g., live loads, dead loads).

• Thermal Expansion and Contraction Effects.

• Effects of Support, Anchor, and Terminal Movements.

• Allowable stresses.

• Wall thickness calculation requirements.

• No allowance for pressure above the design pressurepermitted.

• Particular fabrication details not permitted (e.g., miters).

2.0 Examination

While the examination of High Pressure Piping is very similarto that of piping in normal fluid service, it must be moreextensive. For example, in normal fluid service, a sampleselected at random per the inspector's judgement issufficient to make a determination as to the acceptability ofthe material. In high pressure piping, 100% of the materialand components must be examined. Also, only 5% of thefabrication must be examined for normal fluid service,whereas 100% of fabrication must be examined in highpressure piping.

3.0 Testing

Prior to initial operation, each piping system shall be eitherhydrostatically or pneumatically leak tested. Each weld andeach piping component (except bolting and individualgaskets to be used during final assembly) shall be tested. Ifthe testing is done on the equipment prior to installation, anadditional test of the installed piping system shall beconducted at a pressure not less than 110% of the designpressure. If the initial testing is done on the installed piping,then the additional test is not necessary.

Page 162: ASME Boiler & Pressure Vessel Code

160

XI. SUMMARY

A process plant piping system includes much more than just straight sections ofpipe. It also includes fittings, flange assemblies, valves, pipe supports, andrestraints. ASME B31.3 specifies the design, materials, fabrication, erection,inspection, and testing requirements for process plant piping systems. Thiscourse provided an overview of process plant piping system requirements,including items that are not explicitly included in B31.3 (e.g., valve selection anddesign, flexibility analysis guidelines, equipment nozzle load requirements, etc.).Participants can use this information on their jobs, and are prepared to take moreextensive courses if appropriate.