asbestos reinspection report - sodexo... · 2020-01-13 · insulation residue to pipework (post...
TRANSCRIPT
Asbestos Reinspection Report
(with Priority Assessments)
Raynes Park High School
Bushey Road
London
SW20 0JL
Project Number: B-87863
Issue Date: 7th November 2019
Issue No: 1
Client Contact:Barry Pratt
Life Environmental Services Ltd Contact: Phil James
47a Leopold Road Wimbledon, London, SW19 7JG
4 Duckett’s Wharf South Street Bishop’s Stortford Hertfordshire CM23 3AR
Tel: Tel: 01279 503117 Fax: Fax: 01279 503162
Life Environmental - Survey Report Guide
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 2 of 60
This guide explains the Section content of the survey report. Failure to use the information provided in the report correctly may result in incorrect information or assumptions being obtained.
Section 1.0 Executive Summary
The Executive Summary contains details of the scope and extent of the works. The reader must ensure that the scope covers the required areas and that any variations do not impact on any proposed works or management of the site. All areas of no access should be considered as containing asbestos until proven otherwise.
Recommended Actions provides a summary of all identified and presumed asbestos containing materials (ACMs). ACMs are listed by recommendation with those requiring urgent attention listed first.
The Asbestos Register presents ACMs by building, floor & location. It provides a detailed list of all locations included within the survey where positive samples have been taken or items are presumed to contain asbestos. Items physically sampled will show the asbestos type within the analysis column.
Items cross referenced (strong presumption) have their asbestos type determined by the sample result of materials of similar appearance and use that have been sampled elsewhere on site. These will show the analysis proceeded by X.
Strongly Presumed samples are items that the surveyor was unable to sample but the materials are similar in appearance and use to known asbestos-containing materials and hence they are confirmed as containing asbestos.
Presumed items are those that the surveyor was unable to sample or inspect adequately to confirm the presence of asbestos, as such there is a potential for asbestos being present and the item is presumed to contain asbestos.
A Material Assessment algorithm has been completed for all positive samples. It should be noted that to enable an accurate Priority Assessment to be undertaken this requires a detailed knowledge of the property. The responsibility for this lies with the dutyholder, although Life Environmental can assist with the provision of information or generic assessments where agreed.
Recommendations within this report are based on the condition of the asbestos and the Material Assessment. Prior to carrying out these recommendations consideration should be given to the Priority Assessment Algorithm.
Section 2.0 Introduction
The Introduction provides a general overview of the purpose, aims and type of survey undertaken. It also presents Project particulars and Quality Assurance.
Section 3.0 Survey Findings – Survey Reinspection Data Sheets
Survey Data Sheets contains detailed information on all suspect items with a photographic record of each item.
Section 4.0 – Survey Findings – Certificate & Schedule of Additional Bulk Samples This section provides analysis information and results of any additional samples taken.
Appendix 1 - Definitions & Recommended Guidance
These contain a general guidance relating to Samples, Assessments and Recommendations and a detailed Risk Assessment explanation.
Appendix 2 - Material & Priority Assessment algorithms
These contain a general guidance relating to detailed Risk Assessment explanation.
Appendix 3 - Survey Drawings
All locations will be given a unique reference number which corresponds to the location detailed within the Asbestos Register. The drawings highlight areas containing positive information and areas of no access. In the case of planned works, a check should always be made of adjacent areas.
1. Introduction
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 3 of 60
1. Introduction
a. Purpose & Aim of Survey
b. Quality Assurance
2. Executive Summary
a. Revisions
b. Recommended Actions
c. Asbestos Register
3. Reinspection Data Sheets
4. Additional Bulk Samples
Appendices:
• Appendix 1 - Definitions & Recommended Guidance
• Appendix 2 - Material & Priority Assessment algorithms
• Appendix 3 - Survey Drawings
1. Introduction
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 4 of 60
Life Environmental Services Ltd received an order of confirmation to undertake a Reinspection Survey from Sodexo (UK) Ltd. This order has been accepted on the basis of the original Quotation and our terms and conditions of business. This reinspection is subject to copyright and protected by copyright law.
The brief for these works was to carry out a reinspection of the Asbestos Containing Materials (ACMs) within the Raynes Park High School. The reinspection is based upon the previous report ref 408469.
This reinspection considered any damage and disturbance to items identified in the above survey. Every effort has been made to access any areas that were previously not accessible in the original survey. Where such locations have still not been accessed, asbestos should be presumed to be present within these areas.
Each section of this report focuses on one or two aspects; no section should be taken and read as a stand-alone document. It is imperative that each section is read in conjunction with each other.
This reinspection report forms an addendum to the original survey. The original survey report should be referred to for the following items of information:
• Information on the original survey methodology/caveats
• Original laboratory bulk analysis certificate of analysed samples
• Original drawings
It should be noted that this report is not intended as a Scope of Works for asbestos removal and that a detailed technical document could be provided upon request.
If any maintenance works are to be undertaken within the areas not accessed then a further survey and assessment should be carried out prior to these works.
Client Details: Sodexo (UK) Ltd
Date(s) of Survey: 23-October-2019
Surveyor(s): Lead Surveyor(s): Colin Platt
Report Prepared by: Matthew Richards 7th November 2019
Quality Control by: Colin Platt 7th November 2019
Life Environmental Project Manager:
Phil James
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 5 of 60
a. Revisions
The following table summarises the items removed between the most recent re-inspection and its predecessor.
Removal Summary
ACMs removed during the period between previous site inspection visits. For removal details please liaise with the dutyholder.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block B 0 2/056 - Boiler Room
Bitumen Wrap To Live Electrical Cable
No Suspect Materials Seen
IA 0
b. Recommended Actions
Detailed below is guidance on actions to be taken to prevent potential exposure to ACMs. There follows a summary of all reinspected asbestos items that require further action in order that they can be managed safely
Please note that if additional samples or suspect items have been identified during the reinspection these will be detailed in Section 3 (Reinspection Data Sheets) of this report only and will not be detailed below or within any part of Section 2 of the report.
Please note the colour coding is based on the recommendation only and is not determined by the Material Assessment scores, these are explained within the original asbestos survey report. Some lower risk items may be recommended for removal based on its location or usage rather than the score only.
Please contact Life Environmental Services Ltd for advice in dealing with any asbestos in poor, unsealed or damaged condition or for assistance in developing your management plan and scheduling reinspections.
Remove
Asbestos that is redundant, in a poor condition or has the potential to be easily damaged, has been identified. It is recommended that these items are removed by an Approved or Licensed Asbestos Removal Contractor.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A External
Tank Room - Tank Room
Insulation Residue To Walls
Thermal Insulation
SP 8
Encapsulate/Repair and Manage
ACMs which are damaged or unsealed have been identified within the following areas. It is recommended that remedial work to repair & seal these materials is undertaken.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A 0 1/0130 - Boiler Room
Insulation Residue To South Wall
Thermal Insulation
SP 8
Block A 0 1/0130 - Boiler Room
Insulation Residue To East Wall
Thermal Insulation
SP 8
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 6 of 60
Encapsulate/Repair and Manage
ACMs which are damaged or unsealed have been identified within the following areas. It is recommended that remedial work to repair & seal these materials is undertaken.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A 0 1/0130 - Boiler Room
Insulation Residue To South Wall
Thermal Insulation
SP 8
Block A 0 1/0130 - Boiler Room
Insulation Residue To North Wall
Thermal Insulation
SP 8
Block A 0 1/0130 - Boiler Room
Insulation Residue To West Wall
Thermal Insulation
SP 8
Block A 0 1/040A - Stores Insulation Residue To Pipework
Thermal Insulation
SP 8
Manage and Re-inspect
ACMs have been identified which are in good condition. A management policy and plan need to be implemented to manage these materials safely.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A 0 1/006 - Meeting Room
Stair Nosing Strip
Reinforced Composites
SP 2
Block A 0 1/007 - Risers
Insulation Residue To Wall (post Removal)
Thermal Insulation
SP 7
Block A 0 1/007 - Risers
Insulation Residue To Pipework (post Removal)
Thermal Insulation
SP 7
Block A 0 1/007 - Risers
Insulation Residue To Residue (post Removal)
Thermal Insulation
SP 7
Block A 0 1/008 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0101 - Lift Motor Room
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0116 - Classroom G17
Bitumen Below Parquet Floor
Bitumen Products
P 3
Block A 0 1/0117 - Classroom G18
Bitumen Below Parquet Floor
Bitumen Products
P 3
Block A 0 1/0130 - Boiler Room
Rope Seal To Skylight
Textile Rope & Yarn
P 4
Block A 0 1/0131 - Tank Room Gaskets To Pipework
Thermal Insulation
SP 3
Block A 0 1/0132 - Electrical Cupboard
Bitumen Wrap To Live Cable
Bitumen Products
P 2
Block A 0 1/0132 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0137 - Bathroom Floor Tiles Vinyl SP 3
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 7 of 60
Manage and Re-inspect
ACMs have been identified which are in good condition. A management policy and plan need to be implemented to manage these materials safely.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A 0 1/026 - Kitchen Rope Seal To Skylight
Textile Rope & Yarn
P 4
Block A 0 1/071 - Classroom G3
Floor Floor Tiles SP 2
Block A 0 1/073 - Classroom G2
Floor Floor Tiles SP 2
Block A 1 1/115 - Roof void above Classroom F8
Insulation Residue To Floor Duct
Thermal Insulation
SP 10
Block A 1 1/136 - Classroom F1
Stair Nosing Strip
Reinforced Composites
SP 2
Block A 1 1/137 - Roof Void above Classroom F1
Insulation Residue To Pipework (post Removal Findings)
Thermal Insulation
SP 9
Block A External
Tank Room - Tank Room
Gaskets To Pipework
Thermal Insulation
P 3
Block A External
Outside Main Hall 1/097 - External (low Level)
Damp Proof Membrane
Bitumen Products
SP 3
Block A External
Water Room - Tank Room
Gaskets To Pipework
Thermal Insulation
P 3
Block B 0 2/002 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/002 - Stores Floor Tiles Vinyl SP 2
Block B 0 2/003 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/004 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/006 - Classroom BG1
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/007 - Classroom BG2
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/009 - Classroom BG3
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/012 - Classroom BG5
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/045 - Canteen
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/056 - Boiler Room Gaskets To Pipework
Gasket P 3
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 8 of 60
Manage and Re-inspect
ACMs have been identified which are in good condition. A management policy and plan need to be implemented to manage these materials safely.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block B 1 2/103 - Sixth Form Maths Classroom
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/105 - Classroom B11
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/106 - Staff Room
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/107 - Classroom B12
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/109 - Classroom B13
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/110 - Classroom B14
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/111 - Classroom B15
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/114 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/115 - Staff Room
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/122 - Classroom B17
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/123 - Classroom B16
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/002 - Classroom DG4
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/003 - Classroom DG4 Cupboard
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/033 - Classroom DG1
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/044 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block C 0 3/048 - Stores S47
Bitumen Wrap To Live Electrical Cable
Bitumen Products
P 3
Block C 0 3/054 - Classroom Bitumen Below
Bitumen Products
P 2
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 9 of 60
Manage and Re-inspect
ACMs have been identified which are in good condition. A management policy and plan need to be implemented to manage these materials safely.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Parquet Floor
Block C External
Design Block Roof - External (high Level)
Flue Pipe Cement Products
P 3
Block C External
Design Block Roof - External (high Level)
Cowl Cement Products
P 3
Presumed Items
The following items have been presumed to contain asbestos where it was not possible to access the item in order to sample. These items must be treated as containing asbestos until access can be arranged in order to inspect or sample to confirm or refute the presence of asbestos.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Block A 0 1/008 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0101 - Lift Motor Room
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0116 - Classroom G17
Bitumen Below Parquet Floor
Bitumen Products
P 3
Block A 0 1/0117 - Classroom G18
Bitumen Below Parquet Floor
Bitumen Products
P 3
Block A 0 1/0130 - Boiler Room
Rope Seal To Skylight
Textile Rope & Yarn
P 4
Block A 0 1/0132 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block A 0 1/0132 - Electrical Cupboard
Bitumen Wrap To Live Cable
Bitumen Products
P 2
Block A 0 1/023 - Canteen Life Wall Heaters
Unspecified Material
P 6
Block A 0 1/026 - Kitchen Rope Seal To Skylight
Textile Rope & Yarn
P 4
Block A 0 1/075 - Corridor Insulation Residue To Floor Duct
Thermal Insulation
P 10
Block A 0 1/093 - Stores Sash Window Cord
Textile Rope & Yarn
P 4
Block A 0 1/099 - Stores Insulation Residue To Floor Duct
Thermal Insulation
P 10
Block A 0 1/099 - Stores Board Lining To Sealed Safe
Insulating Board
P 5
Block A External
Tank Room - Tank Room
Gaskets To Pipework
Thermal Insulation
P 3
Block A External
Water Room - Tank Room
Gaskets To Pipework
Thermal Insulation
P 3
Block B 0 2/002 - Office Bitumen Below Parquet
Bitumen Products
P 2
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 10 of 60
Presumed Items
The following items have been presumed to contain asbestos where it was not possible to access the item in order to sample. These items must be treated as containing asbestos until access can be arranged in order to inspect or sample to confirm or refute the presence of asbestos.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Floor
Block B 0 2/003 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/004 - Office
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/006 - Classroom BG1
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/007 - Classroom BG2
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/009 - Classroom BG3
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/012 - Classroom BG5
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/045 - Canteen
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 0 2/056 - Boiler Room Gaskets To Pipework
Gasket P 3
Block B 1 2/103 - Sixth Form Maths Classroom
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/105 - Classroom B11
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/106 - Staff Room
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/107 - Classroom B12
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/109 - Classroom B13
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/110 - Classroom B14
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/111 - Classroom B15
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/114 - Office Bitumen Below Parquet
Bitumen Products
P 2
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 11 of 60
Presumed Items
The following items have been presumed to contain asbestos where it was not possible to access the item in order to sample. These items must be treated as containing asbestos until access can be arranged in order to inspect or sample to confirm or refute the presence of asbestos.
Building Floor Location Number
and Name Item Material
Level of Identification
Risk Assessment
Floor
Block B 1 2/115 - Staff Room
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/122 - Classroom B17
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block B 1 2/123 - Classroom B16
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/002 - Classroom DG4
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/003 - Classroom DG4 Cupboard
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/033 - Classroom DG1
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C 0 3/044 - Electrical Cupboard
Flashguards Textile Rope & Yarn
P 4
Block C 0 3/048 - Stores S47
Bitumen Wrap To Live Electrical Cable
Bitumen Products
P 3
Block C 0 3/054 - Classroom
Bitumen Below Parquet Floor
Bitumen Products
P 2
Block C External
Design Block Roof - External (high Level)
Flue Pipe Cement Products
P 3
Block C External
Design Block Roof - External (high Level)
Cowl Cement Products
P 3
All locations were accessible at the time of this survey.
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 12 of 60
c. Asbestos Register
Building
Flo
or
Location
Leve
l o
f Id
en
tifi
cati
on
Item
Exte
nt
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal
Sc
ore
Block A 0 1/006 - Meeting Room
SP Stair Nosing Strip
4Lm Reinforced Composites
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Routinely Disturbed
8 Manage & Re-inspect
23 October 2020
Block A 0 1/007 - Risers SP
Insulation Residue To Wall (post Removal)
6m² Thermal
Insulation Good
Condition Sealed AIB,
spray, textile etc. Crocidolite 7 Easily Disturbed 3
Manage & Re-inspect
23 October 2020
Block A 0 1/007 - Risers SP
Insulation Residue To Pipework (post Removal)
10m² Thermal
Insulation Good
Condition Sealed AIB,
spray, textile etc. Crocidolite 7 Easily Disturbed 3
Manage & Re-inspect
23 October 2020
Block A 0 1/007 - Risers SP
Insulation Residue To Residue (post Removal)
1m² Thermal
Insulation Good
Condition Sealed AIB,
spray, textile etc. Crocidolite 7 Easily Disturbed 2
Manage & Re-inspect
23 October 2020
Block A 0 1/008 - Electrical Cupboard
P Flashguards 1Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Occasional Disturbance
3 Manage & Re-inspect
23 October 2020
Block A 0 1/0101 - Lift Motor Room
P Flashguards 1Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Occasional Disturbance
5 Manage & Re-inspect
23 October 2020
Block A 0 1/0116 - Classroom G17
P
Bitumen Below Parquet Floor
60m² Bitumen Products
Good Condition
Sealed AIB, spray, textile etc.
Chrysotile 3 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block A 0 1/0117 - Classroom G18
P
Bitumen Below Parquet Floor
70m² Bitumen Products
Good Condition
Sealed AIB, spray, textile etc.
Chrysotile 3 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block A 0 1/0130 - Boiler Room
SP Insulation Residue To South Wall
40m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 8 Encapsulate / Repair and Manage
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 13 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block A 0 1/0130 - Boiler Room
SP Insulation Residue To East Wall
20m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 8 Encapsulate / Repair and Manage
23 October 2020
Block A 0 1/0130 - Boiler Room
SP Insulation Residue To South Wall
40m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 8 Encapsulate / Repair and Manage
23 October 2020
Block A 0 1/0130 - Boiler Room
SP Insulation Residue To North Wall
40m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 8 Encapsulate / Repair and Manage
23 October 2020
Block A 0 1/0130 - Boiler Room
P Rope Seal To Skylight
8Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Usually inaccessible
3 Manage & Re-inspect
23 October 2020
Block A 0 1/0130 - Boiler Room
SP Insulation Residue To West Wall
40m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 8 Encapsulate / Repair and Manage
23 October 2020
Block A 0 1/0131 - Tank Room
SP Gaskets To Pipework
1m² Thermal
Insulation Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Usually
inaccessible 3
Manage & Re-inspect
23 October 2020
Block A 0 1/0132 - Electrical Cupboard
P Flashguards 1Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Occasional Disturbance
3 Manage & Re-inspect
23 October 2020
Block A 0 1/0132 - Electrical Cupboard
P Bitumen Wrap To Live Cable
1Lm Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 1
Manage & Re-inspect
23 October 2020
Block A 0 1/0137 - Bathroom SP Floor Tiles 6m² Vinyl Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Occasional Disturbance
5 Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 14 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block A 0 1/023 - Canteen P Life Wall Heaters
1Lm Unspecified
Material Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Crocidolite 6 Occasional Disturbance
0 No Access - Inspection Required
23 October 2020
Block A 0 1/026 - Kitchen P Rope Seal To Skylight
8Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Usually inaccessible
5 Manage & Re-inspect
23 October 2020
Block A 0 1/040A - Stores SP Insulation Residue To Pipework
6m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Amosite 8 Easily Disturbed 6 Encapsulate / Repair and Manage
23 October 2020
Block A 0 1/071 - Classroom G3
SP Floor 40m² Floor Tiles Good
Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Easily Disturbed 8 Manage & Re-inspect
23 October 2020
Block A 0 1/073 - Classroom G2
SP Floor 40m² Floor Tiles Good
Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Easily Disturbed 8 Manage & Re-inspect
23 October 2020
Block A 0 1/075 - Corridor P Insulation Residue To Floor Duct
15m² Thermal
Insulation High
Damage Sealed AIB,
spray, textile etc. Crocidolite 10
Usually inaccessible
4 No Access - Inspection Required
23 October 2020
Block A 0 1/093 - Stores P Sash Window Cord
8Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Occasional Disturbance
2 No Access - Inspection Required
23 October 2020
Block A 0 1/099 - Stores P Board Lining To Sealed Safe
1m² Insulating Board Good
Condition Sealed AIB,
spray, textile etc. Amosite 5
Occasional Disturbance
3 No Access - Inspection Required
23 October 2020
Block A 0 1/099 - Stores P Insulation Residue To Floor Duct
5m² Thermal
Insulation High
Damage Sealed AIB,
spray, textile etc. Crocidolite 10
Usually inaccessible
3 No Access - Inspection Required
23 October 2020
Block A 1 1/115 - Roof void above Classroom F8
SP Insulation Residue To Floor Duct
32m² Thermal
Insulation High
Damage Sealed AIB,
spray, textile etc. Crocidolite 10
Usually inaccessible
3 Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 15 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block A 1 1/136 - Classroom F1
SP Stair Nosing Strip
4Lm Reinforced Composites
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Routinely Disturbed
9 Manage & Re-inspect
23 October 2020
Block A 1 1/137 - Roof Void above Classroom F1
SP
Insulation Residue To Pipework (post Removal Findings)
2m² Thermal
Insulation Medium Damage
Sealed AIB, spray, textile etc.
Crocidolite 9 Occasional Disturbance
3 Manage & Re-inspect
23 October 2020
Block A Extern
al Tank Room - Tank Room
SP Insulation Residue To Walls
30m² Thermal
Insulation Low
Damage Sealed AIB,
spray, textile etc. Crocidolite 8
Occasional Disturbance
4 Remove by Licensed Asbestos Contractor
23 October 2020
Block A Extern
al Tank Room - Tank Room
P Gaskets To Pipework
2m² Thermal
Insulation Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Usually
inaccessible 3
Manage & Re-inspect
23 October 2020
Block A Extern
al
Outside Main Hall 1/097 - External (low Level)
SP Damp Proof Membrane
50Lm Bitumen Products
Low Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Usually
inaccessible 3
Manage & Re-inspect
23 October 2020
Block A Extern
al Water Room - Tank Room
P Gaskets To Pipework
1m² Thermal
Insulation Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Usually
inaccessible 3
Manage & Re-inspect
23 October 2020
Block B 0 2/002 - Office P
Bitumen Below Parquet Floor
15m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 16 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block B 0 2/002 - Stores SP Floor Tiles 1m² Vinyl Good
Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Easily Disturbed 3 Manage & Re-inspect
23 October 2020
Block B 0 2/003 - Office P
Bitumen Below Parquet Floor
15m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
Block B 0 2/004 - Office P
Bitumen Below Parquet Floor
15m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
Block B 0 2/006 - Classroom BG1
P
Bitumen Below Parquet Floor
48m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
Block B 0 2/007 - Classroom BG2
P
Bitumen Below Parquet Floor
48m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
Block B 0 2/009 - Classroom BG3
P
Bitumen Below Parquet Floor
48m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 17 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block B 0 2/012 - Classroom BG5
P
Bitumen Below Parquet Floor
50m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block B 0 2/045 - Canteen P
Bitumen Below Parquet Floor
140m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block B 0 2/056 - Boiler Room
P Gaskets To Pipework
2m² Gasket Low
Damage
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 3 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block B 1 2/103 - Sixth Form Maths Classroom
P
Bitumen Below Parquet Floor
20m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 4
Manage & Re-inspect
23 October 2020
Block B 1 2/105 - Classroom B11
P
Bitumen Below Parquet Floor
54m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block B 1 2/106 - Staff Room P
Bitumen Below Parquet Floor
25m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 18 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block B 1 2/107 - Classroom B12
P
Bitumen Below Parquet Floor
54m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 6
Manage & Re-inspect
23 October 2020
Block B 1 2/109 - Classroom B13
P
Bitumen Below Parquet Floor
45m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block B 1 2/110 - Classroom B14
P
Bitumen Below Parquet Floor
40m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block B 1 2/111 - Classroom B15
P
Bitumen Below Parquet Floor
40m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block B 1 2/114 - Office P
Bitumen Below Parquet Floor
15m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block B 1 2/115 - Staff Room P
Bitumen Below Parquet Floor
15m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 19 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block B 1 2/122 - Classroom B17
P
Bitumen Below Parquet Floor
35m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block B 1 2/123 - Classroom B16
P
Bitumen Below Parquet Floor
40m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block C 0 3/002 - Classroom DG4
P
Bitumen Below Parquet Floor
66m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 8
Manage & Re-inspect
23 October 2020
Block C 0 3/003 - Classroom DG4 Cupboard
P
Bitumen Below Parquet Floor
1m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 5
Manage & Re-inspect
23 October 2020
Block C 0 3/033 - Classroom DG1
P
Bitumen Below Parquet Floor
90m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 8
Manage & Re-inspect
23 October 2020
Block C 0 3/044 - Electrical Cupboard
P Flashguards 1Lm Textile Rope &
Yarn Good
Condition Sealed AIB,
spray, textile etc. Chrysotile 4
Occasional Disturbance
3 Manage & Re-inspect
23 October 2020
Block C 0 3/048 - Stores S47 P
Bitumen Wrap To Live Electrical Cable
1Lm Bitumen Products
Good Condition
Sealed AIB, spray, textile etc.
Chrysotile 3 Occasional Disturbance
2 Manage & Re-inspect
23 October 2020
2. Executive Summary
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 20 of 60
Building
Flo
or
Location
Le
vel o
f Id
en
tifi
cati
on
Item
Ex
ten
t
Material Assessment
Acces
sib
ilit
y
Pri
ori
ty
As
se
ssm
en
t
Recommendation N
ext
Insp
ecti
on
Product Type Condition Surface
Treatment Asbestos
Type
To
tal S
co
re
Block C 0 3/054 - Classroom P
Bitumen Below Parquet Floor
50m² Bitumen Products
Good Condition
Composite materials containing asbestos,
plastics, resins etc.
Chrysotile 2 Usually
inaccessible 7
Manage & Re-inspect
23 October 2020
Block C Extern
al
Design Block Roof - External (high Level)
P Flue Pipe 3Lm Cement Products
Good Condition
Sealed AIB, spray, textile etc.
Chrysotile 3 Usually
inaccessible 1
Manage & Re-inspect
23 October 2020
Block C Extern
al
Design Block Roof - External (high Level)
P Cowl 1No. Cement Products
Good Condition
Sealed AIB, spray, textile etc.
Chrysotile 3 Usually
inaccessible 1
Manage & Re-inspect
23 October 2020
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 21 of 60
Surveyor Colin Platt Room/Area 1/006 - Meeting Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Stair Nosing Strip
Item Accessibility Easy Amount 4Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Reinforced Composites 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 3 H – Extent 0
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 2 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Brown stair nosing strips, previously sampled by Safer Spaces as sample 024/182 in report 408469 found to contain chrysotile.
Surveyor Colin Platt Room/Area 1/007 - Risers
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To Wall (post Removal)
Item Accessibility Easy Amount 6m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 7
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 1
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Thermal Insulation residue to walls previously sampled by Safer Spaces as sample 024/166 in report 408469 found to contain crocidolite. Residues remain below painted surfaces not removed from area. Unsealed areas of wall have been encapsulated with ET150 during asbestos remedial works undertaken on 05/01/2019. See Life Environmental air certificate B-80385.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 22 of 60
Surveyor Colin Platt Room/Area 1/007 - Risers
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To Pipework (post Removal)
Item Accessibility Easy Amount 10m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 7
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Visually consistent with sample number 024/166 Thermal Insulation residue to pipework previously x ref by Safer Spaces as sample 024/166 in report 408469 found to contain crocidolite. Pipework have been encapsulated in previous asbestos remedial works undertaken on 05/01/2019. See Life Environmental air certificate B-80385.
Surveyor Colin Platt Room/Area 1/007 - Risers
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To Residue (post Removal)
Item Accessibility Easy Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 7
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
2 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 2 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Visually consistent with sample number 024/166 Thermal Insulation residue to pipework previously x ref by Safer Spaces as sample 024/166 in report 408469 found to contain crocidolite. Pipework have been encapsulated in previous asbestos remedial works undertaken on 05/01/2019. See Life Environmental air certificate B-80385.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 23 of 60
Surveyor Colin Platt Room/Area 1/008 - Electrical Cupboard
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Flashguards
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM flashguards within electrical box, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
Surveyor Colin Platt Room/Area 1/0101 - Lift Motor Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Flashguards
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 1 J – Frequency of use 1 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance1
M – Frequency of maintenance 2
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM flashguards within electrical box, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 24 of 60
Surveyor Colin Platt Room/Area 1/0116 - Classroom G17
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 60m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 1/0117 - Classroom G18
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 70m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 25 of 60
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Rope Seal To Skylight
Item Accessibility Difficult Amount 8Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 1
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 0 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/21
L – Type of maintenance2
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM role seal to skylights previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To West Wall
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
16 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Insulation Residue to West wall previously sampled by Safer Spaces as sample 024/194 in report 408469 to contain amosite. Wall poorly encapsulated with paint, large asbestos insulation shots remain. Lumps to be removed and walls encapsulated or all paint to be removed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 26 of 60
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To North Wall
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
16 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Visually consistent with sample number 024/194 Insulation Residue to north wall previously cross referenced by Safer Spaces as sample 024/194 in report 408469 to contain amosite. Wall poorly encapsulated with paint, large asbestos insulation shots remain. Lumps to be removed and walls encapsulated or all paint to be removed.
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To South Wall
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
16 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Visually consistent with sample number 024/194 Insulation Residue to south wall previously cross referenced by Safer Spaces as sample 024/194 in report 408469 to contain amosite. Wall poorly encapsulated with paint, large asbestos insulation shots remain. Lumps to be removed and walls encapsulated or all paint to be removed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 27 of 60
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To East Wall
Item Accessibility Easy Amount 20m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
16 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Visually consistent with sample number 024/194 Insulation Residue to east wall previously cross referenced by Safer Spaces as sample 024/194 in report 408469 to contain amosite. Wall poorly encapsulated with paint, large asbestos insulation shots remain. Lumps to be removed and walls encapsulated or all paint to be removed.
Surveyor Colin Platt Room/Area 1/0130 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To South Wall
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
16 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Visually consistent with sample number 024/194 Insulation Residue to south wall previously cross referenced by Safer Spaces as sample 024/194 in report 408469 to contain amosite. Wall poorly encapsulated with paint, large asbestos insulation shots remain. Lumps to be removed and walls encapsulated or all paint to be removed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 28 of 60
Surveyor Colin Platt Room/Area 1/0131 - Tank Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Gaskets To Pipework
Item Accessibility Difficult Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 1 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance1
M – Frequency of maintenance 2
Recommendation:
Manage & Re-inspect
Further Information: Gaskets to pipework, previously sampled by Safer Spaces as sample 024/200 in report 408469 found to contain chrysotile.
Surveyor Colin Platt Room/Area 1/0132 - Electrical Cupboard
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Flashguards
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM flashguards within electrical box, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 29 of 60
Surveyor Colin Platt Room/Area 1/0132 - Electrical Cupboard
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Bitumen Wrap To Live Cable
Item Accessibility Difficult Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
1 Total Risk Ass’ Score (P.A. + M.A)
3 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen wrap to live electrical cable, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
Surveyor Colin Platt Room/Area 1/0137 - Bathroom
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Floor Tiles
Item Accessibility Medium Amount 6m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Vinyl 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 1
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Floor Tiles and adhesive, previously sampled by Safer Spaces as sample 024/165 in report 408469 found to contain chrysotile.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 30 of 60
Surveyor Colin Platt Room/Area 1/023 - Canteen
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Life Wall Heaters
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Unspecified Material 2 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Crocidolite 3 6
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
0 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 0 F – Location 0 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
No Access - Inspection Required
Further Information: This location was not accessed and as such should be presumed to contain asbestos until proven otherwise. No access into live wall heaters previously presumed by Safer Spaces in report 408469 to contain crocodile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 1/026 - Kitchen
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Rope Seal To Skylight
Item Accessibility Difficult Amount 8Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 1
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 2
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM role seal to skylights previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 31 of 60
Surveyor Colin Platt Room/Area 1/040A - Stores
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Insulation Residue To Pipework
Item Accessibility Easy Amount 6m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 8
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
6 Total Risk Ass’ Score (P.A. + M.A)
14 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 1
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 1
Recommendation:
Encapsulate / Repair and Manage
Further Information: Insulation Residue to pipework Previously sampled by Safer Spaces as sample 024/203 in report 408469 found to contain Amosite. Upon re-election further than encapsulation is required.
Surveyor Colin Platt Room/Area 1/071 - Classroom G3
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Floor
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Floor Tiles 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Floor Tiles and adhesive below carpet, previously sampled by Safer Spaces as sample 024/179 in report 408469 found to contain chrysotile.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 32 of 60
Surveyor Colin Platt Room/Area 1/073 - Classroom G2
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor Ground Floor Item Floor
Item Accessibility Easy Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Floor Tiles 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 2 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Visually consistent with sample number 024/179 Floor Tiles and adhesive below carpet, previously cross referenced by Safer Spaces as sample 024/179 in report 408469 found to contain chrysotile.
Surveyor Colin Platt Room/Area 1/075 - Corridor
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Insulation Residue To Floor Duct
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 High Damage 3
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 10
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
14 Risk Coding MEDIUM
2 = Disturbance = (F+G+H)/3 2 F – Location 3 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance3
M – Frequency of maintenance 1
Recommendation:
No Access - Inspection Required
Further Information: Presumed ACM Thermal Insulation Residue to floor duct previously presumed by Safer Spaces in report 408469 to contain crocidolite until accessed. No access into duct due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 33 of 60
Surveyor Colin Platt Room/Area 1/093 - Stores
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Sash Window Cord
Item Accessibility Medium Amount 8Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
2 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 1
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 1
Recommendation:
No Access - Inspection Required
Further Information: Presumed ACM sash window cords previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access into duct due to damage limitations.
Surveyor Colin Platt Room/Area 1/099 - Stores
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Board Lining To Sealed Safe
Item Accessibility Medium Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Insulating Board 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Amosite 2 5
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
No Access - Inspection Required
Further Information: Presumed ACM board lining to Sealed safe previously presumed by Safer Spaces in report 408469 to contain amosite until accessed. No access due to damage limitations. No access for purposes of reinspection.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 34 of 60
Surveyor Colin Platt Room/Area 1/099 - Stores
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor Ground Floor Item Insulation Residue To Floor Duct
Item Accessibility Difficult Amount 5m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 High Damage 3
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 10
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
13 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 3 G – Accessibility 0 H – Extent 1
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance3
M – Frequency of maintenance 1
Recommendation:
No Access - Inspection Required
Further Information: Presumed ACM Thermal Insulation Residue to floor duct previously presumed by Safer Spaces in report 408469 to contain crocidolite until accessed. No access into duct due to damage limitations. No access for purposes of reinspection.
Surveyor Colin Platt Room/Area 1/115 - Roof void above Classroom F8
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor 1st Floor Item Insulation Residue To Floor Duct
Item Accessibility Difficult Amount 32m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 High Damage 3
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 10
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
13 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance3
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Visually consistent with sample number 024/193 insulation residue to pipework Previously S ref by Safer Spaces to sample 25/193 in report 408469. Roof void inspected as part of the remedial works undertaken on the 05 01/2019. Sectional areas Previously sheets to create clean area for maintenance access had been visually inspected and no visible asbestos containing materials identified. Areas beyond the sheeted area are still deemed to be contaminated.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 35 of 60
Surveyor Colin Platt Room/Area 1/136 - Classroom F1
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor 1st Floor Item Stair Nosing Strip
Item Accessibility Easy Amount 4Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Reinforced Composites 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
9 Total Risk Ass’ Score (P.A. + M.A)
11 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 3 H – Extent 0
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Brown stair nosing strips, previously sampled by Safer Spaces as sample 024/190 in report 408469 found to contain chrysotile.
Surveyor Colin Platt Room/Area 1/137 - Roof Void above Classroom F1
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor 1st Floor Item Insulation Residue To Pipework (post Removal Findings)
Item Accessibility Medium Amount 2m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Medium Damage 2
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 9
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
12 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance3
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Previously sampled by Safer Spaces as sample 024/193 Pipework sealed as part of previous asbestos remedial works. Thermal residue identified to Wall behind pipework, within pipe flashing to Floor penetration point and adjacent surfaces had been removed as far as reasonably practicable during asbestos remedial works undertaken on 05/01/2018. See Life Environmental Services air test certificate B-80385.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 36 of 60
Surveyor Colin Platt Room/Area Tank Room - Tank Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor External Item Gaskets To Pipework
Item Accessibility Difficult Amount 2m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 1 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance1
M – Frequency of maintenance 2
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM Gaskets to pipework, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access into room at time of survey, item presumed to remain I. Situ.
Surveyor Colin Platt Room/Area Tank Room - Tank Room
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor External Item Insulation Residue To Walls
Item Accessibility Medium Amount 30m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 3 Low Damage 1
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Crocidolite 3 8
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
12 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 1 H – Extent 2
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance3
M – Frequency of maintenance 1
Recommendation:
Remove by Licensed Asbestos Contractor
Further Information: Insulation Residue to walls, previously sampled by Safer Spaces as sample 024/198 in report 408469 to contain crocidolite. No access into room at time of survey, item presumed to remain in Situ.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 37 of 60
Surveyor Colin Platt Room/Area Outside Main Hall 1/097 - External (low Level)
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block A Sample No SP
Floor External Item Damp Proof Membrane
Item Accessibility Difficult Amount 50Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 0 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Bitumen camp proof course to perimeter of building, previously sampled by Safer Spaces as sample 024/197 in report 408469 to contain chrysotile.
Surveyor Colin Platt Room/Area Water Room - Tank Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block A Sample No P
Floor External Item Gaskets To Pipework
Item Accessibility Difficult Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Thermal Insulation 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 1 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance1
M – Frequency of maintenance 2
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM Gaskets to pipework, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to height restrictions.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 38 of 60
Surveyor Colin Platt Room/Area 2/002 - Office
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/002 - Stores
Survey Date 23 October 2019 Level of Identification
Strongly Presumed (SP)
Building Block B Sample No SP
Floor Ground Floor Item Floor Tiles
Item Accessibility Easy Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Vinyl 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
5 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 2 H – Extent 0
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Floor Tiles and adhesive previously sampled by Safer Spaces as sample 024/209 in report 408469 found to contain chrysotile
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 39 of 60
Surveyor Colin Platt Room/Area 2/003 - Office
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/004 - Office
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 40 of 60
Surveyor Colin Platt Room/Area 2/006 - Classroom BG1
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 48m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/007 - Classroom BG2
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 48m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 41 of 60
Surveyor Colin Platt Room/Area 2/009 - Classroom BG3
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 48m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/012 - Classroom BG5
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 50m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 42 of 60
Surveyor Colin Platt Room/Area 2/045 - Canteen
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 140m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 1 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/056 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor Ground Floor Item Gaskets To Pipework
Item Accessibility Difficult Amount 2m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Gasket 1 Low Damage 1 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 1 J – Frequency of use 2 K – Average time in use 1
4 = Maintenance activity = (L+M)/22
L – Type of maintenance1
M – Frequency of maintenance 2
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM Gaskets to pipework, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 43 of 60
Surveyor Colin Platt Room/Area 2/056 - Boiler Room
Survey Date 23 October 2019 Level of Identification
Inspected Area (IA)
Building Block B Sample No IA
Floor Ground Floor Item Bitumen Wrap To Live Electrical Cable
Item Accessibility Amount
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
No Suspect Materials Seen
Asbestos Removed 0
1 = Normal Occupant Activity = (E) E – Main type of activity Total Priority Score (P.A.) = (1+2+3+4):
Total Risk Ass’ Score (P.A. + M.A)
0 Risk Coding
2 = Disturbance = (F+G+H)/3 F – Location G – Accessibility H – Extent
3 = Exposure potential = (I+J+K)/3 I – Number of occupants J – Frequency of use K – Average time in use
4 = Maintenance activity = (L+M)/2 L – Type of maintenance M – Frequency of maintenance
Recommendation:
No recommendation required
Further Information: Area visually inspected. No suspect materials seen. Presumed ACM bitumen wrap to live electrical cable, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. Asbestos Removed
Surveyor Colin Platt Room/Area 2/103 - Sixth Form Maths Classroom
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 20m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
4 Total Risk Ass’ Score (P.A. + M.A)
6 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 44 of 60
Surveyor Colin Platt Room/Area 2/105 - Classroom B11
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 54m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/106 - Staff Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 25m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 2 J – Frequency of use 3 K – Average time in use 2
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 45 of 60
Surveyor Colin Platt Room/Area 2/107 - Classroom B12
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 54m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 2 E – Main type of activity 2 Total Priority Score (P.A.) = (1+2+3+4):
6 Total Risk Ass’ Score (P.A. + M.A)
8 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 2 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/109 - Classroom B13
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 45m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 46 of 60
Surveyor Colin Platt Room/Area 2/110 - Classroom B14
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/111 - Classroom B15
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 47 of 60
Surveyor Colin Platt Room/Area 2/114 - Office
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 1 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/115 - Staff Room
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 15m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 2 J – Frequency of use 3 K – Average time in use 2
4 = Maintenance activity = (L+M)/21
L – Type of maintenance0
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 48 of 60
Surveyor Colin Platt Room/Area 2/122 - Classroom B17
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 35m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 2/123 - Classroom B16
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block B Sample No P
Floor 1st Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 40m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 2
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 49 of 60
Surveyor Colin Platt Room/Area 3/002 - Classroom DG4
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 66m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 3/003 - Classroom DG4 Cupboard
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 1m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
5 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 1 I – Number of occupants 0 J – Frequency of use 3 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 50 of 60
Surveyor Colin Platt Room/Area 3/033 - Classroom DG1
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 90m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
8 Total Risk Ass’ Score (P.A. + M.A)
10 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 3 I – Number of occupants 3 J – Frequency of use 3 K – Average time in use 3
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
Surveyor Colin Platt Room/Area 3/044 - Electrical Cupboard
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Flashguards
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Textile Rope & Yarn 2 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 4
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
3 Total Risk Ass’ Score (P.A. + M.A)
7 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/22
L – Type of maintenance2
M – Frequency of maintenance 1
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM flashguards within electrical box, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 51 of 60
Surveyor Colin Platt Room/Area 3/048 - Stores S47
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Bitumen Wrap To Live Electrical Cable
Item Accessibility Medium Amount 1Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 1 E – Main type of activity 1 Total Priority Score (P.A.) = (1+2+3+4):
2 Total Risk Ass’ Score (P.A. + M.A)
5 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 1 F – Location 2 G – Accessibility 1 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM Bitumen Wrap to Live Electrical cable, previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
Surveyor Colin Platt Room/Area 3/054 - Classroom
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor Ground Floor Item Bitumen Below Parquet Floor
Item Accessibility Difficult Amount 50m²
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Bitumen Products 1 Good Condition 0 Composite materials; reinforced plastics, resins, vinyl tiles, sealed decorative finishes, etc.
0 Chrysotile 1 2
1 = Normal Occupant Activity = (E) 3 E – Main type of activity 3 Total Priority Score (P.A.) = (1+2+3+4):
7 Total Risk Ass’ Score (P.A. + M.A)
9 Risk Coding LOW
2 = Disturbance = (F+G+H)/3 2 F – Location 2 G – Accessibility 0 H – Extent 3
3 = Exposure potential = (I+J+K)/3 2 I – Number of occupants 2 J – Frequency of use 3 K – Average time in use 1
4 = Maintenance activity = (L+M)/20
L – Type of maintenance0
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM bitumen below parquet floor previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed. No access due to damage limitations.
3. Reinspection Data Sheets
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 52 of 60
Surveyor Colin Platt Room/Area Design Block Roof - External (high Level)
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor External Item Cowl
Item Accessibility Difficult Amount 1No.
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Cement Products 1 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
1 Total Risk Ass’ Score (P.A. + M.A)
4 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 0 F – Location 0 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM cement cowl previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
Surveyor Colin Platt Room/Area Design Block Roof - External (high Level)
Survey Date 23 October 2019 Level of Identification
Presumed (P)
Building Block C Sample No P
Floor External Item Flue Pipe
Item Accessibility Difficult Amount 3Lm
A - Product Type: B - Extent of Damage: C – Surface Treatment D – Asbestos Type Material Ass (M.A) (A+B+C+D):
Cement Products 1 Good Condition 0
Enclosed sprays, lagging and textiles, AIB (encapsulated), asbestos cement and unsealed decorative finishes
1 Chrysotile 1 3
1 = Normal Occupant Activity = (E) 0 E – Main type of activity 0 Total Priority Score (P.A.) = (1+2+3+4):
1 Total Risk Ass’ Score (P.A. + M.A)
4 Risk Coding VERY LOW
2 = Disturbance = (F+G+H)/3 0 F – Location 0 G – Accessibility 0 H – Extent 0
3 = Exposure potential = (I+J+K)/3 0 I – Number of occupants 0 J – Frequency of use 0 K – Average time in use 0
4 = Maintenance activity = (L+M)/21
L – Type of maintenance1
M – Frequency of maintenance 0
Recommendation:
Manage & Re-inspect
Further Information: Presumed ACM cement flue pipe previously presumed by Safer Spaces in report 408469 to contain chrysotile until accessed.
4. Additional Bulk Samples
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 53 of 60
No further Bulk samples taken
Appendix 1 – Definitions & Recommended Guidance
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 54 of 60
Level of Identification
Sample (S) A physical sample was taken on site by the Surveyor and analysed by the laboratory.
Cross reference (X) No sample was taken but the material is visually similar to a sample that has been analysed from
the survey. This is a form of Strong Presumption as defined in HSG264.
Strongly Presumed (SP) No sample was taken but due to the appearance of the material and with the surveyor’s
knowledge and experience the material has been identified as containing asbestos.
Presumed (P) No sample was taken and therefore due to this lack of information the material or item must be
presumed to contain asbestos. This will often be because the item could not be sampled due to excessive height (such
as soffits) or an item could not be inspected (or sampled) as this may have presented a risk to the Surveyor (e.g.
opening up live plant and electrics).
No access areas are also treated as a presumption.
Recommendations
The various recommendations given within this report are explained below:-
Manage & Re-inspect
Where asbestos is left in situ there is a duty to formulate and implement a Management Plan to help prevent accidental
damage and exposure.
The basic requirements of this policy are (from HSG 264):
• Keep and maintain an up-to-date record of the location, condition, maintenance and removal of all asbestos-
containing materials
• Maintain it in a good state of repair and regularly monitor the condition
• Inform anyone who will potentially come into contact with or disturb the material as to its location and condition
• Have arrangements and procedures in place, so that work which may disturb the materials complies with the Control
of Asbestos Regulations 2012
• Review the plan at regular intervals
Label
A decision should be taken as to whether to label ACMs. The decision will depend on the confidence in the
administration of the asbestos management system and whether communication with workers and contractors coming
to work on site can be effective.
Labelling ACMs should not be solely relied on as a control measure; however it is an effective method of preventing
exposure to building occupants (and, in particular, maintenance workers). If, for any reason, management procedures
fail, it may act as an effective last barrier to uncontrolled damage to the ACM.
It may not always be prudent or practical to label all installations of asbestos; for example high level items such as roof
sheets, flue cowls and soffits or items such as gaskets to pipe flanges, textured coating and floor tiles.
Encapsulate
When this recommendation has been given, the ACM is raw and requires encapsulating with a suitable sealant or the
existing sealant or covering has deteriorated and the installation requires either a complete or partial re-encapsulation.
Appendix 1 – Definitions & Recommended Guidance
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 55 of 60
We recommend that sealing or painting of insulating board, insulation or spray coatings should be undertaken by a
licensed contractor and is likely to be subject to a 14 day notification to the HSE, (as per the Control of Asbestos
Regulations 2012).
Repair
The material has sustained damage to some area or areas and requires attention to make good the material so that it
can be managed safely. This will often involve some element of decontamination if debris is associated with the
damage.
Remove
If an item is recommended for removal it has either sustained damage and is posing an increased risk in its current
condition; or due to its location it is considered high risk as it could easily be disturbed in the future. Materials
recommended for removal will be given one of the following recommendations:-
Removal by Licensed Contractor. This will include removal of AIB, Insulation, and Spray Coatings and is likely to be
subject to a 14 day notification to the HSE, (as per the Control of Asbestos Regulations 2012).
Removal by Approved Contractor. This will include removal of lower risk materials such as Asbestos Cement,
Bitumen Products, Reinforced Composites, and Floor Tiles etc. Some such works may be considered Notifiable Non-
Licensed Works.
The Control of Asbestos Regulations 2012 does not necessarily require such removal works to be undertaken by a
licensed contractor. However it is good practice, and we would strongly recommended that all removal works are
undertaken by a licensed contractor.
Restrict Access
Materials have been identified that are in a damaged condition often with associated debris that can be easily
disturbed. As such access to the area should be prevented to all persons until such a time when the area has been
deemed safe for reoccupation. This will usually be once removal works have been completed.
No Access – Inspection Required
Access to the given location was either not possible at all or only limited access was possible. In both instances there
is the potential for unidentified asbestos being present and as such the area must be treated as containing asbestos
until full access is possible.
Arrangements should be made at the earliest opportunity to revisit locations where access was not possible or access
was limited in order that such areas can be inspected fully.
Items and materials that are presumed to contain asbestos will also be given the recommendation of ‘No Access –
Inspection required’. In these instances the item or material should be treated as containing asbestos until
arrangements can be made to access such items or materials in order to carry out an inspection or sample to confirm
or otherwise the presence of asbestos.
No Recommendation Required
Asbestos has not been identified and as such no further action is required.
Recommended Guidance
To comply with and ensure that the requirements of section 2 & 3 of the Health and Safety at Work Act (as amended)
1974, the Management of Health and Safety at Work Regulations 1999, the Control of Asbestos Regulations 2012 and
the Control of Substances Hazardous to Health 2002 are met, the following recommendations should be implemented:
Appendix 1 – Definitions & Recommended Guidance
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 56 of 60
Undertake suitable and sufficient Risk Assessments of identified ACMs against normal occupation and maintenance
operations, in compliance with Regulations 3 of the Management of Health & Safety at Work Regulations 1999 and
Regulation 6 of the Control of Asbestos Regulations 2012.
The findings of the survey be brought to the attention of those persons who are likely to come in contact with asbestos, in
compliance with Section 2 and 3 of the Health and Safety at Work Act (as amended) 1974 and Regulation 9 of the Control
of Asbestos Regulations 2012.
Implement an Asbestos Management Policy, Plan and review process in compliance Regulation 4 of the Control of
Asbestos Regulations 2012.
During the course of the survey it may not have been possible to access all areas of the site. Details of areas requiring
further access is identified within the Data Sheets and Executive Summary of this report. In accordance with HSG 264,
asbestos is presumed to be present within these areas and should be treated accordingly until further inspection and
analysis of building fabric and services proves otherwise.
It is recommended that air monitoring is carried out within any areas where ACMs have been identified in order to assess
airborne fibre levels within adjacent occupied areas in relation to the clearance indicator, as documented by HSG 248 The
Analyst Guide.
Where asbestos debris or asbestos in poor condition has been found it is recommended that access is restricted to these
areas in accordance with Regulation 11 of the Control of Asbestos Regulations 2012 and that air monitoring is carried out
within adjacent areas in order to assess airborne fibre levels.
All identified asbestos to be appropriately identified and subject to Risk Assessment, management, and re-inspection.
Site specific recommendations in respect to the location and condition of asbestos materials identified during the
course of this inspection are detailed in the Survey Data Sheets and Asbestos register. In considering the management
of asbestos materials identified to date, these recommendations should be referred to and complied with.
It is recommended that work on, or removal of, both licensed and non-licensed ACMs is undertaken by a licensed
asbestos removal contractor so that the Duty Holder / Client can have confidence that the contractor has provided the
correct level of training and has the experience and knowledge necessary to deal with these products safely.
It is a requirement of CAR 2012 that further intrusive investigations and sampling be carried out where any refurbishment,
maintenance, or similar activity is planned that may expose asbestos materials. This should be a refurbishment/demolition
survey as documented by HSG 264.
The findings of this report should not be solely relied upon in obtaining costs for proposed asbestos abatement work. Any
proposed abatement/removal of the asbestos should be undertaken against a detailed specification.
Appendix 2 – Material & Priority Assessment Algorithms
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 57 of 60
Where ACMs have been identified or presumed to be present a Material Assessment Algorithm has been calculated as detailed in HSG 264 and reproduced in line with the table overleaf.
The Material Assessment is an assessment of the condition of the ACM, or the presumed ACM, and the likelihood of it releasing fibres in the event of it being disturbed in some way. This Material Assessment will give a good initial guide to the priority for management as it will identify the materials which will most readily release airborne fibres if disturbed. However, there are other factors to take into account when prioritising action. These are considered in the Priority Assessment which is described later.
For each of the four variables given by the table a score is allocated. The four scores are added together to give a Material Assessment score of between 2 and 12.
HIGH RISK 10-12 Materials with scores of 10 or more should be regarded as high risk with a significant potential to release fibres if disturbed;
MEDIUM RISK 7- 9 Those materials with a score between 7 and 9 are regarded as medium risk to release fibres.
LOW RISK 5-6 Materials with a score between 5 and 6 are low risk to release fibres.
VERY LOW RISK 4 or less Scores of 4 or less are very low risk.
Section Sample Variable
Score Examples of Score
A Product type (or debris from product).
1 Asbestos reinforced composites (plastics, resins, mastics, roofing felts, vinyl floor tiles, semi rigid paint or decorative finishes, asbestos cement, etc).
2 Asbestos insulating board, mill boards, other low-density insulation boards, asbestos textiles, gaskets, ropes and woven textiles, asbestos paper and felt.
3 Thermal insulation (e.g.: pipe and boiler lagging), sprayed asbestos, loose asbestos, asbestos mattresses and packing.
BExtent of damage/ deterioration.
0 Good condition: no visible damage.
1 Low damage: a few scratches or surface marks; broken edges on boards, tiles, etc.
2 Medium damage: significant breakage of materials or several small areas where material has been damaged revealing loose asbestos fibres.
3 High damage or delamination of materials, sprays and thermal insulation. Visible asbestos debris.
C Surface Treatment
0 Composite materials containing asbestos: reinforced plastics, resins, vinyl tiles.
1 Enclosed sprays and lagging, AIB (with exposed face painted or encapsulated), unsealed cement sheets, etc.
2 Unsealed AIB, or encapsulated lagging and sprays.
3 Unsealed lagging and sprays.
D Asbestos type
1 Chrysotile.
2 Amphibole asbestos excluding Crocidolite.
3 Crocidolite.
Material Assessment Score = A + B + C + D
Appendix 2 – Material & Priority Assessment Algorithms
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 58 of 60
The Material Assessment identifies the high risk materials, that is, those which will most readily release airborne fibres if disturbed. It does not automatically follow that those materials assigned the highest score in the Material Assessment will be the materials that should be given priority for remedial action. Management priority must be determined by carrying out a Risk Assessment which will also take into account the likely maintenance activity; occupant activity; likelihood of disturbance; and human exposure potential.
The Priority Assessment Algorithm looks at the likelihood of someone disturbing the ACM. Please note Priority Assessments have not been undertaken as part of this survey.
A legal requirement to carry out a Risk Assessment for all work activities exists under the Management of Health and Safety at Work Regulations 1999. The requirement to assess the risk posed by asbestos is further enforced by the Control of Asbestos Regulations 2012. These regulations require that asbestos present in the workplace must not present a hazard to health
The risks from asbestos should be assessed and managed for all identified or presumed ACMs. The Risk Assessment or priority rating will establish the likelihood of people being exposed to the hazard and identify the measures to be taken that will either eliminate the hazard or adequately control it.
The Priority Assessment Score is calculated on the average scores for each of the four human exposure factors given by the table on the following page.
It is the responsibility of the Duty Holder to complete the Priority Risk Assessment, and ensure it remains up to date and accurate.
Section Factor Score Examples of Score
Normal Occupant Activity Score = E
E Main Type of Activity
0 Rare Disturbance activity (e.g. Store Room) 1 Low Disturbance Activity (e.g. Office) 2 Periodic Disturbance (May contact ACMs) 3 High Level of disturbance (e.g. panel on door)
Likelihood of Disturbance Score = Average of F + G + H
F Location
0 Outdoors 1 Large Rooms or well ventilated Areas 2 Rooms up to 100sqm 3 Confined Spaces
G Accessibility
0 Usually Inaccessible or unlikely to be disturbed 1 Occasional Disturbance 2 Easily Disturbed 3 Routinely Disturbed
H Extent
0 Very Small Amounts 1 <10sqm or <10lm 2 >10sqm to <50sqm or >10lm to <50lm 3 <50sqm or >50lm
Human Exposure Potential Score = Average of I + J + K
I No of Occupants
0 None 1 1-3 2 4-10 3 >10
J Frequency of Use
0 Infrequent 1 Monthly 2 Weekly 3 Daily
K Average Time in Use
0 <1 Hour 1 >1 hour and <3 hours 2 >3 hours to <6 hours 3 >6 Hours
Maintenance Activity Score = Average of L + M
L Type of Activity
0 Minor disturbance e.g. possible contact 1 Low disturbance e.g. removing light bulb 2 Medium Disturbance 3 High levels of disturbance
Appendix 2 – Material & Priority Assessment Algorithms
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 59 of 60
MFrequency of Maintenance
0 ACM unlikely to be disturbed 1 1 per Year 2 >1 per year 3 >1 per Month
Risk Assessment
The Risk Assessment Priority Algorithm is calculated by adding the Material Assessment Score obtained during the survey to the Priority Assessment Score.
HIGH RISK - 18 POINTS OR MORE
The potential hazard arising from this category warrants urgent action. Immediate plans should be made for the removal/containment of the ACM. If delay in remedial action is likely to occur the affected area should initially be sealed-off and appropriate warning signs posted.
MEDIUM RISK - 14-17 POINTS
This category indicates that deterioration in any of the contributory factors may result in fibre release. Therefore all asbestos should be contained/sealed/encapsulated.
LOW RISK - 9-13 Points
This category indicates the need for regular monitoring. Although the current risk of fibre release is low, this material may suffer deterioration through age/local accidental damage.
VERY LOW RISK 8 or less
Similarly this category requires regular monitoring. Although the current risk of fibre release is low, this material may suffer deterioration through age/local accidental damage.
Appendix 3 – Survey Drawings
Version 08, May 2018 Life Environmental Services Issue No. 1
Reinspection Survey & PA B-87863 - Raynes Park High School Page 60 of 60
COURTYARD
UP
void
UP
UP
UP
UP
UP
UP
UP
UP
UP
GIA: 3 779.3 m²
Raynes Park High School - Ground FloorBlock A
A-E5
A-E3A-E4
A-E6
A-E8A-E7
A-E9
A-E12 A-E11
A-E10
A-E1
A-E2
1/076Corridor54.52 m²
1/095Store6.37 m²
1/096Store6.33 m²
1/097Hall227.08 m²
1/075Corridor38.58 m²
1/0111Corridor51.03 m²
1/009Corridor40.61 m²
1/002Reception45.91 m²
1/094Store (Tables)16.55 m²
1/093Store24.77 m²
1/081Corridor8.62 m²
1/091Corridor1.25 m²
1/086Corridor1.85 m²
1/080Store13.22 m²
1/082Lobby1.84 m²
1/082Lockers (Sodexo Staff)8.59 m²
1/085Toilet (Sodexo Staff)3.79 m²
1/087Staff Room (Sodexo Staff)16.43 m²
1/092Workshop9.54 m²
1/090Office5.09 m²
1/0129Store2.01 m²
1/0128Entrance to the flat6.60 m²
1/088Lobby2.72 m²
1/089Store2.28 m²
1/083Corridor3.04 m²
1/084Toilet (Sodexo Staff)2.01 m²
1/098Store2.74 m²
1/079Drama Studio82.67 m²
1/078Drama Studio82.88 m² 1/077
Office17.11 m²
1/074Classroom58.30 m² 1/073
Classroom50.24 m²
1/071Classroom44.34 m²
1/072Store12.78 m²
1/070Classroom45.71 m²
COURTYARD
1/0115Office4.87 m²
1/0114MFL Base Room22.85 m²
1/0116Classroom44.90 m²
1/069Corridor159.17 m²
1/0117Classroom44.92 m²
1/0118Classroom44.79 m²
1/0119Classroom44.67 m²
1/0112Classroom56.17 m²
1/0113Classroom53.27 m²
1/040Classroom45.43 m²
1/039AST Base29.61 m²
1/037AST Base13.79 m²
1/036Deputy Head's Office14.95 m²
1/035PA to Deputy Head's Office9.23 m²
1/0121Assistant Head's Office9.91 m²
1/0120Data Man's Office10.02 m²
1/034Lobby5.54 m²
1/038Lobby0.93 m²
1/0122Cleaning Store2.34 m²
1/0123Toilet (Girls)11.81 m²
1/0125Toilet (Boys)10.04 m²
1/0124Toilet (Accessible)3.50 m²
1/0126Assistant Head's Office10.39 m²
1/0127Office9.54 m²
1/025Corridor21.79 m² 1/033
Stairwell16.97 m²
1/029Store5.10 m²
1/028Store10.50 m²
1/027Office9.15 m²
1/0133Gas Meter3.08 m²
1/0132Elect Room5.50 m²
1/0131Tank Room17.63 m²
1/0130Boiler Room41.85 m²
1/026Kitchen105.81 m²
1/032Chemical Store0.87 m²
1/031Toilet (Staff)1.60 m²
1/030Changing (Staff)3.26 m²
1/023Dining Hall188.66 m²
1/024Store4.40 m²
1/021Corridor21.11 m²
1/0110Store1.05 m²
1/022Classroom43.64 m²
1/020Meeting Room43.81 m²
1/017Reprographics28.08 m²
1/019Corridor4.74 m²
1/018Lobby9.62 m²
1/016Help Desk Office29.04 m²
1/015Support Team Office56.97 m²
1/014Store2.53 m²
1/013Exam Store7.21 m²
1/010Waiting Room8.58 m²
1/011PA to Head's Office9.34 m²
1/012Head's Office26.12 m²
1/008Archive Store9.41 m²
1/0137Toilet6.17 m²
1/006Conference Room31.65 m²
1/005Office9.28 m²
1/004Finance Office13.03 m²
1/001Entrance Lobby5.35 m²
1/003Waiting Room7.18 m²
1/007Riser0.54 m²
1/099Store7.29 m²
1/0100Stairwell9.64 m²
1/0101Lift Motor Room2.65 m²
1/0102Lift 1.42 m²
1/0103Medical Room8.69 m²
1/0104Toilet1.64 m²
1/0105PA to Deputy Head's Office8.66 m²
1/0106Exam Office9.66 m²
1/017Deputy Head's Office8.90 m²
1/0108Toilet (Staff/Female)12.87 m²
1/0109Toilet (Staff/Male)11.30 m²
1/043Stairwell15.88 m²
1/041The Base43.93 m²
1/042Office11.81 m²
1/044Corridor52.66 m²
1/046Classroom56.49 m²
1/064Staff Room61.78 m²
1/063Staff Room67.84 m²
1/062Meeting Room28.79 m² 1/061
Lift 2.56 m²
1/045Corridor37.15 m²
1/051Corridor67.63 m²
1/054Corridor13.24 m²
1/058Server Room20.95 m²
1/059ICT 72.16 m²
1/057Classroom72.14 m²
1/060Resource Centre122.75 m²
1/056Toilet (Girls)22.21 m²
1/049Toilet (Staff/Female)10.19 m²
1/052Store5.19 m²
1/053Cleaning Store2.14 m²
1/055Lobby1.88 m²
1/050Toilet (Accessible)2.87 m²
1/048Toilet (Staff/Male)6.69 m²
1/047Lobby3.61 m²
1/065The Hub64.50 m²
1/066The Hub19.09 m²
1/068Chill Out Room4.85 m²
1/067Intervention Room10.85 m²
1/0136Store11.32 m²
1/1035Stairwell21.23 m²
1/0134Plant Room29.01 m²
1/040A
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
1 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
P
P
024/197
P
024/166
024/182 024/165 024/169 024/171 P P P P 024/200 P
024/194
024/204
P P P
P
P
P
024/179PP
X024/166
X024/166
X024/194
NO ACCESS WITHINHEATERS
X024/179
UP
UP
UP
void
UP
GIA: 3 070.0 m²
Raynes Park High School - First FloorBlock A
UP
UP
UP
UP
UP
UP
UP
1/112Corridor90.13 m²
1/113Corridor46.13 m²
1/109Corridor80.34 m²
1/118Corridor11.85 m²
1/120Stairwell21.70 m²
1/123Corridor53.06 m²
1/126Corridor45.09 m²
1/133Corridor6.15 m²
1/130IT Room9.89 m²
1/132Stairwell17.85 m²
1/131Lift1.42 m²
1/129Toilet (Girls)13.36 m²
1/128Toilet (Boys)14.13 m²
1/136Classroom82.32 m²
1/138Classroom83.60 m²
1/140Classroom89.67 m²
1/141Classroom88.53 m²
1/143Classroom90.93 m²
1/121Classroom84.40 m²
1/144Classroom75.61 m²
1/145Intervention Room14.67 m²1/122
Store7.10 m²
1/125Boiler Room1.39 m²
1/124Science Teachers Work Room65.58 m²
1/142Store (Science)7.09 m²
1/139Prep Room (Science)18.34 m²
1/137Store14.22 m²
1/135Store (Sound)8.12 m²
1/134Sound/Light Room32.91 m²
1/176Living Room15.58 m²
1/177Kitchen7.80 m²
1/175Bedroom12.49 m²
1/174Bedroom10.72 m²
1/172Bedroom7.89 m²
1/173Store0.79 m²
1/183Store1.58 m²
1/171Corridor9.27 m²
1/178Store1.97 m²
1/180Store1.75 m²1/179Store1.75 m²
1/119Classroom91.97 m²
1/115Classroom69.17 m²
1/114Classroom75.92 m²
1/158Stairwell14.39 m²
1/150Classroom61.49 m²
1/148Classroom61.95 m²
1/147Stairwell14.03 m²
1/146Corridor55.35 m²
1/149Studio14.57 m²
1/151Store (Music)12.04 m²
1/153Practice Room16.24 m²
1/152Corridor15.18 m²
1/154Practice Room5.55 m²
1/155Practice Room5.36 m²
1/156Practice Room5.36 m²
1/157Practice Room5.62 m²
1/159Classroom74.34 m²
1/111Classroom56.70 m²
1/110Classroom56.73 m²
1/161Stairwell29.78 m²
1/116Store4.45 m²
1/117Cleaning Store4.83 m²
1/160Store10.49 m²
1/107Office17.16 m²
1/108Lift2.56 m²
1/106Library93.94 m²
1/105Classroom86.94 m²
1/104Classroom56.05 m²
1/103Classroom55.63 m²
1/101Stairwell35.45 m²
1/167Classroom56.18 m²
1/102Corridor63.18 m²
1/168Classroom56.31 m²
1/169Classroom58.21 m²
1/170Store4.07 m²
1/164Toilet (Boys)16.84 m²
1/162Toilet (Accessible)3.10 m²
1/163Lobby2.64 m²
1/165Cleaning Store2.45 m²
1/166Group Room27.70 m²
1/182Toilet1.85 m²
1/181Toilet3.91 m²
1/127Office8.71 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
2 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
024/193024/190 P
X024/193
UP
UP
GIA: 520.7 m²
Raynes Park High School - Second FloorBlock A
1/202Stairwell29.83 m²
1/203Corridor38.13 m²
1/208Lift2.56 m² 1/209
Office8.91 m²
1/207Store11.04 m²
1/206Store2.58 m²
1/210Cleaning Store3.72 m²
1/212Store11.66 m²
1/215Store6.01 m²
1/216Store2.68 m²
1/205Store10.46 m²
1/204Classroom110.16 m²
1/211Classroom106.20 m²
1/214Classroom102.23 m²
1/213Kiln Room10.19 m²
1/217Toilet (Staff)2.90 m²
1/201Stairwell39.80 m²
External Tank Room
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
3 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
024/198
P
UP
UP
UPUP
GIA 1 204.6 m²
Raynes Park High School - Ground FloorBlock B
UP
B-E7
B-E6
B-E5
B-E8
B-E9
B-E10
B-E1
B-E2
B-E3
B-E4
2/013Corridor22.34 m²
2/032Corridor14.47 m²
2/011Corridor5.66 m²
2/008Corridor41.46 m²
2/005Corridor40.88 m²
2/001Corridor15.67 m²
2/048Corridor15.78 m²
2/051Stairwell8.98 m²
2/052Store3.06 m²
2/053Lobby3.79 m²
2/054Office13.73 m²
2/055Toilet (Staff)5.16 m²
2/002Store10.68 m²
2/003Store13.27 m²
2/004Store15.29 m²
2/006Classroom59.54 m²
2/007Classroom59.73 m²
2/009Classroom59.36 m²
2/010Classroom59.43 m²
2/012Classroom55.29 m²
2/021Meeting Room14.30 m²
2/014Plant Room2.43 m²2/022
Office14.96 m²
2/023Changing Room12.25 m²
2/020Lobby12.78 m²
2/024Intervention Room10.81 m²
2/015Corridor56.14 m²
2/017Cloaks6.18 m²
2/016Kitchen15.36 m²
2/018Toilet (Staff/Accessible)3.43 m²
2/019Toilet (Accessible)3.34 m²
2/025Lobby12.55 m²
2/026Group Room12.41 m²
2/027Group Room15.09 m²
2/028Group Room13.96 m²
2/029Classroom48.27 m²
2/030Common Room7.67 m²
2/031SENCO Office14.91 m²
2/033Stairwell8.38 m²
2/034Store3.06 m²
2/037Toilet (Accessible)2.54 m²
2/035Lobby2.80 m²
2/036Toilet (Girls)8.04 m²
2/038Toilet (Boys)15.11 m²
2/040Toilet (Staff)8.55 m²
2/041Cleaning Store1.33 m²
2/042Cleaning Store2.72 m²
2/043Store1.40 m²
2/044Lift1.54 m²2/039
Corridor2.58 m²
2/045Hall171.88 m²
2/046Kitchen25.09 m²
2/047Plant Room1.39 m²
2/056Boiler Room11.72 m²
2/049Group Room7.77 m²
2/050Office7.77 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
4 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
P P P P P P P
024/209
P
P P
GIA: 741.9 m²
Raynes Park High School - First FloorBlock B
UP
UP
UP
2/102Corridor57.69 m²
2/125Office15.44 m²
2/101Stairwell14.38 m²
2/124Toilet (Boys)15.45 m²
2/103Group Room24.08 m²
2/104Store11.06 m²2/105
Classroom60.13 m²
2/107Classroom60.08 m²
2/109Classroom59.58 m²
2/110Classroom60.05 m²
2/111Classroom55.09 m²
2/108Corridor49.64 m²
2/106Staff Room29.06 m²
2/123Classroom46.74 m²
2/122Classroom46.67 m²
2/113Stairwell14.28 m²
2/112Toilet (Girls)14.49 m²
2/114Office15.83 m²
2/115Staff Work Room16.62 m²
2/117Toilet (Staff)4.61 m²
2/116Toilet (Staff)3.66 m²
2/118Cleaning Store1.37 m²
2/119Cleaning Store2.23 m²
2/120Plant Room2.13 m²
2/121Lift1.54 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/112019MR
5 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
P
P
P P P P P
PP
PP
UP
courtyard
UP
UP
GIA: 1 272.2 m²
Raynes Park High School - Ground FloorBlock C
C-E1
C-E2
C-E3
C-E4
3/001Corridor10.05 m²
3/045Corridor29.35 m²
3/004Corridor41.71 m²
3/007Corridor20.82 m²
3/010Corridor12.15 m²
3/011Corridor28.43 m²
3/019Corridor17.05 m²
3/054Staff Room57.52 m²
3/022Changing (Girls)19.85 m²
3/024Changing (Girls)16.38 m²
3/026Changing (Boys)16.62 m²
3/023Showers8.37 m²
3/025Showers8.07 m²
3/027Showers8.48 m²
3/017Store8.80 m²
3/020Changing (Girls)17.34 m²
3/021Showers8.12 m²
3/053Boiler Room10.47 m²
3/018Showers2.95 m²
3/014Toilet (Girls)17.41 m²
3/028Toilet (Boys)13.20 m²
3/016Toilet (Accessible)4.33 m²
3/015Store1.32 m²
3/013Store0.95 m²
3/012Office11.82 m²
3/055Office7.84 m²
3/032Corridor8.99 m²
3/034Store7.24 m²
3/035Store3.22 m²
3/037Store3.71 m² 3/031
Toilet (Staff/Male)2.12 m²
3/030Toilet (Staff/Female)6.76 m²
3/029Cleaning Store3.73 m²
3/008Classroom77.43 m²
3/005Classroom77.37 m²
3/002Classroom77.08 m²
3/052Boiler Room27.51 m²
3/003Store4.40 m²
3/006Store4.65 m²
3/009Store4.78 m²
courtyard
3/039Store9.64 m²
3/038Corridor13.13 m²
3/040Store7.60 m²
3/036Store9.55 m²
3/033Classroom114.73 m²
3/041Classroom117.63 m²
3/046Classroom95.88 m²
3/048Store10.66 m²
3/047Store7.22 m²
3/049Store8.62 m²
3/051Store10.21 m²
3/050Store9.75 m²
3/043Lift1.56 m²
3/044Elect Store5.23 m²
3/042Work Prep Room29.53 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
6 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
P P P
P
P P
GIA: 394.3 m²
Raynes Park High School - First FloorBlock C
UP
UP
UP
3/101Corridor37.24 m²
3/107Corridor21.45 m²
3/110Teacher's Work Room29.57 m²
3/109Store14.60 m²
3/108Store5.61 m²
3/102Lift1.56 m²
3/103Store5.61 m²
3/104Classroom (Food Techlonogy)111.74 m²
3/106Classroom (Food Techlonogy)113.74 m²
3/105Prep Room (Food Techlonogy)22.35 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
7 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
P P
UP
GIA: 827.8 m²
Raynes Park High School - Ground FloorBlock D
D-E4
D-E3
D-E2
D-E1
4/007Corridor10.61 m²
4/003Corridor27.90 m²
4/001Corridor29.17 m²
4/002Lift1.54 m²
4/015Reception4.43 m²
4/004Lobby5.32 m²
4/014Store18.52 m²
4/011PE Store58.01 m²
4/010Sports Hall522.96 m²
4/016Boiler Room25.69 m²
4/009Toilet (Boys)15.81 m²
4/008Changing (Boys)29.88 m²
4/005Changing (Boys)28.64 m²
4/006Toilet (Girls)10.35 m²
4/013Toilet (Accessible)4.84 m²
4/012Cleaning Store2.19 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
8 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
UP
void
GIA: 734.6 m²
Raynes Park High School - First FloorBlock D
4/106Lift1.54 m²
4/105Office22.85 m²
4/101Stairwell32.74 m²
4/102Store3.98 m²
4/104Store7.11 m²
4/103Multipurpose Room130.01 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
9 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
GIA: 784.4 m²
Raynes Park High School - Ground FloorBlock E
UP
UP
E-E2
E-E1
E-E3
5/006Corridor57.58 m²
5/012Corridor33.93 m²
5/022Corridor30.54 m²
5/021Store3.26 m²
5/016Store7.51 m²
5/018Store7.70 m²
5/015Cleaning Store2.89 m²
5/011Store6.25 m²
5/014Store6.17 m²
5/027Boiler Room17.51 m²
5/017Toilet (Staff/Female/Accessible)3.21 m²
5/019Toilet (Staff/Male/Accessible)3.36 m²
5/024Toilet (Accessible)3.45 m²
5/020Classroom70.62 m²
5/026Common Room142.69 m²
5/013Classroom63.00 m²
5/010Study Room122.93 m²
5/008Head of 6th Form Office19.94 m²
5/0096th Form Office19.92 m²
5/007Corridor10.36 m²
5/003Kitchen (Staff)9.73 m²
5/002Intervention Room8.80 m²
5/004Corridor27.27 m²
5/005Lift1.51 m²
5/001Lobby17.96 m²
5/025Toilet (Girls)25.55 m²5/023
Toilet (Boys)22.90 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
10 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
GIA: 782.9 m²
Raynes Park High School - First FloorBlock E
accessible toilet
UP
UP
UP
no access
5/110Corridor65.25 m²
5/101Stairwell18.48 m²
5/111Corridor51.98 m²
5/103Lift1.51 m²
5/102Unknown1.77 m² 5/105
Elect Store4.26 m²
5/106Media Suite23.01 m²
5/104Drama Studio104.84 m²
5/107Store (Drama) 23.18 m²
5/108Classroom55.19 m²
5/112Stairwell13.73 m²
5/113Cleaning Store6.18 m²
5/114Creche21.40 m²
5/109Store4.39 m²
5/115Classroom42.39 m²
5/116Store6.48 m²
5/117Teacher's Work Room14.56 m²
5/118Group Room16.13 m²
5/119Classroom61.95 m²
5/122Classroom51.36 m²
5/124Classroom51.34 m²
5/127Classroom63.69 m²
5/128Store5.98 m²
5/125Store5.98 m²
5/121Store3.39 m²
5/120Server Room2.72 m²
5/126Store13.59 m²
5/123Store6.13 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
11 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
GIA: 342.9 m²
Raynes Park High School - Ground FloorBlock F
F-E2F-E4
F-E3
F-E1
6/001Corridor18.67 m²
6/011Corridor9.40 m²
6/016Store0.83 m²
6/015Store0.85 m²
6/009Store2.55 m²
6/010Office3.32 m²
6/012Officials Room8.29 m²
6/008Store4.54 m²
6/017First Aid Room11.30 m²
6/018Toilet/Shower (Accessible)7.36 m²
6/014Shower Room2.08 m²
6/013Toilet1.34 m²
6/004Toilet4.06 m²
6/003Toilet (Accessible)3.58 m²
6/002Toilet (Unisex)13.08 m²
6/005Hall47.70 m²
6/007Kitchen10.77 m²
6/006Store4.74 m²
6/036Store9.78 m²
6/035Cleaning Store2.40 m²
6/032Changing Room10.29 m²
6/033Changing Room16.18 m²
6/030Changing Room16.08 m²
6/034Showers7.76 m²
6/031Showers7.85 m²
6/027Plant Room15.14 m² 6/025
Changing Room16.27 m²
6/021Changing Room15.93 m²
6/026Showers7.74 m²
6/022Showers7.84 m²
6/023Changing Room4.45 m²
6/029Toilet5.55 m²
6/028Changing Room4.70 m²
6/024Toilet5.32 m²
6/019Changing Room4.67 m²
6/020Toilet5.53 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
12 of 13
Reinspection
B-87863
Sodexo
Raynes Park High SchoolBushey Road
LondonSW20 0JL
GIA: 37.2 m²
Raynes Park High School - Ground FloorBlock G
G-E3
G-E1
G-E2 G-E4
7/002Store10.33 m²
7/001Garage26.34 m²
Drawing Not to Scale Drawing should not be viewed in isolation. Please refer to Report Asbestos Register.
Drawn By:
Surveyor Initials:Survey Date:Revision No.:
Date:
Page:2.4 Oct 2016
Life Environmental Services Ltd.4 Ducketts Wharf
South StreetBishop’s Stortford CM23 3AR
Telephone: 0844 335 1281Email: [email protected]
www.lifeenvironmental.co.ukRegistered in England No. 3053057
Key
- Location Number
- Asbestos Present (Please refer to register)
- No Access
- Limited Access
- Outside Scope of Survey
- Asbestos Removed
- Positive Sample
- Cross Referenced Sample
- Strongly Presumed Asbestos
- Presumed Asbestos
- Negative Sample
- Negative Cross Referenced Sample
SP
S0001
Survey Plan
001
S0001
X0001
P
S0001
X0001
Job No.:
23/10/2019CP07/11/2019MR
13 of 13
Reinspection
B-87863
Sodexo