MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/ 4335 Jabalpur, dated : 17.12.2015 To As per distribution list Sub: Agenda of 49 th meeting of Operation and Coordination Committee of MP. The Agenda of 49 th meeting of the Operation and Coordination Committee of MP scheduled at 10.30 AM on 22 nd December, 2015 at SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur

Upload: others

Post on 31-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/ 4335 Jabalpur, dated : 17.12.2015

To

As per distribution list

Sub: Agenda of 49th meeting of Operation and Coordination Committee of MP.

The Agenda of 49th meeting of the Operation and Coordination Committee of MP

scheduled at 10.30 AM on 22nd December, 2015 at SLDC, MPPTCL, Jabalpur has been

uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur

Page 2: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Distribution List

1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected]

2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected]

4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected]

5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749.

6. The General Manager( PM), MPPMCL, Jabalpur Email – [email protected] [email protected]

7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]

8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]

9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]

10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]

11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]

12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]

13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected]

16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]

18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

20. The Vice President, Welspun Solar MP Pvt. Ltd., C-11, Sector-65, Noida-201301, Fax no. 0120-6757000, Email – [email protected]. [email protected]

21. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

Page 3: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

AGENDA FOR 49TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE

HELD ON 22ND DECEMBER 2015 AT 10.30 AM AT SLDC, MPPTCL, JABALPUR ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 48TH meeting of Operation & coordination committee of MP held on 28TH October 2015 at SLDC, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/4204 dated 07.12.2015. [OCC may confirm the minutes]

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCT 2015 TO NOV 2015.

2.1 Frequency Particulars: During Nov 2015 the system frequency was below 49.9 Hz for 11.48% of time against 13.93 % of time during Oct 2015. The system frequency was above 50.05 hz for 21.46 % of time during Nov 2015 against 16.97 % of time during Oct 2015. The system frequency was within the IEGC range of 49.9-50.05 Hz for 67.06 % of the time during Nov 2015 against 69.10 % of time during Oct 2015. The average monthly frequency was 49.99 Hz during Nov 2015 whereas it was 49.98 Hz in the month of Oct 2015. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Oct 2015 and Nov 2015 are enclosed at Annexure-

2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous minimum frequency

Instantaneous maximum frequency

Oct 2015 49.98 Hz 49.08 Hz 50.11 Hz 49.62 Hz 50.33 Hz Nov 2015 49.99 Hz 49.79 Hz 50.15 Hz 49.64 Hz 50.28 Hz

[Committee may like to note]

2.2 Operational Matters

2.2.1 Operational Discipline : System operated in terms of frequency profile for the months Oct 2015 and Nov 2015 is as given below for discussion by the committee :

Month % of time

Frequency Below 49.9

Hz

% of time Frequency

above 50. 05 Hz

% of time frequency within the permissible range of 49.9-

50.05 Hz

Average monthly

frequency

No. of times frequency

dipped below 49.2 Hz

Oct 2015 13.93 % 16.97 % 69.10 % 49.98 Hz 0 Nov 2015 11.48 % 21.46 % 67.06 % 49.99 Hz 0

[Committee may like to note.]

2.3.1 Voltage Profile : Date wise voltage profile at some of the important 400 KV and 220 KV substations during the months Oct 2015 and Nov 2015 is enclosed at Annexure -2.3.1.

During the months Oct 2015 and Nov 2015, the deviation of voltage from the accepted limit on either

side was recorded at following important 400 KV s/s in MP Grid.

49th OCC Agenda Of MP 1

Page 4: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Sr No

Name of 400 KV

Substation

Oct 2015 Nov 2015

Max. Voltage observed

Min. Voltage observed

Max. Voltage

observed Min. Voltage observed

Voltage KV

Date Voltag

e KV

Date

Voltage

KV

Date Voltage

KV Date

1 Indore 420 29.10.15 386 31.10.15 420 02.11.15 391 04.11.15 2 Itarsi 418 01.10.15 390 30.10.15 418 11.11.15 392 30.11.15 3 Bina 419 28.10.15 398 15.10.15 426 12.11.15 396 20.11.15 4 Gwalior 415 28.10.15 388 05.10.15 434 25.11.15 385 18.11.15 5 Nagda 420 11.10.15 386 31.10.15 426 19.11.15 386 06.11.15 6 Satpura 422 28.10.15 401 18.10.15 419 11.11.15 412 01.11.15 7 Birsinghpur 426 30.10.15 405 14.10.15 423 20.11.15 409 29.11.15 8 ISP 426 29.10.15 400 19.10.15 427 19.11.15 401 05.11.15 [Committee may please note & discuss]

2.3.2 Status of Capacitor Banks in sub-transmission system : The updated information of the status of capacitor banks in sub-transmission system as on 30th Nov 2015 as submitted by DISCOMs is detailed below:

[Action : DISCOMS]

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of Installed capacitor banks (in MVAR) in EHV transmission system as on 30.11.2015 as submitted by MPPTCL is given below :

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

No of 100

KVAR Units

required

600 KVA

R

1200 KVA

R

600 KVA

R

1200 KVA

R

600 KVA

R

1500 KVA

R

EZ 406 146 15 - - - 34 20 0 94 0 0 0 0 0 13

CZ 5 687 644 0 0 0 0 0 0 0 0 0 0 588 0 120

WZ 589 517 255 36 31 6 85 73 89 612 14 37 - - 0 0

49th OCC Agenda Of MP 2

Page 5: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

[Action : MPPTCL ]

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL : The various ongoing Transmission Schemes completed during the current financial year 2015-2016 (upto Nov. 2015) and plan for completion of various ongoing Transmission Schemes for the Year 2015-2016 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).

[Action: Committee may like to note] 2.3.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz or below during Oct 2015 and Nov 2015. There was no df/dt operation during the same period.

In the last OCC SLDC requested MPPTCL to submit the revised list of AUFLS due to allocation of

group to new feeders commissioned after implementation of revised AUFLS. T&C MPPTCL were ensured to submit the same by 30.11.2015. The information is yet to be received from MPPTCL. It is again requested that the revised feeder wise list under AUFLS due to allocation of group to new feeders commissioned to SLDC . [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in good/healthy

working condition. (iii) Revised df/dt Plan : The revised df/dt plan has been prepared in consultation of MPPTCL and

implemented by SLDC wef 20.08.2015. [Committee may like to note]

2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders :

(i) Details of DISCOM wise Power supply given to various domestic categories during the period Oct 2015 and Nov 2015 is enclosed at Annexure 2.4(i). [Committee may like to note]

(ii) Group Allocation to Newly Commissioned existing EHV substations :- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below :

SN DISCOM Region No of 33 KV feeders for which groups to

be allocated 01

EAST

Jabalpur 01 02 Sagar 00 03 Rewa 00 04 Total 01

Voltage Class

Capacitor bank installed as on 30.09.15 (MVAR)

Capacity Added after Last OCC Meeting (MVAR)

Capacitor banks already covered under

ADB T-V

Capacitor Bank Installed but defective

& are not repairable (No & MVAR)

220 KV 100.00 MVAR 0.00 100.00 MVAR All in Service 132 KV 1122.00 MVAR 0.00 1122.00 MVAR

33 KV 4351.00 MVAR 0.00 4351.00 MVAR Total 5573.00 MVAR 0.00 5573.00 MVAR

49th OCC Agenda Of MP 3

Page 6: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

05 WEST

Indore 16 06 Ujjain 04 07 Total 20 08

CENTRAL Bhopal 18

09 Gwalior 17 10 Total 35

TOTAL Grand Total 56 Discoms are requested to furnish the details as per list enclosed at Annexure-2.4(ii) in the

meeting. [ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : The annual maintenance /outages of thermal generating units of MPPGCL during Dec’15 to Jan‘16 is as under :-

POWER STATION UNIT NO. FROM TO REASON/REMARK Amarkantak -II 4 30.04.14 Continue Electrical Fault / Turbine Inspection. Unit

shall be kept under permanent shut down.

Amarkantak -II 3 12.01.15 Continue Rising trend in HP, Eccentricity and excessive vibration. Unit shall be kept under permanent shut down.

Satpura-IV 11 25.07.15 Continue GT caught fire (B Ph. Bushing burst). The probable date of synchronization of unit will be end of January, 2016.

Satpura-III 8 30.11.2015 Continue Turbine bearing vibration high.

[Committee May like to discuss] 3.2 Proposed shutdown programme of Transmission lines / Transformers : The proposed shutdown of transmission elements for the period 20.12.2015 to 19.01.2016 submitted by MPPTCL is enclosed as Annexure-3.2 [Committee May like to discuss]

3.3 Long Outages of transmission elements and protections : The status submitted by MPPGCL / MPPTCL are given below :

SN Line/Transformer/B

reaker/ Reactor etc under long outage

Outage date Reason Response from Utility

1 63MVAR Bus-I Reactor at Satpura TPS

24.05.2005 Damage of all three limbs along with reactor tank

The installation work of Bus-I reactor is completed. Erection & Commissioning work started by M/s BHEL. The probable date of

charging will be Dec., 2015. 2 220 KV Bus bar

protection scheme at SGTPS Birsinghpur

Since commissioning of 220 KV switch yard

The scheme not available

Work is completed. Service Engineer from M/s GE is required

for commissioning of bus bar protection panel.

3 315 MVA , Generator Transformer of unit no. 11 of Satpura

TPS

25.07.2015 GT Problem (GT caught fire, B Ph. Bushing burst)

The probable date of synchronization of unit will be by

end of January 2016

49th OCC Agenda Of MP 4

Page 7: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

4 100MVA(BHEL), 220/132 KV transfomer at 220 KV s/s Sarni

31.05.2015 Abnormal sound observed and Differential protection optd.

160 MVA X’mer will be commissioned by January 2016 in place of failed 100 MVA X’mer. Order for supply of 160 MVA X’mer is already placed on M/s BHEL and delivery is expected by end of Dec., 2015.

5 Main Breaker of 400 KV Nagda-Rajgarh-II

23.07.15 Y-phase CT burst / BKR Problem

Not available

6 40 MVA 132/33 KV Transformer ECE make at 132 KV Lakhnadon

Not available - The defective developed in transformer and matter under correspondence with M/s ECE for its repair at their works.

7 20 MVA NGEF make X’mer at 132 kV S/s Pichhore

23.10.2015 X’mer failed 40 MVA X’mer will be commissioned in place of failed 20 MVA X’mer by 22.12.2015.

8 12.5 MVA 132/33 KV HEL make X’mer at 220 KV S/s Nimrani

30.10.2015 X’mer hand tripped due to high Tan-Delta of 2 No. 132 KV bushings

After obtaining bushing for replacement of high Tan-Delta bushings, X’mer will be charged.

9 3x105 MVA , 400/220 KV ICT-I at 400 KV Indore

02.08.15 Differential protection optd. And 33 KV tertiary PT burst

Two No. 105 MVA Units of these bank have failed. The complete bank has to be replaced with 1X315 MVA 3 Ph. Transformer. Tender for procurement of new transformer has been initiated, on receipt of 315 MVA X’mer, the failed 3x105 MVA Bank will be replaced.

10 20 MVA Transformer –II at 132 KV S/s Jaora

14.11.15 Not available Detailed inspection of X’mer carried out by lifting core and winding and no fault found, complete reconditioning of X’mer is in process. The X’mer is expected to be charged by December 2015.

11 315 MVA 400/220 kV ICT-III at 400 kV S/s, Bina

29.09.15 Due to Buchholtz relay alarm and PRV indication.

X’mer is out of circuit from 29.09.15 and for repairs has to be sent to M/s BHEL. 315 MVA CGL make X’mer shifted from 400 KV S/s Julwaniya, will be commissioned in place of defective X’mer by 31.12.15.

12 315 MVA 400/220 kV ICT-I at 400 kV S/s Bina

15.10.15 Due to Buchholtz relay alarm.

This transformer is out of circuit from 15.10.2015, site repairs was in process but M/s BHEL has shown inability to repair the X’mer at site. Hence the X’mer has to be sent to M/s BHEL. To replace this transformer, 315 MVA BHEL make X’mer is under manufacturing stage. The X’mer is likely to be commissioned by February, 2016.

The utilities may submit the latest status. [Action : MPPGCL/MPPTCL] ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF Oct 2015 and Nov 2015: The details of actual generation, Schedule from Central Sector demand etc. are given in the following

Annexures:

49th OCC Agenda Of MP 5

Page 8: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units.

Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. [Committee may like to note]

ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING OCT 2015 AND NOV 2015 : There was no major grid disturbance in MP during Oct 2015 and Nov 2015. However the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.0.

[Committee may like to note] 5.1 Obtaining Code from SLDC for charging / opening of transmission elements:- As per IEGC Sub-Regulation (b) of Regulation 5.6.2, it is mandatory for the substation/switchyard officials to obtain the code from SLDC for transmission element outage/charging. This practice is being regularly followed by the state entities; however some instances have been noticed where the outage/charging of transmission elements have been done without obtaining code from SLDC. This is a violation of the Grid Code and hence should be avoided by the state utilities. The instances of such violations should be avoided and compliance of above IEGC Regulation in this regard should be complied strictly.

[Action: MPPTCL/MPPGCL/IPPs/NHDC/Kalpataru] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES 6.1 MPERC (Forecasting, Scheduling, Deviation Settlement and related matters of Solar and

Wind Energy Generation Sources) Regulations, 2015- MPERC has proposed to make the Regulation-2015 regarding (Forecasting, Scheduling, Deviation Settlement and related matters of Solar and Wind Energy Generation Sources) Regulations, 2015 (G-40 of 2015) dated 08.012.2015, which shall come into force from the date of publication in the official gazette of Madhya Pradesh. This regulation is available on the official website of MPERC- www.mperc.nic.in which may kindly be downloaded for further needful. This regulation is in four parts including Appendix I & II, pertaining to above Energy Generation Sources.

All the entities are requested to send their suggestions/objections/comments on the above mentioned Regulations to the Commission Secretary, M.P. Electricity Regulatory Commission, Bhopal latest by 31.12.2015. [Committee may like to discuss]

6.2 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /

TRANSMISSION ELEMENTS:-

The present status regarding schedule and commissioning of reactors / transmission elements is as below:

Sr. No.

400 KV S/S Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1 Bus Reactor : Nagda 125 MVAR

MPPTCL December 2015

2 Bus Reactor : ISP 125 MVAR

NHDC June 2016

3 Line reactor at Nagda-ISP line at Nagda end

50 MVAR

MPPTCL January 2016

49th OCC Agenda Of MP 6

Page 9: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

4 Line Reactor on 400 kV Satpura –ISP line

50 MVAR MPPGCL September 2016

5 Bus Reactor at SSTPS 125 MVAR

MPPGCL September 2016

The latest status may be submitted in the meeting. [Action : MPPGCL/MPPTCL/NHDC]

6.3 Commissioning of new Generating units in Madhya Pradesh and the capacity expected to be commissioned during the current year 2015-16 :- The status regarding Generating units, commissioned /expected to be commissioned during the current year 2015-16 according the available information is as below :

S.No Name of the Power Projects Unit no. Capacity MW Date of Commissioning

/Schedule Date 1 M/s Jhabua Power, Seoni 1 600 December – 2015 2 Moser Bear (Hindustan power) 2 600 December – 2015 3 Essar Power MP Ltd (Mahan) 2 600 - The matter was discussed in last OCCM in which SLDC has requested MPPMCL to submit the latest

status of above power plants, but MPPMCL has not submitted the same. It is requested to submit the latest status in the meeting. [Action : MPPMCL]

6.4 Poor condition of 48 Volt Battery set and Battery Charger at Power Stations : The condition of 48 Volt Battery bank and Battery Charger at Rajghat HPS and SGTPS Birsinghpur is very poor which are unable to keep important services of telemetry and voice communication healthy in case of interruption in AC supply. This issue was brought to the notice of concerned authorities several times for ensuring the healthiness of Battery Bank and 48 Volt Battery Charger at these stations. The continuity of telemetered data as well as voice communication is vital for safe, secure & reliable operation of the state grid, as during recent blackout at SGTPS the total communication & telemetry was interrupted.

MPPGCL, MPPTCL and IPPs are requested to ensure 48 V battery set in healthy condition all the times

so that in case of any grid incidents data and voice communication is not interrupted. The information of status of Battery & battery charger from SSTPS, ISP, T& C circles, MPPTCL of

Indore , Satna, Seoni, Ujjain and Bhopal have not received to SLDC despite repeated requests in the last four OCCM. It is once again requested that the information in format provided in last OCCM may please be submitted to SLDC at the earliest.

[Action : MPPGCL/MPPTCL/NHDC]

6.5 Generator Dynamic Data Requirement for Modelling in PSS/E software :- The PSS/E Software Modeling for Dynamic load flow studies is being done at National level so that the grid security matters are dealt with efficiently and reliably to avert grid disturbance like situations. The same shall also be integrated into new SCADA/EMS system for online real time dynamic load flow studies. Work for this has been undertaken at regional levels throughout the country.

The Western Regional Load Despatch Centre insisting hard to provide Dynamic Data for Generators

within the MP SLDC Control Area in the prescribed formats (Schedule-IV, V, VI, VII & VIII) which was

49th OCC Agenda Of MP 7

Page 10: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

forwarded to the Generating Companies. The data from any entities has not been received completely by this office. [Action: MPPGCL/NHDC/BLA]

6.6 Provision of synchronization facility at EHV sub-stations of MPPTCL :- As per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations. In last OCC meeting MPPTCL representative informed that synchronization facility is available at all 400 KV S/s and for 220 KV and 132 KV sub - station in the path of black start the matter for providing synchronization trolley is being taken up. It was pointed out by SLDC that synchronization trolley at 400 KV S/s Indore is not in order and require immediate attention for its proper functioning.

The MPPTCL may submit the plan to provide the synchronization facilities all the 220 kV S/s and

designated 132 kV S/s. [Action: MPPTCL]

6.7 SCHEDULING ACTIVITY BY MPPMCL ON BEHALF OF DISCOM :- SLDC has taken up the issue of round the clock functioning of MPPMCL Control Room so that revision to schedule requisitions are made on behalf of DISCOMs as only two shifts were running and only day ahead activities were performed by MPPMCL CR.

MPPMCL through a letter dated 27.07.2015 requested to provide sitting arrangement in SLDC Control

room for MPPMCL shift engineers till their CR is made operational from Shakti Bhawan which was agreed as an interim arrangement. As about five month times have passed and MPPMCL engineers have acquired sufficient knowledge of requisition/scheduling. Now from 01-Jan 2016 MPPMCL shall take over the day-ahead and real time requisition/scheduling activity from MPPMCL CR.

[Action : MPPMCL]

6.8 SENDING DISTURBANCE RECORDER (DR)/SEQUENTIAL EVENT LOGGER (SERS) OUTPUT TO WRLDC: With Reference to section 5.9.6(c) of the IEGC and section 9.5.3 of Operating Procedure of WR-2013, the DR/SER details for all grid incidents/disturbances need to be sent by the concerned agency to RLDC within 24 hrs of the incident. It is observed that in many grid incidents/disturbances DR’s and SERs outputs are not being submitted to SLDC even with the final report. The matter has been discussed in various OCC meetings over last 3 years but despite assurance none of the state entities is following the time line as well as not furnishing DR/SER output in soft/Hard copy.

All the state entities are requested to instruct right up to Division level preferably through a circular, to

submit the detailed report in prescribed format along with DRs and SERs output in .cfg and .dat format for analysis within 24 hours of the incident to SLDC. However, the flash report is required within one hour of the incident. [Action: MPPTCL/MPPGCL/IPPs/NHDC/Kalpataru]

6.9 Tertiary Reactors in MP :- AGM WRLDC, vide email dtd 09.12.2015 intimated that while reviewing high voltage in the M.P. substations during off-peak hours and dip in voltage during morning hours it was noted that there are few 25 MVAR reactors installed on the 33 kV tertiary winding of 400/220/33 kV ICTs in MPPTCL substations.

AGM WRLDC requested to update the following information for operational purpose:

- Healthiness of tertiary reactors - Is there a facility to switch these reactors online ? - Whether any new tertiary reactors installed on the new ICTs that were commissioned ?

List is enclosed and pasted below for ready reference.

49th OCC Agenda Of MP 8

Page 11: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Sl. No. Substation

Owner Agency

ICTs

MVA Tertiary Reactor details (MVAR)

Rated Voltage in kV

Net MVAR capacity

1 Bina MPPTCL 3x315 2 x 25 33 50

2 Nagda MPPTCL 3x315 2 x 25 33 50

3 Indore MPPTCL 4x315 2 x 25 33 50

4 Bhopal MPPTCL 3x315 2 x 25 33 50

5 Satpura MPPGL 1x500 2 x 25 33 50

MPPTCL and MPPGCL are requested to submit the status of above reactors installed 33 kV tertiary winding of 400/220/33 kV ICTs in the meeting, so that same could be forwarded to WRLDC.

[Action : MPPTCL/ MPPGCL]

6.10 REMOVAL OF 3X16.67 MVAR LINE REACTOR OF 400 KV SARNI-SEONI FEEDER AT STPS SARNI:-

ED (O&M:Gen) MPPGCL has intimated that due to high furanic contents 3 X 16.67 MVAR line reactor of 400 KV Sarni-Seoni feeder in R & B phase have increased beyond 2500 ppb, which falls under “Rewind/ Replace solid insulation category as defined IEEE guidelines and recommended for removal of 3X16.67 MVAR line reactor from service. Further, it is also mentioned by CE (Gen.) MPPGCL, STPS Sarni vide letter No. 08-004/Reno-II/3556 dated 21.11.2015 and ED (O&M:Gen) MPPGCL vide letter No. 07-03/GCC/2273 dated 11.12.2015 that the line length of 400 KV STPS-Seoni circuit is 149 KM and also sufficient reactive compensation is available at the switchyard of STPS. It is also mentioned in the above letter that 1 No. 63 MVAR bus reactor and 1 No. 50 MVAR line reactor are already in service, one No 50 MVAR line reactor for ISP is also under tendering stage, one No. 63 MVAR bus reactor and 1 No. 50 MVAR line reactor in Asta-2 feeder will be commissioned shortly. Matter has been referred to CE (P&D) MPPTCL, WRPC & WRLDC by SLDC for carrying out necessary system study whether above 3x16.67 MVAR line reactor can be removed permanently from 400 KV STPS-Seoni line at STPS Sarni. MPPTCL is requested to submit the status in this regard in the meeting. [Action: MPPTCL] 6.11 UNDER VOLTAGE LOAD SHEDDING SCHEME (UVLS) IN WESTERN REGION :- In the 475th OCC meeting WRLDC had suggested that as per the CEA Planning Criteria the emergency rating for minimum voltage is 119 kV for 132 kV system; 194 kV for 220 kV system and 372 kV for 400 kV system.

The need for UVLS for system security was recognized and discussed last several OCCM. In 474th

OCCM, WRLDC had informed that Low Voltage area in Gujarat are Sabarkundla, Vapi, Bhilad, Vertej&Navsari, in Madhya Pradesh are Nagda & Indore, in Maharashtra are Lonikhand, Bableshwar, Padgha, Jejuri. It was also informed that Chhattisgarh do not face any low voltage problem.

Further, It was suggested and agreed that all concerned SLDCs shall study there low voltages area

and submit a detail scheme for mitigation of these Low voltage pockets. MPPTCL is requested to examine the same and submit the status in the meeting.

[Action : MPPTCL]

49th OCC Agenda Of MP 9

Page 12: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

6.12 SHEDULING FOR NTPC JHANOR GPP FOR GGF GAS UTILISATION :- In 478 the OCC meeting of WRPC, GM NTPC informed that the Jhanor gas station is under close reserve due to less /no requisition from beneficiaries. This is resulting in non utilisation of GGF Gandhar gas field gas. Due to non-availability of generation schedule, the station is not able to draw any ONGC’s South Gujarat gas from GAIL which can only be taken at Jhanor Gandhar GPS. The gas suppliers are compelled to flare gas due to low off take by consumers.

GAIL has stated that if this situation continues, they would be constrained to raise Take-or-Pay

clause in line with the contractual obligations. The GGF is in APM category which is the cheapest gas in the country, any shortfall in its drawl may lead the Govt. to reduce allocation of the same.

The matter was discussed in 28th WRPC meeting dated 04.03 2015, the utilisation of the GGF was

in principal agreed and constituents were advised to give schedule accordingly. In view of above, it is requested that sufficient generation schedule may be given to Jhanor-Gandhar

station so that the station can operate at least at its technical minimum load (149 MW) in combined cycle mode and can draw the committed gas from GAIL to avoid Take-or-Pay situation. M/S GAIL is likely to invoke take or pay clause and such amount will have to be loaded to fuel cost to be recovered from beneficiaries. MPPMCL is requested to submit their comments in the meeting, so that the same could be forwarded to NTPC/WRLDC.

[Action : MPPTCL]

6.13 Special Meeting at WRPC Mumbai Frequency Response Characteristic :- Member secretary WRPC informed that during the earth quake on 26th September 2015 in north India there was a load throw of around 1200 MW and frequency rose from 50.02 Hz to 50.29 Hz and on dtd 12th November due to tripping of 2x600 MW units at Kalisindh, generation loss of 1120 MW in NR and frequency drop of 0.17 HZ was observed. Frequency response of generators in both the events in Western Region was found to be unsatisfactory and even negative response has been observed on some of the units and need investigation. WRPC requested that all the generators have to submit status of RGMO through SLDC to WRPC in the format given below :- Name of the Power Station :- Unit No: Unit-1 Unit-2 Unit-3 Unit-4 Unit-5 Unit-6 Whether RGMO/FGMO is implemented or no? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Whether RGMO is in Service? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Whether FGMO with manual control is in Service? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Droop Setting in % Upper Load Limit setting in MW Lower Load Limit setting in MW Unit Capacity in MW

SLDC though email requested all the entities to submit the above information to SLDC. The information from thermal units of MPPGCL, Indira Sagar, JP Bina has been received. The information from Hydel units of MPPGCL and Omkareshwar HPS is yet to be received. MPPGCL/OSP is requested to submit the same in the meeting. [Action : MPPGCL/NHDC]

49th OCC Agenda Of MP 10

Page 13: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

6.14 Scheduling of Indian Railways under long Term:- Hon’ble CERC has issued an order dtd 05.11.2015 in petition no. 197/MP/2015 that Indian Railways is a deemed licensee under 3rd proviso to section 14 of Electricity Act. The Indian Railways as a deemed licensee shall be bound by the terms and condition of license specified or to be specified by the appropriate commission under proviso to section 16 of the Electricity Act. Accordingly Indian Railway has applied for disconnection supply of power to 24 nos TSS located in East, Central and West Discom. A meeting was held on 7th December 2015 in the conference hall of SLD to discuss and finalise the modalities of Long term Access (LTA), scheduling, metering, imbalance settlement and other regulatory requirements for starting scheduling of 100 MW power from Ratnagiri Gas and Power Private Ltd. (RGPPL) to railway traction substation (TSS) of railway in Madhya Pradesh, It was decided in the meeting the scheduling of 100 MW power from RGPPL to Railway under LTA shall be commence only after submission of NOC from STU and CTU, Copy of BPTA with MPPTCL and TSA with PGCIL to SLDC and allocation of 100 MW power from RGPPL to Indian railway by WRPC for Madhya Pradesh. WRPC vide order no WRPC/Comml-I/6/Alloc/2015/1530 dtd. 15.12.2015 has allocated 100 MW power to Indian railways for Madhya Pradesh. However remaining documents are to be submitted by Indian railways to SLDC. Indian Railways have to confirm that WRLDC and MP SLDC Fees and charges wrt MW allocation to Indian Railway in MP shall be born by Indian railways to the extent of their allocation in MP. The necessary accounting formalities shall be finalised by Indian Railway with M.P.Power Management Co. Ltd. before commencement of scheduling. [Action : Railways/MPPMCL]

6.15 Huge Fluctuations in scheduled & actual drawal by the Discoms at hour boundaries– The MPPMCL and Discoms have not taken any action to plan their demand management so that large fluctuations in drawal/demand (more than 100 MW) at hour boundary and other timings could be avoided. The large fluctuations have been observed at hour boundary at 2 Hrs, 6 Hrs, 12 Hrs and 18 Hrs. This is violation of IEGC Clause 5.2 (j). In this regard WRLDC Control Room issues violation notice to SLDC on almost every occasion for avoiding such large fluctuations. Sometimes WRLDC Control Room Suo Motu curtails the schedule of MP in ISGS incase of huge under drawal of MP at hour boundary. The matter of large fluctuations at hour boundary was also raised by WRLDC in Operation & Coordination Committee meeting of WRPC. The Member Secretary, WRPC asked representative of SLDC to submit the action taken by the MPPMCL/Discoms in this regard in the forthcoming OCC meeting. SLDC has already intimated to take suitable action in the matter vide this office letter No. 3874 dated 09.11.2015 and no. 4130 dated 28.11.2015. It is therefore requested that MPPMCL in consultation with MP Discoms should plan segregation of change over of large block of load at hour boundary and also power purchase / sell under Short Term Open Access should be planned in such a way that a large change in quantum at hour boundary / time block boundary could be avoided in the interest of grid security. The action taken in this regard may be furnished to SLDC in the OCC meeting.

[ACTION: MPPMCL & Discoms] ITEM NO. 7 : BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

7.1 Black Start mock drill of Hydel stations of MPPGCL and NHDC : The black start mock drill of Tons HPS, Bargi and Pench HPS have been completed successfully on 08.10.15, 12.10.15 and 06.11.15 respectively.The proposed dates for black start mock drill of remaining hydel power stations is given below :-

49th OCC Agenda Of MP 11

Page 14: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Sl. No. Name of Power Station Date of Mock Drill

1 Indira Sagar Project May 2016 2 Gandhisagar HPS 06.01.2016

In the last OCC meeting, MPPGCL has informed that the Black Start Mock Drill of Birsinghpur, Rajghat

and Madikheda HPS could not be possible due to non-auto operation of governor. MPPGCL is requested to submit the plan for readiness of these units for black start mock drill.

[Action : MPPGCL/NHDC/MMPTCL/DISCOMs] ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION: 8.1 Quarterly Review of Crisis Management Plan: The NHDC & SLDC is submitting the quarterly

crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

However despite continuous persuasion by SLDC other state utilities i.e MPPTCL, MPPGCL and IPPs

are not submitting the report to CEA. It is requested to submit the CMP report in prescribed format for the second quarter of 2015-16 (July to Sept 2015) to CEA under intimation SLDC.

[ACTION: MPPTCL, MPPGCL, IPPs] 8.2 Status of Physical & Cyber Security in Power Sector regarding: Status of physical & cyber

security in Power Sector for the second quarter (Jul to Sep 15) is not received from any of the state utilities. In the past also this report is not being furnished by any of the state utilities despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.

The state entities are requested to furnish the Status of physical & cyber security in Power Sector for

Second quarter (July to Sept 2015) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. [ACTION: MPPGCL, MPPTCL, NHDC & IPPs]

ITEM NO.9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Non receipt of complete ABT meter data through AMR system installed at SLDC:

The complete data of ABT meters installed at interface points are not being downloaded through

AMR system. In the month of Nov 2015, complete data of 519 meters (as per T&C list) was received and partial data of 37 meters and monthly data of 68 Nos. interface points was not received through AMR system. The incomplete data received is due to connectivity / alignment problem of optical cable, network problem or modem not installed. The status of data received through AMR system for Nov’15 was communicated through email on 4th Dec 2015 to all concerned offices including SE(T&C) offices for furnishing the missing data alongwith monthly JMR data. The following may be discussed as an action plan for receiving the complete data through AMR system in in a time bound manner.

1. Arrangement of other service provider SIMs for the locations where there is a network problem. 2. Providing AMR access to the concerned SE(T&C) offices for ensuring the communication status

and data downloading of the meters. M/s Secure Meters ltd. informed that modems have been issued, but SIMs are not provided to SE(T&C) offices.

3. AMR facility is required for newly commissioned substation / Xmers / HT consumers / OACs / REGs – 60 Nos.

[Action : CE(T&C) MPPTCL]

49th OCC Agenda Of MP 12

Page 15: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

9.2 Non reporting of details of newly installed meters, replaced meter & CT and change in polarity of ABT meter installed at interface points to SLDC:

The site officials are not reporting timely the details of the newly installed meters, replaced meters,

change in CT ratio of meter and polarity change in meters installed at interface points to SLDC. This has lead to incorrect data computation of the ABT meter installed at the interface points and may affect the accuracy of MP transmission loss computation and energy accounts of Discoms. Further, the site officials revise the energy input to Discoms (JMR data) at a later date due to some or other reasons. SLDC assess missing meter data on the basis of JMR data furnish by the site officials and revision in energy figures may affect the accuracy of energy accounts prepared by SLDC. CE(T&C) office may issue instructions to field offices for reporting timely meter / CT replacement details and change in polarity to SLDC and furnish the JMR data after ensuring its correctness.

Action : CE(T&C) MPPTCL] 9.3 Interface points of tapped HT Consumers: At present as per MPERC grid code the interface points of HT consumers of Discoms where ABT meters are installed is substation of MPPTCL, reading of these ABT meters are being downloaded through AMR system at SLDC or through MRI and is being considered for accounting purpose. However, Discom bill the energy at the meters installed at consumer premises and same is being considered by CE(Plg&Design) office of MPPTCL as energy input to Discoms for loss computation. Due to different location of installation of ABT meters there is difference in energy recorded in meters due to line loss or different meters. To avoid the mismatch in energy data, it was discussed and decided in the 48th OCC meeting that the ABT meters installed at substation shall be considered by the CE(Plg&Design) office as energy input to Discoms for loss computation. However, in Nov 2015, the CE(Plg& Design) office has again considered the consumer end data as Discom input. CE(T&C) office may request CE(Plg& Design) office for considering the substation end data.

Action : CE(T&C) / CE(Plg&Design) MPPTCL]

9.4 Providing AMR facility for the ABT meters installed at MPPGCL / OSP :

In compliance to state commission directives for computation of weekly transmission losses and

Deviation charges, SLDC has requested the MPPGCL / OSP for providing the AMR facility on the meters installed at the interface points for data communication with AMR System installed at SLDC.

The MPPGCL / OSP may apprise the Committee about the status of AMR implementation.

[Action : MPPGCL/ OSP ]

9.5 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter:

It was discussed and decided in the 45th OCC meeting, that energy accounting of Renewable

Energy Generators (REGs) shall be done as per the actual data recorded in ABT meters installed at the pooling station. SLDC has started the accounting of REGs connected at 132KV level and above as per the actual data recorded in ABT meters installed at the pooling stations w.e.f. April 2015. For REGs connected at 33KV level, SLDC has requested the commercial sections of Discoms to furnish the meter, modem & SIM details for configuration at SLDC. However, Central Discom has furnished the meter details and SE(O&M), Ujjain has furnished the meter & % details but modem and SIM details are still awaited. In the absence of desired information from Discoms, the energy accounting of the REGs connected at 33KV level could not be started. Discoms are therefore again requested to furnish the following information on priority basis.

i. The details of ABT meters installed at the pooling station alongwith modem and SIM details for integrating with AMR system of SLDC.

ii. The pooling station and meter wise details of the % of energy purchased by MPPMCL and % of

energy wheeled to Discoms.

[Action : Discoms]

49th OCC Agenda Of MP 13

Page 16: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

ITEM NO 10: SCADA/EMS RELATED ISSUES:

10.1 (A) The Important SCADA/EMS related pending issues are (MPPTCL)

1. Non availability of telemetry of balance 220KV S/s, important 132KV S/s having injection from renewable /captive generating stations, of S/s having inter discom feeders.

2. Arrangement of telemetry required for Kumbh Mela at Ujjain 3. The arrangement of data channel for remote VDU installed at corporate office/control room of GCC,

DCC,MPPMCL,MPPTCL

4. Delay in restoration of telemetry,

5. Discrepancy in telemetered values received from different EHV S/s and upgradation of RTUs

6. Arrangement of OEM support for telemetry/RTUs

7. Arrangement of space, air conditioning & power supply, for wideband nodes

8. Commissioning of communication channels for dual reportig of RTUs as per backup SLDC requirement:-

(B) The Important SCADA/EMS related pending issues are (MPPGCL) :- 1. Outage of RTU of Rajghat since last two years & BanSagar-III RTU since last six months 2. Arrangement of Outdoor equipments at ATPS, Bargi (Release order already issued by MPPTCL) 3. Issue of AMC Contract for RTU/PLCC etc. 4. Arrangement of material for commissioning of communication channel as per backup SLDC

requirement. Non availability of measuring equipments / spares / 5. Abnormal delay in attending telemetry problems 6. Providing telemetry of STPS-Astha feeder from STPS end. 7. Telemetry of Station Transformer at Tons HPS is not available. 8. Frequent Outage of Telemetry at STPS EXT & SINGAJI. A meeting of officials from SLDC, CE(T&C), CE (Plg & Design ), ED(O&M;GEN),MPPGCL and MPPTCL & MPPGCL field offices was held at SLDC Jabalpur on 14-12-2015. A copy of the record notes of discussions is enclosed herewith As Annexure-10.1. The committee may like to discuss.

Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MPPGCL) 10.2 THE ARRANGEMENT OF DATA CHANNEL FOR REMOTE VDU INSTALLED AT CENTRAL

DISCOM & MPPMCL BHOPAL:- The Backup SLDC at Bhopal is commissioned and remote Video at CZ DISCOM as well as MPPMCL Bhopal office is required to be commissioned with new SCADA/EMS system. The arrangement of optical connectivity from backup SLDC at Govindpura to CZ control room MPPMCL office at Bhopal may please be intimated for further needful action by SLDC. Action:-(CENTRAL DISCOM/MPPMCL)

49th OCC Agenda Of MP 14

Page 17: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

10.3 TELEMETRY OF RENEWABLE GENERATING STATIONS :- SLDC is vigorously pursuing all renewable generating stations to provide telemetry from renewable generating stations end. A special meeting of all renewable generating stations was called by SLDC on 24th August & requirement of telemetry was explained in detail. Further in the meeting it was agreed that all renewable generating stations shall provide telemetry by 15th November 2015. However, telemetry of by only 14 Nos, renewable generating stations is commissioned so far and commissioning of telemetry renewable generating stations of M/s Betul Windfarms Ltd, M/s WANNEP Ltd, M/s NTPC Rajgarh Solar Power Plant, M/s Marut Shakti Energy India Ltd., M/s Shalivahana Green Energy Ltd. M/s Vivan Solar (Banco), M/s Inox Wind Infrastructure Ltd, M/s Waree Ltd, is under progress. M/s Suzlon Ltd, M/s MP WIndfarm Ltd, M/s Girraj Enterprises, M/s Arya Energy Ltd, M/s Orient Green Power, M/s M/s Bhadresh trading Corporation Ltd, is yet to initiate action to provide telemetry All renewable generating stations, who has not initiated action for providing telemetry is given notice to initiate action and arrange telemetry by 31st December 2015 else energy accounting shall be suspended. Similarly all renewable generating stations whose telemetry commissioning is under progress/held up due to backup SLDC commissioning is given notice to complete telemetry commissioning by 15th January 2016, to avoid suspension of energy accounting. The committee may like to discuss.

10.4 Telemetry issues regarding railways :-

The requirement of telemetry was explained to railway during the meeting held at 07-12-2015 as well as during the Visit of Railway SCADA Control Centre by EE SLDC Jabalpur on 08-12-2015.During the visit of railway SCADA control centre by SLDC it is observed that the telemetry of all TSS Sub Stations are not available at Railway single SCADA Control Centre. The divisional SCADA Control centre are having data corresponding to respective area TSS only. To provide data of all railway TSS to SLDC SCADA/EMS system, following three options are available (i) Providing data through respective divisional SCADA Control Centre:- If railways opt to provide the data of TSS through there divisional control centers, then it is required to be ensured that each divisional SCADA control centre is having ICCP protocol and data channel from each division control centre to SLDC is required to be arranged by Railway.

(ii) Railway has to develop Centralized SCADA control centre receiving data from divisional SCADA

control centers and integrating railway Centralized SCDA Control Centre with SLDC . The centralized SCADA Centre is required to have facility of ICCP data transfer. The data channel from railway Centralized SCADA control centre upto SLDC is required to be arranged by railway.

(iii) Railway may install separate RTUS at TSS and integrate the RTUs with SLDC SCADA system

Further, from railway TSS, following data is required to be provided to SLDC SCDA/EMS system:- (i) Active Power of each incoming feeder at TSS (ii) Reactive Power of each incoming feeder at TSS (iii) Circuit Breaker Position of each incoming feeder at TSS (iv) Bus Voltage, Bus Frequency of all buses at TSS (v) Master Trip Relay Position as SOE

Railway to decide the option for providing telemetry and intimate to SLDC. Further till arrangement of real time telemetered data by railway, railway is required to provide DISCOM wise drawal by railway to SLDC through fax/mail on every half hourly basis.

[Action : Railways]

ITEM No 11 : Membership of new Entities 11.1 Membership for Indian Railways :- Indian Railways in MP is deemed licensee as per CERC 05.11.2015 in petition no. 197/MP/2015. The Chief Electrical Distribution Engineer, Western Central Railway, Jabalpur shall be a member of the OCC representing the Indian Railways in MP. [Committee may like to discuss]

49th OCC Agenda Of MP 15

Page 18: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

11.2 Membership for Renewable Generators :- As there is sufficient growth in the Installed capacity of renewable Energy Generators in Madhya Pradesh, it is essential that the representative from RES generators should also participate in the OCC meeting of MP for discussion on the operational and related issues for grid security. The M/s Welspun Solar being a large RE generator has been invited from last one year to participate in the OCC meeting of MP. Now many RE generator with large capacity have been installed in the MP control area. Looking to above it is proposed that RE having capacity of 50 MW and above, one member from Wind and one member from Solar generators / developers for one year shall be nominated as member of OCC meeting of MP. The rotation of the same shall be discuss and finalise in the meeting. [Committee may like to discuss] ITEM No 12 : DATE AND VENUE OF NEXT OCC MEETING : It is proposed to hold 50th OCC meeting of Operation and Coordination Committee of MP on 24.02.2016. The host and venue of the same shall be decided in the meeting.

***********

49th OCC Agenda Of MP 16

Page 19: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. Particulars

1

1.1 Maximum Frequency 50.11 HzBetween 13.00 hrs & 14.00 Hrs on 28.10.15

50.15 HzBetween 13.00 hrs & 14.00 Hrs on 11.11.15

1.2 Minimum Frequency 49.8 HzBetween 14.00 hrs & 15.00 Hrs on 13.10.15

49.79 HzBetween 07.00 hrs & 08.00 Hrs on 21.11.15

1.3 Average Frequency 49.98 Hz 49.99 Hz

2

2.1 Maximum Frequency 50.33 Hz AT 18.02 HRS ON 01.10.15 50.28 Hz AT 13.02 HRS ON

13.11.15

2.2 Minimum Frequency 49.62 Hz AT 18.22 HRS ON 17.10.15 49.64 Hz AT 07.51. HRS

ON 21.11.153 Percentage of time when frequency was :-

%age of time when frequency was अक्तूबर-15 नवम्बर-15

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.14 0.15

3.6 Between 49.70 Hz and 49.9 Hz 13.79 11.33

3.7 Between 49.9 Hz and 50.05 Hz 69.10 67.06

3.8 Between 50.05 Hz AND 51.5 Hz 16.97 21.46

3.9 Above 51.5 Hz 0.00 0

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

अक्तूबर-15 नवम्बर-15

49th OCC Agenda Of MP 17

Page 20: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Max Min Max Min Max Min Max Max Max Min Max Min Max Min1 418 397 418 399 414 401 406 398 420 402 416 410 423 4082 415 401 415 401 413 404 408 395 417 402 416 412 421 4143 415 397 414 399 413 400 404 393 415 397 415 412 420 4084 415 397 414 399 411 401 405 396 415 397 415 412 422 4095 414 400 413 401 410 400 402 388 417 400 415 410 421 4106 415 398 413 396 411 400 400 391 417 397 415 408 421 4077 416 397 413 396 411 399 401 391 417 395 415 408 420 4088 414 397 413 397 410 399 403 389 416 396 416 408 420 4089 417 397 414 396 410 399 403 389 418 397 415 408 423 408

10 416 397 413 396 413 401 411 400 419 395 414 409 420 40611 417 400 414 399 412 403 413 398 420 397 414 410 421 41012 415 399 412 399 411 402 408 398 419 398 414 409 420 40913 414 400 413 399 412 403 407 395 417 399 413 409 421 40014 414 394 413 394 413 399 408 398 416 394 413 405 419 40615 415 386 411 391 411 398 411 398 419 386 412 407 421 40516 415 386 411 391 410 401 408 395 419 386 412 407 421 40517 415 386 411 391 410 399 407 393 419 386 413 407 421 40818 415 386 411 391 411 403 404 394 419 386 412 407 422 41119 413 394 410 393 408 400 403 392 407 393 413 407 421 40020 415 386 412 394 411 400 404 394 415 393 413 408 423 40721 416 402 414 397 411 405 412 397 417 396 418 410 422 40822 419 386 414 397 411 405 409 400 419 386 422 415 423 41323 415 386 414 400 412 403 407 397 411 397 419 413 421 40524 416 396 411 396 414 405 409 401 420 396 422 415 424 41125 415 386 414 399 415 405 410 402 409 399 421 415 422 41126 415 386 411 391 413 402 409 395 419 386 420 414 423 40527 419 397 413 397 414 401 408 395 419 386 422 414 425 40828 420 400 417 397 419 404 415 396 419 386 424 416 426 40929 420 393 415 394 417 403 411 398 419 386 422 415 426 40530 419 393 414 390 416 399 410 393 419 386 427 412 423 40331 415 386 411 391 417 400 410 396 419 386 419 413 423 405

Max /Min 420 386 418 390 419 398 415 388 420 386 427 405 426 400

Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 418 393 413 392 413 397 409 398 419 386 419 413 422 4022 420 394 417 393 425 404 411 392 422 390 421 413 424 4053 416 398 414 396 420 404 406 390 419 386 419 413 422 4074 417 391 415 394 422 402 407 388 421 392 418 414 421 4055 417 392 415 394 422 401 407 392 422 389 419 412 425 4026 419 394 416 392 423 400 409 390 419 386 419 410 425 4037 419 395 418 394 424 401 409 385 423 396 419 410 426 4078 419 396 417 397 424 401 409 387 423 396 419 412 425 4069 416 396 416 396 424 403 407 389 421 396 420 413 423 411

10 419 402 418 402 424 409 406 392 424 401 421 415 426 41211 419 402 418 402 423 409 401 391 422 400 423 415 426 40912 418 401 417 402 426 410 409 398 419 400 421 416 422 41113 418 395 415 396 422 402 406 391 423 394 419 413 424 40614 419 399 416 397 423 404 406 390 424 402 419 413 426 40915 419 398 417 397 424 402 406 386 424 400 421 412 425 40816 418 396 417 395 423 400 408 387 423 399 419 412 426 40617 419 396 417 395 425 401 411 388 424 398 421 412 426 40618 419 396 417 396 425 404 417 385 426 398 423 412 426 40819 419 400 414 396 414 401 413 396 426 404 423 413 427 40920 419 397 416 392 412 396 408 385 423 399 423 412 425 40721 418 397 414 395 414 399 408 390 422 402 421 413 423 40722 418 397 414 395 412 401 408 390 422 402 423 413 423 40823 419 396 416 394 418 409 410 389 424 399 423 412 424 40824 417 397 415 395 418 401 408 386 423 395 423 413 424 40825 417 397 415 408 415 399 434 426 423 395 421 412 424 40826 417 400 414 396 418 400 410 388 421 399 422 413 423 41027 417 399 413 397 415 399 406 389 423 399 421 411 425 40728 418 395 415 394 417 400 412 391 422 394 422 412 425 40629 418 395 415 394 414 398 413 393 422 394 421 409 422 40530 417 396 413 392 415 401 410 396 421 396 420 411 422 40831 420 418 420 418

Max /Min 420 391 418 392 426 396 434 385 426 386 423 409 427 402

BirsingpurVoltage Profile During the Month of November - 2015

Indore ISPVoltage Profile During the Month of October- 2015

DateIndore

BinaDate

Itarsi Bina

NagdaGwalior Birsingpur

Gwalior Nagda ISP

Itarsi

49th OCC Agenda Of MP 18

Page 21: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

I

S. No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR

CUITS

ROUTE LENGTH

CIRCUIT KMS.

DATE OF COMPL-

ETION

DATE OF COMMI- SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1

220KV DCDS from 220Kv S/s Daloda to proposed 180 MW Wind Energy Genration Project (wind farm)of M/s D.J. Energy Pvt. Ltd. at Bhatkheda near jaora Dist- Ratlam (2x19.875) (Contributory)

DCDS 19.875 39.75 April'2015

18.04.2015 (ckt-I)/

20.04.2015 (ckt-II))

22nd ckt. Of 220 kv line Damoh - Tikamgarh line (157.7) (JICA) 2nd ckt. 157.7 157.70 May'15 28.05.2015

3

220 kv line from Gwalior(400Kv s/s PGCIL) to 220Kv S/s Gwalior II (2x2.51) (JICA) (balance I-ckt)

DCDS 2.51 2.51 May'15Comm.on

May'15

4LILO of 220kv Rewa-Tons line at 220Kv S/s Sirmour(2x4.9) (PFC-II)

DCDS 4.9 9.80 July'15 12.10.2015

C. 132 KV TRANSMISSION LINES

1132 kv DCDS line between Bairagarh s/s(132KV) to Runaha line (2x48.202) (JICA) DCDS 48.202 96.40 April'2015 15.04.2015

2132 kv Sitamau- Daloda DCSS line (1x34.317) (JICA) DCSS 34.317 34.32 April'2015 20.04.2015

3

132 kv DCDS Line for LILO of Ujjain- Ratadiya S/c line at 132 kv s/s at Bherugarh (2x3.842) (Ckt-I charged on 14.03.2015) Priority

DCDS 3.842 3.842April'2015

(II ckt )20.04.2015

4

132Kv DCSS line from 132Kv S/s Ichhawar to 50 MW Solar Energy Power plant of M/s Waaneep Solar Pvt. Ltd. at Village Molga,Ichhawar Distt.Bhopal (1X9.5) (Contribution Work)

DCSS 9.556 9.56 April'2015 25.04.2015

5

132Kv DCSS line from 220Kv S/s Badod - 2x20MW Solar PV Power project of M/s IL&FS Energy devlopement co. Ltd. at Tehsil Badod Distt. Agar (1X12.632) Contributory Work

DCSS 12.632 12.63 April'2015 28.04.2015

6132 kv Shajapur- Moman Badodia DCDS line (2x25.17) (JICA) DCDS 25.17 50.34 May'15 11.05.2015

7

132kv DCDS line for Diversion of 132 kv Handiya-Nasrullaganj tap line & second circuiting of 132 kv Handiya-Nasrullaganj line and * 132 kv DCSS Tap line for proposed 132kv S/s GOPALPUR (Ckt.Km.-36.62) = (2x7.9+1x3.35+1x17.47) (GoMP) (Note- tap line completed on April 2013)

DCDS 25.37 33.27May'15 June'15

25.05.2015 03.06.2015

8 132 kv Datia Interconnector (2x6.2) ( JICA ) DCDS 6.2 12.40 May'15 29.05.2015

9

132 kv DCDS Line for LILO of Ujjain- Ingoriya line at existing 132 kv s/s Ratadiya (2x1.684) (Priority)

DCDS 1.684 3.37 May'15 29.05.2015

Annexure-2.3.4(i)

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2015-16 (UP TO 30.11.2015)

EHV TRANSMISSION LINES

49th OCC Agenda Of MP 19

Page 22: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

I

S. No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR

CUITS

ROUTE LENGTH

CIRCUIT KMS.

DATE OF COMPL-

ETION

DATE OF COMMI- SSIONING

Annexure-2.3.4(i)

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2015-16 (UP TO 30.11.2015)

EHV TRANSMISSION LINES

10

132Kv DCSS line from 132 Kv S/s Vijaypur - 50MW Solar PV Power project of M/s Renew Solar Energy(TN)Pvt. Ltd. at village Hulpur Distt. Sheopur (1X1.2) (Contributory Work)

DCSS 1.2 1.20 May'15 07.05.2015

11

132Kv DCSS line from 132 Kv S/s Sitamau - 132Kv Pooling S/s at 40MW Solar PV Power project of M/s Focal Energy Solar India Pvt. Ltd. at village Cchoti Patlasi & Kochariakhedi, Sitamau Distt. Mandsour (1X0.43) (Contributory Work)

DCSS 0.43 0.43 May'15 30.05.2015

12

132Kv DCSS line from 220kv S/s MandiDeep -M/s Proctor & Gamble MandiDeep (DIST.-Bhpoal) DCSS line (1x8.973) (Contributory)

DCSS 8.973 8.973 June'15 19.06.2015

13132 kv DCDS Dewas (220KV) to Shankargarh (Dewas bypass) line (2x5.6) (JICA) DCDS 5.6 11.20 June'15 30.06.2015

14

LILO of one S/C ckt of 132 KV Chhegaon - Khargone 132Kv DCDS Line at Andad(Bediya) (2x6.33) (PFC-II)

DCDS 6.33 12.66 June'15 25.06.2015

15

LILO of one ckt of 132 KV Amarkantak-- Rajmilan line at 132Kv S/s Dongrital Distt- Singrauli for power supply to M/s APMDCL & Ms MPJCL (contributory)

DCDS 0.141 0.28 June'15 20.06.2015

16132 kv DCSS Damoh (220Kv )-Batiyagarh line on 220Kv Towers (1x39.95) (JICA)

DCSS 39.95 39.95 July'15 17.07.2015

17132 kv DCSS Sheopur-Baroda line (1x33.481) (JICA)

DCSS 33.481 33.48 July'15to be

charged

18132 kv DCSS line between 132KV Ganj Basoda to Saharwasa (1x28.927)

DCSS 28.927 28.93 July'15 06.07.2015

19Stringing of 3rd conductor from Bina to Mungaoli (31.30) (ADB-III)

Stinging 31.3 31.30 July'15to be

charged

20LILO of malanpur -- Ambah 132KV line at Badagaon (Dimni)(2x2.5) PFC- DCDS 2.5 5.00 Oct'15 14.10.2015

21Malanpur -- Gohad 132KV DCSS line (1x14.55) ADB-III DCSS 14.55 14.55 Oct'15 28.10.2015

22132KV Gwalior-II Hastinapur DCSS line (JICA counter part)(1x23.276) DCSS 23.276 23.28 Oct'15

To be charged

23LILO of 132Kv Sironj-Maksudangarh line at 132Kv S/s Lateri (2x6.7)PFC-saving

DCDS 6.7 13.40 Nov'15 09.11.2015

24132Kv Moman Badodiya- Nalkheda DCSS line (1x28.383)(PFC-II)

DCSS 28.383 28.38 Nov'15 03.11.2015

25

132Kv DCSS line from 132Kv S/s Banmore for power supply of 25WVA to M/s Amba Shakhty Udyog Ltd. Banmore Dist. Gwalior.(1x0.631) (Contributory work)

DCSS 0.631 0.63 Nov'15 06.11.2015

49th OCC Agenda Of MP 20

Page 23: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

I

S. No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR

CUITS

ROUTE LENGTH

CIRCUIT KMS.

DATE OF COMPL-

ETION

DATE OF COMMI- SSIONING

Annexure-2.3.4(i)

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2015-16 (UP TO 30.11.2015)

EHV TRANSMISSION LINES

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE

RATIO (KV)

No.OF X-

mer & Cap.(MVA

)

EFFECTIVE

CAPACITY MVA

DATE OF COMPL-

ETION

DATE OF COMMI- SSIONING

A. 400 KV SUBSTATIONS

1 Nagda (ADDL.) (Distt. Ujjain) (JICA) 400/220 1x315 315.00 Aug'15 28.08.2015

22x80 MVAR Reactor at 400Kv S/s Bhopal (1No. 80MVAR charged on 27.08.2015) (JICA)

400KV - - Aug'15

27.08.2015 (1No.

80MVAR charged on 27.08.2015)

3 50 MVAR Reactor at 400Kv S/s Pithampur ( ) 400KV - - Aug'15 28.08.2015

4 50 MVAR Reactor at 400Kv S/s Nagda ( ) 400KV - - Jun'15 20.06.2015

5Katni 400Kv S/s, addl. 315 MVA Transformer (JICA)

400KV 1x315 315.00 Nov'15 03.11.2015

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (JICA)

220/132 1x160 160.00 Aug'1521.08.2015

(1No. Charged)

2Sirmour 220/132kv S/s (Distt. Rewa) (2x160+40 MVA) (PFC-II)

220/132 1x160 160.00 Oct'15 12.10.2015

EHV SUB - STATIONS

49th OCC Agenda Of MP 21

Page 24: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. NAME OF THE TRANSMISSION LINE TYPE OF CKT.CKT.KMS.

Expected month of completion

PROGRESS IN %

A. 400 KV TRANSMISSION LINES

Nil 0 0

B. 220 KV TRANSMISSION LINES

1LILO of one Ckt of 220kv DCDS Bhopal - Ashta line at 220kv S/S Mugaliya chhap. (DCDS)

DCDS 52 Contract terminated 37%

2 2nd Ckt of 220kv Satna - Chhatarpur line (152) 2nd ckt 160 Contract terminated 10%

3 220Kv DCDS line from Pithampur-Depalpur line (2X31) DCDS 62 14%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

DCDS 34 10%

6LILO of one ckt of Bina-Guna 220Kv line at Ashoknagar 220Kv S/s (2x3.794)

DCDS 8 78%

7LILO of Indore 400 -Pithampur 220Kv line at Pithampur-II 220Kv S/s in Indore (1x7.38)

DCDS 7.38 67%

8 220Kv DCDS Julwaniya- Kukshi (2X58) DCDS 116 5%

C. 132 KV TRANSMISSION LINES

1 132kv Birsinghpur -Shahdol DCSS line (1x48) DCSS 48 Contract still to be placed 4%

2 132kv Ichhawar -Sehore DCSS line (1x35.298) DCSS 35.298 Contract terminated 37%

3 132kv Chhatarpur (220kv)- Laundi line (1x43) DCSS 43 Dec'15 88%

4132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42)

DCDS 70.84 Contract terminated 90%

5 132 kv DCSS Dewas-Barotha line (1x23) DCSS 23 Contract terminated 75%

6 132 kv DCSS Ghatabillod-Betama line (1x18) DCSS 18 Contract terminated 57%

7 132kv Jeerapur -Susner DCSS line (1x32) DCSS 32 Contract terminated 51%

8 132kv DCSS Gautampur -Depalpur line (1x19) DCSS 19 Contract terminated 50%

9 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) DCSS 64 Contract terminated 44%

10132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5)

DCSS 35.5 Contract terminated 45%

11 132kv Mugaliya Chaap - Sehore DCSS line (1x24) DCSS 24 Contract terminated 13%

12 132kv Pipariya 220kv- Bareli DCSS line (1x34) DCSS 34Charged on

2-12-15100%

13132 kv DCSS line between 220KV Harda s/s and 132KV Khirkiya s/s (1x36.55)

DCSS 36.55Ready for charging

100%

14132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209)

DCSS 53.209 36%

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.11.2015)Annexure-2.3.4(ii)

49th OCC Agenda Of MP 22

Page 25: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. NAME OF THE TRANSMISSION LINE TYPE OF CKT.CKT.KMS.

Expected month of completion

PROGRESS IN %

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.11.2015)Annexure-2.3.4(ii)

15 132Kv Chapda-Sivni DCDS line (1x18) DCDS 18Charged on

9-12-15100%

16LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

DCDS 40 Contract terminated 14%

17 132 kv DCSS Julwaniya (400kv-)-Sendhwa line (1x27) DCSS 27Charged on

3-12-15100%

18132 kv DCSS Line from 220Kv S/s Kotar-132Kv S/s Rampur Baghelaan line, by stringing 2nd ckt.220Kv S/s Kotar to 132Kv Prism II Line (1x20)

DCSS 20 99%

19132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.859)

DCSS 32.859 57%

20 132 kv DCSS Alot-Tal line (1x16.23) DCSS 16.23 75%

21 132 kv DCSS Moman Barodiya-Nalkheda line (1x34) DCSS 34Charged on

4-11-15100%

22132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1)

DCSS 27.1 59%

23 132 kv Gwalior II - Hastinapur DCSS line (1x30.00) DCSS 30Charged on

7-12-15100%

242nd ckt of Chhatarput- Khajuraho line upto location no. 73(1x8.31)

2nd ckt 8.31 15%

25LILO of Malanpur-Ambaah 132 kv DCDS line at Badagaon(Dimni) (2x2.50)

DCDS 5Charged on

14-10-15100%

26LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

DCDS 55.09 36%

27132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35)

DCSS 35 Contract terminated 11%

28 132 kv Sirmour - Katra DCDS line (2x37.67) DCDS 75.34 34%

29 132 kv DCSS Guna-Eshagarh line (1x72) DCSS 72 26%

30 132 kv Sagar-Rahatgarh DCSS line (1x55) DCSS 55 Contract terminated 27%

312nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.46)

DCSS 32.46 71%

32 132 kv DCSS Malanpur-Gohad line (1x14.55) DCSS 14.55Charged on

28-10-15100%

33 132 kv DCSS Datiya- Bhander line (1x35) DCSS 35 55%

34132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x35)

DCSS 35 Contract terminated 8%

49th OCC Agenda Of MP 23

Page 26: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. NAME OF THE TRANSMISSION LINE TYPE OF CKT.CKT.KMS.

Expected month of completion

PROGRESS IN %

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.11.2015)Annexure-2.3.4(ii)

35LILO of 132Kv Sironj-Maksudangarh line at 132Kv S/s Lateri (2x7)

DCDS 14Charged on

9-11-15100%

36 132 kv DCSS line Mehgaon - Pratappura (1x28) DCSS 28 41%

37 2nd ckt of 132kv RTS Mangliyagaon line 2nd ckt 9 99%

38LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Munaoli (4x7.8+2x0.7)

DCDS 32.6 97%

39 132 kv DCSS Ashoknagar - Kothiya line (1x31.8+4x3.2) DCSS 44.6 60%

40132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower)

DCDS 94 22%

412nd ckt of 132kv Bairagarh - Shyampur line (1x0.5+4x1.9+19)

2nd ckt 27.1 Nov'15 98%

42132 kv DCSS line from 132Kv S/s Porsa - 132Kv S/s Ambah (1x23.059)

DCSS 23.059 54%

43132 kv DCSS line from 132Kv S/s Lahar - 132Kv S/s Seondha (1x15.5)

DCSS 15.5 78%

44 132 kv DCSS line Datiya - Dabra (1x30) DCSS 30 58%

45132 kv DCSS Line from 220Kv S/s Shujalpur - 132Kv S/s Kalapipal (1x16.46)

DCSS 16.46Ready for charging

100%

46132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s Kishangarh (1x57.139)

DCSS 57.139 22%

44 132 kv DCSS Panagar - Patan line (1x26) DCSS 52 5%

S.No.

NAME OF THE SUBSTATIONVOLTAGE

RATIO (KV)

EFFECTIVE

CAPACITY MVA

Expected month of

completion

PROGRESS IN %

A. 400 KV SUBSTATIONS

12x80 MVAR Reactor at 400Kv S/s Bhopal (1 No. charged on 27.08.2015)

400KV 0 Completed 100%

2 Katni (ADDL.) (Distt. Katni) 400/220 3153-11-15

X-mer charged100%

B. a 220 KV SUBSTATIONS

1Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015)

220/132 320

160 charged on 21.8.1540 MVA Dec-15

89%

49th OCC Agenda Of MP 24

Page 27: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. NAME OF THE TRANSMISSION LINE TYPE OF CKT.CKT.KMS.

Expected month of completion

PROGRESS IN %

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.11.2015)Annexure-2.3.4(ii)

2 Shajapur 220kv S/s (Distt. Shajapur) (2x160+40 MVA) 220/132 320

160 MVA- 4.3.15

40 MVA- 30.6.15

100%

3 Sirmour 220kv (New S/s) (Distt.Rewa) 220/132 160

160 charged on 12.10.15

40 MVA- 13.10.15

Wrok partly completed

4 Mugaliachhap(Bhopal) 220kv (New S/s)(1x160+40) 220/132 160 Jan-16 77%

5 Upgradation of Ashoknagar 132Kv S/s to 220kv with 2no.220Kv feeder bay & 1x160MVA (Distt. )

220/132 160 Dec-15 82%

6 Upgradation of Pithampur 132Kv S/s to 220/132kv 1x160MVA with 1no.220Kv X-mer bay,BC bay, 2no. 200Kv feeder bay & 1no 132KV X-mer bay (Distt. )

220/132 160 March-16 74%

7Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged on31.3.2015)

220/132 160

1x160 charged on 31.3.15 &40 MVA

Charged on 27.10.15

100%

5 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA (Distt. )

220/132 160 2%

1Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank

220/132 160 26%

b ADDITIONAL TRANSFORMER

1Shivpuri 220/132 kv s/s Addl. 160 MVA X-mer (Distt.Shivpuri)

220/132 160 Dec-15 94%

2Anuppur 220/132 kv s/s Addl. 160 MVA X-mer (Distt. Anuppur)

220/132 160 8-11-15 100%

3 Dewas 220/132 kv s/s Addl. 160 MVA X-mer (Distt. ) 220/132 160 T&C 50%

4Chhindwara 220/132 kv s/s Addl. 160 MVA X-mer (Distt. )

220/132 160 T&C 41%

5 Chhegaon 400 kv s/s Addl. 160 MVA X-mer (Distt. ) 220/132 160 T&C 37%

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Hastinapur (New S/s) (Distt.Gwalior) (40 MVA) 132/33 40 Dec-15 83%

2 Eshagarh132kv s/s (Distt. Guna) 132/33 40 Dec-15 91%49th OCC Agenda Of MP 25

Page 28: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S. No. NAME OF THE TRANSMISSION LINE TYPE OF CKT.CKT.KMS.

Expected month of completion

PROGRESS IN %

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.11.2015)Annexure-2.3.4(ii)

3 Tal 132kv s/s (Distt.Guna) 132/33 40 Dec-15 30%

6 Bairad 132kv s/s(Dist.-Shivpuri ) 132/33 40 Mar-16 29%

7 Badagaon (Dimni) 132kv s/s(Dist.-Morena ) 132/33 40 16-10-15

100%work

Partely completed

x-mer charged

8 Andad (Bediya)132kv s/s (Distt.Khargone) 132/33 40 Dec-15 53%

9 Barahi 132kv s/s (Distt.Katni) 132/33 40 24%

10 Karapgaon 132kv s/s (Distt-Narsinghpur) 132/33 40 32%

11 Sivni 132kv s/s (Distt.Indore) 132/33 40 Dec-15 90%

12 Lateri 132kv s/s (Distt.Vidisha) 132/33 40 Dec-15 68%

13 Rahatgarh132kv s/s (Distt.Sagar) 132/33 40 Mar-16 22%

14 Indergarh 132kv s/s (Distt.Datia) 132/33 40 Mar-16 45%

15 Pratappura 132kv s/s (Distt.Bhind ) 1x40 MVA 132/33 40 Mar-16 84%

16 Gohad 132kv s/s (Distt. Bhind) 1x63 MVA 132/33 63 3-12-15 100%

17 Bhander 132kv s/s (Distt. Datia) 1x63 132/33 63 Jan-16 80%

18 Mungaoli 132kv s/s (Distt.Ashoknagar) 1x63 132/33 63 Jan-16 91%

19 Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA 132/33 40 Apr-16 48%

20 Umreth 132kv s/s (Distt. Chhindwara ) 1x40 MVA 132/33 40 Dec-15 75%

21 Dongari Tal 132kv s/s (Distt. Sidhi) 132/33 40 1-12-15 100%

22Katangi 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. - Jabalpur)

132/33 40 44%

23Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Dewash)

132/33 40 40%

24Kalapipal 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Sujalpur )

132/33 40 Dec-15 88%

24 Khimlasa 132kv s/s with 1x40 MVA (Distt. ) 132/33 40 8%

24Bilpank 132kv s/s with 2 no. 132 kv feeder bay & 1x40 MVA (Distt. )

132/33 40 15%

49th OCC Agenda Of MP 26

Page 29: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

अक्तूबर-15 नवम्बर-15 अक्तूबर-15 नवम्बर-15

Commissinary HQ 23:53 23:55 23:40 23:46

District HQ 23:53 23:57 23:43 23:46

Tehsil HQ 23:47 23:52 23:20 23:32

Rural -Mixed 23:30 23:35 22:42 23:00

Rural -DLF 23:30 23:35 23:00 23:16

Rural -Irrigation 9:59 9:58 9:36 9:44

अक्तूबर-15 नवम्बर-15 अक्तूबर-15 नवम्बर-15

Commissinary HQ 23:49 23:51 23:47 23:51

District HQ 23:46 23:55 23:48 23:54

Tehsil HQ 23:38 23:47 23:36 23:44

Rural -3Phase 23:09 23:25 23:09 23:21

Rural -1Phase 23:25 23:37 23:19 23:30

Total Rural 9:44 9:54 9:47 9:52

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

49th OCC Agenda Of MP 27

Page 30: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

132 KV Shahpura 33 KV PGCIL 31.03.2015

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220KV Indore (Jetpura)-II 33KV PGCIL-II feeder 24.08.2014220KV Nimrani 33KV Maral Overseas 08.06.2015220KV Indore-West (Bicholi) 33KV Scheme No.114 24.12.2014220KV Julwaniya 33KV New Discom bay 11.04.2015

132KV Raukhedi 33KV DLF-I 01.03.201433KV DLF-II 01.03.2014

132KV Balwada 33KV Choural 25.06.201533KV Balwada 25.06.2015

132KV Anjad 33KV Surana 03.04.2015

132KV Chandrawatiganj 33KV Feeder No.2 31.12.201433KV Feeder No.3 31.12.201433KV Feeder No.4 31.12.2014

132KV Chambal (Indore) 33KV MP Nagar-I 07.08.201333KV MP Nagar-II 07.08.2013

132KV Khandwa 33KV AKVN-I 16.04.201533KV AKVN-II 16.04.2015

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

132KV Susner 33KV Evershine 21.05.2014132KV Sandalpur 33KV AKVN Ind 19.02.2015132KV Maxi Sudheer Project 18.02.2015

Annexure-2.4(ii)LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

(For which group to be allocated)

30.03.201533KV Jamgod Rani-I

132KV

132KV

UJJAIN REGION

INDORE REGION

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

220KV

132KV

220KV Dewas

220KV

49th OCC Agenda Of MP 28

Page 31: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annexure-2.4(ii)

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Betul 33 KV Industrial 13.06.2014220 KV Vidisha 33 KV ISanchi 30.01.2015

33 KV Barna 19.02.201433 KV Boras 19.02.201433 KV Bhainsdehi-II (Chandu)

132 KV Chicholi 33 KV Chirapatla 03.03.201533 KV BMC 25.03.201433 KV Tirupati Abhinav 09.01.2015

132 KV Khilchipur 33 KV Khajla 29.10.201433 KV Nagar Palika 09.03.201433 KV Water Works 09.03.201433 KV Industrial 07.11.2010 (four feeder)33 KV Dashehrabag-II 09.05.201433 KV Jatkheda-I 07.05.201433 KV Jatkheda-II 07.05.201433 KV Runaha 15.04.201533 KV Nazirabad 18.09.201533 KV Ramgarh 19.09.2015

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Malanpur 33 KV Montez (feeder no.13) 15.06.201533 KV Mangrol 30.05.201433 KV Mamchone 25.09.2015

132 KV Karera 33 KV Narua 20.09.2014132 KV Kolaras 33 KV Rai 27.09.2014132 KV Ambah 33 KV Gundbada 21.12.2013132 KV Morena 33 KV Bagchini 02.02.2015132 KV Datia 33 KV Karapura 17.05.2014132 KV Ron 33 KV Mangarh 21.11.2013132 KV Sheopur 33 KV Bhogika 07.08.2015

33 KV Baroda 16.06.201533 KV Pandola 16.06.201533 KV Salmaniya 16.06.201533 KV Bhadroli 16.02.201433 KV Sagartal 24.07.201433 KV Readymade 22.08.2014 Garment

132 KV Motizheel 33 KV Transport Nagar 30.05.2015

132 KV

132 KV Biora

132 KV Bareli

132 KV Gurgaon

132 KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated)

BHOPAL REGION

24.05.2014

132 KV Ayodhya Nagar BPL

220 KV

132 KV Baroda

132 KV Morar

GWALIOR REGION

132 KV Sehore

132 KV Shyampur

132 KV Runaha

220 KV

220 KV Sagalgarh

49th OCC Agenda Of MP 29

Page 32: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annexure-3.2

FROM TO

1 Nagda 400 KV NAGDA-INDORE - 21-Jan-16 10:00 17:00 07:00 Pre Monsoon Maintenance work

2 Nagda 400 KV NAGDA-RAJGARH-I LINE WITH REACTOR - 23-Jan-16 10:00 17:00 07:00 Pre Monsoon Maintenance work

3 Nagda 400 KV NAGDA-RAJGARH-II LINE WITH REACTOR - 28-Jan-16 10:00 17:00 07:00 Pre Monsoon Maintenance work

4 Nagda 400 KV NAGDA-ISP - 30-Jan-16 10:00 17:00 07:00 Pre Monsoon Maintenance work

5 Nagda 50 Mvar Bus Reactor - I - 02-फरवर�-16 10:00 17:00 07:00 Pre Monsoon Maintenance work

1 220 Sagar BINA - I 20-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

2 220 Sagar BINA - II 21-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

3 220 Sagar PGCIL 22-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

4 220 Sagar DAMOH 23-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

5 220 Sagar Rly Traction - I 26-जनवर�-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

6 220 Sagar Rly Traction - II 27-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

8 220 Damoh Katni - I 28-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

9 220 Damoh Katni - II 29-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

10 220 Damoh Sagar 23-Jan-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

11 220 Damoh PGCIL - I 30-जनवर�-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

12 220 Damoh PGCIL - II 5-Feb-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

15 220 Damoh Traction - I 8-Feb-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

16 220 Damoh Traction - II 9-Feb-16 08:00 17:00 09:00 Pre Monsoon Maintenance work

220 KV Lines

PROPOSED SHUTDOWN PROGRAMME OF 400 KV EQUIPMENT / FEEDER DURING 20-01-2016 TO 19-02-2016PERIOD OF SHUTDOWN

S-NO. NAME OF 400 KV SUBSTATION NAME OF EQUIPMENT/FEEDER/LINE CIRCUIT NO. DATE DURATION IN HRS- MAINTENANCE WORK PROPOSED REMARK

49th OCC Agenda Of MP 30

Page 33: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

A. ThermalStn. Name UNIT No. Capacity

MW October-15 November-153 120 0.00 0.004 120 0.00 0.00

PH II 240 0.00 0.005 210 141.84 150.55

PH III 210 141.84 150.55TOT 450 141.84 150.55

1 62.5 0.00 0.002 62.5 0.00 0.004 62.5 0.00 0.00

PH I 187.5 0.00 0.006 200 106.90 112.217 210 110.62 105.96

PH II 410 217.515 218.168 210 136.897 109.279 210 0 1.54

PH III 420 136.897 110.8110 250 164.317 162.5411 0 0.00

PH IV 250 164.317 162.54TOT 1267.5 518.73 491.52

1 210 107.322 93.512 210 116.78 110.16

PH I 420 224.10 203.673 210 110.28 104.454 210 74.34 115.79

PH II 420 184.62 220.245 500 354.75 341.40

PH III 500 354.75 341.40TOT 1340 763.46 765.31

1 600 306.18 115.532 600 320.67 253.83

PH1 600 626.85 369.36

3057.5 2050.88 1776.74AMARKANTAK POWER HOUSE-I RETIRED FROM SERVICE WEF 01.04.2009

B. HydelCapacity

MW October-15 November-15115.0 1.56 39.23172.0 51.02 73.4799.0 32.89 49.84

386.0 85.47 162.54193.0 42.74 81.27160.0 69.24 44.04107.0 46.16 29.3690.0 21.26 16.89

315.0 35.11 38.7520.0 0.17 0.0860.0 38.85 0.0030.0 3.85 4.4345.0 1.70 10.4122.5 0.85 5.2020.0 4.02 4.9060.0 21.38 14.83

1186.0 281.04 296.85915.0 197.13 173.55917.5 214.38 195.70

CapacityMW October-15 November-15

Indira Sagar Hydel Project 1000 179.003 133.960Omkareshwar Hydel Project 520 78.224 60.872

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

M.P.CHAMBALPENCHM.P.PENCHBARGITONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

49th OCC Agenda Of MP 31

Page 34: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S No. Source Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 TotalA.

1 Thermal 1153.43 1294.73 1139.02 1086.32 843.93 1664.96 1873.90 1613.33 10669.612 Hydel 141.33 125.30 102.47 103.87 237.87 191.06 212.00 192.60 1306.493 Total 1294.76 1420.03 1241.49 1190.19 1081.80 1856.02 2085.89 1805.93 11976.11

B.1 Indira Sagar 166.41 143.44 56.90 119.70 412.89 114.01 175.90 131.88 1321.142 Omkareshwar 75.33 74.45 36.88 75.08 200.32 59.60 78.22 60.87 660.743 MPPMCL Schedule from Central Sector of WR 1480.43 1667.87 1373.88 1455.87 1275.16 1599.69 1752.12 1714.68 12319.704 MPPMCL Schedule from Central Sector ER 28.81 34.50 23.16 40.70 19.16 31.76 36.65 37.97 252.725 Total MPPMCL Schedule from Central Sector (WR+ER) 1509.24 1702.37 1397.04 1496.57 1294.32 1631.45 1788.77 1752.65 12572.436 Deviation Energy of (WR+ER) -39.27 -34.34 -49.81 -57.83 -93.96 -98.04 -29.95 -53.22 -456.437 Schedule From DVC ER 200.99 249.67 161.97 201.83 184.65 209.01 210.32 200.72 1619.168 Schedule From Sugen 21.36 21.48 20.16 7.76 0.00 0.00 0.00 0.00 70.769 LANCO Amk 129.84 176.97 170.46 182.40 107.78 125.63 202.04 195.61 1290.73

10 SASAN 764.50 810.96 856.43 973.70 890.58 891.54 913.52 949.60 7050.8311 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 J P Nigri 140.42 51.26 176.26 175.09 304.29 296.09 321.18 307.71 1772.3013 MB Power 0.00 18.42 9.32 29.32 35.16 65.34 105.59 128.04 391.1814 NTPC BADARPUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0015 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0016 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0017 Schedule from Sardar Sarovar 71.63 133.95 95.48 105.61 444.54 112.82 53.57 41.95 1059.5518 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0019 Schedule from Rihand+Matatila 7.00 2.75 4.41 9.28 16.12 8.13 7.99 5.79 61.48

20 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

21 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 Additional Power Purchase 0.00 0.00 0.00 0.04 0.00 0.00 15.41 0.13 15.5823 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0024 Banking of Energy -259.40 -80.13 -46.66 -536.78 -611.76 -420.43 115.49 613.51 -1226.1625 Sale of Power -145.17 -110.74 -276.27 -68.88 -166.08 -26.35 -11.98 -4.58 -810.0426 MPPMCL Schedule Incl. Power Purchase 2440.42 2976.96 2568.61 2575.94 2499.61 2893.23 3721.91 4191.13 23867.7927 MPPMCL Drawal Including Power Purchase 2401.15 2942.61 2518.79 2518.10 2405.65 2795.19 3691.96 4137.91 23411.3728 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.01 4.47 1.77 3.47 6.65 16.3729 Wheeled Energy of Wind Farm 6.40 8.76 8.53 13.68 9.61 5.40 3.01 2.25 57.6430 Wheeled Energy of Solar Plant 15.36 16.37 13.40 9.86 10.29 13.91 14.44 12.72 106.3531 Wheeled Energy of Ascent Hydro 1.23 1.24 0.06 0.19 0.52 1.26 1.39 1.32 7.2232 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.76 29.7633 Deviation Energy of MPPGCL Thermal -1.25 -5.39 2.96 -9.37 0.49 16.87 14.06 14.41 32.7834 Sale of Power to SEZ by MPPMCL (Not Included in State Supply) -23.93 -27.17 -27.34 -29.51 -28.15 -26.82 -27.15 -24.30 -214.3735 Energy Purchased by MP from Wind Farm 95.03 145.08 145.68 248.69 197.73 114.15 69.31 60.65 1076.3136 Energy Purchased by MP from Solar Plant 56.53 48.66 53.34 42.36 44.19 59.87 64.99 54.83 424.76

37 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 14.24 7.32 7.00 3.61 11.79 42.96 61.71 5.61 154.23

38Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya)

9.89 12.36 9.25 9.31 11.94 13.61 11.47 7.72 85.55

39 Deviation Energy of ISP 2.59 3.90 1.61 2.39 0.70 2.59 3.10 2.08 18.9640 Schedule Energy of BLA Power against LTOA 8.90 6.74 0.49 0.00 0.00 1.74 6.63 1.68 26.1741 Schedule Energy of JP BINA Power against LTOA 137.48 0.00 0.00 0.00 14.35 70.28 157.04 83.52 462.6642 Import from bargi Left Bank Canal Power House + ISP NVDA 0.26 0.01 0.01 0.01 0.98 1.07 1.36 2.14 5.8443 Chambal Complex Excess / less Overshare by MP -2.78 -2.60 -5.36 -9.76 -38.14 -37.03 -48.76 -48.80 -193.2444 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.02 -0.04 0.22 1.96 -0.02 0.52 2.57 5.1745 State Supply (Ex-Power st. Bus) 4281.50 4822.95 4090.97 4214.27 4371.53 5133.25 6395.72 6375.71 39685.9046 AVERAGE DAILY (Ex-Bus) 142.72 155.58 136.37 135.94 141.02 171.11 206.31 212.52 162.6547 MINIMUM DAILY (MP Periphery) 108.61 137.66 101.80 111.57 122.01 139.30 159.47 187.82 101.8048 MAXIMUM DAILY (MP Periphery) 149.60 155.88 155.52 157.44 163.81 185.56 224.87 215.58 224.8749 State Supply (Ex-Power st. Bus):- YEAR : 2014-15 4512.41 4609.06 4315.82 4115.84 4214.10 4486.53 5436.77 6049.66 37740.1850 Year ((15-16)-(14-15))*100/Year (14-15) -5.12 4.64 -5.21 2.39 3.74 14.41 17.64 5.39 5.1651 Unshedule L/S : Year-2015-16 0.00 0.00 0.00 0.00 0.00 0.21 0.99 0.00 1.2052 Frequency Correction -5.58 -4.09 -5.30 -4.21 -1.73 5.33 1.68 1.18 -12.7253 Restricted Requirement : Year-2015-16 4275.92 4818.87 4085.68 4210.06 4369.80 5138.79 6398.39 6376.88 39674.3954 Shedule L/S : Year-2015-16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0055 Un-Restricted Requirement : Year-2015-16 4275.92 4818.87 4085.68 4210.06 4369.80 5138.79 6398.39 6376.88 39674.39

ENERGY BALANCE SHEETYear : 2015 - 16

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

49th OCC Agenda Of MP 32

Page 35: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

S.NO. Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Yr 15-16C.1 DEMAND MET 6141 6369 6416 6453 6093 7597 9655 10089 100892 LOAD RELIEF 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 7259 7250 7210 7303 7580 8256 9117 9153 91532 LOAD RELIEF 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 7259 7250 7210 7303 7580 8488 9823 10112 10112G. COMPUTED MAXIMUM DEMAND 7250 7247 7191 7303 7590 8488 9831 10126 10126H. UNRESTRICTED MAXIMUM DEMAND 7250 7247 7191 7303 7590 8488 9831 10126 10126I.1. Div. Head Quarters 23:46 23:44 23:45 23:43 23:46 23:45 23:47 23:51 23:462. District Head Quarters 23:50 23:49 23:48 23:50 23:50 23:48 23:48 23:54 23:493. Tahsil Head Quarters 23:39 23:33 23:25 23:33 23:39 23:35 23:36 23:44 23:364. Rural -Mixed 23:08 23:06 22:51 23:01 23:16 23:10 23:09 23:21 23:085. Rural -DLF 23:16 23:15 23:02 23:11 23:22 23:20 23:19 23:30 23:176. Rural -Irrigation 9:45 9:45 9:37 9:41 9:46 9:45 9:47 9:52 9:45J LOAD FACTOR % 81.92 89.07 78.63 77.02 76.89 82.93 86.07 85.81 82.29

S.N PARTICULARS Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Yr 15-16A. INTGRATED FREQUENCY

1 MAXIMUM 50.23 50.32 50.31 50.20 50.12 50.13 50.11 50.15 50.322 MINIMUM 49.74 49.75 49.75 49.77 49.77 49.72 49.80 49.79 49.72

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.55 50.55 50.55 50.33 50.25 50.33 50.33 50.28 50.552 MINIMUM 49.50 49.55 49.60 49.58 49.55 49.52 49.62 49.64 49.50

C. AVG FREQUENCY 49.99 49.98 50.00 49.99 49.98 49.95 49.98 49.99 49.98D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 24.86 19.44 25.70 19.07 14.97 10.78 16.97 21.46 19.133 49.9 TO 50.05 Hz 60.20 64.74 65.01 70.29 70.00 59.83 69.10 67.06 65.824 49.7 TO 49.9 Hz 14.35 15.10 9.09 10.43 14.72 28.74 13.79 11.33 14.675 49.5 TO 49.7 Hz 0.59 0.72 0.20 0.21 0.31 0.65 0.14 0.15 0.376 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2015 - 16

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2015-16

49th OCC Agenda Of MP 33

Page 36: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPTotal IPPs

Injection

Total CPPs Injectio

n

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

HP Hydel (C+P+T+K)

SSP SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 50.00 2806 2554 235 242 116 276 112 3534 2313 282 0 259 1174 0 412 141 0 55 0 239 -9 28 0 -52 10 4852 8386 4787 -65 0 8321 0 0 0 8325 8325

2:00 50.03 2801 2549 157 125 62 276 112 3281 2307 283 0 259 1162 0 412 140 0 54 0 239 -9 35 0 -51 10 4841 8122 4634 -207 0 7915 0 0 0 7917 7917

3:00 50.06 2780 2530 170 161 75 272 115 3322 2323 283 0 259 1159 0 412 139 0 54 0 239 -9 43 0 -49 10 4865 8187 4924 60 0 8247 0 0 0 8247 8247

4:00 50.06 2764 2515 179 202 92 276 127 3391 2315 280 0 259 1168 0 412 140 0 54 0 239 -6 45 0 -47 10 4869 8260 4841 -28 0 8232 0 0 0 8233 8233

5:00 50.01 2745 2498 180 222 99 273 122 3394 2295 279 0 259 1170 0 412 136 0 54 0 239 -9 42 0 -48 10 4839 8234 4816 -23 0 8210 0 0 0 8216 8216

6:00 50.06 2739 2493 166 232 104 274 119 3388 2282 276 0 259 1182 0 412 130 0 54 0 239 -7 41 0 -39 10 4839 8227 4619 -221 0 8007 0 5 5 8013 8013

7:00 50.04 2764 2515 228 333 137 289 147 3649 2325 283 0 259 1193 0 412 133 0 63 0 163 -5 54 0 -37 10 4853 8502 4930 77 0 8580 0 5 5 8586 8586

8:00 50.06 2784 2534 233 316 137 292 241 3752 2365 284 0 263 1186 0 416 134 0 75 0 163 -4 54 0 -31 10 4915 8667 4746 -168 0 8499 0 5 5 8505 8505

9:00 50.04 2765 2516 217 254 112 292 342 3733 2392 285 0 263 1186 0 420 134 0 77 0 163 -12 46 0 -47 10 4915 8648 4878 -37 0 8611 0 0 0 8612 8612

10:00 50.05 2746 2499 205 230 97 280 441 3751 2396 286 0 263 1188 0 420 135 0 73 0 163 -6 30 0 -49 10 4907 8658 4826 -81 0 8578 0 0 0 8579 8579

11:00 50.04 2708 2464 182 206 94 274 504 3725 2365 286 0 263 1182 0 420 136 0 61 0 163 -7 16 0 -50 10 4844 8568 4820 -24 0 8544 0 0 0 8546 8546

12:00 50.08 2650 2412 128 125 54 264 521 3504 2311 277 0 263 1184 0 423 137 0 63 0 163 -34 0 0 -50 10 4744 8248 4381 -363 0 7885 0 6 6 7891 7891

13:00 50.09 2645 2407 213 245 102 267 495 3730 2302 287 0 263 1184 0 423 136 0 69 0 89 -8 8 0 -51 10 4713 8442 4762 49 0 8491 0 4 4 8497 8497

14:00 50.03 2677 2436 215 262 109 275 447 3744 2357 290 0 263 1184 0 423 136 0 86 0 89 -8 8 0 -51 10 4785 8529 4770 -15 0 8513 0 2 2 8519 8519

15:00 50.02 2725 2480 218 274 113 281 369 3736 2366 286 0 263 1184 0 422 134 0 84 0 87 -14 8 0 -53 10 4778 8513 4813 35 0 8548 0 2 2 8553 8553

16:00 50.03 2732 2486 235 290 130 284 266 3690 2385 285 0 263 1183 0 422 134 0 85 0 85 -15 0 0 -52 10 4784 8474 4724 -60 0 8414 0 1 1 8420 8420

17:00 50.02 2740 2493 254 317 132 282 140 3618 2378 285 0 263 1180 0 419 134 0 72 0 85 -9 0 0 -50 10 4768 8385 4899 132 0 8517 0 1 1 8523 8523

18:00 50.08 2756 2508 234 240 100 271 79 3432 2318 279 0 263 1177 0 420 135 0 69 0 88 -110 0 0 -55 10 4594 8025 4230 -364 0 7661 0 2 2 7666 7666

19:00 50.02 2803 2551 364 328 141 273 106 3763 2323 283 0 263 1177 0 421 139 0 64 0 24 -31 0 0 -58 10 4614 8378 4496 -119 0 8259 0 0 0 8263 8263

20:00 50.04 2811 2558 327 215 112 272 118 3602 2324 280 0 263 1175 0 421 140 0 68 0 24 -23 0 0 -56 10 4624 8225 4545 -79 0 8147 0 0 0 8148 8148

21:00 50.03 2783 2532 283 100 50 269 130 3365 2286 264 0 259 1179 0 421 140 0 73 0 179 -21 0 0 -49 10 4740 8106 4605 -136 0 7970 0 0 0 7972 7972

22:00 50.07 2760 2511 316 212 95 285 134 3554 2297 265 0 259 1182 0 421 140 0 90 0 182 -17 0 0 -47 10 4783 8337 4590 -193 0 8144 0 0 0 8144 8144

23:00 50.01 2762 2513 385 424 183 291 128 3924 2327 277 0 259 1182 0 421 142 0 77 0 193 -11 19 0 -52 10 4843 8767 4829 -14 0 8753 0 0 0 8757 8757

24:00 50.05 2771 2522 334 374 161 284 126 3801 2328 277 0 259 1176 0 412 142 0 67 0 194 -8 21 0 -50 10 4827 8628 4735 -92 0 8536 0 0 0 8537 8537

Avg. 50.04 2751 2503 236 247 109 278 227 3599 2332 281 0 261 1179 0 418 137 0 68 0 155 -16 21 0 -49 10 4797 8397 4717 -81 0 8316 0 1 1 8320 8320

00 TO 06 HRS. 50.04 2773 2523 181 197 91 274 118 3385 2306 280 0 259 1169 0 412 138 0 54 0 239 -8 39 0 -48 10 4851 8236 4770 -81 0 8155 0 1 1 8159 8159

06 TO 12 HRS. 50.05 2736 2490 199 244 105 282 366 3686 2359 284 0 262 1186 0 418 135 0 69 0 163 -11 33 0 -44 10 4863 8549 4764 -99 0 8449 0 3 3 8453 8453

12 TO 18 HRS. 50.04 2712 2468 228 271 114 276 299 3658 2351 285 0 263 1182 0 421 135 0 78 0 87 -27 4 0 -52 10 4737 8395 4700 -37 0 8358 0 2 2 8363 8363

06TO 18 HRS. 50.05 2724 2479 214 258 110 279 333 3672 2355 285 0 262 1184 0 420 135 0 73 0 125 -19 19 0 -48 10 4800 8472 4732 -68 0 8403 0 2 2 8408 8408

18 TO 24 HRS. 50.04 2782 2531 335 276 124 279 124 3668 2314 274 0 260 1178 0 419 140 0 73 0 133 -18 7 0 -52 10 4739 8407 4633 -105 0 8302 0 0 0 8304 8304

TotAvl.

Act.Drl

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST.

DEMAND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- अक्तूबर 2015

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

49th OCC Agenda Of MP 34

Page 37: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPTotal IPPs

Injection

Total CPPs Injectio

n

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

HP Hydel (C+P+T+K)

SSP SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 50.02 2332 2122 155 104 52 139 141 2713 2335 249 0 261 1272 0 404 163 0 57 0 682 0 0 0 -18 4 5409 8122 5355 -53 0 8068 0 0 0 8071 8071

2:00 50.05 2309 2101 122 66 27 139 143 2597 2286 239 0 255 1268 0 404 158 0 56 0 682 0 0 0 -8 4 5344 7941 5099 -245 0 7696 0 0 0 7697 7697

3:00 50.06 2315 2107 132 91 36 140 144 2650 2271 255 0 258 1271 0 404 165 0 55 0 682 0 0 0 -3 4 5362 8012 5406 44 0 8055 0 0 0 8056 8056

4:00 50.04 2331 2121 153 112 44 147 145 2722 2301 263 0 255 1255 0 404 167 0 55 0 682 0 0 0 -2 4 5384 8106 5387 3 0 8109 0 0 0 8110 8110

5:00 50.09 2357 2145 151 124 58 147 141 2767 2327 268 0 261 1253 0 404 169 0 55 0 682 0 0 0 -14 4 5409 8176 5439 30 0 8206 0 0 0 8206 8206

6:00 50.07 2422 2204 183 188 85 153 140 2953 2330 268 0 261 1253 0 404 175 0 55 0 682 0 0 0 -20 4 5413 8366 5231 -182 0 8184 0 0 0 8185 8185

7:00 50.02 2533 2305 312 342 149 174 149 3431 2359 302 0 261 1253 0 404 180 0 55 0 596 -4 0 0 -28 4 5382 8814 5666 283 0 9097 0 0 0 9103 9103

8:00 50.04 2593 2360 298 249 113 178 241 3439 2369 304 0 261 1256 0 408 180 0 55 0 1196 -8 0 0 -51 4 5973 9412 5868 -105 0 9307 0 0 0 9309 9309

9:00 50.03 2612 2376 302 211 100 183 338 3510 2370 304 0 261 1256 0 412 181 0 55 0 1196 -12 0 0 -68 4 5960 9469 5937 -23 0 9447 0 0 0 9450 9450

10:00 50.06 2617 2381 240 180 84 188 413 3485 2381 304 0 261 1260 0 416 176 0 56 0 1196 0 0 0 -82 4 5972 9457 5859 -113 0 9344 0 0 0 9346 9346

11:00 50.03 2564 2333 214 165 77 187 469 3445 2373 300 0 261 1261 0 417 176 0 56 0 1196 0 0 0 -89 4 5954 9399 5898 -56 0 9344 0 0 0 9347 9347

12:00 50.09 2405 2188 141 120 59 151 469 3129 2334 227 0 261 1262 0 417 167 0 57 0 1196 -37 0 0 -93 4 5795 8924 5515 -280 0 8644 0 0 0 8644 8644

13:00 50.11 2434 2215 206 194 92 161 447 3315 2330 279 0 261 1262 0 417 169 0 58 0 1196 0 0 0 -91 4 5884 9199 5888 4 0 9203 0 0 0 9203 9203

14:00 50.07 2472 2249 188 157 86 170 401 3252 2338 282 0 261 1264 0 416 170 0 58 0 1196 0 0 0 -83 4 5906 9159 5840 -66 0 9093 0 0 0 9093 9093

15:00 50.04 2460 2238 172 146 71 166 309 3102 2344 278 0 261 1268 0 416 169 0 58 0 1196 0 0 0 -69 4 5925 9027 5903 -22 0 9005 0 0 0 9006 9006

16:00 50.05 2482 2259 197 158 81 174 190 3059 2345 278 0 261 1269 0 416 170 0 58 0 1196 -7 1 0 -54 4 5937 8996 5841 -96 0 8899 0 0 0 8900 8900

17:00 50.04 2577 2345 396 400 167 192 74 3574 2375 290 0 261 1254 0 416 173 0 58 0 1196 -52 0 0 -46 4 5930 9504 5659 -271 0 9233 0 0 0 9237 9237

18:00 50.08 2607 2372 442 434 187 193 51 3679 2398 302 0 261 1255 0 417 172 0 58 0 494 -25 0 0 -41 4 5294 8973 4962 -332 0 8641 0 0 0 8641 8641

19:00 50.02 2575 2343 340 288 133 186 79 3369 2360 299 0 261 1260 0 418 171 0 58 0 297 -7 0 0 -33 4 5090 8458 5033 -57 0 8402 0 0 0 8404 8404

20:00 50.04 2468 2245 269 182 89 162 98 3045 2350 278 0 261 1260 0 418 169 0 58 0 289 -2 0 0 -23 4 5062 8107 5111 49 0 8156 0 0 0 8158 8158

21:00 50.03 2335 2125 195 92 44 146 112 2714 2303 216 0 258 1263 0 404 159 0 58 0 682 0 0 0 -16 4 5331 8044 5156 -175 0 7870 0 0 0 7871 7871

22:00 50.12 2350 2139 200 135 55 146 119 2794 2280 226 0 255 1270 0 404 161 0 58 0 682 -7 0 0 9 4 5342 8136 5055 -288 0 7849 0 0 0 7849 7849

23:00 50.03 2438 2218 260 270 113 153 129 3143 2384 286 0 261 1275 0 404 173 0 58 0 682 -6 0 0 -31 4 5491 8634 5456 -35 0 8599 0 0 0 8601 8601

24:00 50.05 2420 2202 196 190 94 153 126 2961 2379 288 0 261 1281 0 403 174 0 59 0 682 0 0 0 -12 4 5519 8479 5349 -169 0 8310 0 0 0 8312 8312

Avg. 50.05 2459 2237 228 192 87 164 211 3119 2342 274 0 260 1262 0 410 170 0 57 0 852 -7 0 0 -40 4 5586 8705 5496 -90 0 8615 0 0 0 8617 8617

00 TO 06 HRS. 50.05 2344 2133 149 114 50 144 142 2734 2308 257 0 258 1262 0 404 166 0 56 0 682 0 0 0 -11 4 5387 8121 5320 -67 0 8053 0 0 0 8054 8054

06 TO 12 HRS. 50.04 2554 2324 251 211 97 177 346 3407 2364 290 0 261 1258 0 412 177 0 56 0 1096 -10 0 0 -69 4 5839 9246 5791 -49 0 9197 0 0 0 9200 9200

12 TO 18 HRS. 50.06 2505 2280 267 248 114 176 245 3330 2355 285 0 261 1262 0 416 171 0 58 0 1079 -14 0 0 -64 4 5813 9143 5682 -131 0 9012 0 0 0 9013 9013

06TO 18 HRS. 50.05 2530 2302 259 230 105 176 296 3368 2360 288 0 261 1260 0 414 174 0 57 0 1087 -12 0 0 -66 4 5826 9194 5736 -90 0 9105 0 0 0 9107 9107

18 TO 24 HRS. 50.05 2431 2212 243 193 88 158 111 3004 2342 266 0 259 1268 0 409 168 0 58 0 552 -4 0 0 -18 4 5306 8310 5193 -112 0 8198 0 0 0 8199 8199

TotAvl.

Act.Drl

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST.

DEMAND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- नवम्बर 2015

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

49th OCC Agenda Of MP 35

Page 38: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 50.00 2677 2585 -92 0 0 2587 2587 2744 2746 2 0 0 2747 2747 2994 2990 -5 0 0 2991 2991

2:00 50.03 2621 2529 -91 0 0 2530 2530 2707 2624 -83 0 0 2625 2625 2801 2761 -40 0 0 2762 2762

3:00 50.06 2556 2505 -51 0 0 2505 2505 2619 2625 6 0 0 2625 2625 3032 3117 85 0 0 3117 3117

4:00 50.06 2556 2483 -74 0 0 2483 2483 2627 2595 -32 0 0 2595 2595 3112 3154 42 0 0 3155 3155

5:00 50.01 2530 2455 -75 0 0 2457 2457 2597 2568 -29 0 0 2570 2570 3174 3187 13 0 0 3189 3189

6:00 50.06 2560 2436 -124 0 0 2436 2436 2622 2531 -90 0 5 2536 2536 3097 3040 -57 0 0 3040 3040

7:00 50.04 2491 2479 -12 0 0 2479 2479 2511 2541 29 0 5 2546 2546 3478 3560 82 0 0 3561 3561

8:00 50.06 2489 2391 -98 0 0 2392 2392 2548 2420 -128 0 5 2425 2425 3599 3687 88 0 0 3688 3688

9:00 50.04 2458 2391 -67 0 0 2392 2392 2533 2526 -7 0 0 2526 2526 3594 3694 100 0 0 3694 3694

10:00 50.05 2477 2410 -67 0 0 2410 2410 2541 2522 -19 0 0 2523 2523 3612 3645 33 0 0 3646 3646

11:00 50.04 2471 2382 -89 0 0 2382 2382 2485 2482 -3 0 0 2482 2482 3630 3681 51 0 0 3682 3682

12:00 50.08 2482 2294 -188 0 6 2300 2300 2477 2294 -183 0 0 2295 2295 3316 3297 -19 0 0 3297 3297

13:00 50.09 2378 2295 -83 0 4 2299 2299 2375 2430 54 0 0 2430 2430 3665 3767 101 0 0 3767 3767

14:00 50.03 2364 2267 -97 0 2 2270 2270 2435 2425 -11 0 0 2426 2426 3737 3822 85 0 0 3823 3823

15:00 50.02 2340 2268 -72 0 2 2271 2271 2431 2425 -6 0 0 2426 2426 3778 3855 77 0 0 3857 3857

16:00 50.03 2338 2229 -109 0 1 2231 2231 2449 2420 -29 0 0 2421 2421 3757 3766 9 0 0 3768 3768

17:00 50.02 2279 2234 -45 0 1 2236 2236 2426 2439 12 0 0 2440 2440 3791 3845 54 0 0 3847 3847

18:00 50.08 2494 2436 -57 0 2 2439 2439 2561 2390 -171 0 0 2391 2391 3007 2835 -172 0 0 2836 2836

19:00 50.02 2724 2686 -38 0 0 2687 2687 2577 2601 24 0 0 2602 2602 3107 2972 -135 0 0 2974 2974

20:00 50.04 2749 2678 -71 0 0 2678 2678 2645 2603 -42 0 0 2603 2603 2863 2866 3 0 0 2867 2867

21:00 50.03 2754 2631 -123 0 0 2631 2631 2645 2587 -57 0 0 2588 2588 2740 2752 12 0 0 2753 2753

22:00 50.07 2743 2586 -156 0 0 2587 2587 2667 2574 -93 0 0 2575 2575 2947 2983 36 0 0 2983 2983

23:00 50.01 2772 2684 -89 0 0 2685 2685 2820 2859 39 0 0 2860 2860 3149 3210 62 0 0 3212 3212

24:00 50.05 2727 2638 -89 0 0 2638 2638 2825 2807 -18 0 0 2808 2808 3070 3091 21 0 0 3092 3092

Avg. 50.04 2543 2457 -86 0 1 2459 2459 2578 2543 -35 0 1 2544 2544 3294 3316 22 0 0 3317 3317

00 TO 06 HRS. 50.04 2583 2499 -84 0 0 2500 2500 2653 2615 -38 0 1 2617 2617 3035 3042 7 0 0 3042 3042

06 TO 12 HRS. 50.05 2478 2391 -87 0 1 2392 2392 2516 2464 -52 0 2 2466 2466 3538 3594 56 0 0 3595 3595

12 TO 18 HRS. 50.04 2365 2288 -77 0 2 2291 2291 2446 2421 -25 0 0 2422 2422 3623 3648 26 0 0 3650 3650

06TO 18 HRS. 50.05 2422 2340 -82 0 2 2342 2342 2481 2443 -38 0 1 2444 2444 3580 3621 41 0 0 3622 3622

18 TO 24 HRS. 50.04 2745 2650 -94 0 0 2651 2651 2697 2672 -25 0 0 2673 2673 2979 2979 0 0 0 2980 2980

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- अक्तूबर 2015

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE

49th OCC Agenda Of MP 36

Page 39: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 50.02 2173 2124 -48 0 0 2125 2125 2915 2909 -5 0 0 2910 2910 3085 3035 -50 0 0 3036 3036

2:00 50.05 2147 2067 -80 0 0 2067 2067 2879 2748 -132 0 0 2748 2748 2973 2882 -92 0 0 2882 2882

3:00 50.06 2070 2054 -17 0 0 2054 2054 2726 2752 26 0 0 2752 2752 3268 3250 -18 0 0 3250 3250

4:00 50.04 2069 2045 -24 0 0 2045 2045 2764 2748 -16 0 0 2748 2748 3317 3316 -1 0 0 3317 3317

5:00 50.09 2054 2046 -8 0 0 2046 2046 2751 2777 26 0 0 2777 2777 3352 3383 31 0 0 3383 3383

6:00 50.07 2137 2109 -28 0 0 2109 2109 2820 2779 -41 0 0 2779 2779 3360 3297 -63 0 0 3298 3298

7:00 50.02 2163 2247 84 0 0 2248 2248 2734 2935 201 0 0 2936 2936 3881 3916 35 0 0 3918 3918

8:00 50.04 2288 2255 -33 0 0 2256 2256 2950 2902 -47 0 0 2903 2903 4151 4150 -1 0 0 4151 4151

9:00 50.03 2288 2242 -47 0 0 2242 2242 2999 3014 15 0 0 3015 3015 4169 4191 22 0 0 4192 4192

10:00 50.06 2303 2232 -71 0 0 2232 2232 3014 2994 -20 0 0 2994 2994 4126 4118 -8 0 0 4119 4119

11:00 50.03 2264 2197 -67 0 0 2198 2198 2964 2972 8 0 0 2973 2973 4201 4175 -26 0 0 4176 4176

12:00 50.09 2260 2102 -158 0 0 2102 2102 2923 2733 -190 0 0 2733 2733 3871 3809 -62 0 0 3809 3809

13:00 50.11 2214 2096 -118 0 0 2096 2096 2758 2831 73 0 0 2831 2831 4200 4276 76 0 0 4276 4276

14:00 50.07 2167 2038 -129 0 0 2038 2038 2824 2803 -22 0 0 2803 2803 4160 4252 92 0 0 4252 4252

15:00 50.04 2112 2020 -92 0 0 2021 2021 2809 2777 -32 0 0 2777 2777 4132 4208 76 0 0 4208 4208

16:00 50.05 2125 2025 -99 0 0 2026 2026 2838 2804 -34 0 0 2805 2805 4051 4070 19 0 0 4070 4070

17:00 50.04 2211 2141 -70 0 0 2142 2142 2922 2876 -46 0 0 2877 2877 4314 4216 -98 0 0 4218 4218

18:00 50.08 2403 2414 11 0 0 2414 2414 2972 2864 -108 0 0 2864 2864 3620 3363 -257 0 0 3363 3363

19:00 50.02 2450 2452 2 0 0 2453 2453 2790 2781 -9 0 0 2782 2782 3220 3168 -52 0 0 3169 3169

20:00 50.04 2428 2410 -19 0 0 2410 2410 2764 2748 -16 0 0 2749 2749 2975 2998 23 0 0 2999 2999

21:00 50.03 2417 2315 -101 0 0 2316 2316 2777 2697 -80 0 0 2698 2698 2895 2857 -38 0 0 2858 2858

22:00 50.12 2351 2215 -137 0 0 2215 2215 2756 2678 -78 0 0 2678 2678 3007 2956 -50 0 0 2956 2956

23:00 50.03 2334 2261 -73 0 0 2262 2262 2986 3046 60 0 0 3047 3047 3284 3292 7 0 0 3293 3293

24:00 50.05 2299 2195 -105 0 0 2195 2195 3029 2971 -58 0 0 2972 2972 3156 3144 -12 0 0 3145 3145

Avg. 50.05 2239 2179 -59 0 0 2180 2180 2861 2839 -22 0 0 2840 2840 3615 3597 -19 0 0 3597 3597

00 TO 06 HRS. 50.05 2108 2074 -34 0 0 2074 2074 2809 2786 -24 0 0 2786 2786 3226 3194 -32 0 0 3194 3194

06 TO 12 HRS. 50.04 2261 2213 -49 0 0 2213 2213 2931 2925 -6 0 0 2926 2926 4066 4060 -7 0 0 4061 4061

12 TO 18 HRS. 50.06 2205 2122 -83 0 0 2123 2123 2854 2826 -28 0 0 2826 2826 4079 4064 -15 0 0 4065 4065

06TO 18 HRS. 50.05 2233 2167 -66 0 0 2168 2168 2892 2875 -17 0 0 2876 2876 4073 4062 -11 0 0 4063 4063

18 TO 24 HRS. 50.05 2380 2308 -72 0 0 2308 2308 2850 2820 -30 0 0 2821 2821 3090 3069 -20 0 0 3070 3070

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- नवम्बर 2015

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE

49th OCC Agenda Of MP 37

Page 40: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annexure-5.0

System Disturbance / System Incidence :

1. System Disturbance on 06.10.2015 at 220KV S/s Satna: On dated 06.10.2015 at around 11:00 Hrs. MP System was normal and frequency of National Grid was 49.98 HZ. Prior to fault, shutdown was availed on 220KV Satna-Rewa Ckt & 220KV Satna-Birsinghpur Ckt at 11:03 Hrs. & 11:04 Hrs. respectively, for bunching work at 220KV S/s Satna and to make these Ckt’s as 220KV Birsinghpur-Rewa Ckt. Also, 220KV Satna(PG)-Maihar Ckt & 132KV Chattarpur-Bijawar Ckt was kept open for load management. At around 11:04 Hrs., 220KV Auxiliary Bus side ‘R’-Phase P.I of 220KV Satna-Satna (PGCIL)-II failed at 220KV S/s Satna resulting in 220KV Bus fault at 220KV S/s Satna resulting 220KV Satna-Satna (PGCIL) Ckt-II, 220KV Satna-Satna (PGCIL) Ckt-I, 220KV Satna-Kotar Ckt, 220KV Satna-Tons Ckt, 400/220KV, 315MVA ICT-I&II at 400KV S/s Satna (PGCIL), 220KV Satna (PG)-Katni Ckt tripped. Consequently interruption occurred at 220KV S/s Satna, 220KV S/s Chhatarpur, 220KV S/s Kotar, 132KV S/s Majhgawan, 132KV S/s Satna, 132KV S/s Rampur Bhagalen, 132KV S/s Nagod, 132KV S/s Pawai, 132KV S/s Panna, 132KV S/s Khajuraho and 132KV S/s Nowgaon. Due to the above tripping there was consumer load loss of about 218MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 02.11.2015 at Omkareshwar HPS: On dated 02.11.2015 at at around 10:45 Hrs. M.P system was normal and frequency of National Grid was 49.96Hz. Prior to fault, all 220 KV feeders were in charged condition and normally loaded and Unit no.-4, 5 & 7 were on Bar at Omkareshwar HPS. At 10:50 Hrs. during changing of isolator of Unit No.-4 from Bus-B to Bus-A, both isolators opened simultaneously and Unit No.4 tripped on over speed and 220KV Bus Bar Protection also operated at Omkareshwar HPS. Consequently Unit No.-4, 5 & 7, 220KV Omakreshwar-Nimrani (tap Barwaha) Ckt, 220KV Omkareshwar-Barwaha Ckt, 220KV Omkareshwar-Julwania Ckt, 220KV Omkareshwar-Chhegaon Ckt and 220KV Omkareshwar-Khandwa Ckt tripped. Due to the above tripping there was no consumer load loss. There was generation loss of 174 MW and System was normalized in due course of time.

49th OCC Agenda Of MP 38

Page 41: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

ANNEXURE-10.1

Record notes of discussions of the meeting held at

SLDC Jabalpur on 14-12-2015.

In order to discuss and finalise the issues related with SCADA/EMS system, a meeting of officials from SLDC, CE(T&C), CE (Plg & Design ), ED(O&M;GEN),MPPGCL and MPPTCL & MPPGCL field offices was held at SLDC Jabalpur on 14-12-2015. The list of the participants attended the meeting is enclosed as annexure-I and The list of sub-stations whose telemetry is required at SLDC is enclosed as Annexure-II. The record notes of the discussion are as given hereunder:- 1. Long Outages of telemetry :- SLDC informed that the telemetry of Bansagar III HPS, 220KV Sagar S/s, 220KV Sarni S/s, 220KV Betul S/s, 220KV Panagar S/s, 132KV Gadarwara S/s,132KV Morwa S/s are out since long time. Similarly telemetry of 132KV Waidhan S/s, 132KV Beohari S/s, 220KV Anuppur S/s is intermittent and telemetry of 400KV Julwaniya & 220KV Chichli S/s is not available completely. The matter of outage/intermittent functioning was discussed in detail in it was agreed to ensure reliable availability of telemetry within fifteen days. It was also decided that the restoration of RTU at 220KV Sagar S/s is not possible, hence the telemetry of 220KV Sagar S/s shall be restored by replacing existing Chemtrol RTU with Dongfeng RTU. Further, it was categorically informed by SLDC that based on MIS report submitted by SLDC, MPERC has raised query on non availability of telemetry of 220KV Gwl-2, 220KV Sirmore, 220KV Datia and outage of telemetry of 220KV Sagar. Accordingly, it was decided to arrange/restore these telemetry on priority basis. Further representative from MPPTCL requested to forward a copy of MIS submitted to CERC to CE (T&C) office also which was agreed by SLDC. 2. Discrepancy in telemetered values received from different EHV S/s and Upgradation of existing RTUS:- The CE (SLDC) informed that matter of removal of telemetry discrepancy, upgradation of RTUs to accommodate telemetry of new feeders/transformers etc before commissioning of these grid elements is being persued by SLDC since long . However, desired progress is not achieved so far. The circle wise list of telemetry discrepancy is handed over to all participants (copy is attached as Annexure-III). The following issues are discussed in detail :-

(1) SLDC informed that the telemetry of 220/132KV transformers at 220KV Vidisha S/s, 220KV Rajgarh Beora S/s, 220KV Handia S/s, 220KV Shivpuri S/s, 220KV Beragarh S/s, 220KV Narsingpur S/s, 220KV Sarni S/s, 220KV Chindwara S/s. 220KV S/S Ratlam S/s is either not available of faulty. It was agreed that the telemetry of these transformers shall be arranged within fifteen days.

49th OCC Agenda Of MP 39

Page 42: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

(2) The matter of pending status telemetry commissioning at Astha 400KV Sub

Station (400/220 Transformer- CB, 220KV Shajapur-1, Dewas 1 & 2 CB, 400KV Bus HZ,KV) & 220KV Anuppur S/s was discussed in detail. The MPPTCL representative informed that the problem at Anuppur was due to non availability of CMRS. The CMR is now arranged and balance telemetry from Anuppur shall be provided within a week. The matter of non availability of telemetry at 400KV Astha S/s shall be examined by MPPTCL and shall be arranged shortly.

(3) The non availability of telemetry of interconnector-1 at 220KV Birsingpur S/s,

220KV Sarni-Betul, 220KV Sarni-Sarni PH2, 220KV Sarni-Pandurna, 220KV Tikamgarh-Damoh line from Tikamgarh, 220KV Pipariya –Chichli line from 220KV Pipariya S/s, 220KV Kotar-Tons feeder from Kotar S/s 220KV Sidhi-Hindalco feeder, Sidhi-Rewa feeder from Sidhi S/s is either not available or faulty. It was agreed that telemetry of these elements shall be arranged within fifteen days. Regarding RTU configuration, it was decided that CPU from 220KV TIKAMGARH S/s shall be sent to SLDC while CPU for 220KV Sarni S/s has already been configured and available with Bhopal Communication division which will be sent to Sarni within a week.SLDC pointed out that communication channel of 220KV Sarni is required to be restored for testing of new Configured CPU.

(4) Similarly it was agreed that the telemetry of Hoshangabad feeder & 160MVA

transformer from 220KV Mandideep,S/s, 132KV Runaha 1 & 2 feeders from 220KV Beragarh S/s, 132KV Shahganj, 132Kv Trident, 132KV SPM feeders telemetry from 220KV Hoshangabad S/s, telemetry of 132KV Maqsudangarh,132Kv Raghogarh feeders from 220KV Rajgarh Beora S/s shall be arranged on priority basis.

(5) SLDC requested to complete the removal of telemetry discrepancy related to

CBs as well as analog values of 220/132KV Transformers and feeders on top most priority and in any case by December end. As the same is essential for EMS testing and its subsequent functioning.

(6) Field T&C officers reported that some times proper coordination from Sub-

SLDC is not obtained in data validation/rectification work. CE(LD) informed that now number of RTUs are growing very fast and by the end of year may touch 200 Nos. Accordingly, it is not possible to handle the data validation/rectification work from single location. Accordingly, in view of the growing number of RTUs/data points, the field officers are required to coordinate with concern Sub-LDC / SLDC according to location of Sub Station. However, in case of non availability of concern officers at Sub-LDC, SLDC may be contacted to avoided delay.

3. Arrangement of infrastructure For reporting of RTUs to dual control centers, As per requirement of main and backup SLDC. MPPTCL representative informed that material has already been arranged for the same and now commissioning activity is to be taken up. SLDC requested to expedite the same and provide the schedule of commissioning activity for which MPPTCL agreed.

49th OCC Agenda Of MP 40

Page 43: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Further issue of Alternate Communication Channel for S/s in Sub_LDC Indore area is discussed & it was informed by SLDC that after commissioning of wideband node at 400KV Nagda, the PLCC channel from 400KV Nagda S/s is decommissioned. It was decided that alternate data channel for 400KV Nagda S/s using PLCC shall be restored. 4. Integration of RTUs for monitoring of injection from renewable generating Stations/captive power plant and new 220KV Sub Stations:-

SLDC informed that the telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations & Captive Power Plant, is to be provided through Dongfeng RTUs installed and commissioned under MPPTCL SCADA project. The list of identified Sub Stations was forwarded to MPPTCL long back for arranging integration of telemetry. In this matter, a special meeting of MPPTCL filed officers/T&C officers was held at SLDC Jabalpur wherein it was decided that all these RTUs shall be integrated by October 2015. Further in the meeting it was decided that progress of commissioning of these RTUs shall be monitored on weekly basis for which weekly commissioning schedule shall be provided by T&C. However, no such commissioning schedule is provided so far. Accordingly it was agreed to expedite the commissioning of RTU. Further SLDC pointed out the problem in contacting Sub Stations having injection from renewable generating Stations as the CUG mobile facility is not available at many such sub stations and emphasized the need to provide CUG Mobile facility for which MPPTCL informed that the action shall be initiated to arrange the CUG mobile facility at Sub Stations having injection from renewable generating Stations also. In addition to the above, EE SUB-LDC Indore/Bhopal informed that while integration of new RTUs, problem in wiring at Sub-LDC end (from PLCC panels/wideband to FEP) is observed. It was decided that local communication staff at respective 400KV S/s shall carry out the wiring and termination at 400KV Indore/400Kv Bhopal.

5. ARRANGEMENT OF TELEMETRY REQUIRED FOR KUMBH MELA AT UJJAIN:- SLDC informed that, for ensuing Kumbh Mela scheduled to be held at Ujjain in April 2016, WRLDC has prepared a Contingency plan and essential telemetry requirement for grid monitoring during the Kumbh Mela. As per contingency plan prepared by WRLDC telemetry of eight number S/s is 132KV Deplapur S/s, 132KV Sanwer S/s, 132KV Ingoria, 132KV Ghosla, 132KV Dewas MSP, 132KV Makshi, 132KV Ratodiya, 132KV Bherogad) required at SLDC for grid monitoring during Kumbh Mela. Further the telemetry of transformers at 220KV S/S Ratlam, 220 KV S/S Rajgarh, 220 KV S/S Pithampur, 132 KV S/S Indore (Chamble), 220 KV S/S NepaNagar, 220 KV S/S Barwaha is also required to be integrated before Kumbh Mela. The SLDC has already requested MPPTCL to provide the telemetry of these Sub Stations by March 2015. It was decided that the PLCC panels and Modems required for integration of these RTUs shall be released immediately to Indore and Ujjain Communication Divisions. It was

49th OCC Agenda Of MP 41

Page 44: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

further agreed that the telemetry required for Kumbh mela shall be commissioned by January 2016. 5. Wideband nodes related issues:- MPPTCL representative informed that for installation of wideband node equipment at 220KV Sujalpur S/s space is not available. Further, the wideband node equipment was installed at 400KV Nagda S/s without proper air-conditioning. SLDC requested to look into it as non availability of air conditioning may create maintenance issue. Officers from CE(T&C) MPPTCL, assured to sort out the issue on priority basis. 6. MPPGCL Issues:- following issues related with MPPGCL was brought to the notice of MPPGCL by SLDC :-

i. Outage of RTU of Rajghat since last two years & BanSagar-III RTU since last six months. It was informed by MPPGCL that order for procurement of RTU for Rajghat is expected to be issued within next fifteen days.

ii. Arrangement of Outdoor equipments at ATPS (Release order already

issued by MPPTCL). MPPGCL confirmed that the vehicle shall be arranged on 26th December 2015.

iii. Issue of AMC Contract for RTU/PLCC etc. It was informed by MPPGCL

that information is being collected by them from power stations. SLDC requested to arrange the AMC on top most priority as matter has already been delayed abnormally.

iv. Arrangement of material for commissioning of communication channel as

per backup SLDC requirement. Non availability of measuring equipments / spares . SLDC informed that matter is being persued by SLDC since last two years. However, no progress is observed. No satisfactorily reply is given by MPPGCL.

v. Abnormal delay in attending telemetry problems. SLDC categorically

informed that recently restoration of Madikheda RTU took one month while replacement of transducer at Sarni STPS took twenty days. No action plan to expedite the restoration/satisfactorily reply is given by MPPGCL.

vi. Providing telemetry of STPS-Astha feeder from STPS end. It was

informed by MPPGCL that telemetry of fist feeder shall be arranged along with second feeder. SLDC informed that synchronization of second feeder shall be allowed only after successful commissioning of telemetry of both the feeders.

vii. Telemetry of Station Transformer at Tons HPS is not available. It was

informed by SLDC that transducers for providing telemetry is available in SIC panel.

49th OCC Agenda Of MP 42

Page 45: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

viii. Frequent Outage of Telemetry at STPS EXT & SINGAJI. However no satisfactorily reply/commitment to rectify the fault is provided by MPPGCL officials.

ix. SLDC pointed out that as the wideband node at SGTPS has already

been commissioned, MPPGCL should arrange an alternate channel of SGTPS upto backup SLDC Bhopal. However, SGTPS officers informed that the wideband node at SGTPS has been kept power-off since its commissioning. Accordingly, it was decided that SLDC shall takeup the matter of functioning of wideband equipments of SGTPS with PGCIL.

As satisfactorily progress/reply on most of the issues was not provided by MPPGCL representative & CE SLDC requested to expedite the all telemetry issues and provide the progress in next OCCM.

49th OCC Agenda Of MP 43

Page 46: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

49th OCC Agenda Of MP 44

Page 47: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annexure-II

S.No. NAME OF SUB-STATION

1 Sirmore 220

2 Gwalior -2 220

3 Datia 220

4 132 KV Susner5 132 KV Jaora6 132 KV Delchi(Makdone )7 132/33 KV Ratangarh8 132 KV Kukshi9 132 KV Umariya10 132 KV Chapda11 132 KV Sailana12 132 KV Agar13 132 KV Gadarwara14 132 KV dewas BNP S/s15 132KV Sitamau16 132KV Khilchipur17 132KV Vijaypur18 132KV Alot19 132KV Icchawar20 132KV Suasra21 132KV Gudgaon dist betul22 132 KV Mandideep23 132 KV kymore24 132 KV Rewa25 132 KV Satna26 132 KV Boregaon27 132 KV Bioara28 132 KV Ashok Nagar29 132 KV Raisen30 132 KV Sagar31 132 KV Sironj32 132 KV Petlawad

33 132 KV Chanderi34 132 KV Arniakala35 132 KV Nasrullaganj36 132 KV Sonkach37 132 KV Kannod38 132KC Bercha39 132 KV Poliakalan40 132KV Momin Barodia41 132 KV Pachore

42 132KV Deplapur S/s43 132KV Sanwer S/s44 132KV Ingoria45 132KV Ghosla46 132KV Dewas MSP47 132KV Makshi48 132KV Ratodiya49 132KV Bherogad

INTERD DISCOM STATIONS

FOR KUMBH MELA

LIST OF SUB STATIONS WHOS TELEMETRY IS REQUIRED AT SLDC

IMPORTANT 220KV Sub STATIONS

FOR RENEWABLE GENERATION INTEGRATION

49th OCC Agenda Of MP 45

Page 48: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

Annexure-IIIRTU NOT FUNCTIONING

1 SAGAR 220 KV S/S 2 SARNI 220 KV S/S3 MORWA 132 KV S/S4 BEOHARI 132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERSr.no. DESCRIPTION Status telemetry value at actual value at site

1 220 KB BUS TIE CB FAULTY CLOSE2 220 KV INTERCONNECTOR 1 MW/MVAR N/C 115/15

1 220 KV BUS VOLTAGE/FREQ N/C2 160 MVA TR MW/MVAR N/C 40/103 132KV MOHANA MW/MVAR N/C 15/5

1 132 KV RAGHOGRAH CB,MW/MVAR N/C2 132 KV MAQSUDANGRAH CB,MW/MVAR N/C3 132 KV NTPC I MW 25 154 220/132 KV TR S 2 MW /MVAR /CB N/C5 220 KV BUS MAIN BUS 1 & 2 VOLTAGE N/C

1 400/220 KV TR 1 & 2 PRI/SEC CB FAULTY CLOSE2 400 KV BUS VOLTAGE/FREQ N/C3 220 KV SHAJAPUR CB FAULTY CLOSE4 132 KVBUSCOUPLER CB FAULTY CLOSE5 220 KV DEWAS 1 & 2 CB FAULTY CLOSE

1 132 KV VIJAYPUR CB FAULTY

1 220/132 KV TR(160 MVA) 2 MW N/C2 220/132 KV TR(160 MVA) 2 PRI CB FAULTY3 220/132 KV TR(160 MVA) 2 SEC CB FAULTY4 132 KV NASRULAGANJ MW/MVAR /CB N/A5 132 KV SATAWAR MW/MVAR /CB N/A6 132 KV GOPALPUR MW/MVAR /CB N/A7 132 KV SULTANPUR MW/MVAR /CB N/A8 220 KV ITARSI CB FAULTY CLOSE9 220 KV BARWAHA CB FAULTY CLOSE

1 220/132 KV TR 2 PRI CB,MW/MVAR/OLTC N/C2 220/132 KV TR 2 SEC CB N/C3 132 KV SNC TRACTION MW/MVAR N/C 2/1

CHATTURPUR 220KV S/S & WAIDHAN 132 KV S/SALL ANALOG DATA NON CURRENT

ASHTA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDSABALGRAH 220 KV S/S

HANDIA 220 KV S/S

RAJGRAH (B) 220 KV S/SPROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

BIRSINGHPUR 220 KV S/S

BETUL 220KV S/SALL ANALOG DATA OF 220 KV SIDE NON CURRENT

SHIVPURI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDVIDHISHA 220 KV S/S

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

49th OCC Agenda Of MP 46

Page 49: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

1 220/132 KV TR PRI & SEC CB FAULTY CLOSE2 132 KV BARWANI CB FAULTY CLOSE3 132 KV NIMRANI CB FAULTY CLOSE

1 132 KV CHOTIKHARGAON MVAR N/A

1 133/32 KV TR (20 MVA) CB,MW/MVAR/OLTC N/A PROCESSES CONNECTION 2 220 KV BUS COUPLER CB FAULTY CLOSE3 220/132 KV TR 3X40MVA CB FAULTY CLOSE4 220/132 KV TR 160 MVA (SEC) CB FAULTY CLOSE5 132 KV CHEGAON I CB TRANSIT CLOSE

1 132 KV CHAPDA 1 & 2 CB/MW/MVAR N/A 2 132 KV SHANKARGRAH 2 CB/MW/MVAR N/A

1 220 KV KOTOR CB FAULTY CLOSE

1 220/132 TR 2 CB FAULTY CLOSE2 220 KV SUKHA 1 & 2 CB FAULTY CLOSE3 220 KV JBP 1 ,2 CB FAULTY CLOSE4 133/32 KV TR 2 CB,MW/MVAR/OLTC N/A5 132 KV BARMAN 2 CB,MW/MVAR N/A

1 220 KV BUS COUPLER CB FAULTY CLOSE2 220 KV BUS TIE CB FAULTY CLOSE3 132 KV TR 1 CB FAULTY CLOSE4 132 KV I/C 1 ,2 CB FAULTY CLOSE5 132 KV KYMORE 1 & 2 CB FAULTY CLOSE6 220/132 KV TR 2 CB,MW/MVAR/OLTC N/A7 132/33 KV TR 1 &2 CB,MW/MVAR/OLTC N/A

1 132/33 KV TR CB FAULTY CLOSE2 132 KVBUSCOUPLER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY

2 220/132 TR 3(160MVA 2) CB,MW/MVAR/OLTC N/APROCESSES CONNECTION REQUIRED

1 BPL400-BDTL 765 1 & 2 CB N/A CLOSE2 80 MVAR REACTOR CB N/A CLOSE

3 220 BUS TRANSFER CB FAULTY CLOSE4 220 KV SARNI PH 1 CB FAULTY CLOSE5 220 KV BETUL CB,MW/MVAR FAULTY6 220 KV SARNI PH 2 CB,MW/MVAR/OLTC N/A7 220 KV PANDURNA CB,MW/MVAR N/A8 220/132 KV TR 2 CB,MW/MVAR/OLTC N/A

PROCESSES CONNECTION REQUIRED

GUNA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGWALIOR 220 KV S/S

BHOPAL 400 KV S/S

SARNI 220 KV S/S

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

BARWAHA 220 KV S/S

NEPANAGAR 220 KV S/S

KATNI 220 KV S/S

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S

SATNA220 KV S/S

NARSINGHPUR 220 KV S/S

JULWANIA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

49th OCC Agenda Of MP 47

Page 50: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

1 220 KV MAIN BUS 1 VOLTAGE N/C 2302 132 KV LALGHATI 2 CB FAULTY CLOSE3 132 KV BUS COUPLER CB FAULTY CLOSE4 220/132 KV TR 1 CB FAULTY CLOSE5 220/132 KV TR 2 CB,MW/MVAR FAULTY6 132/33 KV TR 4 CB,MW/MVAR/OLTC N/A7 132 KV BHOPAL CB,MW/MVAR N/A

1 132/33 KV TR PRI CB OPEN CLOSE2 132 KV I / C 2 CB FAULTY CLOSE3 132 KV SIHORE CB FAULTY CLOSE4

1 220 KV GUNA 2 CB FAULTY CLOSE2 400/200/33 KV TERTIARY REACTOR 1 & 2MVAR N/A 3 400/220 TR 3 PRI & SEC CB FAULTY OPEN4 220 KV BUS 2 VOLTAGE 182 224

1 220 KV PITAMPUR CB FAULTY CLOSE

1 220 KV OSP CB FAULTY4 400 KV REACTOR CB FAULTY

2 220 KV PGCIL 2 CB FAULTY CLOSE

2 220 KV BUS TIE CB FAULTY CLOSE3 220 KV DAMOH CB/MW/MVAR N/A4 220 /132 KV TR 2 MW /MVAR /CB/OLTC N/A5 132/33 KV TR 2 MW /MVAR /CB/OLTC N/A6 132KV INTERCONNECTOR 2 CB/MW/MVAR N/A

2 220 KV REWA MW/MVAR N/C3 220 KV HINDALCO MW/MVAR N/C

1 132 KV JP NIGRI CB/MW/MVAR N/CPROCESSES CONNECTION

REQUIRED

1 220 KV TONS PH MW /MVAR N/C 5 /5

1 132/33 TR 4 CB FAULTY CLOSE

1 132 KV GADARWARA CB TRANSIT CLOSE2 220 KV CHICHLI MW /MVAR /CB 0 110/10

3 220/132 KV TR 2 (160 MVA) CB,MW/MVAR/OLTC N/APROCESSES CONNECTION

REQUIRED

1 220 KV BUS FREQUENCY N/C

1 132 KV I/C 2 MW N/C 10

1 132 KV KURAWAR CB FAULTY CLOSE

1 220/132 KV TR (160 MVA) 2 PRIMARY CB N/A CLOSE2 132 KV IFLS CB N/A CLOSE3 220/132 KV TR (160 MVA) 2 SEC CB N/A CLOSE

NEEMACH 220 KV S/S

PROCESSES CONNECTION REQUIRED

DAMOH 220 KV S/S

ITARSI 220 KV S/S

PIPARIA 220 KV S/S

MEHGAON 220 KV S/S

REWA 220 KV S/S

SHUJALPUR 220 KV S/S

BADOD 220 KV S/S

KOTAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDASTHA 132 KV S/S

CHEGAON 400 KV S/S

INDORE 400 KV S/S

TIKAMGRAH 220 KV S/S

SIDHI 220 KV S/S

BINA 400 KV S/S

BAIRAGRAH 220 KV S/S

PROCESSES CONNECTION REQUIRED

49th OCC Agenda Of MP 48

Page 51: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

1 132 KV BUS COUPLER CB FAULTY CLOSE2 132 KV GRASIM CB FAULTY CLOSE

1 132 KV KOTMA CB N/A

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A

1 132 KV CHANERA MVAR N/C 5

1 220 KV SATPURA T P S CB /MW/MVAR N/C

1 132 KV GANJBASODA CB FAULTY2 220/132 KV TR 3 PRI CB FAULTY

1 220 /132 KV TR 1 MW/MVAR 0 60/152 220 /132 TR 1 SEC CB FAULTY CLOSE3 220 KV PGCIL 1 MW/MVAR N/C 75/104 220 /132 KV TR 2 MW/MVAR 40/10 60/155 132 KV BUS V0LTAGE/FREQ N/C

3 132/33 kv TR 63 MVA CB /MW/MVAR/OLTC N/APROCESSES CONNECTION REQUIRED

1 132 KV P & G CB /MW/MVAR N/APROCESSES CONNECTION REQUIRED

2 220 KV HASANGABAD MW/MVAR N/A3 220 KV BUS VOLTAGE /FREQUENCY N/A2 132 KV BUS VOLTAGE /FREQUENCY N/A

2 220/132 KV TR 2 CB FAULTY

1 132 KV BALAGHAT 1 CB FAULTY CLOSE2 132 KV PENCH 2 CB FAULTY CLOSE3 132/33 TR 1 & 2 CB FAULTY CLOSE4 132 KV I /C 1 & 2 CB FAULTY CLOSE5 132 KV MANDLA CB FAULTY CLOSE6 132 KV LAKHNADON CB FAULTY CLOSE7 132 KV BUS COUPLER CB FAULTY CLOSE

1 132/33 KV TR 2 CB FAULTY CLOSE2 132 KV VFJ 1 CB FAULTY CLOSE

1 400 KV RAJGRAH 1 CB FAULTY CLOSE2 400 KV DEHGAON LINE REACTOR MVAR N/A

1 132 KV ANUPPUR 2 CB /MW/MVAR N/A

PANDURNA 220 KV S/S

KOTMA 132 KV S/S

CHINDWARA 220 KV S/S

MANDIDEEP 220 KV S/S

SEONI 132 KV S/S

ANUPPUR 220 KV S/S

HARDA 132 KV S/S

BINA 220 KV S/S

NAGDA 220 KV S/S

NAGDA 400 KV S/S

PROCESSES CONNECTION REQUIRED

ALL CB FAULTY EXCEPT HANDIA1

JABALPUR220 KV S/S

49th OCC Agenda Of MP 49

Page 52: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

1 220 KV BUS FREQUENCY N/A2 132 KV BAMORE CB FAULTY CLOSE3 132 KV BUS VOLTAGE 112 1304 220/132 KV TR 2 MVAR N/A 105 132 KV MOHAN MVAR N/A 10

1 132 KV SIDTUBE CB /MW/MVAR N/A

1 220 KV BUSCOUPLER CB FAULTY CLOSE

1 132 KV MONAWAR 3 CB FAULTY CLOSE

1 220/132 KV TR 2 SEC CB FAULTY CLOSE

1 220 /132 KV TR 3 MW/MVAR N/A

1 132 KV CHANDERI CB FAULTY CLOSE2 132 KV DATIA CB FAULTY CLOSE3 132/33 KURAWAR CB FAULTY CLOSE4 132 KV RAJGHAT CB FAULTY CLOSE5 132/33 KV TR NGEF CB FAULTY CLOSE

ALL CB DATA NOT AVIALABLE

MALANPUR 220 KV S/S

SHAJAPUR 220 KV S/S

INDORE EAST 220 KV S/S

NIMRANI 220 KV S/S

RAJGRAH (DHAR) 220 KV S/S

RATLAM 220 KV S/S

PICHORE 132 KV S/S

CHICHLI 220 KV S/S

49th OCC Agenda Of MP 50

Page 53: As per distribution list FOR 49th...06 Ujjain 04 07 Total 20 08 CENTRAL Bhopal 18 09 Gwalior 17 10 Total 35 TOTAL Grand Total 56 Discoms are requested to furnish the details as per

1 GEN 6 GT MW/MVAR 76/4 02 GEN 7 GT MW/MVAR 152/4 03 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE6 400 KV ASTHA 1 MW /MVAR N/C 220/25

1 220 KV SGTPS 3 CB TRANSIT CLOSE

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 220 KV SIRMORE CB FAULTY CLOSE2 GEN 3 CB TRANSIT CLOSE

1 400 KV INDORE 2 MW/MVAR N/C 220/352 GEN 7 MVAR N/C 10

Annexure-III

ISP

RAJGHAT H P S RTU OUT

TONS H P S

SATPURA T P S

A T P S T P S

SINGHA JI S T P S

49th OCC Agenda Of MP 51