    BP01OF222

    BP01OF223

    BP06OF213

    BP06OF214

    BP05OF183

    BP07OF147

    BP07OF148

    BP03OF217

    OF149 _G A _Z 3 _

    M R T 3 R D R E S E R V E L I N E ( S U R

    4 0 m S AF E T Y L I N

    TBP03AOF269

    PTP 19

    MP01OF184BMP01OF184A

    MP01OF184C

    MP01OF184D

    MP01OF224B

    MP01OF224A

    MP01OF225B

    MP01OF225A

    MP01OF185A

    MP01OF185B

    MP01OF185D

    MP01OF185C

    MP01OF186C

    MP01OF186B

    MP01OF186A

    MP01OF186D

    TMP01OF187A

    TMP01OF187B

    MP01OF226B

    MP01OF226A

    MP01

    OF216B

    MP01OF216D

    MP01OF216C

    MP01OF216AMP01

    OF215B

    MP01OF215D

    MP01OF215C

    MP01OF215A

    OF.5

    OF.4

    OF.3

    OF.2

    OF.1

    PDA TEST PILE

    PDA TEST PILE

    ARUP

    DP ARCHITECTS PTE LTD

    SQUIRE MECHPTE LTD

    UGL SERVICES PREMAS OPERATIONS LTD

    DRAGAGES SINGAPOREPTE LTD

    AECOMSINGAPORE PTE LTD

    SportsHUB PTE. LTD.

    ISSUER

    ISSUER

    ISSUER

    ISSUER

    ISSUER

    ISSUER

    ISSUER

    REVIEWED WITH COMMENTS

    DSP's / CONSULTANT's INITIAL CHECK

    REVIEWED WITHOUT COMMENT

    CONSULTANT's / DSP's INITIAL REVIEW

    DSP's COMBINED STATUS

    ISSUER

    REVISE & RESUBMIT

    WSG

    UPL

    ICT

    CAT

    GSP

    SSC / SPL REVIEW

    NO COMMENT

    DSP's FINAL COMBINED STATUS

    RCS RAISED

    NO RCS RAISED

    and RESOLVED(RCS NO.

    [..........................]

    SSC

    PARTNER'S REVIEW

    RAISE COMMENTSPL

    (1)

    (2)

    NO COMMENT

    RAISE COMMENT

    (1)

    (2)RET

    REVIEWED WITH COMMENTS

    REVIEWED WITHOUT COMMENT

    REVISE & RESUBMIT

    REVIEWED WITH COMMENTS

    REVIEWED WITHOUT COMMENT

    REVISE & RESUBMIT

    ISSUER

    KEY PLAN:

    Architect

    NOTES:

    Developer

    SpecialistSub-contractor:

    MainContractor

    DRAWING NAME :

    PROJEC T TITLE

    Singapore Sports Hub Proposed Erection of a 7-sty Stadium, 3-sty Aquatic Centre, 3-sty

    Multi P urpose Indoor Arena, 2-Sty WaterSports Centre, Commercial Facilities andBasementCarpark On Lot 6816l,2441W, 2422C PT, 6724K PT, 6815X PT ,6263 PT, 6720V PT & 5704A PT Mk 25 atNicoll Highway (Kallang Planning Area)

    OtherConsultant

    FacilitiesManagement

    Masterplanning&LandcapingArchitect

    M&E Consultant

    SportsVenueDesign /StructuralDesign

    NTS

    AS-BUILT PILE ECCENTRICITYAND PENETRATION PLAN

    20.06.2013

    AS-BUILT PILE ECCENTRICITY AND PENETRATION PLAN

    - 13/03/12 AmendmentSubmiss iontoST252-ForBCA(ST257)

    01 01

    - 23/04/13 AmendmentSubmiss iontoST257-ForBCA(ST265)