Artificial Wetland Documentation
Tom Nedland Wetland Identification Coordinator
SEWRPC Photo
![Page 2: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/2.jpg)
Importance of Documentation Artificial Wetland: a landscape feature where hydrophytic vegetation may be present as a result of human modifications to the landscape or hydrology and for which there is no prior wetland or stream history
![Page 3: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/3.jpg)
Importance of Documentation Sets limits and extent of state jurisdiction NR 103.06(4) – Artificial Wetland Exemptions
A person who proposes a project that may affect an artificial wetland shall notify the department at least 15 working days prior to initiating the project… …the following artificial wetlands are exempt from the provisions of this chapter unless the department notifies the applicant... that the artificial wetland has significant functional values…
![Page 4: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/4.jpg)
NR 103 Exemptions Only applicable for state of Wisconsin decisions. USACE has separate decision making process.
![Page 5: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/5.jpg)
NR 103 Exemptions NR 103.06(4a)
Sedimentation and stormwater detention basins and associated conveyance features operated and maintained only for sediment detention and flood storage purposes
U.S. EPA Photo
![Page 6: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/6.jpg)
NR 103 Exemptions
Active sewage lagoons, cooling ponds, waste disposal pits, fish rearing ponds, and landscape ponds
NRCS Photo
NR 103.06(4b)
![Page 7: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/7.jpg)
NR 103 Exemptions NR 103.06(4c)
Actively maintained farm drainage and roadside ditches
U.S. EPA Photo
![Page 8: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/8.jpg)
NR 103 Exemptions NR 103.06(4d) Artificial wetlands within active nonmetallic mining operations
WDNR Photo
![Page 9: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/9.jpg)
DNR Exemption Process DNR process for determining exemptions 1. Is the feature “artificial” 2. Does it meet one of the listed exemptions 3. Does it provide significant functional values
related to a) Aquatic organism habitat b) Other wildlife habitat c) Recreational, cultural, educational, scientific, or
natural scenic beauty
![Page 10: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/10.jpg)
Consultant Process Provide agencies information showing: 1. Proof of artificial nature 2. Proof exemption is fulfilled Preferred Format: 1. Submit request form to Wetland ID Program 2. Include information listed on checklist
![Page 11: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/11.jpg)
Consultant Process Request Form: http://dnr.wi.gov/topic/wetlands/identification.html • Requester information • Landowner information • Site Location • Size/Service Fee
![Page 12: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/12.jpg)
Consultant Process Request Form Service Fee:
Acres of Property Reviewed
Review Fee
Acres of Property Reviewed
Review Fee
1 - 20 acres $300
81 - 100 acres $1500
21 - 40 acres $600
101 - 120 acres $1800
41 - 60 acres $900
121 - 140 acres $2100
61 - 80 acres $1200
141 - 160 acres $2400
Other enter acres:
![Page 13: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/13.jpg)
Information to Submit - artificial Information regarding artificial nature: 1. Soil Mapping and WWI Mapping 2. Previous Agency Approvals 3. Supplemental Data (soil data, topography,
historic aerial photographs, etc.) 4. Previous Agency Correspondence
![Page 14: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/14.jpg)
Information to Submit - Artificial Information regarding artificial nature: Soil Mapping: • Mapped hydric soil = not artificial.
– Shows Wetland History • Mapped inclusion soil = possibly artificial
– Need supplemental data, such as soil profile, aerial photographs, topographic survey, etc.
• Mapped non-hydric soil= possibly artificial – Need supplemental data, such as soil profile,
aerial photographs, topographic survey, etc.
![Page 15: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/15.jpg)
Information to Submit - Artificial Soil Mapping Example: Granby = hydric
ditch
![Page 16: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/16.jpg)
Information to Submit - Artificial Soil Mapping Example: Granby = hydric not artificial therefore… not exempt
ditch
![Page 17: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/17.jpg)
Information to Submit - artificial Soil Mapping Example Hu = hydric ZuB = not hydric HrC = not hydric
ditch
![Page 18: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/18.jpg)
Information to Submit - artificial Soil Mapping Example Hu = hydric ZuB = not hydric HrC = not hydric
ditch
Hu = not artificial therefore not exempt ZuB = potentially artificial – need supplemental info (soil) HrC = potentially artificial – need supplemental info (soil)
![Page 19: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/19.jpg)
Information to Submit - artificial Soil Profile Information – where to collect? No: Doesn’t tell if area was wetland before ditch construction
Ditch
Undisturbed
![Page 20: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/20.jpg)
Information to Submit - artificial Soil Profile Information – where to collect? Yes: Tells pre-ditch conditions.
Ditch
Undisturbed
![Page 21: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/21.jpg)
Consultant Process Provide agencies information showing: 1. Proof of artificial nature - documented 2. Proof exemption is fulfilled – still need
to document
![Page 22: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/22.jpg)
Information to Submit - exempt Information regarding exempt status: 1. Construction Plans 2. Maintenance Plans 3. Permit Approvals (WPDES, stormwater,
Chapter 30, etc.) 4. Previous Agency Correspondence
Provide as much of the above mentioned information as possible.
![Page 23: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/23.jpg)
Information to Submit Showing Potentially Exempt Areas
Wetland
Potentially Exempt Wetland
Make it clear in text of report that final authority on exemptions rests with the regulating agencies. • Will require an
agency review • You/your client
need to officially request an exemption review.
![Page 24: Artificial Wetland Documentation](https://reader033.vdocuments.us/reader033/viewer/2022053112/6291fa9c6eb5c62b11262a0b/html5/thumbnails/24.jpg)
Getting an exemption - conclusion 1. Prove artificial nature • Soil mapping is great source • Provide supplemental data as needed
– (eg. properly placed soil profile data)
2. Prove feature meets exemption • Construction plans • Maintenance plans • Permit approvals • Etc. 3. Submit to agencies for approval