arctic facility user input

10
OPP OAC May 2005 Arctic Facility User Arctic Facility User input input Simon Stephenson Simon Stephenson Research Support and Research Support and Logistics Manager Logistics Manager Arctic Sciences Section Arctic Sciences Section Office of Polar Programs Office of Polar Programs

Upload: adelie

Post on 22-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

Arctic Facility User input. Simon Stephenson Research Support and Logistics Manager Arctic Sciences Section Office of Polar Programs. Facilities. Toolik Field Station Arctic Icebreaker Coordinating Committee (HEALY & Polars) BASC - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Arctic Facility User input

OPP OAC May 2005

Arctic Facility User inputArctic Facility User input

Simon StephensonSimon StephensonResearch Support and Logistics ManagerResearch Support and Logistics Manager

Arctic Sciences Section Arctic Sciences Section Office of Polar ProgramsOffice of Polar Programs

Page 2: Arctic Facility User input

OPP OAC May 2005

FacilitiesFacilities

• Toolik Field Station

• Arctic Icebreaker Coordinating Committee (HEALY & Polars)

• BASC

• Science Coordination Office for Summit, Greenland (Geosummit)

Page 3: Arctic Facility User input

OPP OAC May 2005

ToolikToolik

• Cooperative Agreement with UAF, station operator

• On-site user group meetings– Minutes feed into Steering

Committee

– Discussion and written response provided

Page 4: Arctic Facility User input

OPP OAC May 2005

ToolikToolik

• Successes– Living

• Washing machine

• Toilets

– Labs• Incubation facility

– Station• Safety officer

• Field Training

– Futures workshop

Page 5: Arctic Facility User input

OPP OAC May 2005

AICCAICC

• Subgroup of UNOLS – operators and managers of the US academic fleet

• Formed to advice USCG & NSF of Healy layout and modifications while it was under construction

Page 6: Arctic Facility User input

OPP OAC May 2005

AICCAICC

• Lead on ship trials of scientific systems

• Lead user debriefs– Analyze responses and

prioritize recommendations

– Advise NSF on upgrades - ADCP

Page 7: Arctic Facility User input

OPP OAC May 2005

BASCBASC

• BASC have CA with OPP• BASC are none-profit

organization• Have Board, and Science

Management committee• Science Advisory Group

under SMAC• Other subgroups

– IT– Barrow Environmental

Observatory

Page 8: Arctic Facility User input

OPP OAC May 2005

BASCBASC

Successes? Early Days• Communication with

Users• Safety • Compliance e.g.

OSHA• coordination

Page 9: Arctic Facility User input

OPP OAC May 2005

Summit, GreenlandSummit, Greenland

• Grant to Science Coordination Office since 2000

• PIs Bales and Dibb• Track projects• Build GIS of sites• Help VECO set sound

site policies

Page 10: Arctic Facility User input

OPP OAC May 2005

SummarySummary

• User input critical

• Has to be seen to influence operations and development

• Feeds into OPP performance evaluation

• Model used for other activity e.g. data centers