Page 1: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

February 2019

Archaeology in offshore?

Page 2: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

I. Introduction

II. Windplanblauw – Offshore Archeology

Contents

Page 3: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Background

• Wind Power Consultancy & Engineering

• Since 2004

• Techno-Economic Advisor & Engineer

• Taiwan, Japan, NW-Europe

• Owners, Financers, Developers

Core Strengths

• Holistic Approach

• Bridging Commercial - Technical – Legal

• Bridging Cultures

• IX Network

I – Introduction (1/2)

Page 4: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDI. Introductions (2/2)

Some ReferencesProject Size (MW) Loc

Formosa 1 OWF 130 TW

Eurus M&A Yard portfolio 103 NL / F

Sandbank & Dan Tysk 2 x 288 DE

Gwynt y Mor 576 UK

Hitachi 100 JP

3 x OSS design review 900 CN

€ 10 bn.+ investment

Page 5: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II – Offshore Consultancy References

Page 6: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Offshore substructures

II – Offshore Foundation References

Client Project Size Location Scope

EnbW5 Hohe See 497 MW North Sea, Germany Monopile Design

Aspiravi/Sumitomo Northwind 216 MW Belgium Monopile + Jacket Design

Vatenfall / SWM Dan Tysk 288 MW North Sea, Germany Monopile + Jacket Design

Eneco / Mitsibishi Luchterduinen 129 MW North Sea, Netherlands Owner’s Engineer – Monopiles

RWE Innogy Nordsee Ost 295 MW North Sea, Germany Owner’s Engineer – Jackets

Elicio/Eneco/Mitsubishi Norther 370 MW Belgium Owner’s Engineer – Monopiles

Iberdrola Wikinger 350 MW Baltic Sea, Germany OHVS Substructure Design

Vattenfall / SWM Sandbank 288 MW North Sea, Germany OHVS Substructure Design

Northland Power Gemini 600 MW the Netherlands 2 x OHVS Substructure Design

Meerwind Meerwind 288 MW North Sea, Germany OHVS Substructure Design

E.ON Amrumbank West 302 MW North Sea, Germany OHVS Substructure Design

Vattenfall / SWM Dan Tysk 288 MW North Sea, Germany OHVS Substructure Design

EWE / ENOVA Riffgatt 108 MW North Sea, Germany OHVS Substructure Design

Page 7: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Formosa I Offshore Wind Farm Power COLocation: Taiwan

Projected Capacity: 130 MW

WTG Model: 2 x Siemens 4.0MW + ???

Commissioning Date: 2016 / 2019

Project Value: Confidential

IX Involvement: Technical Advisor:

• WTG contracts

• O&M

• Vessels

• Financial model

• Master Schedule

• Interface Matrix

• Electrical design

Clients: Swancor Renewable Energy

Formosa I Wind Power Co.M/V Torben – installation vessel

Results:

✓ Phase 1 Operational – first Taiwanese offshore turbines

✓ Commercially viable project

Development Support

III – Expertise – Case Examples

Page 8: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Offshore Wind Farm Gwynt y MôrLocation: United Kingdom

Projected Capacity: 576 MW

WTG Model: 160 x Siemens 3.6MW

Commissioning Date: Q3 2014

Project Value: $ 2,800,000,000

IX Involvement: Due Diligence for Sponsors

Technical Advisor

Clients: German Utility SWM

Siemens Project Ventures

Gwynt y Môr OWF Layout and Turbines

(Courtesy RWE innogy)

Results:

✓ Successful deal

✓ Improved cost insight

✓ Key risks managed

Technical Due DiIligence

III – Expertise – Case Examples

Page 9: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Offshore substructures

III – Expertise – Design & Engineering

❑ Hohe See (Jackets)

❑ Eldepasco (Monopile & Jackets)

❑ Dan Tysk (Monopile & Jackets)

❑ Luchterduinen (Owner’s Engineering – Monopiles)

❑ Nordsee Ost (Owner’s Engineering – Jackets)

❑ Norther (Owner’s Engineering – Monopiles)

Platforms:

Wikinger, Meerwind, Dan Tysk, Ravn, Gemini, Riffgat,

Sandbank, Amrumbank West (Concept)

Page 10: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

San Marcos Wind Farm

Location: San Marcos, Honduras

Projected Capacity: 50 MW + extension

WTG Model: Gamesa G9x

BOP Works: Very Complex

Project Value: $ 150.000.000

IX Involvement: Basic Designs

Tendering

Technical Advisor

Client: Grupo TERRA

Site visit welcome by local population

Plant (pre) Design

Tender Management & Contracting

Results & advantages:

✓ Several tens of millions US$ cost savings

✓ Improved guarantees & certainty

✓ Bankable

III – Expertise – Case Examples

Page 11: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Results & advantages:

➢ New tech Bankable

➢ Risks managed

➢ Reduced costs

➢ Increased certainty on OPEX

Siemens SWT 3.0

Technology Evaluation

III – Expertise – Case Examples

Page 12: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Results & advantages:

✓ Good working power plant

✓ Minimized extra work / damage

✓ Quality & supplier under control

✓ Documentation complete

✓ Certainty for stakeholders

✓ All issues solved

Contract Management

III – Expertise – Case Examples

Page 13: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Have full control over the visual

planning of your wind projects

Page 14: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Shaping tomorrow - Performing today

Page 15: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Input data sheets

Availability & Production

Life-time costResults & advantages:

✓ Optimised business case

✓ Improved cashflow forecast

✓ Insight & control

Financial Modelling & Strategies: SOMOS

III – Expertise – Case Examples

Page 16: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDRecent and current projects

Client Project Scope Loc

Obayashi Corp. Various Offshore Confidential Japan

VattenfallWindplan Blauw (O)

WP Moerdijk

Risk assessment & management

Development supportNetherlands

EDP / Engie Les Eoliens en Mer (OWF)O&M Strategy

Service Agreement NegotiationsFrance

JGC Corp. Various Offshore Wind Consultancy Japan

Eurus Energy Various Owner’s Engineer Japan

OX2 Confidential Quality Inspections Sweden

Triodos bank Confidential Lender’s Technical Advisor Netherlands

Page 17: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II. Windplanblauw

Specifications

Location Flevoland / IJsselmeer, the Netherlands

Size ~250 MW

WT 61 x 4MW ???

Start construction 2020

Comment Mixed onshore and lake-wind

Page 18: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDIV Windplanblauw

Page 19: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDII. Windplanblauw

Page 20: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDII. Windplanblauw

❑ 61 WTG’s

❑ 26 x offshore

❑ Tipheight: 248 meters

❑ Permitting: 2019

❑ FID: 202

❑ Commissioning: 2021

21

Page 21: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDII. Windplanblauw - Role IX Wind

❑ Coorditating permit

procedures

❑ Managing technical

surveys

22

Page 22: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II. Windplanblauw - Offshore archaeology:

side scan sonar

❑ Scanning for:

- Objects in water soil

- Soil conditions

23

Page 23: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II. Windplanblauw - Offshore archaeology:

unidentified objects

❑ 251 unidentified objects

found

❑ Possibility for WWII

bomber remains (bombs

of wraks)

❑ Expensive salvage

24

Page 24: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II. Windplanblauw - Offshore archaeology:

soil

❑ Strange soil structures

found

❑ Hypothesis: prehistoric

river dunes

25

Page 25: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

II. Windplanblauw - Offshore archaeology:

strange soil structures

❑ Strong connection

with prehistoris

structures onshore

❑ Possible unique places

for scientific research

to the origin of farmer

life

❑ Cooportaion made

with universities for

further boring

research

26

Page 26: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDII.Windplanblauw - Planning

Time Activities

2018 Q1+2 Pre-design, EIA, Permitting

2018 Q3+4 Permit finalization

Design layout, roads, cabling

Installation pre-engineering

Engineering O&M concept

2019 Tendering & contracting

Archeology management

2020 Start construction BOP

2021 Installation WTGs

2022 COD

Page 27: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WINDVideo

Page 29: Archaeology in offshore?jwpa.jp/pdf/20190226_5_IX.pdf · BRIDGING WORLDS IN WIND Offshore Wind Farm Gwynt y Môr Location: United Kingdom Projected Capacity: 576 MW WTG Model: 160

BRIDGING WORLDS IN WIND

Asia

Paris Tzou

T: +886 90 626 8039

[email protected]

HQ

Eric Kamphues

T: +31 88 8860 888

[email protected]

m

ありがとうございました。

感謝您的聆聽

Thank you for your attention。

BRIDGING WORLDS IN WIND