Challenges in the Construction of Offshore Wind Structures

Dr Ned Minns IT Power UK

Page 2: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Foundations - Options

Gravity Monopile Jacket Tripod

Floating

<40m <40m <60m <60m

>60m

Shallow Intermediate Deep

Page 3: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Floating Wind Foundations

Tested Prototypes

100m

HyWind – 2.3MW WindFloat – 2MW

BlueH – 80 kW

Page 4: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Challenges

• Not just installing onshore WT at sea. – Specialist skills required. – Marinisation. – Maintenance. – Supply chain. – Cables

Page 5: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Installation

• Typical offshore works process for monopile foundation

Start Finish

Approximately 4 – 10 days

Page 6: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Small survey boats required for initial work

Page 7: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Aura and Toisa Sonata - Transport of monopiles from the Netherlands

• Carry two monopiles per voyage

~100m long vessels

Page 8: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Oleg Strashnov – Installation of 1,000 tonne substations and 88 monopiles

• Four piles per voyage cycle

5,000 tonne crane, 183 m long vessel

Page 9: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Three Jack Up Barges to install turbines and towers – two turbines at a time

GMS Endeavour Leviathan SEA JACK

All +90m long vessels, with ~90m long legs

Page 10: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Team Oman – Cable laying vessel – transport of cable from Norway and installation of infield and export cable

Page 11: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Toisa Warrior – infield and export cable burying using an ROV trencher

Page 12: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Rock dumping for scour protection of turbines and cable • Larger rocks to protect underlying layers

Jan Steen Four foundations per day

HAM 602 Two foundations per day

Page 13: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Regina Baltica - Personnel accommodation “Floatel” • Temporary living for 100 workers • Former cruise ferry

Page 14: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Windcat – Operations and maintenance vessels for transportation of personnel

Page 15: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessels

• Helicopter – expensive but quick

Page 16: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Transition Piece

• Transition piece between tower and monopile • Grouted to compensate imperfection in pile verticality

to ensure turbine tower will be vertical

Grout

Transition Piece

Monopile

Export Cable

J Tube

Scour Protection

Supports for installation

Page 17: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Transition Piece - Solutions

Conical Joint • Allows and expects failure in the grout • Shape of tapered interface causes recompression to a

stable condition • Quality is key as any “ovality” of either component will

affect the locking together of the two

Used on the recently completed London Array

Page 18: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Transition Piece - Solutions

Shear Keys • Circumferential rings on the outside of

the monopile and inside of the transition piece

• Increase the sliding resistance between the grout and steel

• Requires more fabrication and cost but benefits outweigh cost of offshore repair

Transition Piece

Grout Pile

Page 19: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Transition Piece - Solutions

Elastomeric Bearings • If slippage occurs, bearings gradually take load to

assist grout

Used on: Sheringham Shoal, Belwind (BE), Greater Gabbard, Gwynt y Môr & Rhyl Flats

Top of pile wall

Grout

Transition piece wall

Compression jack

Elastomer bearing

Bearing units

Page 20: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Challenges

• Not just installing onshore WT at sea. – Specialist skills required. – Marinisation. – Maintenance. – Supply chain. – Cables.

• Learn from worldwide experience and mistakes.

Page 21: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Offshore Wind in the UK Offshore Wind Resource UK wind farms

Practical OSW Resource of ~ 400 TWh/yr

Page 22: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

IT Power Marine Energy Group

Supporting the emergent marine energy industry Covering the following technologies • Tidal stream • Tidal barrages • Wave power • Hydropower • Offshore wind

Page 23: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Marine - Long Track Record

Courtesy Severn Tidal Fence Group

Page 24: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Support Services to: Investors

Project developers Venture capital companies

Public Sector National & regional government Resource owners Research organisations

Developers & Utilities Site developers Resource owners Grid operators Power purchasers

Industry Device developers Component or system suppliers Integrators

Page 25: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Thank you

Dr Ned Minns [email protected]

+44 117 214 0518

Page 26: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Supporting Information

Page 27: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

OSW – Vessel Costs

• Jack-up - £100 - 150k/day • Floating crane ships – £200 - 270k/day • Trenching vessel - £75 - 90k/day • Export cable laying vessel - £75 - 125k/day • Array cable laying vessel - £65 - 95k/day • Ornithological survey vessel - £8 - 10k/day • Coastal survey vessel - £4 - 6k/day • Geophysical survey vessel - £14 - 16k/day • Geotechnical survey vessel - £40 - 70k/day • Windcat workboat - £1,500/day

Page 28: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Monopiles

Page 29: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Jackets

Page 30: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Tripods

Alpha Ventus, Germany

Narec, UK

Page 31: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Gravity Foundations

Page 32: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Suction Caisson

Page 33: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Floating Wind Foundations Spar Buoy (Ballast

Stabilised)

Semi-Submersible (Buoyancy Stabilised)

Tension Leg Platform (Mooring Stabilised)

Page 34: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Conclusions

‐ Many challenges and important lessons are still

being learned

‐ A variety of expensive, specialist vessels are

required for installation

Page 35: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Offshore Wind Turbines – Growing!

50 kW Ø 15 m

100 kW Ø 20 m

500 kW Ø 40 m

600 kW Ø 50 m

2000 kW Ø 80 m

5000 kW Ø 125 m

1980 1985 1990 1995 2000 2010

Page 36: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Name Operation date Size, MW Turbine Distance to Shore km Water Depth, m Foundation Type Cost, million

£

Barrow 03/2006 90 Vestas V90 3MW 7.5 12–16 Steel Monopile 139.5

Beatrice 07/2007 10 REpower 5MW 23 45 Steel Quadropod 35

Blyth 11/2000 4 Vestas V66 2MW 1 6-11 Steel Monopile 4

Burbo Bank 07/2007 90 Siemens SWT 107 3.6MW 6 0-8 Steel Monopile 181

Gunfleet Sands I + II 01/2010 172.8 Siemens SWT 3.6MW 7 2-15 Steel Monopile 420

Inner Dowsing 10/2008 97.2 Siemens SWT 107 3.6MW 5 6-18 Steel Monopile 300

Kentish Flats 08/2005 90 Vestas V90 3MW 9 3-5 Steel Monopile 105

Lynn 10/2008 97.2 Siemens SWT 107 3.6MW 5 6-18 Steel Monopile 300

North Hoyle 03/2004 60 Vestas V80 2MW 7 7-11 Steel Monopile 80

Ormonde 03/2012 150 Repower 5MW 10 17-22 Jacket 500

Ryhl Flats 12/2009 90 Siemens 3.6MW 8 6-12 Steel Monopile 198

Robin Rigg 04/2010 180 Vestas V90 3MW 11 4-13 Steel Monopile 396

Scroby Sands 12/2004 60 Vestas V80 2MW 3 0-8 Steel Monopile 75.5

Thanet 09/2010 300 Vestas V90 3MW 12 14-23 Steel Monopile 900

Walney Phase 1 04/2011 183.6 Siemens SWT 107 3.6MW 14 19-28 Steel Monopile 183.6

Walney Phase 2 04/2012 183.6 Siemens SWT 120 3.6MW 14 25-30 Steel Monopile 183.6

Greater Gabbard 09/2012 504 Siemens SWT 107 3.6MW 36 20-32 Steel Monopile 1,300

Sheringham Shoal 12/2012 316.8 Siemens SWT 107 3.6MW 23 15-22 Steel Monopile 1,100

Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW 13 12-28 Steel Monopile 1,600

Lincs Under construction 270 Siemens SWT 120 3.6MW 8 10-15 Steel Monopile 725

London Array Ph 1 Under construction 630 Siemens SWT 120 3.6MW 20 0-25 Steel Monopile 2,200

Teeside Under construction 62.1 Siemens SWT 93 2.3MW 2 7-15 Steel Monopile

Page 37: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Turbine Failures

• Electrical control, gearbox, yaw system, generator,

hydraulic, grid and blades are rated (60% of the total

failures)

Page 38: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Turbine Failures

• Yaw Control - cracking of yaw drive shafts, fracture of

gear teeth, pitting of the yaw bearing race and failure

of the bearing mounting bolts

• Gearbox – wear and tooth breakage due to particle

contaminations, frequent stoppage and starting and

high loaded operation conditions

Page 39: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Turbine Failures

• Hydraulics – leakages in the pitch, yaw, braking system

and gearbox lubrication system. Failure due to high/low

temperature, corrosion, vibration and improper

installation

• Blades - turbulent wind, out-of-control rotation,

lightning and production defects.

Page 40: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Turbine Failures

‐ Lightning Damage to Transformer

Page 41: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessel Failures

• Failure of jacking mechanisms on installation vessels

Page 42: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Vessel Failures

• Foundation failure below legs – feet pierce the sea bed

causing the platform to list

Page 43: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Met Mast Failures

• Failure of met mast structures due to fatigue

Page 44: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

O&M Access

• Windcat – cheaper but can be slow travel and limited by

sea conditions

Page 45: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

UK Offshore Wind - Rounds

Sheringham Shoal

Greater Gabbard

Robin Rigg

Ormonde

Page 46: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Sheringham Shoal - Information

Page 47: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

Sheringham Shoal - Information

Page 48: Challenges in the Construction of Offshore Wind Structures · Pile . Transition Piece - Solutions Elastomeric Bearings ... Gwynt y Mor Under construction 576 Siemens SWT 107 3.6MW

OSW – Vessel Costs

• Jack-up - £100 - 150k/day • Floating crane ships – £200 - 270k/day • Trenching vessel - £75 - 90k/day • Export cable laying vessel - £75 - 125k/day • Array cable laying vessel - £65 - 95k/day • Ornithological survey vessel - £8 - 10k/day • Coastal survey vessel - £4 - 6k/day • Geophysical survey vessel - £14 - 16k/day • Geotechnical survey vessel - £40 - 70k/day • Windcat workboat - £1,500/day