Arawak Cay Port BHM CO. LTD
New port facility at Arawak CayClient: Arawak Port Development Ltd.
Services Provided• Risk management
• Value engineering
• Design management of surfacingmaterials
• Asphalt and concrete design
• Consideration of local environmentand ensuring no contamination issues
Benefits to Customer• Safe and secure working on the
Client’s facility
• On-site impact kept to a minimum
• Works carried out to suit otherongoing improvement works
• Integrated team working with the Port Owners
• Ability to accommodate design changes during construction
• Innovative solutions
BackgroundThe relocation of the port was required to ease heavy Bay Street container traffic and allows shipping companies to operate from one location at the mouth of the Nassau Harbour. Arawak Cay marine works and new apron will allow the port to operate as a recognised international container port.
The 40-acre development is the home for local shipping companies and a distribution facility for international freight to the whole of the Bahamas.
Project DescriptionBHM was appointed by Arawak Port Development Limited for the construction of the landside facilities for the new Port on Arawak Cay to service the island of New Providence and a vital link for goods transfer to the Family Islands. The works included:- • Bulk earthworks and preparation for terminal areas• Asphalt and concrete surfacing to Container stacking areas• All associated ancillary works• Construction of access and service roadways• Utilities, drainage, lighting, and landscaping for terminal areas• Demolition of two earthen water reservoirs and ancillary works• Electrical and telecom works.
www.bhm.construction
-
BHM branding - February 2014
Baha Mar Resort BHM CO. LTD
Background
The Baha Mar Resort (also known as The Bahamian Riviera) is located on the world famous Cable Beach in Nassau. The resort will feature four elite hotels (SLS Lux, Rosewood, Grand Hyatt & the Bahamar Casino Hotel) and a state-of-the-art convention facility, including 2,000-seat performing Arts Centre and Art Gallery. Amenities will include the 18-hole, 72-par championship Jack Nicklaus Signature Golf Course.
Project Description
BHM as part of a joint venture were contracted by China State Construction America for the construction of the major infrastructure works on one of the largest resort developments in the Caribbean. Scope of works included:
• Installation of utility services, potable water, storm water,drainage, sanitary sewer, reclaim water, gas, electrical distribution,external lighting.
• New car parking areas for the resort, employees, and patrons;
• New roadways into the resort.
• Hard landscaping, decorative sidewalks, waterside place andHotel Porte Cochère’s
• Tennis Court construction
• Injection and cooling well construction
• The Design and Build of main entry lake and showcase fountainwater feature and all associated MEP works including lake filtrationand water flow and return systems
• Three pedestrian bridges
Major Infrastructure works Client: China State Construction America (CCA)
Services Provided
• Risk management
• Value engineering
• Ashpalt and concrete Design
• Consideration of local environment
Benefits to Customer
• Works carried out to avoid disruptionto existing hotels and residents.
• Integrated team working closely withthe China State Construction Americaand the Baha Mar team.
• Working in close collaboration withthird party contractors on site.
• Ability to react promptly to design changes.
www.bhm.construction
-
BHM branding - February 2014
Baillou Hill Road BHM CO. LTD
Ground works, Infrastructure and Roadways Client: Ministry for Public Works and Transport Bahamas
Services Provided• Risk management
• Value engineering
• Construction management
• Phased traffic management
Benefits to Customer• Value engineering input
• Minimal disruption to road users,local business and general public
• High quality of works achieved
• Safe environment for road usersand public maintained
Background
BHM were awarded this scheme following on from the successful completion of the Harrold Road project. BHM assisted the client in reaching their budget by offering a number of value engineering savings, including the use of swales in lieu of a gravity drainage system. The implementation of a phased traffic management solution within a highly trafficked, urban area was of significant importance to the delivery of the project.
Project Description
BHM were employed by the Ministry for Public Works and Transport to carry out the following scope of works:
• Site clearance and bulk earthworks
• Stabilisation of base material
• New utility ducts
• New road drainage system
• Road lighting and electrical work
• Kerbing & sidewalks
• Realignment of roadway and roundabouts
• Rehabilitation of Harrold Road Roundabout to allow for new filterlanes and increased traffic capacity
• Hard and soft landscaping
• White lining
www.bhm.construction
-
BHM branding - February 2014
Balmoral Residence BHM CO. LTD
Background
The Balmoral Development is a gated community comprising a total of 70 single family lots, located on the south side of Stanford Drive. As part of sub-division works, BHM were initially employed by Balmoral Development Ltd to carry out site clearance and bulk earthworks on the project. Having successfully delivered this element of the works, the client had the confidence to negotiate significant additional works including the installation of a gravity and forced sewer system, water main, road sub base and hot mix asphalt paving. The works took place on a congested site as the lots were built while BHM carried out the subdivision element. BHM liaised closely with other contractors to ensure the works progressed smoothly and safely.
Project Description
BHM were employed by Balmoral Developments to carry out the following scope of works:
• Site clearance
• Bulk earthworks
• Storm and sewerage drainage
• Associated manholes and laterals
• Water main
• Roadway sub base
• Hot Mix Asphalt paving
Subdivision including Ground works, Infrastructure and Roadways Client: Balmoral Development Ltd
Services Provided• Risk management
• Value engineering
• Construction management
• Coordination with othercontractors on site
• Engineering including drainageand asphalt design
Benefits to Customer• Collaborative approach to negotiate
additional works
• Delivery on time and budget
• Single point of contact for client team
• Extensive value engineering input
• Close working relationship with other contractors on site
www.bhm.construction
-
BHM branding - February 2014
Freeport Container Port BHM CO. LTD
Background
Since 2005 BHM has executed multiple projects at the Freeport Container Port creating over 30 acres of container stacking areas inclusive of GS6, Delta 2,3,4, ASC, Shoreline protection Works, and Roadway Rehabilitation of Alpha and Bravo Blocks.
Project Description
The project scope included:
• Site clearance
• Removal of contaminated soils
• Bulk earthworks
• Drainage and well drilling
• Density testing
• Sub base and base layers
• 4 inch type S-II hot mix asphalt pavement
• Areas of chip and seal
• Security fencing
www.bhm.construction
Container stacking port Client: Hutchinson Whampoa
Services Provided
• Risk management
• Value engineering
• Construction management
• Laboratory testing
Benefits to Customer
• Collaborative approach to give clientbest value
• Single point of contact for client team
• Coordination with existing infrastructure
• In house plant, materials and testing
-
BHM branding - February 2014
New Providence Road BHM CO. LTD
New Providence Island road corridor improvementsClient: Jose Cartellone
Services Provided• Risk management
• Value engineering
• Design management of surfacingmaterials
• Asphalt and concrete design
• Liaison with existing localbusinesses, home owners and motorists
• Consideration of local environmentandtrafficcongestion
Benefits to Customer• Ensuring minimum disruption to
road users
• Out of hours working hours
• Advancenotificationofareasofworktothelocalcommunitiesandpress
• Impact of the works on neighbours kept to a minimum.
• Integrated team working collaboratively with main Contractor
• Abilitytoreactpromptlytounforeseencircumstancesortrafficcongestion
• Innovative solutions to keep road fully operational at busy times
BackgroundTheNewProvidenceRoadImprovementProjecthasdecreasedtrafficcongestion and relieved motorists frustration, with a major upgrade and improvement of the road network.
The project includes construction of 11.6 miles of roads, and comprises of nine new roads, major improvement of ten existing roads and numerous new or improved intersections
Project DescriptionBHM was appointed as a major specialist subcontractor to support and collaborate with the main contractor, Jose Cartellone Construcciones Civiles. The project included the major reconstruction and improvement of numerous roads within the urban environment of Nassau. Much of the works were undertaken out of busy commuter hours to minimise disruption to the general public and road users. The works for BHM being predominately:-
• All base course works
• Full depth reconstruction of the existing roads
• Earthworks and full depth construction of new roads
• All asphalt surfacing works
• Associated sidewalk and concrete pavements.
www.bhm.construction
-
BHM branding - February 2014
Sports Complex Development ProjectBHM CO. LTD
National Sporting Complex DevelopmentClient: Ministry of Works and Transport
Services Provided• Risk management• Value engineering• Special design of surfacing materials
for Sporting Association compliance• Asphalt and concrete design• Liaison with stakeholders, users and
approved associations• Consideration of local environment
and relocation of existing facilities
Benefits to Customer• Single point of contact for
stakeholders and Client• Impact of the works on existing users addressed• Integrated team working collaboratively with the Client and Stakeholders• Ability to react promptly to the requirements of the specialist associations• Innovative solutions proposed and agreed with specialists
BackgroundThe new National Stadium is in the heart of New Providence on a 450 acre plot which includes access roads, 15,000 capacity parking, a recreational park, velodrome cycling track, athletes’ village - complete with facilities for American football, baseball and softball stadiums. The whole complex includes commercial and press facilities.
To achieve the National Stadium in this key location, the existing hot rod drag racing strip and other facilities had to first be successfully relocated.
Project DescriptionBHM was the lead partner of the Joint Venture contracted by the Government of the Commonwealth of the Bahamas for the construction of infrastructure works for the National Stadium together with major works for the overall National Sporting Complex Development. Works being undertaken included: • 4 Major roadways to supplement the New Providence Road
Network and provide stadium access;• 4 Major junction improvements along Yellow Elder Way,
Thompson Boulevard and Baillou Hill Road;• Stadium parking areas with ancillary works;• Utility, drainage and landscaping for Stadium surrounds;• Upgrade of the existing waste water treatment plant for the
Greater Oakes Field and Yellow Elder Area;• Relocation and upgrade of drag racing track to International
Hot Rod Association compliance.
www.bhm.construction
-
BHM branding - February 2014
West Bay Street RealignmentBHM CO. LTD
BackgroundBaha Mar, hotel development and major infrastructure is set on 3,000 feet of white-sand beach just 12 minutes from Nassau’s newly expanded Lynden Pindling International Airport. The resort features an elite collection of hotel brands with gaming, entertainment, private residences, shopping and natural attractions that reflect an authentic Bahamian experience.
Amenities include the 18-hole, 72-par championship Jack Nicklaus Signature Golf Course, a state of the art convention facility, which includes a 2,000-seat performing arts centre and art gallery.
The whole project has required major new and upgraded infrastructure including new highways, reinforced power and other utility supplies support by a full upgrade of Nassau International Airport.
Project DescriptionBHM as lead partner of a joint venture and overall contract administrator were contracted by Baha Mar Ltd for the construction of the major infrastructure works on one of the largest resort developments in the Caribbean. The project included: • The realignment of West Bay Street, a major arterial roadway for
New Providence;• Construction of 7 roundabouts to supplement access to the new hotel
resort development;• Ancillary works for utility service upgrades, drainage, street lighting, and landscaping;• New parking areas for relocated Straw Market, employees, and patrons;• Relocation of the famous Cable Beach Median Walk.• The construction of a new dual carriageway between realigned West Bay
Street, the development and John F. Kennedy Drive, part of the mainspine road for the island of New Providence;
• Construction of a further 3 roundabouts on existing major roads;• Ancillary works for utility service upgrades, drainage, street lighting,
and landscaping;• Relocation of 132kVA high voltage power lines.
Infrastructure works for Cable Beach resortClient: Baha Mar Ltd.
Services Provided• Risk management• Value engineering• Design management of surfacing
materials• Asphalt and concrete design• Liaison with existing local businesses
and hotels• Consideration of local environment and
ensuring no contamination issues
Benefits to Customer• Ensuring minimum disruption to
road users• Impact of the works on neighbours kept to a minimum.• Works carried out to avoid disruption to existing hotels• Integrated team working closely with Baha Mar team• Ability to react promptly to design changes or unforeseen circumstances• Working closely with Power Company to completely avoid power outages• Innovative solutions
www.bhm.construction
-
UTILITIES DATASHEETS IN PROGRESSBHM CO. LTD
www.bhm.construction
The following1 DATA SHEETIS UNDER CONSTRUCTION
-
BHM branding - February 2014
BAHAMAR COOLING WELLSBHM CO. LTD
Background
As part of wider infrastructure upgrades on Abaco Island, BHM completed the contract for the rehabilitation of North Abaco Settlement Roads over a distance of 33 miles.
Project Description
Our scope of works included:
• Bulk Earthworks
• Shaping and grading
• Traffic management to ensure works carried out safely
• Edge treatment and making good of existing surface
• New chip and sand seal roads construction
• Thermoplastic road markings
TitleClient: Name
Services Provided
• Value Engineering
• Risk Management
• onstruction management
• Traffic management
• Ashpalt Design
Benefits to Customer
• Single point of contact for client
• Works planned to minimize impacton road users
• High standards of quality andsafety management
• In house plant and materials
• Employment of skilled local workforce
www.bhm.construction
DATA SHEETUNDER CONSTRUCTION
Arawak Cay Port - BHM Co - Project Data SheetBaha Mar - BHM Co - Project Data SheetBaillou Hill Road - BHM Co - Project Data SheetBalmoral Residence - BHM Co - Project Data SheetFreeport Container PortSports Complex Development Project - BHM Co - Project Data Sheet - PrintWest Bay Street Realignment for Baha Mar - BHM Co - Project Data Sheet