april 27-28, 2007 barnes & tucker project€¦ · barnes-watkins refuse pile, barnes and...

28
Barnes & Tucker Project Daniel Sammarco,P.E. Jon Smoyer, P.G. DEP-Bureau of Abandoned Mine Reclamation Cambria Office [email protected] [email protected] Project Team: Art Crossman Darryl Audia Pat Webb Bob Oshaben Ken Bobak Max Scheeler West Branch Susquehanna Restoration Symposium April 27-28, 2007

Upload: others

Post on 14-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Barnes & Tucker Project

Daniel Sammarco,P.E.Jon Smoyer, P.G.

DEP-Bureau of Abandoned Mine ReclamationCambria Office

[email protected]@state.pa.us

Project Team:Art Crossman Darryl AudiaPat Webb Bob OshabenKen Bobak Max Scheeler

West Branch Susquehanna Restoration SymposiumApril 27-28, 2007

Page 2: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

OutlineA. Background

B. Project Assessment- inter-basin transfer- Blacklick Creek - West Branch Susquehanna River

C. Project Design

D. Q&A

Page 3: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

X Project Location

Page 4: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

A. Background – existing plant

Page 5: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Mahaffey, Pa

Curwensville Dam

Page 6: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Barnes & Tucker filed bankruptcy in 2001 – Cleans

Streams Foundation takes over operation of the

Dumans Plant

DEP explores long-term operation alternatives.

Page 7: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

…a Win – Win Scenario

www.srbc.netwww.dep.state.pa.us

more efficient treatment needed existing pumping costs are high trust fund is limited mine pool resource recovery

agricultural consumptive use demands approx. 25 miles of stream restored allows for increased low flow releases

from the Curwensville reservoir SRBC, through a PA General Assembly

grant, will contribute $3.9 milliontowards long-term O&M.

Page 8: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Duman Treatment Plant

Proposed New Treatment Area

1970 Blow out Area

Eastern Continental Divide

B. Project Assessment - Inter-basin Transfer

OSM: Hawkins,Perry

x

Page 9: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Inter-basin Transfer (IT)

1. PA law requires projects involving IT to have a NPDES permit.

2. Assessment of watershed basins’ (Susquehanna and Ohio )

West Branch Susquehanna Ohio River Basin

> restore ~25 miles stream > BAMR commitment to treat the Red Mill, Vinton #6,

> addresses water demand issues and Wehrum discharges

> continue AML and AMD remediation projects

Page 10: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Susquehanna River BasinOhio River Basin

Page 11: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

pH – 7.3Total Iron: 0.50 mg/lTotal Al: 0.28 mg/lTotal SO4 : 62.6 mg/lAlkalinity: 38 mg/l

pH – 7.9Total Iron: <.30mg/lTotal Al: <.50 mg/lTotal SO4 : 34.3 mg/lAlkalinity: 55 mg/l

pH – 3.7Total Iron: 8.1 mg/lTotal Al: 13.6 mg/lTotal SO4 : 420.0 mg/lAlkalinity: -150 mg/lAvg. Flow: 1450 mg/l

B. B. Project Assessment – Blacklick Creek

Page 12: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Barnes & Tucker Lancashire No. 15pH – 7.4Total Iron: 1.5 mg/lAlkalinity: 194 mg/lAvg. Flow: 4689 gpmTHAT’S AN AVERAGE OF 10934 LBS/DAYALKALINITY LOST FROM THE BLACKLICK WATERSHED!

Eastern Associates Coal Co. – Colver PlantpH: 7.8Total Iron: 1.90Alkalinity: 58 mg/lAvg. Flow: 2430 gpm

Page 13: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

North Branch Blacklick Creek above Elk CreekpH – 7.3Alkalinity: 31 mg/lTotal Iron: <0.3 mg/lTotal Al: < 0.3 mg/lVery low (< 200 gpm) flow during dry periods due to groundwater recharge lost to underground mines

Elk Creek Downstream at MouthpH - 8.0Alkalinity: 94 mg/lTotal Iron: 0.93 mg/lTotal Al: 0.55 mg/lTSS: 5.0 mg/l

Without B&T dischargeElk Creek at mouth:pH – 7.2Alkalinity: 10 – 50 mg/lTotal Iron: 0.5 –2.0 mg/lTotal Al: 0.5 mg/l

Page 14: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

North Branch Blacklick below Elk CreekpH – 8.0Alkalinity: 95 mg/lTotal Iron: 0.55 mg/lTotal Al: <.5mg/l

Red Mill Discharge – Commercial No. 16 minepH- 3.5Hot Acidity: 172.6 mg/lTotal Iron: 52 mg/lTotal Al: 7.7 mg/lAvg. Flow: 210 gpm

Without B&T discharge, North Branch Blacklick belowRed Mill:pH – 6.9Alkalinity: 18 mg/lTotal Iron: .92 mg/lTotal Al: 0.6 mg/l

Page 15: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

North Branch aboveVintondalepH – 7.3Alkalinity: 46 mg/lTotal Iron: 1.7 mg/lTotal Al: 0.5 mg/l

Vintondale BoreholesDischarge from Vinton #6 minepH- 4.9Hot Acidity: 307 mg/lTotal Iron: 136 mg/lTotal Al: 5.0 mg/lAvg. Flow: 2200 gpm

South Branch of Blacklick CreekpH- 6.03Hot Acidity: 24 mg/lTotal Iron: 2.21Total Al: 1.93NO BUFFERING HELP HERE!

Page 16: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Wehrum Shaft DischargepH – 3.4Hot Acidity: 298 mg/lTotal Iron: 68 mg/lTotal Al: 20.1 mg/lAvg. Flow: 609 gpm

Blacklick Creek Above Wehrum ShaftpH- 6.4Hot Acidity: 11.4 mg/lTotal Iron: 2.08 mg/lTotal Al: 1.17 mg/l

Blacklick Creek below Wehrum ShaftpH – 6.4Hot Acidity: 14.0 mg/lTotal Iron: 4.8 mg/lTotal Al: 1.5 mg/l

Blacklick Creek without B&T’s water:pH –6.2Acidity – 20 mg/lTotal Iron – 5.5 mg/lTotal Al – 1.7 mg/l

Page 17: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

WHAT’S THE SOLUTION?

• Reclaim and remediate the refuse piles at Colver.

• Continue AMD remediation efforts in the South Branch Blacklick

treatRed Mill Mine

Vinton #6 mine

Wehrum mine

Page 18: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

B. Project Assessment – West Branch Susquehanna

Page 19: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Barnes-Watkins Refuse Pile project

Page 20: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

West Branch- Net Alkalinity Barnes-Watkins Refuse

Pile, Barnes and Tucker, and Bear Run Projects

-300

-250

-200

-150

-100

-50

0

50

100

150

200

250

185.

0

192.

0

199.

0

206.

0

213.

0

220.

0

227.

0

234.

0

Stream Mile

mg/

l

PrePost

increase in Net AlkalinityWest Branch -Total Al

Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects

0

5

10

15

20

25

30

185.

00

192.

00

199.

00

206.

00

213.

00

220.

00

227.

00

234.

00

Stream Mile

mg/

l PrePost

92% reduction in Al t

West Branch - Total Iron Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear

Run Projects

0

2

4

6

8

10

12

14

16

18

185.

00

192.

00

199.

00

206.

00

213.

00

220.

00

227.

00

234.

00

Stream Mile

mg/

l

PrePost

82% reduction in Fe t

Page 21: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

C. Project Design – Proposed Site Location

Page 22: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0
Page 23: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

C. Project Design – Exploratory Drilling Program

Page 24: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

1460

1465

1470

1475

1480

1485

1490

1495

1500

1505

1510

1515

7/2/20060:00

8/21/20060:00

10/10/20060:00

11/29/20060:00

1/18/20070:00

3/9/20070:00

4/28/20070:00

1479

1479.5

1480

1480.5

1481

1481.5

1482

1482.5

1483

1483.5

7/2/2006 0:00 8/21/2006 0:00 10/10/2006 0:00 11/29/2006 0:00 1/18/2007 0:00 3/9/2007 0:00 4/28/2007 0:00

1475.00

1480.00

1485.00

1490.00

1495.00

1500.00

1505.00

1510.00

0 50000 100000 150000 200000 250000 300000 350000

B1 - BOREHOLE (PATTERSON ROAD)

1470

1472

1474

1476

1478

1480

1482

1484

1486

1488

1490

8/23

/200

68/

24/2

006

8/25

/200

68/

26/2

006

8/27

/200

68/

28/2

006

8/29

/200

68/

30/2

006

8/31

/200

6

9/1/

2006

9/2/

2006

9/3/

2006

9/4/

2006

9/5/

2006

9/6/

2006

9/7/

2006

9/8/

2006

9/9/

2006

9/10

/200

6

9/11

/200

69/

12/2

006

9/13

/200

69/

14/2

006

9/15

/200

6

9/16

/200

69/

17/2

006

9/18

/200

69/

19/2

006

9/20

/200

69/

21/2

006

9/22

/200

69/

23/2

006

9/24

/200

69/

25/2

006

9/26

/200

69/

27/2

006

9/28

/200

69/

29/2

006

9/30

/200

6

10/1

/200

610

/2/2

006

10/3

/200

610

/4/2

006

10/5

/200

610

/6/2

006

DATE

AVE

RA

GE

ELEV

ATI

O

Draw Down Rate = -0.259'/Day

Draw Down Rate = -0.527'/Day

Page 25: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Active Treatment - Dense Sludge Technology

Pre-Aeration Basin

Ferrous ReactorBasin

Floc. Clarifier/Thickener

Sludge ConditioningReactor

Hydrated lime

Mine pool

Underflow disposal

Polishing Pond

Polymer

Q design = 10.5 MGD

to WBSR

Page 26: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Project Team: Art Crossman Daryl AudiaPat Webb Bob OshabenKen Bobak Max Scheeler

D. Q&A

existing proposed

Page 27: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Hydrology Analysis-Plant effluent

100 year flow = 2400 cfs

Project flow ~ 16 cfs

Page 28: April 27-28, 2007 Barnes & Tucker Project€¦ · Barnes-Watkins Refuse Pile, Barnes and Tucker, and Bear Run Projects-300-250-200-150-100-50 0 50 100 150 200 250 234.0 227.0 220.0

Maberry (2002-2003)6.

94

4.68

6.64

9.36

9.36

9.36

6.79

4.68

4.68

6.7 6.94

6.34

9.36

9.36

9.36

7.02

4.68

9.36

9.36

9.36

6.55

9.36

-1.2

-1.2

-2.5

-6.1

-13.

9

-15

-15

-11.

7

-6.2

-1.3

-1.3

-1.2

-2.5

-6.1

-8.8

-13.

9

-15

-15

-11.

7

-6.2

-1.3

-1.3

5.74

3.48 4.

14

3.26

-4.5

4

-5.6

4

-8.2

1 -7.0

2

-1.5

2

5.4 5.64

5.14

6.86

3.26

0.56

-6.8

8

-10.

32

-5.6

4

-2.3

4

3.16

5.25

8.06

7.84

-20

-15

-10

-5

0

5

10

15

Month

Flow

Rat

e (m

gdAve. Maberry Pump Rate (mgd)SRB Consumptive Use Need (mgd)Excess (+) / Deficit (-) Resultant (mgd)

1/02 2/02 3/02 4/02 5/02 6/02 7/02 8/02 9/02 10/02 11/02 12/02 1/03 2/03 3/03 4/03 5/03 6/03 7/03 8/03 9/03 10/03 11/03 12/03 Total

2Year

No

Mon

thly

Dat

a

No

Mon

thly

Dat

a