1 Compass Charitable Foundation 20 Humberline Dr. 104 Replace appliances $104,000
1 Maurice Coulter Housing Co-operative
174 John Garland Blvd.
110 Lighting retrofit $5,000
1 Maurice Coulter Housing Co-operative
174 John Garland Blvd.
110 Replace heating boilers $155,000
1 Maurice Coulter Housing Co-operative
174 John Garland Blvd.
110 Replace domestic hot water boiler
$100,000
1 Maurice Coulter Housing Co-operative
174 John Garland Blvd.
110 Replace make up air unit $41,000
1 Our Saviour Thistletown Lutheran Lodge
2715 Islington Ave. 80 Install door operators in accessible units
$28,000
1 Our Saviour Thistletown Lutheran Lodge
2715 Islington Ave. 80 Replace appliances $80,000
1 Our Saviour Thistletown Lutheran Lodge
2715 Islington Ave. 80 Lighting retrofit $107,350
1 Our Saviour Thistletown Lutheran Lodge
2715 Islington Ave. 80 Install programmable thermostats
$85,000
2 Rexdale Presbyterian Senior Citizens Corp.
2314 Islington Ave. 194 Install backflow prevention device
$8,000
2 Rexdale Presbyterian Senior Citizens Corp.
2314 Islington Ave. 194 Replace boilers $25,000
4 Richview Baptist Foundation 1540 Kipling Ave. 128 Replace toilets $28,750
4 Richview Baptist Foundation 105 Clement Rd. 195 Replace toilets $41,250
6 Barsa Kelly/Cari Can Co-op Homes Inc.
1 Coin St. 133 Building envelope work (caulking, flashing, siding, masonry etc.)
$545,000
6 Birmingham Homes Co-operative Inc.
10 Elsinore Path 50 Replace refrigerators $20,500
6 Birmingham Homes Co-operative Inc.
10 Elsinore Path 50 Replace stoves $19,350
6 Church of Atonement 256 Sheldon Ave. 76 Replace domestic hot water heater
$24,170
6 Forty-Third Housing Co-operative Inc.
15 43rd St. 106 Replace windows and boiler room insulation
$350,000
6 Lakeshore Village Artists Co-operative Inc.
115 Birmingham St. 92 Replace appliances $145,000
6 Lakeshore Village Artists Co-operative Inc.
115 Birmingham St. 92 Replace window weather stripping
$60,000
Appendix D Page 2 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
6 Nakiska Co-operative Homes Inc. 3078 Lakeshore Blvd. W.
107 Replace refrigerators $51,000
6 Nakiska Co-operative Homes Inc. 3078 Lakeshore Blvd. W.
107 Install backflow prevention device
$20,000
6 Nakiska Co-operative Homes Inc. 3078 Lakeshore Blvd. W.
107 Replace boilers, make-up air units, etc.
$275,000
6 Nakiska Co-operative Homes Inc. 3078 Lakeshore Blvd. W.
107 Mould remediation work $10,000
6 Nakiska Co-operative Homes Inc. 3078 Lakeshore Blvd. W.
107 Repair balconies and terraces
$234,000
7 Ahmadiyya Abode of Peace Inc. 3001 Finch Ave. W. 166 Install shower base in accessible units
$100,000
7 Ahmadiyya Abode of Peace Inc. 3001 Finch Ave. W. 166 Heating & cooling loop repairs
$150,000
7 Ahmadiyya Abode of Peace Inc. 3001 Finch Ave. W. 166 Install backflow prevention device
$50,000
7 Ahmadiyya Abode of Peace Inc. 3001 Finch Ave. W. 166 Lighting retrofit $35,000
7 Ahmadiyya Abode of Peace Inc. 3001 Finch Ave. W. 166 Replace fan coil ECM motors and install additional insulation
$130,000
7 Glen Gardens Housing Co-operative Inc.
2750 Jane St. 83 Building envelope work (caulking, flashing, siding, masonry etc.)
$160,000
8 Harry Sherman Crowe Housing Co-operative Inc.
51 The Chimneystack Rd.
164 Replace boilers $250,000
9 Palisades Housing Co-operative Inc.
1206 Wilson Ave. 68 Install make-up air unit $53,160
9 Palisades Housing Co-operative Inc.
1206 Wilson Ave. 68 Replace appliances $57,800
10 Palisades Housing Co-operative Inc.
2 Mascot Pl. 71 Lighting retrofit - emergency lights
$5,000
10 Palisades Housing Co-operative Inc.
2 Mascot Pl. 71 Building envelope work (caulking, flashing, siding, masonry etc.)
$55,000
10 Palisades Housing Co-operative Inc.
2 Mascot Pl. 71 Lighting retrofit $18,500
10 Emek Charitable Foundation 623 Finch Ave. W. 140 Replace heat and hot water boilers and space heaters
$420,000
10 Upper Canada Lodge B'nai B'rith Seniors
4266 Bathurst St. 130 Replace toilets, shower heads and sink aerators
$52,000
10 Upper Canada Lodge B'nai B'rith Seniors
4266 Bathurst St. 130 Install backflow prevention device
$10,000
Appendix D Page 3 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
10 Upper Canada Lodge B'nai B'rith Seniors
4266 Bathurst St. 130 Replace balcony storm and exterior doors
$275,000
10 Zahav Charitable Foundation 625 Finch Ave. W. 123 Replace heat and hot water boilers and space heaters
$420,000
11 Ashprior Charitable Foundation 29 South Station St. 128 Lighting retrofit $8,000
11 Central King Seniors Residence 15 King St. 119 Replace appliances $110,000
11 Central King Seniors Residence 15 King St. 119 Replacement of emergency on-call system
$88,900
11 Central King Seniors Residence 15 King St. 119 Install Energy Star qualified windows
$32,000
11 Central King Seniors Residence 15 King St. 119 Lighting retrofit $30,958
11 Chord Housing Co-operative Incorporated
43 Goldwin Ave. 136 Replace make-up air units
$120,000
11 Hickory Tree Road Co-operative Homes
111 Hickory Tree Rd. 73 Replace appliances $64,837
11 Hickory Tree Road Co-operative Homes
111 Hickory Tree Rd. 73 Install Energy Star qualified windows
$761,670
11 New Spadina Garment Industry "Wm. A. Villano Building"
3561 Eglinton Ave. W.
140 Replace boilers $30,000
11 Our Lady of Victory Senior Citizens Res. Inc.
200 Dora Spencer Rd. 125 Lighting retrofit $1,600
11 Our Lady of Victory Senior Citizens Res. Inc.
200 Dora Spencer Rd. 125 Replace appliances $86,000
11 Our Lady of Victory Senior Citizens Res. Inc.
200 Dora Spencer Rd. 125 Install automatic door openers
$70,000
11 Our Lady of Victory Senior Citizens Res. Inc.
200 Dora Spencer Rd. 125 Replace domestic hot water boilers
$12,000
11 Stanchester Charitable Foundation
15 Oxford Dr. 174 Lighting retrofit $8,000
11 Wigwamen Incorporated 37 Bartonville Ave. 2 Install additional insulation
$3,522
11 Wigwamen Incorporated 37 Bartonville Ave. 2 Install Energy Star qualified windows
$10,000
11 Wigwamen Incorporated 14 Clouston Ave. 1 Install additional insulation
$3,522
11 Wigwamen Incorporated 14 Clouston Ave. 1 Replace furnace $4,000
11 Wigwamen Incorporated 14 Clouston Ave. 1 Install Energy Star qualified windows
$5,000
Appendix D Page 4 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
11 Wigwamen Incorporated 23 Foxwell St. 2 Install additional insulation
$3,522
11 Wigwamen Incorporated 23 Foxwell St. 2 Replace furnace $4,000
11 Wigwamen Incorporated 23 Foxwell St. 2 Install Energy Star qualified windows
$10,000
11 Wigwamen Incorporated 20 Hollis St. 1 Install Energy Star qualified windows
$5,000
11 Wigwamen Incorporated 800 Jane St. 2 Replace furnace $4,000
11 Wigwamen Incorporated 804 Jane St. 3 Replace furnace $4,000
11 Wigwamen Incorporated 800 Jane St. 2 Install Energy Star qualified windows
$20,000
11 Wigwamen Incorporated 20 Hollis St. 1 Replace furnace $4,000
11 Wigwamen Incorporated 20 Hollis St. 1 Install additional insulation
$3,522
11 Wigwamen Incorporated 31 Lambton Ave. 3 Install additional insulation
$1,122
11 Wigwamen Incorporated 31 Lambton Ave. 3 Replace boiler $9,000
11 Wigwamen Incorporated 7 Ray Ave. 2 Install additional insulation
$1,122
11 Wigwamen Incorporated 7 Ray Ave. 2 Install Energy Star qualified windows
$20,000
11 Wigwamen Incorporated 9 Ray Ave. 3 Install additional insulation
$1,122
11 Wigwamen Incorporated 9 Ray Ave. 3 Replace roof $18,000
11 Wigwamen Incorporated 9 Ray Ave. 3 Install Energy Star qualified windows
$20,000
11 Wigwamen Incorporated 706 Weston Rd. 3 Install additional insulation
$1,122
11 Wigwamen Incorporated 706 Weston Rd. 3 Install Energy Star qualified windows
$20,000
11 Wigwamen Incorporated 706 Weston Rd. 3 Replace boiler $9,000
11 Wigwamen Incorporated 710 Weston Rd. 3 Install additional insulation
$1,122
11 Wigwamen Incorporated 710 Weston Rd. 3 Replace boiler $9,000
11 Wigwamen Incorporated 710 Weston Rd. 3 Install Energy Star qualified windows
$20,000
Appendix D Page 5 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
12 1630 Lawrence Avenue West Residences Inc.
1630 Lawrence Ave. W.
100 Building envelope work (caulking, flashing, siding, masonry etc.)
$200,000
12 Bello Horizonte Non-Profit Homes Corporation
1500 Keele St. 132 Replace boiler $32,000
12 Bello Horizonte Non-Profit Homes Corporation
1500 Keele St. 132 Replace refrigerators $88,000
12 Bello Horizonte Non-Profit Homes Corporation
1500 Keele St. 132 Install automatic door openers
$14,000
12 Maple Leaf Drive Seniors Non-Profit Residence Corp.
10 Maple Leaf Dr. 150 Replace chiller $280,000
12 Micah Homes Non-Profit Housing Corporation
2480 Eglinton Ave. W.
97 Replace appliances $30,400
12 Northminster Residences of Toronto
2214 Keele St. 89 Install backflow prevention device. Replace boilers
$405,000
12 Upwood Park/Salvador Del Mundo Co-op Homes Inc.
298 & 300 Queens Dr. 318 Replace appliances $250,000
12 Upwood Park/Salvador Del Mundo Co-op Homes Inc.
298 & 300 Queens Dr. 318 Replace HVAC system $22,000
12 Upwood Park/Salvador Del Mundo Co-op Homes Inc.
298 & 300 Queens Dr. 318 Lighting retrofit $200,000
12 Upwood Park/Salvador Del Mundo Co-Op Homes Inc.
298 & 300 Queens Dr. 318 Install programmable thermostats
$125,000
12 Wigwamen Incorporated 227 Bicknell Ave. 3 Install additional insulation
$1,122
12 Wigwamen Incorporated 227 Bicknell Ave. 3 Install Energy Star qualified windows
$20,000
12 Wigwamen Incorporated 227A Bicknell Ave. 3 Install additional insulation
$1,122
12 Wigwamen Incorporated 227A Bicknell Ave. 3 Install Energy Star qualified windows
$20,000
13 Swansea Town Hall Residences 93 Lavinia Ave. 68 Replace appliances $83,000
13 Swansea Town Hall Residences 93 Lavinia Ave. 68 Install backflow prevention device
$35,000
13 Villa Otthon 4062 Old Dundas St. 202 Replace appliances $110,000
13 Villa Otthon 4062 Old Dundas St. 202 Install backflow prevention device
$12,000
13 Wigwamen Incorporated 422 & 422A Annette St.
2 Install additional insulation
$3,522
13 Wigwamen Incorporated 422 & 422A Annette St.
2 Install Energy Star qualified windows
$10,000
Appendix D Page 6 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
13 Wigwamen Incorporated 695 Annette St. 2 Replace boiler $6,000
13 Wigwamen Incorporated 695 & 697 Annette St. 2 Install Energy Star qualified windows
$10,000
13 Wigwamen Incorporated 697 Annette St. 2 Replace boiler $6,000
13 Wigwamen Incorporated 713 & 713A Annette St.
2 Install additional insulation
$3,522
13 Wigwamen Incorporated 713 & 713A Annette St.
2 Install Energy Star qualified windows
$10,000
13 Wigwamen Incorporated 504 & 504A Jane St. 2 Install additional insulation
$3,522
13 Wigwamen Incorporated 504 & 504A Jane St. 2 Replace boiler $9,000
13 Wigwamen Incorporated 504 & 504A Jane St. 2 Install Energy Star qualified windows
$10,000
14 55 Howard Park Ave. Co-operative Homes Inc.
55 Howard Park Ave. 89 Energy efficiency retrofit – controls, pumps and lighting
$141,200
14 55 Howard Park Ave. Co-operative Homes Inc.
91 Spencer Ave. 73 Replace appliances $74,130
14 Bonar-Parkdale Senior Citizen Non-Profit Housing. Corporation
240 Dunn Ave. 72 Replace fan coil units $166,500
14 Churchstation Charitable Foundation
345 Dufferin St. 200 Lighting retrofit $35,000
14 Ecuhome Corporation 188 Dunn Ave. 8 Building envelope work (caulking, flashing, siding, masonry etc.)
$28,125
14 Ecuhome Corporation 14 Gwynne Ave. 9 Building envelope work (caulking, flashing, siding, masonry etc.)
$146,250
14 Ecuhome Corporation 149 Jameson Ave. 48 Balcony waterproofing, masonry repairs and exterior caulking
$97,550
14 Ecuhome Corporation 1387 Queen St. W. 24 Building envelope work (caulking, flashing, siding, masonry etc.)
$248,063
14 Ecuhome Corporation 162 Dowling Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$3,165
14 Ecuhome Corporation 15 Tyndall Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$3,165
14 Loyola Arrupe Corporation 515 Parkside Dr. 75 Replace balcony roofs and soffits and insulate
$73,920
Appendix D Page 7 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
14 Loyola Arrupe Phase II Inc. 1709 Bloor St. W. 80 Replace appliances $45,000
14 Parkdale United Church Foundation I
1355 King St. W. 136 Replace boiler $32,730
14 Parkdale United Church Foundation I
1355 King St. W. 136 Building envelope work (caulking, flashing, siding, masonry etc.)
$8,500
14 St. Johns Polish National Catholic Cathedral Res. Corp.
176 Cowan Ave. 127 Replace appliances $147,200
14 St. Johns Polish National Catholic Cathedral Res. Corp.
176 Cowan Ave. 127 Replace boiler $80,500
14 St. Johns Polish National Catholic Cathedral Res. Corp.
176 Cowan Ave. 127 Building envelope work (caulking, flashing, siding, masonry etc.)
$75,000
14 St. Johns Polish National Catholic Cathedral Res. Corp.
176 Cowan Ave. 127 Replace toilets $52,000
14 Toronto Lithuanian Senior Citizens Inc.
1700 Bloor St. W. 116 Replace roof top heating & A/C units
$70,000
14 Toronto Lithuanian Senior Citizens Inc.
1700 Bloor St. W. 116 Bath tub accessibility modifications
$60,000
14 Toronto Lithuanian Senior Citizens Inc.
1700 Bloor St. W. 116 Replace fire alarm monitoring panel
$40,000
14 Toronto Lithuanian Senior Citizens Inc.
1700 Bloor St. W. 116 Replace apartment A/C with high efficiency units
$400,000
14 Wigwamen Incorporated 189 Cowan Ave. 2 Install Energy Star qualified windows
$10,000
14 Wigwamen Incorporated 53 & 55 Marion St. 2 Install additional insulation
$3,522
14 Wigwamen Incorporated 53 & 55 Marion St. 2 Replace boiler $9,000
14 Wigwamen Incorporated 53 & 55 Marion St. 2 Install Energy Star qualified windows
$10,000
15 Italian Canadian Benevolent Seniors Apartment Corp.
3010 Dufferin St. 202 Install Energy Star qualified windows
$975,000
15 Moshav Noam Non-Profit Co-Operative Housing Corp.
525 Lawrence Ave. W 133 Replace weather stripping
$25,000
15 National Council of Jewish Women
3270 Bathurst St. 160 Replace make-up air unit
$56,000
15 National Council of Jewish Women
3270 Bathurst St. 160 In suite doorway modifications
$55,000
15 National Council of Jewish Women
3270 Bathurst St. 160 Install programmable thermostats
$89,000
15 Ridelle Co-operative Homes Inc. 567 Ridelle Ave. 63 Replace boilers $69,000
Appendix D Page 8 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
15 Ridelle Co-operative Homes Inc. 567 Ridelle Ave. 63 Replace main entrance doors
$8,600
15 Ridelle Co-operative Homes Inc. 567 Ridelle Ave. 63 Install backflow prevention device
$6,300
15 Ridelle Co-operative Homes Inc. 567 Ridelle Ave. 63 Replace appliances $55,000
15 St. Hilda's Towers 2339 Dufferin St. & 800 Vaughan Rd.
314 Replace boiler and venting
$95,000
15 St. Hilda's Towers 2339 Dufferin St. & 800 Vaughan Rd.
314 Building envelope work (caulking, flashing, siding, masonry etc.)
$401,950
15 St. Hilda's Towers Lewis Garnsworthy
2353 Dufferin St. 144 Replace heating boiler $68,000
15 St. Hilda's Towers Lewis Garnsworthy
2353 Dufferin St. 144 Install variable frequency drives on make-up air units
$15,000
15 St. Hilda's Towers Lewis Garnsworthy
2353 Dufferin St. 298 Replace boiler $45,000
15 Toronto Christian Resource Centre Self-Help Inc.
499 Lauder Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
15 Toronto Christian Resource Centre Self-Help Inc.
499 Lauder Ave. 4 Replace exterior doors $4,500
15 Toronto Christian Resource Centre Self-Help Inc.
499 Lauder Ave. 4 Replace furnace $7,500
15 Toronto Christian Resource Centre Self-Help Inc.
499 Lauder Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
15 Toronto Christian Resource Centre Self-Help Inc.
48 Rogers Rd. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
15 Toronto Christian Resource Centre Self-Help Inc.
48 Rogers Rd. 4 Replace furnace $7,500
15 Toronto Christian Resource Centre Self-Help Inc.
48 Rogers Rd. 4 Mould remediation work $8,900
15 Toronto Christian Resource Centre Self-Help Inc.
48 Rogers Rd. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
15 Wigwamen Incorporated 4 Keywest Ave. 1 Install additional insulation
$1,122
15 Wigwamen Incorporated 4 Keywest Ave. 1 Install Energy Star qualified windows
$20,000
Appendix D Page 9 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
15 Wigwamen Incorporated 8 Keywest Ave. 3 Install additional insulation
$1,122
15 Wigwamen Incorporated 8 Keywest Ave. 3 Install Energy Star qualified windows
$20,000
15 Wigwamen Incorporated 587 Lauder Ave. 3 Install additional insulation
$1,122
15 Wigwamen Incorporated 587 Lauder Ave. 3 Replace boiler $9,000
15 Wigwamen Incorporated 587 Lauder Ave. 3 Install Energy Star qualified windows
$20,000
15 Wigwamen Incorporated 532 Ridelle Ave. 3 Replace boiler $9,000
15 Wigwamen Incorporated 502 Whitmore Ave. 3 Install additional insulation
$1,122
15 Wigwamen Incorporated 502A Whitmore Ave. 15 Install additional insulation
$1,122
15 Willmar Eight Housing Co-operative Inc.
25 Brucewood Cres. 85 Repairs to garage P1 level mastic topping
$78,200
15 Willmar Eight Housing Co-operative Inc.
25 Brucewood Cres. 85 Building envelope work (caulking, flashing, siding, masonry etc.)
$92,000
15 Willmar Eight Housing Co-operative Inc.
25 Brucewood Cres. 85 Replace toilets $40,884
15 Willmar Eight Housing Co-operative Inc.
25 Brucewood Cres. 85 Water conservation (toilets, shower heads and sink aerators)
$46,431
17 Tahanan Non-Profit Homes Corporation
6A Greenlaw Ave. 44 Replace refrigerators $25,000
17 Tahanan Non-Profit Homes Corporation
6A Greenlaw Ave. 44 Replace stoves $26,000
17 Tahanan Non-Profit Homes Corporation
6A Greenlaw Ave. 44 Toilet retrofit $11,000
17 Toronto Christian Resource Centre Self-Help Inc.
67 Bristol Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
17 Toronto Christian Resource Centre Self-Help Inc.
67 Bristol Ave. 5 Replace exterior doors $4,500
17 Toronto Christian Resource Centre Self-Help Inc.
67 Bristol Ave. 5 Replace garage doors $7,800
17 Toronto Christian Resource Centre Self-Help Inc.
67 Bristol Ave. 5
Install new interconnected smoke/carbon monoxide detection system
$9,800
Appendix D Page 10 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
17 Toronto Christian Resource Centre Self-Help Inc.
16 Chandos Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
17 Toronto Christian Resource Centre Self-Help Inc.
16 Chandos Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
17 Toronto Christian Resource Centre Self-Help Inc.
16 Chandos Ave. 4 Mould remediation work $16,500
17 Wigwamen Incorporated 565 Beresford Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 565 Beresford Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 565 Beresford Ave. 1 Replace furnace $6,000
17 Wigwamen Incorporated 107 Boon Ave. 2 Install additional insulation
$3,522
17 Wigwamen Incorporated 107 Boon Ave. 2 Install Energy Star qualified windows
$10,000
17 Wigwamen Incorporated 289 Caledonia Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 289 Caledonia Rd. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 289 Caledonia Rd. 1 Replace furnace $6,000
17 Wigwamen Incorporated 1885 Davenport Rd. 1 Replace furnace $4,000
17 Wigwamen Incorporated 1885 Davenport Rd. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 46 Dynevor Rd. 6 Install additional insulation
$1,122
17 Wigwamen Incorporated 46 Dynevor Rd. 6 Install Energy Star qualified windows
$20,000
17 Wigwamen Incorporated 46 & 46A Dynevor Rd.
6 Replace boiler $9,000
17 Wigwamen Incorporated 46A Dynevor Rd. 6 Install additional insulation
$1,122
17 Wigwamen Incorporated 46A Dynevor Rd. 6 Install Energy Star qualified windows
$20,000
17 Wigwamen Incorporated 5 Howick Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 5 Howick Ave. 1 Install Energy Star qualified windows
$5,000
Appendix D Page 11 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
17 Wigwamen Incorporated 5 Howick Ave. 1 Replace furnace $6,000
17 Wigwamen Incorporated 10 McRoberts Ave. 3 Install additional insulation
$1,122
17 Wigwamen Incorporated 10 McRoberts Ave. 3 Replace boiler $9,000
17 Wigwamen Incorporated 557 McRoberts Ave. 3 Install additional insulation
$1,122
17 Wigwamen Incorporated 557 McRoberts Ave. 3 Replace boiler $9,000
17 Wigwamen Incorporated 34 Norton Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 34 Norton Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 34 Norton Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 6 Rockwell Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 6 Rockwell Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 87 Rockwell Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 87 Rockwell Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 87 Rockwell Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 130 Rockwell Ave. 1 Install additional insulation
$3,522
17 Wigwamen Incorporated 130 Rockwell Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 130 Rockwell Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 47 Rosethorn Ave. 1 Install wheelchair lift $4,000
17 Wigwamen Incorporated 47 Rosethorn Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 47 Rosethorn Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 95 Rosethorn Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 95 Rosethorn Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 91 Silverthorn Ave. 1 Replace furnace $4,000
Appendix D Page 12 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
17 Wigwamen Incorporated 91 Silverthorn Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 269 Silverthorn Ave. 1 Replace furnace $4,000
17 Wigwamen Incorporated 269 Silverthorn Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 277 Silverthorn Ave. 1 Install Energy Star qualified windows
$5,000
17 Wigwamen Incorporated 277 Silverthorn Ave. 1 Replace furnace $6,000
18 Canrise Non-Profit Housing Inc. 11 Randolph Ave. 95 Building envelope work (caulking, flashing, siding, masonry etc.)
$587,640
18 Ecuhome Corporation 100 Dewson St. 6 Building envelope work (caulking, flashing, siding, masonry etc.)
$4,415
18 Las Flores Non-Profit Housing Corporation
10 Dora Ave. 134 Install Energy Star qualified windows
$175,000
18 LOFT Community Services 661 Dufferin St. 110 Building envelope work (caulking, flashing, siding, masonry etc.)
$300,000
18 LOFT Community Services 661 Dufferin St. 110 Bathroom accessibility $125,000
18 Toronto Christian Resource Centre Self-Help Inc.
415 Bartlett Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
18 Toronto Christian Resource Centre Self-Help Inc.
415 Bartlett Ave. 5 Replace furnace $7,500
18 Toronto Christian Resource Centre Self-Help Inc.
415 Bartlett Ave. 5
Install new interconnected smoke/carbon monoxide detection system
$9,800
18 Villa Luso Non-Profit Housing Corporation
1289 Dundas St. W 149 Building envelope work (caulking, flashing, siding, masonry etc.)
$700,000
18 Villa Luso Non-Profit Housing Corporation
1289 Dundas St. W 149 Exterior window upgrades
$100,000
18 Villa Luso Non-Profit Housing Corporation
1289 Dundas St. W 149 Water and electricity saving measures
$349,850
18 Wigwamen Incorporated 25 Paton Rd. 1 Install additional insulation
$3,522
18 Wigwamen Incorporated 25 Paton Rd. 1 Replace furnace $4,000
Appendix D Page 13 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
18 Wigwamen Incorporated 25 Paton Rd. 1 Install Energy Star qualified windows
$5,000
18 Wigwamen Incorporated 45 Ruskin Ave. 1 Install additional insulation
$3,522
18 Wigwamen Incorporated 45 Ruskin Ave. 1 Replace furnace $4,000
18 Wigwamen Incorporated 45 Ruskin Ave. 1 Install Energy Star qualified windows
$5,000
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Replace exterior caulking
$17,500
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Heating system upgrade $55,000
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Install building automation system
$25,000
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Building envelope work (flashing, siding, masonry etc.)
$24,000
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Replace make-up air unit $35,000
19 Artscape Non-Profit Homes Inc. 900 Queen St. W. 22 Replace toilets $13,800
19 Ecuhome Corporation 490 Delaware Ave. 6 Foundation leak repair $9,000
19 Ecuhome Corporation 100 Crawford St. 6 Building envelope work (caulking, flashing, siding, masonry etc.)
$4,513
19 Homes First Society 800 Adelaide St. W. 64 Lighting retrofit $35,000
19 Niagara Neighbourhood Housing Co-operative Inc.
180 Niagara St. 62 Rehabilitation of barrier free concrete ramp.
$25,000
19 Niagara Neighbourhood Housing Co-operative Inc.
180 Niagara St. 62 Replacement of make-up air unit
$40,000
19 Niagara Neighbourhood Housing Co-operative Inc.
180 Niagara St. 62 Install Energy Star qualified windows
$245,000
19 Terra Bella Non-Profit Housing Corporation
24 Shaw St. 200 Air Make Up Unit $50,000
19 Terra Bella Non-Profit Housing Corporation
24 Shaw St. 200 Building envelope work (caulking, flashing, siding, masonry etc.)
$248,000
19 Terra Bella Non-Profit Housing Corporation
24 Shaw St. 200 Replace CO2 detectors in garage
$32,071
19 Toronto Christian Resource Centre Self-Help Inc.
126 Yarmouth Rd. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
Appendix D Page 14 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
19 Toronto Christian Resource Centre Self-Help Inc.
126 Yarmouth Rd. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
19 Toronto Christian Resource Centre Self-Help Inc.
126 Yarmouth Rd. 4 Mould remediation work $10,500
19 Toronto Christian Resource Centre Self-Help Inc.
126 Yarmouth Rd. 4 Replace boiler $19,000
20 Deep Quong Non-Profit Homes 106 Beverley St. 91 Replace make-up air unit $45,000
20 Harbour Channel Housing Co-operative inc.
633 Lakeshore Blvd W.
119 Install Energy Star qualified windows
$75,000
20 Homes First Society 87 Bellevue Ave. 28 Lighting retrofit $30,000
20 Homes First Society 490 Huron St. 10 Lighting retrofit $20,000
20 Homes First Society 490 Huron St. 10 Replace appliances $40,000
20 Portland Place Non-Profit Housing Corporation
163 Portland St. 46 Replace exterior doors $8,250
20 Toronto Christian Resource Centre Self-Help Inc.
135 Barton Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
20 Toronto Christian Resource Centre Self-Help Inc.
135 Barton Ave. 4 Replace furnace $7,500
20 Toronto Christian Resource Centre Self-Help Inc.
135 Barton Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
20 Wigwamen Incorporated 14 Spadina Rd. 103 Building envelope work (caulking, flashing, siding, masonry etc.)
$100,000
20 Wigwamen Incorporated 14 Spadina Rd. 103 Accessibility retrofit– roll-in showers, counters, etc.
$240,000
21 Habayit Shelanu Seniors Residence Corporation
155 Kendal Ave. 59 Replace appliances $70,000
21 Habayit Shelanu Seniors Residence Corporation
155 Kendal Ave. 59 Install backflow prevention device
$10,000
21 Hellenic Home for the Aged Inc. 11 & 39 Winona Dr. 225 Install automatic door openers
$63,787
21 Hellenic Home for the Aged Inc. 39 Winona Dr. 75 Replace domestic hot water boiler
$175,000
21 Hellenic Home for the Aged Inc. 11 Winona Dr. 150 Install bathtub grab bars $10,000
Appendix D Page 15 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
21 Hellenic Home for the Aged Inc. 39 Winona Dr. 75 Replace make-up air unit $8,500
21 Hellenic Home for the Aged Inc. 39 Winona Dr. 75 Replacement balcony glass sliding doors
$90,000
21 Hellenic Home for the Aged Inc. 11 Winona Dr. 150 Replace balcony doors $150,000
21 Hellenic Home for the Aged Inc. 11 Winona Dr. 150 Install unit balcony threshold ramps
$6,350
21 Hellenic Home for the Aged Inc. 11 & 39 Winona Dr. 225 Modify entrances with w/c accessible ramps
$9,800
21 Hellenic Home for the Aged Inc. 11 Winona Dr. 150 Install Energy Star qualified windows
$275,000
21 Hellenic Home for the Aged Inc. 39 Winona Dr. 75 Install Energy Star qualified windows
$160,000
21 Hellenic Home for the Aged Inc. 39 Winona Dr. 75 Corrosion control study and installation to resolve pinhole leaks
$21,000
21 Hellenic Home for the Aged Inc. 11 Winona Dr. 150 Replace heating and domestic hot water boilers
$150,000
21 Homes First Society 175 Vaughan Rd. 29 Lighting retrofit $37,000
21 Na-Me-Res (Native Men's Residence)
14 Vaughan Rd. 20 Replace boilers $47,000
21 Na-Me-Res (Native Men's Residence)
14 Vaughan Rd. 20 Install Energy Star qualified windows
$82,250
21 Rakoczi Villa 747 St.Clair Ave. W. 97 Corrosion control study and installation to resolve pinhole leaks
$20,000
21 Toronto Christian Resource Centre Self-Help Inc.
95 Burnside Dr. 6 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
21 Toronto Christian Resource Centre Self-Help Inc.
95 Burnside Dr. 6
Install new interconnected smoke/carbon monoxide detection system
$9,800
21 Toronto Christian Resource Centre Self-Help Inc.
95 Burnside Dr. 6 Replace boiler $19,000
21 Wigwamen Incorporated 255 Arlington Ave. 1 Install additional insulation
$3,522
21 Wigwamen Incorporated 255 Arlington Ave. 1 Replace furnace $4,000
21 Wigwamen Incorporated 255 Arlington Ave. 1 Install Energy Star qualified windows
$5,000
Appendix D Page 16 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
21 Wigwamen Incorporated 306 Arlington Ave. 4 Install Energy Star qualified windows
$5,000
21 Wigwamen Incorporated 16 Grimthorpe Rd. 3 Install additional insulation
$3,522
21 Wigwamen Incorporated 16 Grimthorpe Rd. 3 Install Energy Star qualified windows
$20,000
21 Wigwamen Incorporated 117 Kenwood Ave. 3 Replace boiler $9,000
21 Wigwamen Incorporated 160 & 162 Kenwood Ave.
4 Install Energy Star qualified windows
$20,000
21 Wigwamen Incorporated 301 & 303 Vaughan Rd.
4 Install additional insulation
$3,522
21 Wigwamen Incorporated 301 & 303 Vaughan Rd.
4 Install Energy Star qualified windows
$20,000
21 Y.W.C.A. of Greater Toronto 55 - 57 Humewood Dr. 16 Replace caulking and eavetroughs
$44,400
21 Yarford Charitable Foundation 31 Tichester Rd. 174 Water conservation (toilets, shower heads and sink aerators)
$35,000
21 Yarford Charitable Foundation 31 Tichester Rd. 174 Replace balcony storm doors
$350,000
21 Yarford Charitable Foundation 31 Tichester Rd. 174 Install backflow prevention device
$10,000
22 Y.W.C.A. of Greater Toronto 80 Woodlawn Ave. E. 22 Install backflow prevention device
$18,000
22 Y.W.C.A. of Greater Toronto 80 Woodlawn Ave. E. 22 Install Energy Star qualified windows
$180,587
23 Bazaar Non-Profit Housing Corporation
33 Drewry Ave. 81 Install automatic door openers and ramps
$23,000
23 Bazaar Non-Profit Housing Corporation
33 Drewry Ave. 81 Replace appliances $100,900
23 Wigwamen Incorporated 11 Charlemagne Dr. 6 Install additional insulation
$1,122
23 Wigwamen Incorporated 11 Charlemagne Dr. 6 Replace boiler $9,000
23 Wigwamen Incorporated 11 Charlemagne Dr. 6 Install Energy Star qualified windows
$20,000
23 Wigwamen Incorporated 15 Charlemagne Dr. 6 Install additional insulation
$1,122
23 Wigwamen Incorporated 15 Charlemagne Dr. 6 Replace boiler $9,000
23 Wigwamen Incorporated 15 Charlemagne Dr. 1 Install Energy Star qualified windows
$20,000
23 Wigwamen Incorporated 23 Charlemagne Dr. 6 Install additional insulation
$1,122
Appendix D Page 17 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
25 Ontario Mission of the Deaf 2395 Bayview Ave. 43 Elevator refurbishment $330,000
25 Ontario Mission of the Deaf 2395 Bayview Ave. 43 Replace chiller $300,000
26 15 Thorncliffe Park Co-operative Homes Inc.
15 Thorncliffe Park Dr.
74 Install solar hot water system
$71,760
26 Almise Co-operative Homes Inc. 16 Concord Pl. 144 Install backflow prevention device
$4,000
26 Almise Co-operative Homes Inc. 16 Concord Pl. 144 Replace high efficiency boilers
$40,000
26 Almise Co-operative Homes Inc. 16 Concord Pl. 144 Replace chiller $400,000
26 Almise Co-operative Homes Inc. 16 Concord Pl. 144 Replace appliances $159,252
26 Inter Faith Homes (Centenary) Corporation
23 Thorncliffe Park Dr.
77 Replace garage perimeter guardrails
$324,000
26 Thorncliffe Chapel Housing Corporation
18 Thorncliffe Park Dr.
109 Install Energy Star qualified windows
$21,000
26 Thorncliffe Chapel Housing Corporation
18 Thorncliffe Park Dr.
109 Repair concrete balconies
$50,000
26 Willow Glen Co-operative 38 Thorncliffe Park Dr.
69 Replace toilets $13,000
26 Willow Glen Co-operative 38 Thorncliffe Park Dr.
69 Replace appliances $71,500
26 Willow Glen Co-operative 38 Thorncliffe Park Dr.
69 Install pigeon nets on balconies
$26,500
26 Willow Glen Co-operative 38 Thorncliffe Park Dr.
69 Replace exterior caulking
$70,000
26 Willow Glen Co-operative 38 Thorncliffe Park Dr.
69 Lighting retrofit $3,000
27 All Saints Church Homes for Tomorrow Society
70 Pembroke St. 76 Replace toilets $6,336
27 City Park Co-operative Apartments Inc.
484 Church St. 770 Replace air make-up units and exhaust fans
$700,000
27 City Park Co-operative Apartments Inc.
484 Church St. 770 Replace appliances $890,000
27 Jenny Green Co-operative Homes 300 George St. 47 Conduct asbestos study $2,500
27 Jenny Green Co-operative Homes 300 George St. 47 Install backflow prevention device
$9,888
27 Jenny Green Co-operative Homes 300 George St. 47 Lighting retrofit $5,000
27 Jenny Green Co-operative Homes 300 George St. 47 Installation of two variable frequency drive units
$12,000
Appendix D Page 18 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
27 Jenny Green Co-operative Homes 300 George St. 47 Corrosion control study and installation to resolve pinhole leaks
$19,097
27 Margaret Laurence Housing Co-operative
81 Dalhousie St. 149 Replace refrigerators $82,000
27 Margaret Laurence Housing Co-operative
81 Dalhousie St. 149 Install automatic door openers
$20,000
27 Margaret Laurence Housing Co-operative
81 Dalhousie St. 149 Lighting retrofit $22,500
27 Mary Lambert Swale Non-Profit Homes Inc.
269 Jarvis St. 75 Replace appliances $63,000
27 Mary Lambert Swale Non-Profit Homes Inc.
269 Jarvis St. 75 Lighting retrofit $45,259
27 Myrmex Non-Profit Housing Inc. 177 Mutual St. 42 Install programmable thermostats
$5,500
27 Myrmex Non-Profit Housing Inc. 177 Mutual St. 42 Replace HVAC equipment
$300,000
27 Myrmex Non-Profit Housing Inc. 127 Isabella St. 20 Install Energy Star qualified windows
$35,000
27 Peregrine Co-operative Homes Inc.
18 Grenville St. 174 Install roll-in showers $15,000
27 Peregrine Co-operative Homes Inc.
18 Grenville St. 174 Replace appliances $197,000
27 Peregrine Co-operative Homes Inc.
18 Grenville St. 174 Replace fire alarm panel $160,000
27 Peregrine Co-operative Homes Inc.
18 Grenville St. 174 Install plumbing check valves
$35,000
27 Peregrine Co-operative Homes Inc.
18 Grenville St. 174 Replace unit thermostats $64,000
27 Tobias House of Toronto 84 Carlton St. 154 Install high efficiency boilers
$250,000
27 Tobias House of Toronto 84 Carlton St. 154 Building envelope work (caulking, flashing, siding, masonry etc.)
$473,775
27 Tobias House of Toronto 84 Carlton St. 154 Lighting retrofit $24,375
27 Toronto Aged Men's and Women's Home
55 Belmont St. 221 Replace roof top air conditioner
$36,210
27 Toronto Aged Men's and Women's Home
55 Belmont St. 221 Replace auditorium air conditioner
$20,100
27 Toronto Aged Men's and Women's Home
55 Belmont St. 221 Building envelope work (caulking, flashing, siding, masonry etc.)
$135,000
Appendix D Page 19 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
27 Toronto Aged Men's and Women's Home
55 Belmont St. 221 Install grab bars in bathrooms
$12,600
27 Toronto Aged Men's and Women's Home
55 Belmont St. 221 Install backflow prevention device
$10,952
27 Toronto Christian Resource Centre Self-Help Inc.
436 Sherbourne St. 9 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,200
27 Toronto Christian Resource Centre Self-Help Inc.
436 Sherbourne St. 9 Mould remediation work $9,800
27 Toronto Christian Resource Centre Self-Help Inc.
436 Sherbourne St. 9 Install backflow prevention device
$12,000
27 Toronto Christian Resource Centre Self-Help Inc.
436 Sherbourne St. 9 Replace fire alarm system
$18,000
27 Toronto Christian Resource Centre Self-Help Inc.
436 Sherbourne St. 9 Replace boiler $19,000
27 Toronto Christian Resource Centre Self-Help Inc.
438 Sherbourne St. 9 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,200
27 Toronto Christian Resource Centre Self-Help Inc.
438 Sherbourne St. 9 Mould remediation work $9,800
27 Toronto Christian Resource Centre Self-Help Inc.
438 Sherbourne St. 9 Install backflow prevention device
$12,000
27 Toronto Christian Resource Centre Self-Help Inc.
438 Sherbourne St. 9 Replace fire alarm system
$18,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace corridor make-up air unit
$60,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace appliances $155,100
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace washers and dryers and refurbish laundry room
$52,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace domestic hot water boiler
$60,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace heating boiler $70,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace cold water booster pump
$30,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Install CO2 monitoring system in garage
$30,000
27 Victoria Shuter Non-Profit Housing Corporation
80 Dundas St. E. 138 Replace toilets $25,000
27 Yonge Rosedale Charitable Foundation
877 Yonge St. 306 Replace domestic hot water boilers
$95,000
Appendix D Page 20 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
27 Yonge Rosedale Charitable Foundation
877 Yonge St. 306 Install Energy Star qualified windows
$226,000
28 All Saints Church Homes for Tomorrow Society
319 Dundas St. E. 76 Replace toilets $23,110
28 All Saints Church Homes for Tomorrow Society
319 Dundas St. E. 76 Replace make-up air unit
$43,875
28 All Saints Church Homes for Tomorrow Society
319 Dundas St. E. 76 Install Energy Star qualified windows
$159,585
28 Dixon Neighbourhood Homes (30 St. Lawrence) Inc.
30 St. Lawrence St. 54 Replace refrigerators $4,520
28 Dixon Neighbourhood Homes (30 St. Lawrence) Inc.
30 St. Lawrence St. 54 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,500
28 Ecuhome Corporation 252 Seaton St. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,676
28 Ecuhome Corporation 254 Seaton St. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$5,419
28 Edgeview Housing Co-operative 112 George St. S. 49 Lighting retrofit - units $15,000
28 Edgeview Housing Co-operative 112 George St. S. 49 Lighting retrofit - common areas
$17,000
28 Edgeview Housing Co-operative 112 George St. S. 49 Replace main entrance doors
$4,600
28 Edgeview Housing Co-operative 112 George St. S. 49 Install backflow prevention device
$11,500
28 Edgeview Housing Co-operative 112 George St. S. 49 Replace commercial kitchen appliances
$48,000
28 Elizabeth Fry Society Toronto Branch
215 Wellesley St. 9 Replace appliances $58,135
28 Elizabeth Fry Society Toronto Branch
215 Wellesley St. 9 Install Energy Star qualified windows and Replace exterior doors
$572,975
28 Ernescliffe Non-Profit Housing Co-operative Inc.
477 Sherbourne St. 98 Replace make-up air unit $96,558
28 Ernescliffe Non-Profit Housing Co-operative Inc.
477 Sherbourne St. 98 Replace refrigerators $52,760
28 Ernescliffe Non-Profit Housing Co-operative Inc.
477 Sherbourne St. 98 Replace washing machines
$18,480
28 Family Action Network Housing Corporation
31 Princess St. 82 Replace domestic hot water boilers
$160,000
28 Harmony Co-operative Homes Inc.
33 Princess St. 83 Replace heating boilers $160,000
Appendix D Page 21 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
28 Les Centres D'Accueil Heritage 33 Hahn Pl. 135 Install automatic door openers
$60,000
28 Les Centres D'Accueil Heritage 33 Hahn Pl. 135 Replace west side accessibility ramp
$80,000
28 Marketview Housing Co-operative
110 George St. S. 112 Install Variable Frequency Drive fans in corridors
$21,572
28 Marketview Housing Co-operative
110 George St. S. 112 Corrosion control study and installation to resolve pinhole leaks
$20,000
28 Marketview Housing
Co-operative 110 George St. S. 112
Replace garage exhaust fan
$7,848
28 Marketview Housing Co-operative
110 George St. S. 112 Lighting retrofit $6,030
28 Marketview Housing Co-operative
110 George St. S. 112 Install Variable Frequency Drive fans on cooling tower
$9,581
28 Marketview Housing Co-operative
79 Richmond St. E. 128 Lighting retrofit $16,850
28 New Hibret Co-operative Inc. 2 Market St. 141 Replace appliances $144,414
28 New Hibret Co-operative Inc. 2 Market St. 141 Replace exterior doors in accessible units
$16,950
28 New Hibret Co-operative Inc. 2 Market St. 141 Cooling tower repairs $14,238
28 New Hibret Co-operative Inc. 2 Market St. 141 Water conservation (toilets, shower heads and sink aerators)
$7,967
28 New Hibret Co-operative Inc. 2 Market St. 141 Lighting retrofit $22,600
28 New Hibret Co-operative Inc. 115 The Esplanade 142 Install backflow prevention device
$15,000
28 New Hibret Co-operative Inc. 115 The Esplanade 142 Corrosion control study and installation to resolve pinhole leaks
$40,000
28 Performing Arts Lodges, Toronto (PAL Toronto)
110 The Esplanade 205 Replace boilers $140,000
28 Toronto Christian Resource Centre Self-Help Inc.
306 Berkeley St. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
28 Toronto Christian Resource Centre Self-Help Inc.
306 Berkeley St. 5 Replace furnace $7,500
28 Toronto Christian Resource Centre Self-Help Inc.
306 Berkeley St. 5 Mould remediation work $9,800
Appendix D Page 22 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
28 Toronto Christian Resource Centre Self-Help Inc.
197 Carlton St. 8 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,200
28 Toronto Christian Resource Centre Self-Help Inc.
197 Carlton St. 8 Install backflow prevention device
$12,000
28 Toronto Christian Resource Centre Self-Help Inc.
197 Carlton St. 8 Replace fire alarm system
$15,000
28 Toronto Christian Resource Centre Self-Help Inc.
197 Carlton St. 8 Replace boiler $19,000
28 Toronto Christian Resource Centre Self-Help Inc.
199 Carlton St. 8 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,200
28 Toronto Christian Resource Centre Self-Help Inc.
199 Carlton St. 8 Replace furnace $10,500
28 Toronto Christian Resource Centre Self-Help Inc.
199 Carlton St. 8 Install backflow prevention device
$12,000
28 Toronto Christian Resource Centre Self-Help Inc.
199 Carlton St. 8 Replace fire alarm system
$15,000
28 Toronto Christian Resource Centre Self-Help Inc.
201 Carlton St. 8 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,200
28 Toronto Christian Resource Centre Self-Help Inc.
201 Carlton St. 8 Install backflow prevention device
$12,000
28 Toronto Christian Resource Centre Self-Help Inc.
201 Carlton St. 8 Replace fire alarm system
$15,000
28 Toronto Christian Resource Centre Self-Help Inc.
201 Carlton St. 8 Replace boiler $19,000
28 Toronto Christian Resource Centre Self-Help Inc.
8 Prospect St. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
28 Toronto Christian Resource Centre Self-Help Inc.
8 Prospect St. 5 Replace exterior doors $4,200
28 Toronto Christian Resource Centre Self-Help Inc.
8 Prospect St. 5
Install new interconnected smoke/carbon monoxide detection system
$8,500
28 Toronto Christian Resource Centre Self-Help Inc.
8 Prospect St. 5 Replace boiler $19,000
28 Toronto Christian Resource Centre Self-Help Inc.
376 Shuter St. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
28 Toronto Christian Resource Centre Self-Help Inc.
376 Shuter St. 4 Replace furnace $7,500
Appendix D Page 23 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
28 YSM Genesis Place Homes Inc. 280 Gerrard St. 26 Replacement of fire alarm system
$46,760
28 YSM Genesis Place Homes Inc. 280 Gerrard St. 26 Installation of air conditioning multi-zone system
$367,752
29 Ecuhome Corporation 123 Gough Ave. 6 Building envelope work (caulking, flashing, siding, masonry etc.)
$5,018
29 Ecuhome Corporation 9 Thorncliffe Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$3,375
29 Toronto Christian Resource Centre Self-Help Inc.
70 Westwood Ave. 4 Replace exterior doors $4,500
29 Toronto Christian Resource Centre Self-Help Inc.
70 Westwood Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
29 Westminster Court Sen. Cits. Housing Corp. of East York
156 Floyd Ave. 41 Replace stoves $27,300
29 Westminster Court Sen. Cits. Housing Corp. of East York
156 Floyd Ave. 41 Toilet retrofit $30,000
29 Wigwamen Incorporated 219 Browning Ave. 1 Install additional insulation
$3,522
29 Wigwamen Incorporated 219 Browning Ave. 1 Replace furnace $4,000
29 Wigwamen Incorporated 219 Browning Ave. 1 Install Energy Star qualified windows
$5,000
29 Wigwamen Incorporated 212 Gamble Ave. 1 Install additional insulation
$3,522
29 Wigwamen Incorporated 212 Gamble Ave. 1 Replace furnace $4,000
29 Wigwamen Incorporated 212 Gamble Ave. 1 Install Energy Star qualified windows
$5,000
29 Wigwamen Incorporated 240 Torrens Ave. 1 Replace boiler $9,000
29 Wigwamen Incorporated 240 Torrens Ave. 1 Install Energy Star qualified windows
$20,000
30 A. H. E. Affordable Housing East Non-Profit Housing
802 Eastern Ave. 16 Install stove Safe T Elements
$3,500
30 A. H. E. Affordable Housing East Non-Profit Housing
802 Eastern Ave. 16 Replace refrigerators $11,000
30 Birtch Place Co-operative Inc. 1153 Queen St. E 32 Building envelope work (caulking, flashing, siding, masonry etc.)
$100,000
Appendix D Page 24 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Dixon Neighbourhood Homes Inc.
841 Dundas St. E. 7 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,600
30 Dixon Neighbourhood Homes Inc.
841 Dundas St. E. 7 Replace appliances $10,140
30 Heathercross Charitable Foundation
100 Unity Rd. 98 Replace appliances $100,000
30 Heathercross Charitable Foundation
100 Unity Rd. 98 Install backflow prevention device
$10,000
30 Innstead Co-operative Inc. 239 Highfield Rd. 6 Replace boilers $5,000
30 Innstead Co-operative Inc. 239 Highfield Rd. 6 Install Energy Star qualified windows
$8,000
30 Innstead Co-operative Inc. 182 Hiawatha Rd. 3 Install Energy Star qualified windows
$8,000
30 Innstead Co-operative Inc. 29 Hiawatha Rd. Install Energy Star qualified windows
$2,000
30 Innstead Co-operative Inc. 444 Woodfield Rd. 3 Replace boiler $5,000
30 Innstead Co-operative Inc. 444 Woodfield Rd. 3 Install Energy Star qualified windows
$8,000
30 Ray McCleary Towers 444 Logan Ave. 160 Replacement of boiler and hot water storage system
$448,000
30 Riverdale Co-operative Houses 13 Prust Ave. 2 Replace appliances $10,000
30 Riverdale Co-operative Houses 13 Prust Ave. 2 Replace exterior doors $3,200
30 Riverdale Co-operative Houses 13 Prust Ave. 2 Foundation waterproofing and insulation
$24,000
30 Riverdale Co-operative Houses 13 Prust Ave. 2 Install Energy Star qualified windows
$7,600
30 Riverdale Co-operative Houses 36 Pape Ave. 3 Replace stove $650
30 Riverdale Co-operative Houses 36 Pape Ave. 3 Replace exterior doors $4,800
30 St. Joseph's Senior Citizen Apartments
67 Curzon St. 91 Replace boiler $133,000
30 Toronto Christian Resource Centre Self-Help Inc.
37 Boulton Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
37 Boulton Ave. 5 Replace exterior doors $2,500
Appendix D Page 25 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Toronto Christian Resource Centre Self-Help Inc.
37 Boulton Ave. 5
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
37 Boulton Ave. 5 Mould remediation work $12,500
30 Toronto Christian Resource Centre Self-Help Inc.
157 Galt Ave. 5 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
157 Galt Ave. 5 Replace exterior doors $3,500
30 Toronto Christian Resource Centre Self-Help Inc.
157 Galt Ave. 5
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
157 Galt Ave. 5 Mould remediation work $9,800
30 Toronto Christian Resource Centre Self-Help Inc.
248 Jones Ave. 6 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
248 Jones Ave. 6 Replace exterior doors $4,500
30 Toronto Christian Resource Centre Self-Help Inc.
248 Jones Ave. 6 Replace furnace $8,500
30 Toronto Christian Resource Centre Self-Help Inc.
248 Jones Ave. 6
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
260 Logan Ave. 9 Replace boiler $19,000
30 Toronto Christian Resource Centre Self-Help Inc.
260 Logan Ave. 9 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,500
30 Toronto Christian Resource Centre Self-Help Inc.
260 Logan Ave. 9 Mould remediation work $6,500
30 Toronto Christian Resource Centre Self-Help Inc.
260 Logan Ave. 9 Replace fire alarm system
$18,000
30 Toronto Christian Resource Centre Self-Help Inc.
47 Marjory Ave. 14 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
47 Marjory Ave. 14 Replace furnace $7,500
Appendix D Page 26 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Toronto Christian Resource Centre Self-Help Inc.
498 Pape Ave. 11 Building envelope work (caulking, flashing, siding, masonry etc.)
$2,500
30 Toronto Christian Resource Centre Self-Help Inc.
498 Pape Ave. 11 Replace furnace $8,500
30 Toronto Christian Resource Centre Self-Help Inc.
498 Pape Ave. 11 Install backflow prevention device
$12,000
30 Toronto Christian Resource Centre Self-Help Inc.
498 Pape Ave. 11 Mould remediation work $16,000
30 Toronto Christian Resource Centre Self-Help Inc.
498 Pape Ave. 11 Replace fire alarm system
$18,000
30 Toronto Christian Resource Centre Self-Help Inc.
305 Rhodes Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
305 Rhodes Ave. 4 Replace furnace $7,500
30 Toronto Christian Resource Centre Self-Help Inc.
305 Rhodes Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
307 Rhodes Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
307 Rhodes Ave. 4 Replace furnace $7,500
30 Toronto Christian Resource Centre Self-Help Inc.
307 Rhodes Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
20 Saulter St. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
30 Toronto Christian Resource Centre Self-Help Inc.
20 Saulter St. 4 Replace garage doors $7,400
30 Toronto Christian Resource Centre Self-Help Inc.
20 Saulter St. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
30 Toronto Christian Resource Centre Self-Help Inc.
20 Saulter St. 4 Mould remediation work $5,600
30 Toronto Christian Resource Centre Self-Help Inc.
1 Seymour Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
Appendix D Page 27 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Toronto Christian Resource Centre Self-Help Inc.
1 Seymour Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$7,800
30 Toronto Christian Resource Centre Self-Help Inc.
1 Seymour Ave. 4 Mould remediation work $9,800
30 Widworthy Charitable Foundation
110 Unity Rd. 175 Replace balcony storm doors
$350,000
30 Widworthy Charitable Foundation
110 Unity Rd. 175 Replace appliances $185,000
30 Widworthy Charitable Foundation
110 Unity Rd. 175 Install backflow prevention device
$12,000
31 Wigwamen Incorporated 387 Ashdale Ave. 1 Replace furnace $4,000
31 Wigwamen Incorporated 387 Ashdale Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 134 Alton Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 134 Alton Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 134 Alton Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 328 Bain Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 328 Bain Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 328 Bain Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 49 Condor Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 49 Condor Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 920 Dundas St. E. 2 Install Energy Star qualified windows
$10,000
30 Wigwamen Incorporated 920/922 Dundas St. E. 2 Install additional insulation
$3,522
30 Wigwamen Incorporated 920/922 Dundas St. E. 2 Replace boiler $9,000
30 Wigwamen Incorporated 922 Dundas St. E. 2 Install Energy Star qualified windows
$10,000
30 Wigwamen Incorporated 1542 Dundas St. E. 1 Replace furnace $4,000
30 Wigwamen Incorporated 1542 Dundas St. E. 1 Install Energy Star qualified windows
$5,000
Appendix D Page 28 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Wigwamen Incorporated 1567 Dundas St. E 1 Replace furnace $4,000
31 Wigwamen Incorporated 1607 Dundas St. E. 1 Install additional insulation
$3,522
31 Wigwamen Incorporated 1607 Dundas St. E. 1 Install Energy Star qualified windows
$5,000
31 Wigwamen Incorporated 1607 Dundas St. E. 1 Replace furnace $6,000
30 Wigwamen Incorporated 32 Felstead Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 32 Felstead Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 32 Felstead Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 63 Frizzell Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 63 Frizzell Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 82 Hiltz Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 82 Hiltz Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 93 Hiltz Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 93 Hiltz Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 98 Hiltz Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 98 Hiltz Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 43 Myrtle Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 43 Myrtle Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 43 Myrtle Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 433 Rhodes Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 433 Rhodes Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 2A Rushbrooke Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 2A Rushbrooke Ave. 1 Install Energy Star qualified windows
$5,000
Appendix D Page 29 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
30 Wigwamen Incorporated 94 Shudell Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 94 Shudell Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 138 Withrow Ave. 1 Install additional insulation
$3,522
30 Wigwamen Incorporated 138 Withrow Ave. 1 Replace furnace $4,000
30 Wigwamen Incorporated 138 Withrow Ave. 1 Install Energy Star qualified windows
$5,000
30 Woodgreen Community Housing Inc.
1070 Queen St. E 170 Replace boilers $250,000
30 Woodgreen Community Housing Inc.
570 Coxwell Ave. 11 Replace make-up air unit $25,000
30 Woodgreen Community Housing Inc.
570 Coxwell Ave. 11 Building envelope work (caulking, flashing, siding, masonry etc.)
$50,000
30 Y.W.C.A. of Greater Toronto 15 Pape Ave 77 Energy efficiency retrofit – heating, solar hot water, etc.
$295,335
31 Liberty Housing Co-operative 7 Glenburn Ave. 55 Replace heating and domestic hot water boilers
$250,000
31 Operation Springboard 51 Dawes Rd. 10 Basement drain replacement
$6,000
31 Operation Springboard 51 Dawes Rd. 10 Foundation repair $9,800
31 Operation Springboard 51 Dawes Rd. 10 Water conservation (toilets, shower heads and sink aerators)
$2,870
31 St. Clair O'Connor Community Inc.
2701 St. Clair Ave. E. 154 Replace appliances $13,000
31 St. Clair O'Connor Community Inc.
2701 St. Clair Ave. E. 154 Replace toilets $70,000
31 Toronto Christian Resource Centre Self-Help Inc.
851 Cosburn Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
31 Toronto Christian Resource Centre Self-Help Inc.
851 Cosburn Ave. 4 Replace furnace $7,500
31 Toronto Christian Resource Centre Self-Help Inc.
851 Cosburn Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
31 Toronto Christian Resource Centre Self-Help Inc.
8 Westlake Cres. 4 Replace exterior doors $4,500
Appendix D Page 30 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
31 Toronto Christian Resource Centre Self-Help Inc.
8 Westlake Cres. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
31 Toronto Christian Resource Centre Self-Help Inc.
8 Westlake Cres. 4 Replace garage doors $4,400
31 Toronto Christian Resource Centre Self-Help Inc.
8 Westlake Cres. 4 Replace furnace $8,500
31 Toronto Christian Resource Centre Self-Help Inc.
8 Westlake Cres. 4 Mould remediation work $8,900
31 Toronto Christian Resource Centre Self-Help Inc.
265 Westlake Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
31 Toronto Christian Resource Centre Self-Help Inc.
265 Westlake Ave. 4 Replace garage doors $7,400
31 Toronto Christian Resource Centre Self-Help Inc.
265 Westlake Ave. 4 Replace furnace $7,500
31 Toronto Christian Resource Centre Self-Help Inc.
265 Westlake Ave. 4 Mould remediation work $8,900
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Lighting retrofit $32,000
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Corrosion control study feasibility study
$7,500
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Water conservation (toilets, shower heads and sink aerators)
$49,900
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Replace appliances $174,600
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Install automatic door openers in accessible units
$40,000
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Install automatic door opener in laundry room
$2,000
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Asbestos audit $5,000
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Install backflow prevention device
$15,000
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Replace heating boilers $131,100
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Replace domestic hot water boilers
$74,400
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Install variable frequency drive on cooling tower
$11,600
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Replace make-up air units
$202,700
Appendix D Page 31 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
31 VincentPaul Family Homes Corporation
10 Gower St. 164 Install building automation system
$55,400
31 Wigwamen Incorporated 51 Barrington Ave. 1 Install additional insulation
$3,522
31 Wigwamen Incorporated 51 Barrington Ave. 1 Replace furnace $4,000
31 Wigwamen Incorporated 51 Barrington Ave. 1 Install Energy Star qualified windows
$5,000
31 Wigwamen Incorporated 152 Glebemount Ave. 1 Replace furnace $4,000
31 Wigwamen Incorporated 152 Glebemount Ave. 1 Install Energy Star qualified windows
$5,000
31 Wigwamen Incorporated 483 Main St. 1 Install Energy Star qualified windows
$5,000
31 Wigwamen Incorporated 670 Sammon Ave. 1 Install Energy Star qualified windows
$5,000
31 Y.W.C.A. of Greater Toronto Confidential 25 Retrofit windows $30,000
31 Y.W.C.A. of Greater Toronto Confidential 25 Install backflow prevention device
$18,000
31 Y.W.C.A. of Greater Toronto Confidential 25 Bathroom renovations (toilets, showers and lighting)
$56,300
32 Ecuhome Corporation 154 Coxwell Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$3,687
32 Ecuhome Corporation 156 Coxwell Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$3,687
32 Ecuhome Corporation 65 Dixon Ave. 6 Foundation repair $6,750
32 Rakoczi Villa 751 Woodbine Ave. 97 Replace access ramp and install door opener
$15,000
32 Tobias House of Toronto 695 Coxwell Ave. 122 Replace appliances $115,000
32 Tobias House of Toronto 695 Coxwell Ave. 122 Install emergency generator
$200,000
32 Tobias House of Toronto 695 Coxwell Ave. 122 Install barrier free showers
$35,000
32 Tobias House of Toronto 695 Coxwell Ave. 122 Corrosion control study and installation to resolve pinhole leaks
$20,000
32 Toronto Christian Resource Centre Self-Help Inc.
223 Ashdale Ave. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
Appendix D Page 32 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
32 Toronto Christian Resource Centre Self-Help Inc.
223 Ashdale Ave. 4 Replace furnace $7,500
32 Toronto Christian Resource Centre Self-Help Inc.
223 Ashdale Ave. 4 Mould remediation work $9,500
32 Toronto Christian Resource Centre Self-Help Inc.
223 Ashdale Ave. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
32 Toronto Christian Resource Centre Self-Help Inc.
1702 Gerrard St. E. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
32 Toronto Christian Resource Centre Self-Help Inc.
1702 Gerrard St. E. 4
Install new interconnected smoke/carbon monoxide detection system
$9,800
32 Toronto Christian Resource Centre Self-Help Inc.
1702 Gerrard St. E. 4 Mould remediation work $5,600
32 Toronto Christian Resource Centre Self-Help Inc.
19 Normandy Blvd. 4 Building envelope work (caulking, flashing, siding, masonry etc.)
$1,250
32 Toronto Christian Resource Centre Self-Help Inc.
19 Normandy Blvd. 4 Replace furnace $7,500
32 Toronto Christian Resource Centre Self-Help Inc.
19 Normandy Blvd. 4 Replace smoke and carbon monoxide detectors
$9,800
31 Wigwamen Incorporated 247 1/2 Ashdale Ave. 1 Install additional insulation
$3,522
31 Wigwamen Incorporated 247 1/2 Ashdale Ave. 1 Replace furnace $4,000
31 Wigwamen Incorporated 247 1/2 Ashdale Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 8 Athletic Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 8 Athletic Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 8 Athletic Ave. 1 Replace furnace $6,000
32 Wigwamen Incorporated 28 Athletic Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 28 Athletic Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 28 Athletic Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 34 Bastedo Ave. 1 Install additional insulation
$3,522
Appendix D Page 33 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
32 Wigwamen Incorporated 34 Bastedo Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 34 Bastedo Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 41 Bastedo Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 41 Bastedo Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 41 Bastedo Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 57 Bastedo Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 57 Bastedo Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 57 Bastedo Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 18 Cassells Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 18 Cassels Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 367 Coxwell Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 367 Coxwell Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 367 Coxwell Ave. 1 Replace furnace $6,000
32 Wigwamen Incorporated 57 Darrell Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 57 Darrell Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 57 Darrell Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 32 & 34 Devon Rd. 2 Replace furnace $4,000
32 Wigwamen Incorporated 32 & 34 Devon Rd. 2 Install Energy Star qualified windows
$10,000
32 Wigwamen Incorporated 75 & 75A Dixon Ave. 2 Install additional insulation
$3,522
32 Wigwamen Incorporated 75 & 75A Dixon Ave. 2 Replace furnace $4,000
32 Wigwamen Incorporated 75 & 75A Dixon Ave. 2 Install Energy Star qualified windows
$10,000
32 Wigwamen Incorporated 70 & 72 Gainsborough Rd.
2 Install additional insulation
$3,522
Appendix D Page 34 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
32 Wigwamen Incorporated 70 & 72 Gainsborough Rd.
2 Replace furnace $4,000
32 Wigwamen Incorporated 70 & 72 Gainsborough Rd.
2 Install Energy Star qualified windows
$10,000
32 Wigwamen Incorporated 47 Hemlock Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 47 Hemlock Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 85 Hillingdon Ave. 1 Install additional insulation
$1,122
32 Wigwamen Incorporated 85 Hillingdon Ave. 1 Install Energy Star qualified windows
$5,000
30 Wigwamen Incorporated 95 Kent Rd. 1 Replace furnace $4,000
32 Wigwamen Incorporated 95 Kent St. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 84 Moberly Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 84 Moberly Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 84 Moberly Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 5 Murdock Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 5 Murdock Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 76 Oakcrest Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 76 Oakcrest Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 76 Oakcrest Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 139 Pickering St. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 139 Pickering St. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 134 Rhodes Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 134 Rhodes Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 12 Roseheath Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 12 Roseheath Ave. 1 Replace furnace $4,000
Appendix D Page 35 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
32 Wigwamen Incorporated 12 Roseheath Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 14 Roseheath Ave. 1 Install additional insulation
$3,522
32 Wigwamen Incorporated 14 Roseheath Ave. 1 Replace furnace $4,000
32 Wigwamen Incorporated 14 Roseheath Ave. 1 Install Energy Star qualified windows
$5,000
32 Wigwamen Incorporated 133 Wildwood Cres. 1 Replace furnace $4,000
32 Wigwamen Incorporated 133 Wildwood Cres. 1 Install Energy Star qualified windows
$5,000
32 Woodgreen Community Housing Inc.
137 Sears St. 17 Building envelope work (caulking, flashing, siding, masonry etc.)
$20,000
34 Brookbanks Non-Profit Homes Inc.
83 Parkwoods Village Dr.
68 Replace heating and domestic hot water boilers
$132,084
34 Clintwood Non-Profit Housing Co-operative
1974-1982 Victoria Park Ave.
63 Replace refrigerators $31,640
34 Clintwood Non-Profit Housing Co-operative
1974-1982 Victoria Park Ave.
63 Replace furnace $200,000
34 Clintwood Non-Profit Housing Co-operative
1974-1982 Victoria Park Ave.
63 Replace emergency lighting, smoke and heat detectors
$48,000
34 Duncan Mills Labourers' Local 183 Co-operative
2040 Don Mills Rd. 221 Install automatic door openers
$46,000
34 Duncan Mills Labourers' Local 183 Co-operative
2040 Don Mills Rd. 221 Install roll-in showers $117,700
34 Duncan Mills Labourers' Local 183 Co-operative
2040 Don Mills Rd. 221 Lighting retrofit $90,540
34 Emmanuel Lutheran Manor 1684 Victoria Park Ave.
112 Building envelope work (caulking, flashing, siding, masonry etc.)
$300,000
34 Operating Engineers Local 793 Non-Profit Hsg. Inc.
2020 Don Mills Rd. 221 Install automatic door openers
$60,000
34 Operating Engineers Local 793 Non-Profit Hsg. Inc.
2020 Don Mills Rd. 221 Install roll-in showers $70,000
34 St Marks (Don Mills) Non-Profit Housing Corp.
7 The Donway E. 70 Install accessible balcony ramps
$30,000
34 St Marks (Don Mills) Non-Profit Housing Corp.
7 The Donway E. 70 Replace domestic hot water boiler
$70,000
34 St Marks (Don Mills) Non-Profit Housing Corp.
7 The Donway E. 70 Lighting retrofit $5,000
Appendix D Page 36 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
34 St Marks (Don Mills) Non-Profit Housing Corp.
7 The Donway E. 70 Replace stoves $26,000
34 St Marks (Don Mills) Non-Profit Housing Corp.
7 The Donway E. 70 Building envelope work (caulking, flashing, siding, masonry etc.)
$100,000
35 Glen Park Co-operative Homes Inc.
2495 Eglinton Ave. E. 83 Replace appliances $76,000
35 Glen Park Co-operative Homes Inc.
2495 Eglinton Ave. E. 83 Lighting retrofit $25,000
35 Wigwamen Incorporated 70 Chestnut Cres. 2 Install additional insulation
$3,522
35 Wigwamen Incorporated 70 Chestnut Cres. 2 Install Energy Star qualified windows
$5,000
35 Wigwamen Incorporated 70 Chestnut Cres. 2 Replace furnace $6,000
36 Abbeyfield Houses Society of Toronto
38 Lakeside Ave. 11 Replace air conditioning units
$12,000
36 Atahualpa Co-operative Homes Inc.
3 Brimley Rd. 79 Lighting retrofit $10,000
36 Atahualpa Co-operative Homes Inc.
3 Brimley Rd. 79 Replace Make-up Air Units
$50,000
36 Atahualpa Co-operative Homes Inc.
3 Brimley Rd. 79 Install ramps and door openers in common areas
$11,000
36 Atahualpa Co-operative Homes Inc.
3 Brimley Rd. 79 Replace appliances $71,100
36 Gabriel Dumont Non-Profit Homes Inc.
118 Dorsett Rd. 7 Replace furnaces $20,000
36 Gabriel Dumont Non-Profit Homes Inc.
118 Dorsett Rd. 7 Replace refrigerators, stoves, washers and dryers
$14,151
36 Gabriel Dumont Non-Profit Homes Inc.
3370 Kingston Rd. 86 Replace appliances $125,362
36 Gardenview Co-operative Homes Inc.
3370 Kingston Rd. 86 Building envelope work (caulking, flashing, siding, masonry etc.)
$95,000
36 Gardenview Co-operative Homes Inc.
3370 Kingston Rd. 86 Install programmable thermostats
$38,732
36 Orchard Grove Housing Co-operative
3392 Kingston Rd. 83 Replace make-up air units
$90,000
36 Orchard Grove Housing Co-operative
3392 Kingston Rd. 83 install programmable thermostats
$38,000
36 Scarborough Village Non-Profit Housing
225 Scarborough Golf Club Rd.
48 Install bathroom GFI outlets
$7,000
Appendix D Page 37 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
37 Aldebrain Attendant Care Services of Toronto
2155 Lawrence Ave. E.
243 Replace appliances $225,000
37 Aldebrain Attendant Care Services of Toronto
2155 Lawrence Ave. E.
243 Install automatic door openers
$60,000
37 Aldebrain Attendant Care Services of Toronto
2155 Lawrence Ave. E.
243 Install Energy Star qualified windows
$300,000
37 Wexford Residence Inc. 1860 Lawrence Ave. E.
256 Balcony restoration $95,000
37 Wexford Residence Inc. 1860 Lawrence Ave. E.
256 Building envelope work (caulking, flashing, siding, masonry etc.)
$144,000
37 Wexford Residence Inc. 1860 Lawrence Ave. E.
256 Conversion to walk-in bathtub
$150,000
37 Wexford Residence Inc. 1860 Lawrence Ave. E.
256 Install Energy Star qualified windows
$650,000
37 Wilmar Heights United Church Non-Profit Homes
967 Pharmacy Ave. 72 Replace pumps and install backflow prevention device
$40,000
37 Wilmar Heights United Church Non-Profit Homes
967 Pharmacy Ave. 72 Replace boilers $125,000
38 Bellamy Housing Co-operative Inc.
130 Bellamy Rd. N. 69 Replace make-up air units
$60,000
38 Bellamy Housing Co-operative Inc.
130 Bellamy Rd. N. 69 Balcony restoration $540,000
38 Bellamy Housing Co-operative Inc.
130 Bellamy Rd. N. 69 Lighting retrofit $15,500
38 Blue Danube Housing Development
1680 Ellesmere Rd. 145 Building envelope work (caulking, flashing, siding, masonry etc.)
$550,000
38 Blue Danube Housing Development
1680 Ellesmere Rd. 145 Replace refrigerators $75,000
38 Jack Goodlad Senior Citizen Residences Corp.
3010 Lawrence Ave. E.
170 Replace boilers - Domestic Hot Water Replace boilers
$115,000
38 Jack Goodlad Senior Citizen Residences Corp.
3010 Lawrence Ave. E.
170 Install Energy Star qualified windows
$850,000
38 St. David's Village Corporation 1290 Danforth Rd. 179 Replace doors and install openers
$8,000
38 St. David's Village Corporation 1290 Danforth Rd. 179 Install Energy Star qualified windows
$500,000
38 St. David's Village Corporation 1290 Danforth Rd 179 Replace boiler $54,015
38 Ujamaa Housing Co-operative Inc.
138 Bellamy Rd. N. 56 Accessibility work-showers, counters, door openers, etc.
$128,500
Appendix D Page 38 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
38 Ujamaa Housing Co-operative Inc.
138 Bellamy Rd. N. 56 Replace appliances $112,000
38 Ujamaa Housing Co-operative Inc.
138 Bellamy Rd. N. 56 Building envelope work (caulking, flashing, siding, masonry etc.)
$120,000
38 Ujamaa Housing Co-operative Inc.
138 Bellamy Rd. N. 56 Lighting retrofit $150,000
40 St. Paul's L'amoreaux Centre 3333 Finch Ave. E. 298 Replace make-up air units
$240,000
40 St. Paul's L'amoreaux Centre 3333 Finch Ave. E. 298 Replace domestic hot water and heating boilers
$50,000
40 St. Paul's L'amoreaux Centre 3333 Finch Ave. E. 298 Replace of unit hot water tanks
$120,000
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Replace appliances $237,800
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Replace boilers $230,000
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Replace make-up air units
$145,000
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Replace chiller $140,000
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Install automatic door openers
$120,000
41 Yee Hong Chinese Evergreen Homes (Metro Toronto) Corporation
2319 McNicoll Ave. 156 Corrosion control study and installation to resolve pinhole leaks
$25,000
42 Grace Hartman Housing Co-operative Inc.
22 Forest Creek Pathway
84 Replace boilers and furnaces
$348,000
42 Saints Peter and Paul Residence 221 Milner Ave. 211 Conduct asbestos survey $2,500
42 Saints Peter and Paul Residence 221 Milner Ave. 211 Install backflow prevention device
$15,000
42 Saints Peter and Paul Residence 221 Milner Ave. 211 Retaining wall repairs $25,500
42 Saints Peter and Paul Residence 221 Milner Ave. 211 Replace windows and caulking
$75,000
42 Saints Peter and Paul Residence 221 Milner Ave. 211 Install exterior ramp, door and opener
$38,000
42 Wilcox Creek Co-operative Homes Inc.
22 Forest Creek Pathway
84 Install Energy Star qualified windows
$370,700
Appendix D Page 39 of 39
Ward Provider Name Project Address No. of Units Project Summary Estimated
Capital Costs
43 Inter Faith Homes (Centenary) Corporation
2877 Ellesmere Rd. 126 Building envelope work (caulking, flashing, siding, masonry etc.)
$683,000
43 Inter Faith Homes (Centenary) Corporation
2877 Ellesmere Rd. 126 Replace concrete steps and walkways
$74,500
43 Masaryktown Non-Profit Residences Inc.
450B Scarborough Golf Club Rd.
112 Install Energy Star qualified windows
$25,000
43 Masaryktown Non-Profit Residences Inc.
450B Scarborough Golf Club Rd.
112 Replace boilers $57,000
43 Robin Gardner Voce Non-profit Homes Inc.
525 Markham Rd. 115 Replace weather stripping
$50,000
43 Robin Gardner Voce Non-profit Homes Inc.
525 Markham Rd. 115 Paint garage $10,000
44 Akwa Honsta Non-Profit Aboriginal Homes Inc.
23 Edgewood Ave. 117 Install garage exhaust fan
$10,000
44 Knights Village Non-Profit Homes Inc.
33 Durnford Rd. 164 Replace appliances $115,000
44 West Rouge Housing Co-operative Inc.
8 Clappison Blvd. 50 Replace domestic hot water boiler and storage tanks
$30,000
44 West Rouge Housing Co-operative Inc.
8 Clappison Blvd. 50 Replace windows and caulking
$30,000
44 West Rouge Housing Co-operative Inc.
8 Clappison Blvd. 50 Replace exterior doors $36,000
44 West Rouge Housing Co-operative Inc.
8 Clappison Blvd. 50 Replace furnaces $99,000