Appendix C2Alternative 2 – Conceptual Plans
Figure C2-1Conceptual Graphic of Alternative 2 (Project Area One - Reaches A through D)
EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1
NOTE: Preliminary Design Concept
FIELD 2 SHIFTED EAST
Figure C2-2EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1 Conceptual Graphic of Alternative 2 (Project Area One - Reaches E through H)
NOTE: Preliminary Design Concept
NEW BRIDGE RAMP
FIELD 3 SHIFTED EAST
Figure C2-3EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1 Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J)
NOTE: Preliminary Design Concept
kmui
Text Box
The flood protection alignment in Project Area Two would be similar to the alignment for the Preferred Alternative except for Murphy Brothers Playground and Asser Levy Playground, where they would be replaced in kind under this alternative. Please refer to Appendix C1 for conceptual design drawings for Project Area Two.