anthony zampolin portfolio

11
Architecture & Design Portfolio Anthony Louis Zampolin

Upload: anthony-zampolin

Post on 05-Feb-2016

213 views

Category:

Documents


0 download

DESCRIPTION

short sample portfolio

TRANSCRIPT

Page 1: Anthony Zampolin portfolio

Architecture & Design PortfolioAnthony Louis Zampolin

Page 2: Anthony Zampolin portfolio

2

Contents

Experimental Parametric DevelopmentRevit, Adobe Photoshop

Westinghouse Residential TowerRevit, Adobe Photoshop, Adobe Illustrator

Roosevelt Island Biotech Research FacilityRevit, Rhino3D, 3DS Max, Vray, Adobe Illustrator

Custom Residential InteriorsAutoCAD, Rhino3D Grasshopper, CNC

Hillsdale Apartment ComplexRevit Autodesk Showcase

Honkatalot Private Residence Revit, 3DS Max, Vray, Adobe Photoshop

Union City Residential Mid-rise Revit

3

4

5

6

7

8-9

10-11

Page 3: Anthony Zampolin portfolio

3

3

4

5

6

7

8-9

10-11 Lost in a Blizzard

Walking on the Moon

Experimental Parametric DevelopmentNJIT: 2nd Year Studio I

Mo

vem

en

t C

hu

nk

Lig

htin

g C

hu

nk

Re

ad

ing

Ch

un

k C

ato

log

Ch

un

k

Re

sea

rch

Ch

un

k P

erp

era

tion

Ch

un

k

Ve

rtic

al C

hu

nk

Inq

uiry

Ch

un

k

To understand parametric design this studio focused on the creation of variables and the manipulation of formulas to design conceptual spaces.

Page 4: Anthony Zampolin portfolio

4

Westing House Residential Tower NJIT: 3rd Year Studio II

A Reverberation is a continuation of an original wave or pulse. If we apply that same rule;the historical reverberating projections on the site can manipulate the main structures accordingly. At the beginning of my drafting and rendering education, I utilized BIM software to translate what I created free of the computer. Using the parametric restrictions of Revit’s massing tools I was able to manipulate the buildings form. These efficiencies allowed designing to continue into and during the Schematic phase without creating more work while working on revisions.

Page 5: Anthony Zampolin portfolio

5

30

Conference Wet Lab Analysis Circulation between

Circulation between

Tech/Storage

Queens

Small Pox Hospital Terrain and Path

Subway Station\Tram Station\Pedestrian Entry

FDR Memorial Cornell Tech Campus/Project Site

Bridg

eQ

uee

nsbo

roug

h

1

1

12

17

10

20

23

27

2625

19

16

131415

18

21

22

24

6

2

3

4

711

10

8

9

5

2829

3031

32

33

34

35

36363738

39

40

41

42

Biotech Laboratory Typical Detail Section

Program and Site Analysis

1 Water Tube In2 Photovoltaic Panel3 Water Tube Out4 Absorber Plate5 Water Tube welded to Absorber6 8mm Non-permeable Insulation7 Metal wall Sheathing and Finish8 Horizontal channel bracing9 Ligh-guage Metal stud10 Ventilation Duct11 Open web steel joists12 Precast Concrete Curtain Panel13 Plasterboard Lining14 Radiant Heat Distributor 15 Vent Grille16 Polished metal sill17 Service Duct18 Steel Beam19 Horizontal and Diagonal briding20 Ventilation duct fins21 Louver Track22 6mm toughed safety glass23 Louver rigid connection to structure24 Triple Pan low-e glazing25 Vertically pivoting metal casement26 Compression Gasket27 Glazing Stop28 Drop ceiling panel29 LED heat sink30 Frosted light screen31 LED 32 Suspension Channel33 Ceiling Vent34 50mm metal railing35 Single pan glass panel36 130mm Concrete slab with rebar37 75mm Metal decking38 Cantilever Beam39 Metal floor skirt 40 Wiring and pipe channel41 Door Frame41 Door swing

1 Water Tube In2 Photovoltaic Panel3 Water Tube Out4 Absorber Plate5 Water Tube welded to Absorber6 8mm Non-permeable Insulation7 Metal wall Sheathing and Finish8 Horizontal channel bracing9 Ligh-guage Metal stud10 Ventilation Duct11 Open web steel joists12 Precast Concrete Curtain Panel13 Plasterboard Lining14 Radiant Heat Distributor 15 Vent Grille16 Polished metal sill17 Service Duct18 Steel Beam19 Horizontal and Diagonal briding20 Ventilation duct fins21 Louver Track22 6mm toughed safety glass23 Louver rigid connection to structure24 Triple Pan low-e glazing25 Vertically pivoting metal casement26 Compression Gasket27 Glazing Stop28 Drop ceiling panel29 LED heat sink30 Frosted light screen31 LED 32 Suspension Channel33 Ceiling Vent34 50mm metal railing35 Single pan glass panel36 130mm Concrete slab with rebar37 75mm Metal decking38 Cantilever Beam39 Metal floor skirt 40 Wiring and pipe channel41 Door Frame41 Door swing

Fourth Floor

Fifth Floor

Sixth Floor

Seventh Floor

Eigth Floor

Exoskeleton, Interior Structure

Wall/Floor System

Radient Heating, Ventilation,

Roosevelt Island Biotechnology Research FacilityNJIT: 5nd Year Comprehensive Studio II

This genetics research facility is a state of the art lab designed around the marriage of the programs needs and sustainable strategies. Directly connected but not accessible to it is the Louis Kahn Center. An exhibition space, information center, and viewing deck that moves fluidly against the research facility; creating the primary structure on the site within the Cornell tech campus. Using the capabilities of Revit and visualization tools in Rhino3D the twisting structure opened up many needs for typical details as well as custum engineered materials.

Page 6: Anthony Zampolin portfolio

6

Custom Residential InteriorsZampolin & Associates: Oct-Nov ‘13

Catering to custom residential projects, I educated myself with efficiencies so I can quickly digital model during design meetings. This ability allows for the translation of the design infront of the proposed user. In this case study, I was able to give the client a very clear picture of the final product with custom details and 3D prints. I use my knowledge of digital fabrication to effectively 3D model presentation quality work in all phases of development.

Interior Wall Elevation

Client Wish List Newel Elevation

Digitaly Fabricated Model

Page 7: Anthony Zampolin portfolio

7

Camera View From Dwelling Across Esplande Drive 10' - 12'

10' - 12'

Closest Facade to DwellingsAcross Esplande Drive

F.F. EL. 83.10

F.F. EL. 74.50

218'

- 5

1/2"

Hillsdale Apartment BuildingZampolin & Assocates Mar-May ‘13

Existing Zone Condition

Compliant Site Retention

Proposed First Winter/Summer Conditions

Proposed Ten Year Winter/Summer Conditions

Seeking a town approval to rezone a site is no easy task. In this case the residents of Esplande Drive were concerned over the potential visual presence the building would have on its suburbian community. Working with the land use attorney; along side the site engineers, I came up with a persuasive presentation. Using Revit and real time animation in Showcase I demostrated the future outcome to the board and towns people of Hillsdale.

Page 8: Anthony Zampolin portfolio

8

Honkatalot Private ResidenceZampolin & Associates: July-Aug ‘13

A private design competition was held by the Honkatalot(Now Lumi) modular construction company in Finland. As the only American design submitted, I felt compelled to hold back conservative modernism and look towards what was avaliable to withstand the test of time. The presentation of my design boards and 3D printed models, were more than what the Honkatalot expected. What they asked for was a modern vacation lodge, after our success as the winning project, 3 are being constructed acros Europe and Asia as full-time residences.

Ref.

Ref.

DN16 R

UP18 R

DN18 R

TV

UP18 R

DN14 R

CHUTE

UP7R

DN6 R

clo.

clo.

1

23

3

47

1113

98

14

15

16

3

1

2

4

5

8

6

7

12

10

6

5

9

7

12

4

1 1

3

5

13

2

8

10

11

6

UP14 R

UP16 R

DN7 R

DN7 R

TV

DN18 R

BENCH

SECOND FLOOR

FIRST FLOOR

LEFT SIDE ELEVATION SECTION B

FRONT ELEVATION

SECTION ABASEMENT

1.2.3.4.5.6.7.

Private QuartersGarageHockey StorageO�ce/LibraryGuest ParkingCovered Car PortHerbal Terrace

8.9.

10.11.12.13.14.

StorageBathroomWardrobePantryEntry FoyerKitchenDining

15.16.

Living RoomPatio

1.2.3.4.5.6.7.

Guest RoomLaundry RoomMech. RoomLivingPowder RoomBarSpa

8.9.

10.11.12.13.

SaunaPlunge PoolPool PatioIn�nity Edge PoolArtic SpaSpa Patio

1.2.3.4.5.6.7.

Walk In ClosetMaster BedroomTerraceMaster BathroomSitting AreaBedroom #2Bedroom #3

8. Open to Below

A

A

BB

A

A

BB

A

A

BB

BASEMENT

FIRST FLOOR

SECOND FLOOR

BASEMENT

FIRST FLOOR

SECOND FLOOR

BASEMENT

FIRST FLOOR

SECOND FLOOR

N

STONE/WOODSTRUCTURE

SUM

MER

SOLS

TICE

WINTER SOLSTICE

MODULAR

CONSTRUCTION

LIGHT FRAMEWOOD MODULES

SOLAR ANGLE

MODULAR DIVISION

LOAD BEARINGSTONE/WOOD

STRUCTURE

Printed Models

Page 9: Anthony Zampolin portfolio

9

Entry Foyer

Car Port Entry

Family Room Kitchen/Dining Rear Patio

Page 10: Anthony Zampolin portfolio

10

Union City Apartment Mid-riseZampolin & Associates: Jan-Feb ‘14

Outside creating and designing new projects; in architecture school, they do not teach you how to pick up and finish projects in real life. This apartment complex was moved in specific directions upon the clients request. It required for a more in-depth analysis and detailing of the building. What would have been a marvel to complete using Building Information Modeling a decade ago, took mere weeks to coordinate and submit for permits.

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

8' -

7"

9"

T.O. ROOF GALLERY294' - 5"

ELEVATOR PENTHOUSE290' - 10"

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

T.O. ROOF GALLERY294' - 5"

ELEVATOR PENTHOUSE290' - 10"

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

T.O. ROOF GALLERY294' - 5"

ELEVATOR PENTHOUSE290' - 10"

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

T.O. ROOF GALLERY294' - 5"

ELEVATOR PENTHOUSE290' - 10"

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

T.O. ROOF GALLERY294' - 5"

ELEVATOR PENTHOUSE290' - 10"

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

SECOND FLOOR218' - 10"

THIRD FLOOR228' - 2"

FOURTH FLOOR237' - 6"

FIFTH FLOOR246' - 10"

SIXTH FLOOR256' - 2"

SEVENTH FLOOR265' - 6"

EIGHTH FLOOR274' - 10"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

EIGHTH FLOOR CEILING283' - 5"

THIRD FLOOR CEILING236' - 9"

FIRST FLOOR CEILING218' - 1"

SECOND FLOOR CEILING227' - 5"

FOURTH FLOOR CEILING246' - 1"

FIFTH FLOOR CEILING255' - 5"

SIXTH FLOOR CEILING264' - 9"

SEVENTH FLOOR CEILING274' - 1"

FIRST FLOOR PLAN209' - 6"

ROOF PLAN284' - 2"

A-501 3/16" = 1'-0"

1 EXTERIOR WALL SECTION - 1A-501 3/16" = 1'-0"

2 EXTERIOR WALL SECTION - 2

B1A-502

B2A-502

A1A-502

A2A-502

A-501 3/16" = 1'-0"

3 EXTERIOR WALL SECTION - 3A-501 3/16" = 1'-0"

4 EXTERIOR WALL SECTION - 4A-501 3/16" = 1'-0"

5 EXTERIOR WALL SECTION - 5A-501 3/16" = 1'-0"

6 EXTERIOR WALL SECTION - 6

F1A-502

F2A-502

EA-503

DA-503

CA-503

AA-504

1ST FLOOR SLAB209'-6"

MEZZ. PARKING200'-0"

SEC. FLR PARKING191'-8"

FIRST FLR PARKING182'-0"

BRICK ARCH1' -

4"

9"8' -

11"

9"7' -

7"

9"8' -

9"

9"

TOTALFLASH CAVITY WALLFLASHING SYSTEM W/INTEGRATED TERMINATION BAR,DRAINAGE MATT, NO CLOGWEEP TABS AND SS DRIP EDGEAS MFG BY MORTAR NETSOLUTIONS (800-664-6638)

CURVED STEEL LINTELSEE STRUCTURAL DRAWINGS

1"

8"

6"

7 7/8"PRE-CAST CONCRETE SILL

MEMBRANE SILL FLASHING

8" CMU WALL W/GALV. WALLREINFORCEMENT[[[[NEED BILL TO FINISH NOTE]]]SEE STRUCTURAL DRAWINGSFOR ADDITIONAL INFORMATION

SLAB EDGE TO FACE OF BLOCK

FIRST FLRPARKING

182'-0"

4' - 0"1"

7' - 4 1/2"1"

7' - 4 1/2"1"

4' - 0"

8"

9' -

4 3

/4"

1"6' -

3 7

/8"

4' -

0 1

/4"

1' -

4"

R18

' -5

3/4"

4' -

2 1

/2"

24' - 10"

SECOND FLRPARKING

191'8"

MEZZ. PARKING200'-0"

19' -

9 7

/8"

23' - 0"

15' -

9 5

/8"

1' -

4 1

/8"

2"

6"

4' - 0"

CENTER POINT OFARCH RADIUS

R14

' -5

3/4"

4' -

0"

1"6' -

3 1

/8"

4' -

2 3

/8"

4' - 6 1/8"

4' - 5 7/8"

1"

7' - 9 1/2"

PRECASTCONCRETE SILL

FIRST FLRPARKING

182'-0"4' - 0"1"

9' - 0"1"

9' - 0"1"

4' - 0"

8"

9' -

4 3

/4"

1"6' -

3 7

/8"

4' -

0 1

/4"

1' -

4"

SECOND FLRPARKING

191'8"

MEZZ. PARKING200'-0"

R23

' - 5

1/2"

27' - 10 1/4"

19' -

9 7

/8"

26' - 3"

CENTER POINT OFARCH RADIUS

PRECASTCONCRETE SILL

R19

' -5

1/2"

4' - 0"

4' -

0"

1"6' -

3 1

/8"

2"6"

2' -

11

5/8

"

4' - 7 3/8"

4' - 6 7/8"

1"

4' -

0 1

/4"

4' -

0 1

/4"

9' - 5"

15' -

9 5

/8"

3/4" = 1'-0"

EXTERIOR WALL SECTION - A

1/2" = 1'-0"

STUCCO ARCH PANELING DETAIL - A

1/2" = 1'-0"

STUCCO ARCH PANELING DETAIL -B

6" CMU BLOCK W/ GALVANIZED WALLREINFORCED EVERY OTHER COURSE

COMPOSITE EXTERIOR WALLPANEL

STAGGERE

D CLIPS

STAGGERED CLIPS

EXTERIOR STRUCTURAL COLUMN

1/2" GYPSUM BOARD, TAPED SPACKLEDAND SANDED SMOOTH READY FORFINISHES OVER 1 1/2" METAL FURRING @24" O.C.

1 1/2" RIGID INSULATION

C39-W

C39-W

1' -

6"

2' -

5 5

/8"

3' -

11

5/8

"

1' - 8 1/4"

10 3/8"

2' - 6 5/8"

2' -

10"

2 5

/8"

2' -

4 3

/4"

1' - 3 3/8"

2 5/8"

1' - 6"

2 5

/8"

KAWNEER 360 INSULCLAD ENTRANCE SYSTEM ORSIMILAR SEE WEBSITE FOR DETAIL

STAGGERED CLIPS

STAGGERE

D CLIPS

1/2" GYP. BD., TAPED SPACKLED ANDSANDED SMOOTH READY FOR FINISHES

RIGID INSULATION

6" CMU BLOCK

CURTAIN WALL SYSTEM

COMPOSITE EXTERIOR WALLPANEL

EXTERIOR STRUCTURAL COLUMN

C39-W

C39-W

FIRST RETARDANT TREATEDWOOD BLOCKING

CAULK AND SHIM PER MFG.REQUIREMENTS

EXTRUDED ALUM.CLOSURE PANEL, FINISHTO MATCH ENTRANCESYSTEM

ALUM. AND GLASS ENTRY DOORWITH MATCHING SIDELITES,THERMAL BREAK EXTRUDED ALUM.FRAME W/ 1" INSULATED GLASSAND ANODIZED FINISH. DOORS TOHAVE CONCEALED CLOSER,OFFSET PIVOTS AND LOW PROFILETHRESHOLD. KAWNEER 360INSULCAD ENTRANCE SYSTEM ORAPPROVED EQUAL

1' - 6"2 5

/8"

2' -

4 3

/4"

2' -

10"

2 5

/8"

4' - 8 1/4"

9 3/8

"

2' -

0 3

/8"

3' - 0 5/8"

COMPOSITE EXTERIOR WALLPANEL

C39-W

6" CMU BLOCK

BRICK

2-1/2" X 6" EXTRUDED ALUM. THERMAL BREAKCURTAIN WALL SYSTEM WITH 1" INSULATINGGLASS AND ANODIZED FINISH. KAWNEER 1600SERIES 4 OR APPROVED EQUAL

FIRE RETARDANT TREATED WOODBLOCKING

EXTRUDED ALUM. CLOSURE PANEL,FINISH TO MATCH ENTRANCE SYSTEM.

1' -

0 5

/8"

2' -

10"

11 1/8"

2' -

4 3

/4"

2 5

/8"

1' - 3 3/8"

SEC. FLR PARKING191'-8"

MEZZ. PARKING200'-0"

1ST FLOOR SLAB209'-6"

ENTRY LOBBY182'-0"

9"8' -

9"

9"7' -

7"

9"1

1/2"

8' -

8 1

/2"

1"9"

1' - 0 5/8"

1"

1"

1"

1"

1"1"

1' -

11

5/8

"

7 5/8" 6 5/8"3' - 5 3/8"

8"

1' -

4"

2' -

0"

7 5/8"3/8"

5 1/4"

3' - 2" 7"

1' - 1 1/4"

3' - 9"

9"8 1

/4"

8' -

2 3

/4"

EXTERIOR WALL CLADING -ALUMINIUM COMPOSITEMATERIAL(ACM) WITH ALLREQUIRED CLIPS, BRACKETFASTERNERS, ETC. ALUCOBONDDRY SEAL SYSTEM ORAPPROVED EQUAL.

SPANDRAL GLASS

STEEL COLUMN

CURVED STEELPLATEBRICK LINTEL

8"

4' - 0"2 5/8"

3' - 8"

CORBELED BRICK ARCH

THROUGH WALL FLASHING W/WEEP HOLES @ 24" O.C.

MEMBRANE ROOFING

RIGID INSULATION

CONCRETE SIDEWALK

THRESHOLD SET IN CAULKBED

PITCH SLAB OT SIDEWALK

1" THK STONE FLOOR FINISH

ALUMINIUM & GLASS ENTRYDOOR W/ MATCHINGSIDELITES EXTRUDED ALUM.THERMAL BRAKE FRAME1" INSULATING GLASS ANDANODIZED FINISH. KAWNEER360 ENTRY SYSTEM ORAPPROVED EQUAL.

5 1/4" EXTRUDED ALUMINIUMFRAME W/ 1/4" INSET FORSPANDRAL GLASS KAWNEER1600 SERIES OR APPROVEDEQUAL

SEE DWG S-801FOR STRUCTURALDETAILS @ CANOPY

ACM EXTERIOR WALLCLADDING

8" CMU WALLS SEESTRUCTURAL DWGSFOR ADDITIONALDETAILS

1 1/2" CORRUGATEDMETAL WELDED TOCURVED C10X25

1 1/2" CORRUGATED METALWELDED TO CURVED C10X25

FLOOR PLAN - SECONDFLOOR PARKING

191' - 8"

FLOOR PLAN -MEZZANINE PARKING

200' - 0"

FLOOR PLAN - FIRSTFLOOR PARKING

182' - 0"

R81

" -7

7/8

R79

' -7

7/8"

12' -

9 3

/4"

3' - 0 3/4"

36' - 7 1/2"

2' - 8 3/4"

15' -

2 3

/4"

2' -

0"

13' -

7 5

/8"

LINE OF CURVEDC10X25

SEE DWG S-801FOR STRUCTURALDETAILS @ CANOPY

4A-501

5A-501

2' -

10"

11' -

2"

2' -

10"

11' -

2"

2' -

10"

3' -

8"

5' - 0 7/8"5"

8' - 0 5/8"

5"

69°

8"

1 1/

2"

16' -

5"

5"

1' -

9 5

/8"

7 3/8

"

2' -

7"

6' -

0"

2' -

7"

5' -

2 7

/8"

3' -

0"

6' -

0"

2' -

7"

6' -

5 1

/8"

3' - 3 1/8"2' - 4 5/8"

7' - 6 7/8"

9 5/8"

2' - 7 5/8"

2' - 1 3/4"

1 1/2" = 1'-0"

PIER DETAIL C

1 1/2" = 1'-0"

PIER DETAIL B

1 1/2" = 1'-0"

PIER DETAIL A

AA-505

BA-505

CA-505

3/4" = 1'-0"

EXTERIOR WALL SECTION ENTRY 1 1/4" = 1'-0"

Callout of ELEVATION FROM SUMMIT AVENUE

1/4" = 1'-0"

ENLARGED ENTRY PLAN

A-505

1

Page 11: Anthony Zampolin portfolio

11

1' -

6"

3' -

1 1

/2"

5' -

4 3

/4"

1' -

11

3/4

"5' -

1 1

/8"

2' -

3 1

/8"

9"1' -

2 3

/4"

1 3/4

"5 1

/4"

1' -

8 1

/8"

9' -

4"

6"

3' - 0"

3 5/8"

3 5/8"

8"

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

1" INSULATING GLASS @ TOPOF FLOOR ONLY

5/8" DENSDECK PRIME ROOFBOARD AS MFG. BY GEORGIAPACIFIC @ EXTERIOR PARAPET

8" SW16 @ 16"O.C.

SINGLE LAYER MEMBRANEROOFING SYSTEM

(4) 2" X 4" PRESSURETREATED WOOD BLOCKING

3" FIBER CANT STRIP

MEMBRANE FLASHING

CAP FLASHING

6" SW16 @ 16"O.C.

SEAL JOINT

#1004X TYPE III X SCREW ONVANEER ANCHORS @ 32"O.C.MAX. HORIZONTAL &18"O.C. MAX. VERTICAL. SCREWANCHORS THRU SHEATHINGINTO METAL STUDS

FRP CORNICE

3 5/8" BRICK VENEER

2' - 9 3/4"

2"

2"

2" 1' -

1 1

/2"

6"

1' -

2"

9"8' -

7"

9"

6" THERMAL BREAK EXTRUDEDALUM. CURTAIN WALL WITHANODIZED FINISH AND 1"INSULATING GLASS KAWNEER1600 SERIES OF APPROVEDEQUAL

CAULK TERMINATIONBAR

DRIP GROOVE

SHIM AND CAULK PERMFG REQUIREMENTS

1/2" GYP. BD. CEILING ON 7/8"METAL FURRING

TOTALFLASH CAVITY WALLFLASHING SYSTEMW/ INTEGRATED TERMINATIONBAR, DRAINAGE MATT,NO CLOG WEEP TABS AND SSDRIP EDGE AS MFG BYMORTAR NET SOLUTIONS(800-664-6638)

LIVING ROOM

6"

4"

8"

EDGE OF CONCRETE SLAB

CONT. 7" X 4" X 3/8" STEELBRICK LINTEL WELD TOMETAL STUD

10' -

0 1

/4"

8' -

7"

FRP CORNICE

9"1' -

6"

MAIN

WALL B

EYO

ND

EDGE OF SLAB

ROOF SLAB284'-2"

8TH FLOOR CLG.283'-5"

8TH FLOOR SLAB274'-10"

7TH FLOOR CLG.274'-1"

TAPERED RIGID INSULATIONPITCH TO DRAIN 1/4":12" MIN

3' -

0"

1' - 6"

6"

9 1/2"

2 1/2"

1' - 3 1/2"

2 1/2"

1' - 6"

SPANDREL GLASS

SPANDREL PANEL

DOUBLE MULLION PANELINSERT

PITCH 1/6":12"

1' - 5"

2HR. RATED FIRECONTAINMENT SYSTEM. U.L.SYSTEM CW-D-2042.SEE SHEET A-503

METAL STUD FRAMINGTO SUPPORT FRPCORNICE, COORDINATEWITH CORNICE MFG

METAL STUD FRAMINGTO SUPPORT FRPCORNICE, COORDINATEWITH CORNICE MFG

MAIN

BUILD

ING

LIN

E(B

RIC

K V

ENEER

)

1' - 6"

CURTAIN WALL SUPPORT CLIPCOORDINATE WITH CURTAINWALL MFG.

1' - 7"

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

2ND FLOOR SLAB218'-10"

1ST FLOOR CLG.218'-1"

1ST FLOOR SLAB209'-6"

MEZZ. PRK CLG.208'-9"

8' -

7"

9"8' -

7"

9"

9' -

4"

2' -

1 1

/2"

5' -

1 1

/8"

2' -

3 1

/8"

1' -

8 1

/8"

5 1

/4"

1 3/4

"

1/2" GYPSUM BOARD CEILINGON 7/8" METAL FURRING

6" EXTRUDED ALUMINUMTHERMAL BREAK CURTAINWALL W/ANODIZED FINISH AND1" INSULATING GLASS.kAWNEER 1600 SERIES OFAPPROVED EQUAL

SPANDREL PANEL

SPANDREL GLASS

EDGE OF CONCRETE SLAB

LIVING ROOM

1' -

2 3

/4"

9"

2HR. RATED FIRECONTAINMENT SYSTEM. U.L.SYSTEM CW-D-2042.SEE SHEET A-503

EDGE OF CONCRETE SLAB

SHIM AND CAULK PERMFG REQUIREMENTS

DOUBLE MULLION PANELINSERT

CHAMFER SLAB EDGE 1"

6" 4" 8"

DRIP GROVE

MAIN

BUILD

ING

LIN

E(B

RIC

K V

ENEER

)

CURTAIN WALL SUPPORT CLIPCOORDINATE WITH CURTAINWALL MFG.

9' -

4"

2' -

2 1

/2"

7' -

8"

1' -

2 3

/4"

9"2' -

3 1

/8"

5' -

1 1

/8"

1' -

1"

1 3/4

"

9 1/

2"

8"

1' -

6"

9"8' -

7"

9"

1' - 6"

1' - 3 1/2"

2 1/2"

9' -

4"

SPANDREL GLASS

SPANDREL PANEL

3' - 0"

6" EXTRUDED ALUMINUMTHERMAL BREAK CURTAINWALL W/ANODIZED FINISHAND 1" INSULATING GLASSKAWNEER 1600 SERIESOR APPROVED EQUAL

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

1" INSULATING GLASS @ TOPFLOOR ONLY

FRP CORNICE

9' -

10

1/2

"

ROOF SLAB284'-2"

8TH FLOOR CLG.283'-5"

8TH FLOOR SLAB274'-10"

7TH FLOOR CLG.274'-1"

SINGLE LAYER MEMBRANEROOFING SYSTEM

(4) 2" X 4" PRESSURE TREATEDWOOD BLOCKING

3" FIBER CANT STRIP

MEMBRANE FLASHING

TAPERED RIGID INSULATIONPITCH TO DRAIN 1/4":12" MIN

LINE OF PARAPET BEYOND

EDGE OF SLAB

EDGE OF CONCRETE SLAB

LIVING ROOM

DRIP GROOVE

SHIM AND CAULK PERMFG REQUIREMENTS

DOUBLE MULLION PANELINSERT

1 3/4

"

5 1

/4"

1' -

8 1

/8"

1' - 6"

5/8" DENSDECK PRIME ROOFBOARD AS MFG. BY GEORGIAPACIFIC @ EXTERIOR PARAPET

2HR. RATED FIRECONTAINMENT SYSTEM. U.L.SYSTEM CW-D-2042.SEE SHEET A-503

PITCH 1/6":12"

METAL STUD FRAMINGTO SUPPORT FRPCORNICE COORDINATEWITH CORNICE MFG

1/2" GYPSUM BOARD CEILINGON 7/8" METAL FURRING

MAIN

BUILD

ING

LIN

E(B

RIC

K V

ENEER

)

6"

4"

8"

FLASHING

8 SW16 @ 16 O.C.

CURTAIN WALL SUPPORT CLIPCOORDINATE WITH CURTAINWALL MFG.

8" 8" 8"

2ND FLOOR SLAB218'-10"

1ST FLOOR CLG.218'-1"

1ST FLOOR SLAB209'-6"

MEZZ. PRK CLG.208'-9"

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

1/2" GYPSUM BOARD CEILINGON 7/8" METAL FURRING

6" EXTRUDED ALUMINUMTHERMAL BREAK CURTAIN WALLW/ANODIZED FINISH AND 1"INSULATING GLASS KAWNEER1600 SERIES OR APPROVEDEQUAL

SPANDREL GLASS

EDGE OF CONCRETE SLAB

EDGE OF CONCRETE SLAB

SHIM AND CAULK PERMFG REQUIREMENTS

9' -

4"

9"8' -

7"

9"

8' -

7"

5' -

1 1

/8"

2' -

3 1

/8"

1' -

8 1

/8"

5 1

/4"

1 3/4

"

1' -

2 3

/4"

9"

6" 4" 8"

6"1' - 0"

LIVING ROOM

1' - 6"

DOUBLE MULLION PANELINSERT

1' - 7"

CHAMFER SLAB EDGE 1"

2HR. RATED FIRECONTAINMENT SYSTEM. U.L.SYSTEM CW-D-2042.SEE SHEET A-503

DRIP GROOVE

MAIN

BUILD

ING

LIN

E(B

RIC

K V

ENEER

)

CURTAIN WALL SUPPORT CLIPCOORDINATE WITH CURTAINWALL MFG.

6" METAL STUDS @ 16" O.C. W/1/2" GYPSUM BOARDSHEATHING AND R-16 FIBERGLASS BATT INSULATION

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

FRP CORNICE

ROOF SLAB284'-2"

8TH FLOOR CLG.283'-5"

8TH FLOOR SLAB274'-10"

7TH FLOOR CLG.274'-1"

9"8' -

7"

9"

9' -

4"

SINGLE LAYER MEMBRANEROOFING SYSTEM

(4) 2" X 4" PRESSURETREATED WOOD BLOCKING

3" FIBER CANT STRIP

MEMBRANE FLASHING

TAPERED RIGID INSULATIONPITCH TO DRAIN 1/4":12" MIN

BED ROOM

EDGE OF CONCRETE SLAB

RETURN SOFFIT @ CORNER

2' -

2"

5' -

3 1

/2"

1' -

1 1

/2"

3' -

0 1

/8"

1' -

6 1

/8"

1' -

5 1

/4"

3/4

"

1' -

1"

5' -

4 5

/8"

3' -

11

3/8

"

3"

4' -

10

5/8

"3"

2' -

1 3

/8"

9"1' -

1"

2 1

/2"

1/2"

2 1

/2"

1/2"

1 5/8

"

2' - 9 1/2"

4' - 6 3/8"

1"

3 5/8"2"

5/8"

6"

6 1

/8"

6 7

/8"

CURTAIN WINDOW HEADER?

KNEE WALL

EDGE OF CONCRETE SLAB

#1004X TYPE III X SCREW ONVANEER ANCHORS @ 32"O.C.MAX. HORIZONTAL &18"O.C. MAX. VERTICAL. SCREWANCHORS THRU SHEATHINGINTO METAL STUDS

TOTALFLASH CAVITY WALLFLASHING SYSTEM W/INTEGRATED TERMINATION BAR,DRAINAGE MATT, NO CLOGWEEP TABS AND SS DRIP EDGEAS MFG BY MORTAR NETSOLUTIONS (800-664-6638)

PITCH 1/6":12"

5 5/8"

TOTALFLASH CAVITY WALLFLASHING SYSTEM W/ INTEGRATEDTERMINATION BAR, DRAINAGEMATT, NO CLOG WEEP TABS ANDSS DRIP EDGE AS MFG BYMORTAR NET SOLUTIONS (800-664-6638)

3' - 0" 1' - 6 3/8"

WEEP VENTS @ 24" O.C. TYPICAL@TOP OF WALL. MORTER NETSOLUTIONS (800-664-6638) WEEPVENTS OR SIMILAR

6"x6"x3/16" STEAL BRICK LINTEL

MEMBRANE SILL FLASHING

1" RIGID INSULATION

FIRE RETARDANT TREATEDWOOD BLOCKING

EXTRUDED ALUMINUM SILLFINISH TO MATCH WINDOW

BRICK IN HERRINGBONE PATTERNSET BACK 1"(TYPICAL @BEDROOM WINDOW LOCATIONSEXCEPT SUMMIT AVE.

WEEP VENT

5/8" DENSDECK PRIME ROOFBOARD AS MFG. BY GEORGIAPACIFIC @ EXTERIOR PARAPET

8" SW16 @ 16"O.C.

METAL STUD FRAMINGTO SUPPORT FRPCORNICE, COORDINATEWITH CORNICE MFG

6" THERMAL BREAK EXTRUDEDALUM. CURTAIN WALL WITHANODIZED FINISH AND 1"INSULATING GLASS KAWNEER1600 SERIES OF APPROVEDEQUAL

LIN

E O

F B

RIC

K V

ENEER

8 1/4" 8"

2ND FLOOR SLAB218'-10"

1ST FLOOR CLG.218'-1"

1ST FLOOR SLAB209'-6"

MEZZ. PARKING CLG.208'-9"

9"8' -

7"

9"

9' -

4"

2' -

2"

6' -

5"

6 1

/8"

6 7

/8"

BEDROOM

6" SW 16 METAL STUDS @ 16"O.C. W/ 1/2" GYPSUM BOARDSHEATHING AND R-19 FIBERGLASS BATT INSULATION

9" CONCRETE SLAB REF TOSTRUCTURAL DRAWINGS FORDETAILS

RETURN SOFFIT @ CORNER

CURTAIN WINDOW HEADER

EDGE OF CONCRETE SLAB

KNEE WALL

#1004X TYPE III X SCREW ONVANEER ANCHORS @ 32"O.C.MAX. HORIZONTAL &18"O.C. MAX. VERTICAL. SCREWANCHORS THRU SHEATHINGINTO METAL STUDS

3 5/8" BRICK VENEER

TOTALFLASH CAVITY WALLFLASHING SYSTEM W/INTEGRATED TERMINATION BAR,DRAINAGE MATT, NO CLOGWEEP TABS AND SS DRIP EDGEAS MFG BY MORTAR NETSOLUTIONS (800-664-6638)

EDGE OF CONCRETE SLAB

CHAMFER SLAB EDGE 1"

DRIP GROOVE

TOTALFLASH CAVITY WALLFLASHING SYSTEM W/INTEGRATED TERMINATION BAR,DRAINAGE MATT, NO CLOGWEEP TABS AND SS DRIP EDGEAS MFG BY MORTAR NETSOLUTIONS (800-664-6638)

1" RIGID INSULATION

1"3 5/8"

2"5/8"6"

FIRE RETARDANT TREATEDWOOD BLOCKING

EXTRUDED ALUMINUM SILLFINISH TO MATCH WINDOW

BRICK IN HERRINGBONE PATTERNSET BACK 1"(TYPICAL @BEDROOM WINDOW LOCATIONSEXCEPT SUMMIT AVE.

MEMBRANE SILL FLASHING

6"x6"x3/8" STEEL BRICK LINTELWELDED TO HEADER

WEEP VENT

6" THERMAL BREAK EXTRUDEDALUM. CURTAIN WALL WITHANODIZED FINISH AND 1"INSULATING GLASS KAWNEER1600 SERIES OF APPROVEDEQUAL

5/8" REINFORCED GYPSUMEXTERIOR SHEATHING

LIN

E O

F B

RIC

K V

ENEER

3/4" = 1'-0"

SECTION DETAIL A1

3/4" = 1'-0"

SECTION DETAIL A2

3/4" = 1'-0"

SECTION DETAIL B1

3/4" = 1'-0"

SECTION DETAIL B2

3/4" = 1'-0"

SECTION DETAIL F1

3/4" = 1'-0"

SECTION DETAIL F2

Summit Avenue Perspective