annual workshop on crystal collimation h8 layout and infrastructure

13
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1 October 2010 J.LENDARO EN/STI/ECE

Upload: huey

Post on 19-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Annual Workshop on Crystal Collimation H8 Layout and infrastructure. Bld 887: H8 beam line. Experimental Area 138. Experimental Area 138. Experimental Area 138. Cables from control room HNA443: 10 coaxial cables (BNC connectors) 4 HV coaxial cables (SHV connectors) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

Annual Workshop on Crystal Collimation

H8 Layout and infrastructure

1October 2010 J.LENDARO EN/STI/ECE

Page 2: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

Bld 887: H8 beam line

2October 2010 J.LENDARO

Page 3: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

3October 2010 J.LENDARO

Experimental Area 138

Page 4: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

4October 2010 J.LENDARO

Experimental Area 138

Page 5: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

5October 2010 J.LENDARO

Experimental Area 138

Cables from control room HNA443:• 10 coaxial cables (BNC connectors)• 4 HV coaxial cables (SHV connectors)• 1 Ethernet cable (RJ45 connectors)

Services available inside the area:• AC power 230V• 2 Ethernet outlets

Page 6: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

6October 2010 J.LENDARO

Experimental Area 128

Page 7: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

7October 2010 J.LENDARO

Experimental Area 128

Page 8: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

8October 2010 J.LENDARO

Experimental Area 128

Page 9: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

9October 2010 J.LENDARO

Experimental Area 128

Cables available from control room HNA443 • 4x coaxial cables (BNC connectors)• 4x HV coaxial cables (SHV connectors)• 2x Ethernet cable (RJ45 connectors)• 1x I2C control cable• Several optical fibers have been installed in September 2010.

(Thanks to EN-EL-CF)12x Multimode fibers (ST connectors) 36 single mode fibers with E2000/APC connectors

Services available inside the area:• AC power 230V: Will be consolidated during winter shutdown• Network: installation during winter shutdown

Page 10: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

10October 2010 J.LENDARO

Control room HNA443

Page 11: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

11October 2010 J.LENDARO

September 2010

Optical fibers panel

Optical fibers panel

Page 12: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

12October 2010 J.LENDARO

September 2010

Page 13: Annual Workshop on Crystal Collimation H8 Layout  and infrastructure

13October 2010 J.LENDARO

Thank you !