Page 1: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

1

Annual Members Meeting December 18, 2019

1

Page 2: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

E L E C T I O NE L E C T I O N

Tim Kunda

2

2019 TMVOA Board & Staff

Jim Royer Sean StognerVacant Bill Jensen

Tom Richards

Jeff Proteau

Residential Commercial Lodging Mountain Special

A

Board members serve 2-yr terms (Classes A, B, C)

Anton Benitez President & CEO

Garrett Brafford Operations & Finance Director

Heidi Stenhammer Administration & Operations Manager

Whitney Pearce, CPA Accounting Manager

Staff

B C D

CHAIRMANVICE CHAIRMAN

Page 3: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 ELECTION RESULTSBoard of Directors Meeting

December 18, 2019

3

Page 4: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

678

944

716 689

817

914

793

2013 2014 2015 2016 2017 2018 20194

Electronic Ballots

Paper Ballots

Voter participation data is for Residential (Class A)

Page 5: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

CLASS A: RESIDENTIAL

Total Possible Votes: 2078.77

Total Votes Cast: 793.214

Mail In Ballots: 4

Disqualified Ballots: 1

Candidate Votes % of votes

Richard Child 150.336 18.953

Peter Yates 17.33 2.185

Jim Royer 522.101 65.820

Heather Knox 103.447 13.042

Page 6: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

CLASS A: Lodging

Total Possible Votes: 934.26

Total Votes Cast: 424.521

Mail In Ballots: 0

Disqualified Ballots: 0

Candidate Votes % of votes

Michelle Caporicci 424.521 45.439

Page 7: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

7

2020 TMVOA Board & Staff

Jim Royer

Tim Kunda

Michelle Caporicci Bill Jensen

Tom Richards

Jeff Proteau

Residential Commercial Lodging Mountain Special

A B C D

Board members serve 2-yr terms (Classes A, B, C)

Anton Benitez Executive Director

Garrett Brafford Operations & Finance Director

Heidi Stenhammer Administration & Operations Manager

Whitney Pearce, CPA Accounting Manager

Ann Barker Events & Experience Manager

Sean Stogner

Staff

Anton Benitez President & CEO

Garrett Brafford Operations & Finance Director

Heidi Stenhammer Administration & Operations Manager

Whitney Pearce, CPA Accounting Manager

Page 8: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 Review

Local Economy1

2020 Strategic Initiatives

Accomplishments

Need to Know (Member Services)

Real Estate

Trends

Member Services & Representation

Gondola Long-Term Plan

Economic Vibrancy & Sustainability

AGENDA

Financial

Association

Balance Sheet

Quarterly Updates

8

2 3

4

Page 9: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 Review

Local Economy1

2020 Strategic Initiatives

Accomplishments

Need to Know (Member Services)

Real Estate

Trends

Member Services & Representation

Gondola Long-Term Plan

Economic Vibrancy & Sustainability

AGENDA

Financial

Association

Balance Sheet

Quarterly Updates

9

2 3

4

7

Page 10: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

10Mountain Village StationControls Project

Controls ProjectNew Low Voltage Cabinets

G

O

N

D

O

L

A

1

Page 11: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

11

Mountain Village Station

Controls ProjectNew Brake Control Unit

New Rope Tensioning UnitNew Brake Calipers &Speed Feedback Devices

G

O

N

D

O

L

A

Page 12: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

12Mountain Village Station

New Seats & Covers (29 cabins) Cabin Refurb (9)

G

O

N

D

O

L

A

Page 13: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

13

Long-Term Gondola Roadmap

In Progress

Q3

2018

Complete

2027

Existing System Eval• Eng. study (load capacity )

• Independent study: Phase 1• Operating plan

• Maintenance plan• Repair & Capital plan

• Reserve analysis• Historical ridership• Upgrade potential

Desired System• Research • Stakeholder education • Service levels

• Customer expectations• Public communications & education

• Independent Analysis|Options|Summary • Options (upgrade, replace, other)• Initial funding discussions

Community ConsensusApproved

Plan

High-Level Working Document

Jan 2015

K

E

Y

E

L

E

M

E

N

T

S

FINANCIAL OBLIGATIONS

STATS$57M

Ops & Maint$50M

Agreement Expires (12/31/27)

No longer required:

• operate & maintain (TMV)

• pay for ops/maint/cap (TMVOA)

• pay 1% of lif t tickets (TSG)

• buses during G shutdow n (TMV)

SYSTEM BUDGET: 2015-2027 (TMVOA)

Capital$7M$3.5M $1.02M TMVOA

$0.07M TMV

BONDS: 2015-2032

$2.43M TSG

TSG FUNDING: Thru 2027

1%of total

lif t ticket sales

(gross rev enue)

OTHER INFORMATION

Partnering• Education rollout• Stakeholders• Community partners

• Regional partners• RTA

Ops/Maint/Cap Plan• Financial / Business model

Funding Plan (post 2027)

Econ Impact Study• Determination of beneficiaries• Gond/Chond committee formed• TMV, ToT, SMC form subcommittee

• BBC Study• Projected/future ridership

GONDOLA RIDERSHIP

Annually : +2,800,000 (exits/trips)

Winter: ~48%

Summer: ~52%

STAGE 1

STAGE 2

STAGE 3

est.

In-Process / Timeline

Focus Blocks

Complete

Page 14: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

14

Resolved Litigation 2

161-CR

161-CR (land area): 2.842 acres

Gondola stations

▪ Litigation was related to vehicle parking

on Lot 161-CR by owners of Ridge units

▪ TMVOA was defendant

▪ June 2019 - Settlement Agreement

reached

▪ RESULT: Clean title, allows for property

to be positioned with qualified developers

Page 15: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

▪ 9/16/19 - TMVOA announces transition of market to new operator after remodel and enhancements to exterior of building that will provide for a more modern appearance as recommended in the approved Town Hall Subarea Plan that was an amendment to the Town’s Comprehensive Plan in June 2017

▪ 9/30/19 – Previous market operator vacates space

▪ 10/1/19 – Demolition of interior space begins

▪ May 2020 –THE VILLAGE MARKET Grand Opening

MARKET at Town Hall3

Page 16: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

T M V O A

Conceptual Rendering of Town Hall Subarea Buildings MV COMPREHENSIVE PLANJune 2017; pg 64

Page 17: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Current Exterior

New Exterior

▪ More glazing / windows

▪ Removal of tower

▪ Building addition / bump-out

of 600 sq ft for interior

seating area

Page 18: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

12/17: Structural steel in place for addition

Page 19: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

1912/17: All below ground lines in place & concrete fill is complete

Page 20: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Launched of Dial-a-Ride App

20Telluride StationMountain Village – Market StationMountain Village – Market Station

▪ DAR usage continues to increase; total

rides has doubled since TMVOA took

over in 2014

▪ Past year = 41,083 rides

▪ Sep 6, 2019 – App launched

4

MOUNTAIN

VILLAGEDAR

Page 21: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Telluride Brewing Co. - Opening Tasting Room in MV

21Telluride StationMountain Village – Market StationMountain Village – Market Station

What: Tasting room, including signature,

small batch beers brewed on-site, & food

menu (tacos +)

▪Where: Approx. 1,500 sq ft commercial

space adjacent to Black Iron Grill

▪When: Construction is already underway;

targeting May/June opening

5

Page 22: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Telluride Brewing Company

22Telluride StationMountain Village – Market StationMountain Village – Market Station

Page 23: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

23

Launched Common Consumption - June 15, 2019

10

27

+ (soon)Coffee CompanyTracks

6

Page 24: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

On-line Dues Option Now Available

24

▪ You can now pay on-line with a credit card

▪ Need to have signed up for electronic invoicing

▪ Click Link at bottom of invoice – to secure site

7

▪ Save 10% if you pay full-year by Feb 28, 2020

Page 25: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

25

Investment Committee

Brian Kanaga

Michael Zarrilli

Pam Cavness

Served as Chief Compliance Officer with Edward Jones

- Former Chair FINRA National Adjudicatory Council

- Member FINRA Statutory Disqualification Committee

- Past member Securities Industry & Financial Markets

Compliance and Legal Executive Committee

Fixed income, banking and credit marketsAnalytics – statistical and quantitative

Partner, Chief Operating Officer at KLS Diversified Asset Mgt

Served as Chief Executive Officer of Stanwich Capital

- Deputy Head of North American Credit Mkts – JP Morgan

- Syndicated loans

- Credit product & derivatives

- Investment grade bonds

- Asset-backed securities

Served as Director in Global Proprietary Trading with Credit Suisse

Served as Sr Quantitative Analyst, Index Derivatives at Susquehannna

Investment Group

- Statistical arbitrage

- Volatility models

- Quantitative trading & macro strategies

Compliance, regulations and policy

This is an auxiliary committee that provides advice to the TMVOA Finance, Audit, and Budget Committee (FAB) to assist it in the exercise of its fiduciary responsibility

Page 26: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

26

Investment Committee

Pete Mitchell Michael Zarrilli

Pam Cavness

Served as Chief Compliance Officer with Edward Jones

- Former Chair FINRA National Adjudicatory Council

- Member FINRA Statutory Disqualification Committee

- Past member Securities Industry & Financial Markets

Compliance and Legal Executive Committee

Fixed income, banking and credit markets

Partner, Chief Operating Officer at KLS Diversified Asset Mgt

Served as Chief Executive Officer of Stanwich Capital

- Deputy Head of North American Credit Mkts – JP Morgan

- Syndicated loans

- Credit product & derivatives

- Investment grade bonds

- Asset-backed securities

Served as on TMVOA Board of Directors from 2012-2016,

also served at Vice Chairmen and member of Finance,

Audit and Budget committee

Founder & Director of two community banks in CA and AZ

Licensee for 33 years for McDonald’s restaurants

Compliance, regulations and policy

This is an auxiliary committee that provides advice to the TMVOA Finance, Audit, and Budget Committee (FAB) to assist it in the exercise of its fiduciary responsibility

Page 27: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 Review

Local Economy1

2020 Strategic Initiatives

Accomplishments

Need to Know (Member Services)

Real Estate

Trends

Member Services & Representation

Gondola Long-Term Plan

Economic Vibrancy & Sustainability

AGENDA

Financial

Association

Balance Sheet

Quarterly Updates

27

2 3

4

Page 28: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

RETA Historical View

28

Total Historical Since Inception $137,803,15829 Year Average $4,751,833

2004 thru 2018 $93,200,89515 Year Average $6,213,393

2014 thru 2018 $31,688,7425 Year Average $6,337,748

REAL ESTATE TRANSFER ASSESSMENT

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

(P)

20

20

(B)

$5.0M

$6.9M

Page 29: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

RETA Update

$6,940,000

$4,753,249

$5,691,103$6,337,748

-

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

2019 Actual 2019 Budget 2018 Actual 5 Year Average 29

REAL ESTATE TRANSFER ASSESSMENT

YTD 12/18

+$602K+$1.2M

+$2.2M

Page 30: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2018 Act 2019 Bud 2019 Act 5yr Avg

RETA: Real Estate Transfer Assessment

2019 Act

5yr Avg

2018 Act

2019 Bud

RETA Update

as of 12/17

Page 31: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

31

Real Estate

Snapshots

Trends# sold

Avg Price

Total Sales $

Price/sq ft

Pending

Stats

Currently Listed

Page 32: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$9,000,000

$10,000,000

$11,000,000

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Trending: Lodging

-3%

Reference: TMV Sales Tax Collections; graphs represent total sales

Total Lodging $% values are change vs prior year

-8%

32

YTD Oct ‘19

+10%+18%

+25%

▪Winter (+12.3%; +$3.6M)2018-19 $33.3M2017-18 $29.6M2016-17 $28.8M2015-16 $25.9M2014-15 $25.1M2013-14 $19.9M

▪ Summer (+7.5%; $1.3M)2019 $18.0M2018 $16.7M2017 $14.7M 2016 $13.8M2015 $11.6M2014 $9.6M

-4%

+12.3%

Winter

+34%

+0%

+14%

+18% -8%

+7.5%

Summer

+27%

Page 33: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

$0

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

$4,000,000

$4,500,000

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Trending: Restaurant

-3%

Reference: TMV Sales Tax Collections; graphs represent total sales

Total Restaurant $% values are change vs prior year

+33%

33

YTD Oct ‘19

+11%

+6%

+16%

▪Winter (+8.8%; +$1.2M)2018-19 $14.3M2017-18 $13.1M2016-17 $12.7M2015-16 $12.1M2014-15 $11.0M2013-14 $9.4M

▪ Summer (+14.2%; $1.3M)2019 $10.2M2018 $8.9M2017 $8.6M 2016 $8.3M2015 $7.1M2014 $5.7M+7%

+8.8 %

Winter

-11%

-1%

+26%

+14%

+14%

+14.2 %

Summer

+27%

Page 34: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Trending: Retail

-26%

Reference: TMV Sales Tax Collections; graphs represent total sales

Total Retail $% values are change vs prior year

+118%

34

YTD Oct ‘19

+22% +7%

+23%

▪Winter (+3.5%; +$513K)2018-19 $15.3M2017-18 $14.8M2016-17 $13.3M2015-16 $12.6M2014-15 $12.1M2013-14 $11.1M

▪ Summer (+29.9%; $1.6M)2019 $7.0M2018 $5.4M2017 $5.1M 2016 $4.7M2015 $4.1M2014 $4.2M-16%

+3.5 %

Winter

+62%

+19%

+45%

+35%

+12%

+29.9 %

Summer

+14%

$2.36M related to sale of business assets

Page 35: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

$0

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

$4,000,000

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

Trending: Retail- MV vs Out of Area

Reference: TMV Sales Tax Collections; graphs represent total sales

Total Retail-MV vs OoA$% values are change vs prior year

35

YTD Oct ‘19

▪Winter2018-19 Total $15.3M

MV Retail $13.6MOut of Area $1.7M

▪ Summer’19 Total $7.0M

MV Retail $4.5MOut of Area $2.5M

Important Note: Beginning January 2019, the Town made changes to the way sales tax is reported. Specifically, changes are:• Grocery and liquor is now rolled-up into Retail

(it was previously its own category)• Retail is now segmented into 2 categories

o MV (local businesses)o Out of Area (mostly for taxes

received from online purchases)

Page 36: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 Review

Local Economy1

2020 Strategic Initiatives

Accomplishments

Need to Know (Member Services)

Real Estate

Trends

Member Services & Representation

Gondola Long-Term Plan

Economic Vibrancy & Sustainability

AGENDA

Financial

Association

Balance Sheet

Quarterly Updates

36

2 3

4

Page 37: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Balance Sheet: At-a-Glance

$32.9MAssets

$14.845% Marketable & Temporary

Money Mkt Investments

$4.5Property & Equip 14%

$31.4M Member’s

Equity

=

$27.7 Undesignated

& OCI88%

Designated$3.7 12%Gondola & Chondola

Reserves

As of 9/30/19

37

95%

5% $1.5MLiabilities

1 Affordable Housing2 CO Lot 161C-R Mountain Village LLC

Gondola Op & Maint AP ($865K)AP ($907K) 60%

Bond Funding

Other ($46K) 3%

Gondola ($570K) 37%

Land Held for AF14% $1.4

Restricted Cash ($1.0M) 3%

Other ($483K) 1.5%

Cash & equivalents ($1.1M)3%

Land Held for Resale ($586K) 2%

$9.1Investment in Subsidiary228%

Page 38: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Financials

RETA

Gondola

Trends

Investments

Key Points

Ratios

38

pg 2

TMVOA

Quarterly

Financial

Snapshots

CONCISE SUMMARY TO

KEEP MEMBERS UPDATED

Page 39: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

2019 Review

Local Economy1

2020 Strategic Initiatives

Accomplishments

Need to Know (Member Services)

Real Estate

Trends

Member Services & Representation

Gondola Long-Term Plan

Economic Vibrancy & Sustainability

AGENDA

Financial

Association

Balance Sheet

Quarterly Updates

39

2 3

4

Page 40: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Serve

Membersh

ip

Strengthenin

g

Relationship

with

Membership

Inform & educate via consistent &

straightforward communications

Expand website➔Comprehensive

information portal

2020 Initiatives

Member

Representation

&

Services

40

Summer Mtg➔ to gather feedback &

help us better represent members

Page 41: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Serve

Membersh

ip

Strengthenin

g

Relationship

with

Membership

Continue to inform and educate

regional community & partners

Begin the independent analysis

(by gondola industry expert) that will

yield final report of options

(Phase 2)

2020 Initiatives

Transportation

- Gondola -

41

Page 42: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

Serve

Membersh

ipStrengthenin

g

Relationship

with

Membership

Continue to prepare and position

owned properties for next steps and

development

2020 Initiatives

Economic

Vibrancy

&

Sustainability

Continue to build upon Village

Vibrancy Initiatives & Programs

42

Work toward achieving goals in Comp

Plan – Finishing the Core (Vision)

Page 43: Annual Members Meeting · Complete 2027 Existing System Eval Eng. study (load capacity) Independent study: Phase 1 Operating plan Maintenance plan Repair & Capital plan Reserve analysis

43

Thank you for attending

43