Anniston PCB Site Natural Resource Damage Assessment
and Restoration: Draft Assessment Plan
January 21, 2010 Draft Assessment Plan
Public Meeting
![Page 2: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/2.jpg)
Anniston PCB Site Natural Resource Trustees
Alabama Department of
Conservation and Natural Resources
![Page 3: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/3.jpg)
Presentation Objectives
- Overview of the Natural Resource Damage Assessment and Restoration (NRDAR) process.
- Update on the NRDAR activities at the Anniston PCB Site.
- Overview of draft Anniston NRDAR Assessment Plan.
- Review schedule.
- Questions?
![Page 4: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/4.jpg)
It is the process used by natural resource trustees to determine the nature and extent of injury to trust natural resources caused by an oil spill or release of a hazardous substance.
What is Natural Resource Damage Assessment?
![Page 5: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/5.jpg)
General Steps in the NRDAR Process
- Pre-assessment Screen - Assessment Planning - Injury Determination - Injury Quantification - Damage Calculation - Restoration
![Page 6: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/6.jpg)
Superfund ERA Process
Screening-level
Problem Formulation
Study Design
Field Reconnaissance
Site Investigation
Risk Characterization
Risk Management
Remediation and Restoration Construction & Monitoring
Pre-Assessment Screen
Assessment Plan
Injury Determination
Injury Quantification
Damage Assessment
NRDAR Process
![Page 7: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/7.jpg)
concepts: … the process used by natural resource trustees to determine the nature and extent of injury to a trust natural resource caused by a release of a hazardous substance for the purpose of restoring the natural resource or acquiring its equivalent.
What is Natural Resource Damage Assessment?
![Page 8: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/8.jpg)
Anniston PCB Site EPA Superfund Operable Units
- Operable Unit 1 – Residential Areas
- Operable Unit 2 – Non-Residential Areas - from facility to HWY 78
- Operable Unit 3 – Solutia Facility - includes South and West End Landfills
- Operable Unit 4 – Choccolocco Creek and associated floodplain
![Page 9: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/9.jpg)
Red Denotes Fish Consumption Advisories
Superfund Site
Anniston
Logan Martin Lake
Lay Lake
Neely Henry Lake
Mitchell Lake
Anniston PCB Site NRDAR Study Area
![Page 10: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/10.jpg)
concepts: … the process used by natural resource trustees to determine the nature and extent of injury to trust natural resources caused by release of a hazardous substance.
What is Natural Resource Damage Assessment?
![Page 11: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/11.jpg)
Injury … any adverse change in the condition of a
resource caused by exposure to contaminants, including response actions
![Page 12: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/12.jpg)
Examples of Injuries to Fish and Wildlife
• Death • Disease • Cancer • Genetic Mutations • Physical Deformities • Behavioral Abnormalities
![Page 13: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/13.jpg)
concepts: … the process used by natural resource trustees to determine the nature and extent of injury to trust natural resources caused by release of a hazardous substance.
What is Natural Resource Damage Assessment?
![Page 14: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/14.jpg)
Anniston PCB Site Trust Resources
- surface water - groundwater - soils - sediment - benthos - mollusks - fish (and sportfishing) - terrestrial invertebrates - reptiles and amphibians - birds - mammals - threatened/endangered
species (12)
![Page 15: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/15.jpg)
concepts: … the process used by natural resource trustees to determine the nature and extent of injury to trust resources caused by releases of hazardous substances.
What is Natural Resource Damage Assessment?
![Page 16: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/16.jpg)
Anniston PCB Site Hazardous Substances (Chemicals of Concern)
- PCBs - lead, mercury and other
metals - organophosphate
pesticides - chlorophenols - solvents - others
![Page 17: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/17.jpg)
bottom-line: … NRDA is designed to compensate the environment and public for injuries to natural resources resulting from the release of hazardous substances - compensation achieved through:
- restoration, rehabilitation, replacement of injured resources
What is Natural Resource Damage Assessment?
![Page 18: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/18.jpg)
What Is Restoration?
Returning resources to conditions that existed prior to the release of hazardous substances.
![Page 19: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/19.jpg)
Examples of Restoration
• Enhance or restore quality of existing habitat (examples - planting trees, restoring streams, etc.) • Increase populations through reintroduction or
restocking (examples - stocking mussels or fish) • Public access and education (examples - providing nature trails, fishing access,
educational kiosks, etc.)
![Page 20: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/20.jpg)
Creation of riparian buffers benefits wildlife and improves water quality
![Page 21: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/21.jpg)
- Where are we in the NRDAR Process?
Anniston PCB Site NRDAR
![Page 22: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/22.jpg)
- Pre-assessment Screen: Final - February 2005
- Assessment Planning: Draft Stage 1 Assessment Plan
November 2009 - Injury Determination:
Ongoing - Injury Quantification - Damage Calculation - Restoration
Anniston PCB Site NRDAR - Status
![Page 23: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/23.jpg)
Anniston PCB Site Assessment Plan (draft)
![Page 24: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/24.jpg)
Chapter 1: Introduction - overview of the NRDA Process - summary of the Anniston PCB Site Pre-Assessment Screen - description of the intent and organization of the Plan - details on the Public Comment process
Anniston PCB Site Assessment Plan (draft)
![Page 25: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/25.jpg)
Chapter 2: Background - description of assessment area - site history - hazardous substance releases - overview of Superfund activities
Anniston PCB Site Assessment Plan (draft)
![Page 26: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/26.jpg)
Chapter 3: Authorities - review of legal authorities - identification of natural resources considered in the NRDA
Anniston PCB Site Assessment Plan (draft)
![Page 27: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/27.jpg)
Chapter 4: Coordination and Previous Actions of Trustees - Anniston PCB Site Trustee Team
Anniston PCB Site Assessment Plan (draft)
![Page 28: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/28.jpg)
Chapter 5: Confirmation of Exposure - overview of available information demonstrating a NRDAR is warranted - evaluates available data for: - surface water resources - groundwater resources - geological resources - biological resources
Anniston PCB Site Assessment Plan (draft)
![Page 29: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/29.jpg)
Chapter 6: Stage 1 Injury Assessment - describes proposed injury assessment approach - identifies data sources - evaluates exposure pathways - defines injury criteria
Anniston PCB Site Assessment Plan (draft)
![Page 30: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/30.jpg)
Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration or other compensation - describes restoration planning objectives and processes - describes coordination with the Superfund action
Anniston PCB Site Assessment Plan (draft)
![Page 31: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/31.jpg)
Chapter 8: References
Anniston PCB Site Assessment Plan (draft)
![Page 32: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/32.jpg)
Appendices A: Threatened and Endangered Species B: List of Chemicals of Potential Concern
Anniston PCB Site Assessment Plan (draft)
![Page 33: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/33.jpg)
Anniston PCB Site Draft NRDAR Assessment Plan
• A copy may be downloaded at http://www.fws.gov/daphne
or
• Request a copy from: Karen Marlowe Propst Hall, Rm. 229 800 Lakeshore Drive Birmingham, AL 35229-2234 (205)726-2667 [email protected]
![Page 34: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/34.jpg)
Anniston PCB Site Draft NRDAR Assessment Plan
• Comment period is open until January 31, 2010.
• Send comments to:
Karen Marlowe Propst Hall, Rm. 229 800 Lakeshore Drive Birmingham, AL 35229-2234 (205)726-2667 [email protected]
![Page 35: Anniston PCB Site Natural Resource Damage Assessment and ... 2010... · 1/21/2010 · Chapter 7: Damage Determination - describes proposed approach to calculate costs of restoration](https://reader034.vdocuments.us/reader034/viewer/2022051922/600fbd75c6daea6e1e6b684c/html5/thumbnails/35.jpg)
Questions?
Contact: Karen Marlowe Propst Hall, Rm. 229 800 Lakeshore Drive Birmingham, AL 35229-2234 (205) 726-2667 [email protected]