Annexure–1 (INDENT NO. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning
of Data Center at Kaiga Site of NPCIL
NOT FOR PUBLICATION / PRESENTATION OUTSIDE
NPCIL
NPCIL PROPRIETARY
This document is the property of the Nuclear Power Corporation of India Ltd.
No exploitation or transfer of any information contained herein is permitted in the
absence of an agreement with NPCIL and neither the document nor any information
contained herein may be released without the written consent of NPCIL.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 2 of 22
1. Introduction, background & Scope of work
About present Server Setup: Presently a dozen standalone servers are delivering various server
services for catering business needs in a heterogeneous operating system environment including
Windows 2000/2003/2008 Servers and RHEL 2.1/5.2/CentOS 5.2 systems. Server Applications
that are in the scope of migration are MS SQL, MySQL, Apache Web Service, IIS Web Services,
ColdFusion Server, SAMBA File Sharing services, QMail, SendMail, etc.
Scope
Scope of work comprises of Design, Implementation and commissioning of Highly Reliable and
Virtualized Data Center Setup for KGS Site as a replacement for existing servers and support
during the currency of the contract. The contractor's scope of work is to provide a complete
solution for the Data Center Setup including detailed design, supply, installation, configuration,
testing, commissioning and maintenance during the defects liability period for the following
elements and services:
1. Design & Implementation of Consolidated, Fault Tolerant, Highly Reliable Server Setup.
2. Supply of Servers, Storage and other equipments as detailed in bill of quantities and any
other component required for building data center.
3. Carrying out study of existing server hardware & software service infrastructure and suggest
best solution to cater high available server services, solutions, etc., based on the
acceptability to meet NPCIL requirements.
4. Installation of Virtualization platform in each server blades and creation of guest systems.
Installation of required OSs in guest VMs, Configuration of Server Services and migration of
existing application services into the virtualized environment.
5. Installation and Implementation of Desktop Virtualization (VDI) in robust and proven
platform.
6. Part replacement and breakdown maintenance of the system during the warranty period
shall be carried out without any additional charges.
7. Parking of ready-to-use components / spares to be maintained at KGS plant site during
warranty period as per the details given in the end of this document.
8. Training of NPCIL technical personnel.
Note: Bidder has to submit detailed proposed design document showing implementation of all
features meeting NPCIL requirement. The document should contain details of products,
features and implementation plan, without which the tender shall be rejected.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 3 of 22
2. Design Criteria
1. The proposed solution is to replace existing hardware infrastructure with a Consolidated
Virtualized & Fault Tolerant Data Center Setup. Brief information about existing
applications is detailed in this document. Tenderer may consider the information
provided in this document as a guideline for his design.
2. Hardware interoperability must be certified for the proposed main virtualization servers
and SAN Storage solution.
3. Servers and Storages must be enabled with remote administration facility.
4. The unified storage solution must have redundant RAID controllers.
5. Network interface between Servers & LAN will be 10G and Servers with Storage will be
10G iSCSI or higher speed.
6. Operating systems on Guest Systems and Application services will be installed in a
Virtualized environment.
7. The Unified storage shall be configured with high reliable features like de-duplication,
block & file level mirroring, thin provisioning, hybrid storage solution, cloud ready
storage features, regular snapshots, management & monitoring features etc.
8. The SAN should support Consolidated Backup Feature like snapshot-based, online
backups of Virtual Machines, etc.
9. The proposed virtualization solution must incorporate advanced, centralized,
management capabilities, including, but not limited to:
9.1. Provide proactive management and scalability for the virtual environment.
9.2. The virtualization solution must be capable to virtualize, aggregate and allocate
servers, storage and network resources precisely on demand and business priority.
9.3. The Virtual storage solution must provide the ability to handle virtualized disk
devices.
9.4. Virtual machine provisioning and live migration (must include the functionality to
provision virtual machines instantaneously and move virtual machines between
physical servers without incurring downtime.)
9.5. Template-based deployments (must enable the creation of templates from existing
virtual machines.)
9.6. Virtual machine cloning (must include the functionality to copy existing virtual
machines when a new instance of a server is needed )
9.7. Live migration of virtual machine disks (must enable the migration of virtual machine
disks from one physical storage array to another).
9.8. The proposed virtualization solution must provide a centralized management
interface to enable backup and recovery of the virtual machines.
10. The tape backup solution should support online backup of snapshots of VMs, SAN data
etc. Necessary backup agents for Windows Server, Linux Server, MS SQL, SAMBA file
share, and Oracle Database Server shall also be configured.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 4 of 22
11. The backup solution should be capable of LAN based and SAN based backup and restore
from various platforms including Linux and Windows machines.
12. The proposed solution shall contain the provisioning to support 100 numbers of clients in
a Unified VDI (virtual desktop infrastructure), in the initial pilot phase, using any proven
and robust platform. All required software & licenses shall be supplied by the bidder. The
VDI solution should be scalable to minimum 500 users without any need of additional
investment on software component.
13. Offsite Disaster Recovery Setup – Among existing servers, few systems will be made as DR
servers. Necessary jobs for setup like Virtual Systems installation at DR, configuring
application software, pulling data from DC, making reliable services with ready to host
services with data from data center in a scheduled interval etc. shall be carried out by the
bidder.
14. All systems & storages shall be IPv6 compliant.
15. All Servers, Storage SAN / NAS boxes and Switch components should be rack mountable.
3. List of Existing Software Application services:
3.1 Apache Web Server on Linux
3.2 IIS Web services
3.3 MySQL DB Server
3.4 PostgreSQL DB Server
3.5 MS SQL Server
3.6 Symantec Endpoint Servers
3.7 RHEL 2.1 Legacy Server for ColdFusion 5
3.8 QMail Server
3.9 SendMail Server
3.10 SAMBA file sharing services
3.11 SQUID proxy services
3.12 Windows Remote Desktops via Terminal Clients
4. List of Software Application services which are to be created under Guest VMs:
4.1 Windows
4.1.1 Windows IIS server with ColdFusion Application Server
4.1.2 Antivirus Server -1
4.1.3 Antivirus Server -2
4.1.4 SQL Server -1
4.1.5 SQL Server -2
4.1.6 .net Application server
4.1.7 ColdFusion Legacy Server (NTC)
4.1.8 Legacy SQL Server application server.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 5 of 22
4.2 Linux
4.2.1 Local SendMail Server
4.2.2 Apache Web server with PHP
4.2.3 MySQL Server
4.2.4 MySQL Server – Slave
4.2.5 PostgreSQL Server
4.2.6 Legacy Application Server- ColdFusion
4.2.7 SAMBA File Share server
4.2.8 QMail Server with OpenLDAP.
4.2.9 DNS & DHCP Servers (High available Mode )
4.2.10 SysLog Server
4.2.11 SQUID Proxy Server -1
4.2.12 SQUID Proxy Server -2
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 6 of 22
5. Vendor Qualification requirements:
5.1 The bidder should have executed minimum TWO Data Center solution using Virtualized &
VDI based projects, each worth minimum Rs. 34.00 Lakhs or ONE project worth minimum
Rs. 54.00 Lakhs during last three financial years. Copies of Purchase order or work order
to be submitted.
5.2 The bidder should have technical experts in Server Configuration with minimum one of the
experts holding certification from proposed OEM of Server Hardware and Virtualization
platforms employed on bidder’s rolls. List of experts with qualification and company
joining date etc., shall be furnished.
5.3 The bidders should have local support center in South India/Goa/Maharashtra. Detailed
address of the support center to be provided.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 7 of 22
6. Technical Specifications:
6.1 Item No.1.a: Blade Server Chassis
Sr.
Blade Server Chassis Compliance
(Y/N)
1 Slots
Blade Chassis shall have minimum 4 Slots for mounting dual CPU
blade servers. The chassis should have minimum 4 empty payload
slots to accommodate 4 more blades within the same chassis or
vendor shall provide additional chassis with appropriate node
distribution. Chassis should be populated with all required primary
components like RPS, NIC etc., and should be ready for deployment
of blade node servers.
2 RPS Shall have minimum 2 RPS units
3 NIC Shall have Minimum 2 NIC
4 Admin Shall have Remote administration features
5 Fillers Shall have Node fillers
6 Rail Kit Shall supply along with Rail Kit
7 KVM Shall have Remote Management facility thru IP Based KVM feature
8 Certification Electrical Approvals and Compliances
9 Restrictions on Hazardous Substances (RoHS) Compliance
10 Shall be certified for UL/cUL/TUV certifications.
6.2 Item No.1.b: Blade Servers
Sr. Description Server Details Compliance
(Y/N)
1 CPU
Each server should be configured with a minimum of two (2) Intel
Xeon E5 V3 Series CPU with 8 core, 20MB Cache, 2.4 GHz or
higher available in latest series compatible for the blade chassis
offered.
2 HDD
The server should have minimum 2 hot-swappable SSD drives
loaded with 2 x 120 GB Enterprise / Power series SSD HDD. MTBF
of SSD should be minimum 2.0 million hours.
SSDs
Each SSD shall support TRIM and TRIM 3, Power loss data
protection, S.M.A.R.T, etc.
3 RAID The RAID controller should support RAID 1
4 RAM
Should have at least 8 DIMM slots and scalable up to 256 GB
memory. The server should be populated with 64 GB memory
with 16 GB or higher capacity modules
5 ECC RAM The Memory should be DDR4 ECC 2133 MHz or higher
6 NIC Ports
(a) Should have 2 x 1 Gbe LAN for network connectivity
(b) Should have 2 x 10Gbps iSCSI ports for Network & Storage
connectivity
7 PCI Each server should offer minimum 1 PCI Express 3.0 slot
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 8 of 22
8 Ports Should have the following ports for server connectivity: 2 USB
ports, 1 video port
9 Redundancy Should have redundant fans
10 Management Shall provide remote management facility like iLo, etc.
11 OS Server shall be compatible with Citrix XenServer 6.2, VmWare,
RHEL 5.2/6.5/7 and Windows Server 2008, 2012
12 Certification Electrical Approvals and Compliances
13 Restrictions on Hazardous Substances (RoHS) Compliance
14 Shall be certified for UL/cUL/TUV certifications.
6.3 Item No. 2: Unified Storage
Sr. Description Details Compliance
(Y/N)
1 Architecture Unified Storage shall have redundant controllers.
2 Cache Each RAID controller must have cache memory of 1 GB or higher
3 Features • No single Point of Failure (NSPoF) configuration
• Necessary RPS etc. should be configured from day 1
4 Controller
The storage array system must have redundant storage
controllers with automatic failover to each other in case of one
controller failure.
5 RAID Support Should have RAID 5, 6, 10, 50, 60 or equivalent features
6 Disks The storage system must support at least 24 drives of 2.5” unit.
7 Capacity
The storage system is to be supplied with 24 numbers 480 GB or
higher capacity aggregating minimum 11 TB of raw space,
Datacenter series SSD disks. Each SSD shall support TRIM and
TRIM 3 , Power loss data protection, S.M.A.R.T, etc.
Furnish
complete
details.
8 Performance
IOPS of each SSD shall be > 50K for 4K Read and 40 K for 4KB
write; And for the entire SSD array the IOPS Read shall be greater
than 80K. The MTBF of each SSD shall be minimum 2 million
hours.
9 Protocol
Support The storage system must have 2 x 10Gbps unified interface with
licenses for popular protocols like NFS, CIFS, FC
10 OS The Storage system should be suitably configured for achieving
enhanced performance, throughput, high availability etc.
11 OS Support
It must support heterogeneous client operating systems, on both
block and file, which include all flavors of Windows, Linux and
virtualization hypervisors like Citrix XenServer, Microsoft Hyper-V,
VMWare, etc.
12 Interface Must be configured with following minimum interfaces: 2 x 1GbE
copper RJ45 and 2*10 G unified.
13 Management
Interface There must be redundant 1Gbps LAN ports / equivalent
mechanism for management
14 Multipath Shall support Multipath feature with necessary licenses from day
1
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 9 of 22
15 LUN Must support 128 LUNs or more
16 Functionality
The offered storage array shall have support for thin provisioning
and de-duplication (Block as well as file) and compression. All the
licenses for the same should be configured for the total capacity
supported by the storage.
17 Snapshot The storage must provide feature for creation of 32 or more
point-in-time copies / snapshots per file system and to be able to
restore from those copies.
18 ACL Must be configured with user / group / directory based file system
quotas, permissions and access controls.
19 Security The storage shall support all standard SAN & NAS security
features
20 Storage
enclosure
The storage system must be supplied with its storage OEM rack.
All the necessary items like power supply inlets, adapters, all
cables and other optical interfaces and cables for enclosure
interconnections must be part of the storage system supply
21 Firmware
functionality
Should be firmware upgradable for functionality improvement
and enhancements. Must support non-disruptive upgrade of core
software, snap shot, clone, remote mirroring and management
software.
22
Resource
Management
features
Comprehensive storage resource management software (GUI,
Web GUI and CLI) for fully configuring, managing and
administering block & file storage and associated functionalities
including deployment, automation, provisioning, protection and
monitoring. It must support event auditing for security. The date,
time, and nature of the action must also be logged. It shall provide
management control of SNMP, e-mail notification etc.
23 Mirroring
The Unified storage shall support Synchronous Replication
(Campus Mirroring) to another identical or equivalent unit. The
SAN shall be ready with feature like "Delta-based snapshots-on
the secondary appliances maintain point in time recovery".
24 Asynchronous
Replication -
For complete business continuity and disaster recovery, the
storage shall support Asynchronous Replication to a remote site
or to the cloud of all Virtual Machine.
25 Railing Kit Shall supply railing kit.
26 NDMP The proposed solution shall support NDMP (Network Data
Management Protocol) or equivalent.
27 Licenses All the licenses on the storage system must be provided for the
offered capacity & features.
28 Certification Electrical Approvals and Compliances
29 Restrictions on Hazardous Substances (RoHS) Compliance
30 Shall be certified for UL/cUL/TUV certifications.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 10 of 22
6.4 Item No.3: Data Center Switch
Sr.
Details Compliance
(Y/N)
1 Switch 16 Port, 10 Gbps speed - Top of the Rack Unified Switch
2 Shall have minimum 2 RPS units
3 16 Nos. of necessary Fiber/Twin Ax cables to be supplied
4 Certification Electrical Approvals and Compliances
5 Restrictions on Hazardous Substances (RoHS) Compliance
6.5 Item No. 4: NAS Storage box features.
Sr. Description Details Compliance
(Y/N)
1 Architecture 48 TB NAS storage box shall have redundant controllers.
2 Cache Each RAID controller must have cache memory of 1 GB or higher
3 Features • No single Point of Failure (NSPoF) configuration
• Necessary RPS etc. should be configured from day 1
4 RAID Support Should have RAID 5,6,10,50 or equivalent features
5 Disks The storage system must support at least 24 drives unit.
6 Capacity (a) The storage system is to be supplied with 24 x 2 TB SATA 2 or
SATA 3 Hard Disks
7 Protocol
Support The storage system must have 2 x 1 Gbps unified interface with
licenses for popular protocols like NFS, CIFS
8 Management
Interface There must be redundant 1Gbps LAN ports / equivalent
mechanism for management
9 ACL Must be configured with user/ group/ directory based file system
quotas, permissions and access controls.
10 Security The storage shall support all standard SAN & NAS security features
11 Storage
enclosure
The storage system must be supplied with its storage OEM rack.
All the necessary items like power supply inlets, adapters, all
cables and other optical interfaces and cables for enclosure
interconnections must be part of the storage system supply
12
Resource
Management
features
Comprehensive storage resource management software(GUI,
Web GUI and CLI) for fully configuring, managing and
administering block & file storage and associated functionalities
including deployment, automation, provisioning, protection and
monitoring. It must support event auditing for security.
13 Licenses All the licenses on the storage system must be provided for the
offered capacity & features.
14 Certification Electrical Approvals and Compliances
15 Restrictions on Hazardous Substances (RoHS) Compliance
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 11 of 22
6.6 Item No. 4: Tape Library with software.
Sr. Description Details Compliance
(Y/N)
1 Slots
LTO 5 or higher Tape library should be supplied with minimum 2
Nos. Drives of LTO 5 and 12 slots, auto loader with Standard
19”’ rack mount with rail kit. And necessary backup software
also shall be part of the solution.
2 RPS Shall be ready with RPS.
3 Interface 8G / 10 Gbps FC / iSCSI unified interfaces compatible with the
storage solution offered.
4 Bar code
reader
The tape library must support standard ANSI compliant barcodes
and for labeling of the storage media. Bar code reader should be
supplied along with tape library.
5 Rack/Enclosure The appropriate rack should be supplied keeping in mind of its
full scalability and movement of its robotic arm.
6 Hot swappable Following items must be fully hot swappable: Drive, Fans,
Redundant power supplies.
7 Management
Web based remote monitoring and management over LAN. It
should offer detailed drive and media health, utilization,
lifecycle, performance monitoring and tracking for the library
System monitoring & alerting features using SMTP & SNMP
8 Compatibility Full compatibility with all leading backup software products like
Symantec backup software.
9 LTO Cartridges
supply
Shall supply 2 numbers LTO-5 tape cartridges with labels &
barcodes and 2 cleaning LTO cartridges along with the tape
library.
10 Backup
The proposed tape library shall be able to support both
scheduled as well as ad-hoc backup and restore requests.
Backup operations according to the central backup schedule
shall require no manual intervention.
Proposed tape library must be compatible on the following
platforms:
• Windows 2012 server or latest
• Linux (Redhat /CentOS)
11 NDMP The proposed tape library shall support NDMP (Network Data
Management Protocol) or equivalent.
12 Security Drives should support AES-256 bit encryption
13 Reliability
The proposed tape library must be equipped with full capability
in terms of Reliability, Availability and Serviceability (RAS).
Proposed tape library should be able to provide component level
fault isolation. Loss of any single power supply within the library
must not result in loss of any functionality of the robotics or
drives in the proposed library. Proposed Tape Library must be
able to monitor and preemptively alert of potential failure of
components
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 12 of 22
14 Component
supply
The vendor should provide all necessary components, such as
cables, adapters, to connect the tape library to the proposed
Unified storage / server / SAN switches
15 Agents Agents to backup & restore - Windows, Linux, SQL Server,
Oracle Instances & databases
16 Certification Electrical Approvals and Compliances
17 Restrictions on Hazardous Substances (RoHS) Compliance
6.7 Items Nos. 9, 10 & 11: Installation and Commissioning / VDI / DR setup.
Supplier shall ensure that trained and qualified personnel are involved in installation and
commissioning. Personnel engaged in the installation and commissioning work will have to
follow the security procedures controlling entry and movement. These personnel have to
strictly follow the safety regulation of site. In such a matter, purchaser’s instruction wherever
given will be binding.
Installation
The Blade servers will be installed in a virtualized environment with optimum number
of guest systems in each server. All existing applications listed in sl #3 will be migrated
to the new setup. Details of applications that are to be established also mentioned in
the sl #4 of this document. The entire servers data, VMs, etc, will be configured with
backup & restore facility using the Tape Library solution.
The Unified Virtual Desktop setup is to establish fully virtualized desktop from any
device including PC, Laptop, and other smart devices. In the pilot phase, the setup will
have all normal desktop environment features using a thin interface like browser.
Facility to add resources to Servers including computing power, storage etc should be
without any hindrance and shall be done thru a web based portal. Detailed technical
specification of VDI is mentioned in this document.
Few Servers of existing infrastructure will be converted as DR systems and proper
setup will be established in a virtualized environment to mitigate risks. Appropriate
setup shall be implemented to gather data from DC & Storage using PUSH / PULL
methods.
6.8 Items No. 12: On-site Warranty
The data center setup shall carry a comprehensive, on site, maintenance warranty of three
years from the date of commissioning with advance warranty replacement (AWR) scheme
with response time of 48 hours. Documentary proof regarding back to back agreement with
OEM for support of the all hardware components during the period shall be submitted. The
scope of warranty shall include replacement of the defective part, breakdown maintenance
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 13 of 22
etc. during this period. The faulty units shall be replaced/repaired free of cost at site by the
supplier.
NPCIL reserves right to add or remove any components of Servers and SAN, like RAM and
hard disks, and the warranty for the original items supplied by the bidder shall be valid for
the entire currency of the contract. Necessary support for major configuration changes in
hardware / software, during the warranty period shall be extended by the bidder without any
extra cost to purchaser.
7. Documentation:
I. Operation and Maintenance Manual: The Successful bidder has to supply operating and
maintenance manual for all types of servers & storages
II. Technical description: All the technical details of the systems has to be provided in details.
It may include technical data sheets, system architecture, parts catalogue etc.
III. Troubleshooting and Maintenance Instructions: The detailed troubleshooting methods,
routine and periodic maintenance procedures, Manufacturers operating and
maintenance manual and one soft copy in PDF of MS word for each systems shall be
supplied to the purchaser.
8. Training:
The supplier shall provide training with minimum one week duration to purchaser’s
engineers and staff. Supplier shall provide all the facilities and documents or manuals
for training. Hands on training on all major features of the supplied solution shall be
included in the training program.
The training should cover:
1. Configuration of XEN Server installation and creation of Virtual Machines.
2. Installation of VMs in various OS platform with storage from common shared SAN
infrastructure.
3. Server Monitoring and management
4. Troubleshooting
5. Creation of Snapshots of data, VMs, databases etc
6. Backup & restore using tape library.
7. Overall administration.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 14 of 22
9. Inspection & Testing
I. Trial Run testing: After the successful installation and commissioning of all the DC, the
overall server services at Kaiga should function satisfactorily and as per the requirement
of purchaser. Trial Run should be carried out for seven days after the successful
installation and commissioning of systems.
II. Test Reports: Copies of the inspection and test reports signed by the authorized
representative of the supplier shall be submitted to purchaser
10. Payment Terms: 90% against material supply and 10% after successful completion of the
job as certified by EIC of user section as per clause no. 9 of the Annexure-1.
11. Preferred completion time including delivery period:
Two months from the date of Purchase order. Bidder should clearly mention the plan of action
with detailed milestone chart.
12. General Information and Conditions:
12.1 The contractor's scope of work is to provide a complete solution for the Data Center
infrastructure and services including detailed design, supply, installation, configuration,
testing, training, commissioning and maintenance during the defects liability period for
the elements and services.
12.2 The entire scope of the work will be considered as single entity and the order will not
be split.
12.3 The above work / installation is to be done at KAIGA GENERATING STATION, Kaiga P.O.,
Uttar Kannada-District, Karnataka, situated approximately 55 Kms. from Karwar.
12.4 The NPCIL can provide end-user-certificate in its own format, if required. End user
certificate in any other format will not be issued. The bidder may take note of this
point before quoting.
12.5 The OEM should have local TAC (Technical Assistance Centre) based in India for offering
post sales technical support. NPCIL - Kaiga technical / commercial team may decide to
visit the TAC support center during the evaluation of the bids. Documentary proof in
this regard shall accompany the offer.
12.6 The compliance statement for Hardware & Storage solutions, technical specification
listed herewith must be provided on the respective OEM’s letter heads along with the
Manufacturer Authorization letter to each System Integrator (bidder) whom they are
supporting.
12.7 Bidders upon notification from NPCIL-KAIGA should be able to show a PoC complying
the technical requirements specified in the RFP, all the required hardware and software
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 15 of 22
should be organized by the bidder / OEM.
12.8 The bidder must quote for complete scope of work. Offers not covering complete scope
of work will not be accepted.
12.9 The BOM are based on generic requirement. Bidder should carry out detailed analysis
and include all the components, cables, any other items required to implement the
solution as a whole to meet the design requirements. All such items may be clearly
indicated and included in the offer. No claim for any additional item shall be
entertained.
12.10 The bidder has to execute the project by his own strengths and manpower and it should
not be outsourced to any 3rd party vendor.
12.11 Bidder should necessarily quote for the optional items which may be ordered based on
NPCIL requirement. However, Optional items will be considered for evaluation of bid.
The quantity will be decided based on the actual requirement to meet the functionality
of the proposed design and the same will be considered for arriving at lowest bid.
12.12 NPCIL reserves the right to order reduced quantities for all the items including
Blade Server Chassis & Servers.
12.13 Bidders are advised to visit the site and survey to get acquainted with the actual layout
of the site, nature and quantum of work before proposing the solution, prior to bid.
12.14 Material handling and transportation: Contractor shall make his own arrangement for
conveyance, boarding / lodging of their staff without any extra charges to the
corporation. However, local (i.e. Mallapur residential colony) accommodation for staff
stationed at KGS, during the period of the contract, may be provided on chargeable
basis subject to the availability of the room, as per the station policy.
12.15 NPCIL will provide to and fro transport facility for the Service Engineers between
Mallapur Township and Kaiga Site, subject to availability on chargeable basis.
Approximate to & fro charge per person per day is Rs. 40/- and subjected to revision
from time to time.
12.16 During the work at KGS tenderer and all his staff should adhere to the safety & security
guidelines and regulations followed at KGS site.
12.17 Any neglect or failure on the part of the contractor in obtaining necessary and reliable
information upon the foregoing or any other matters affecting the contract shall not
relieve him from risks or liabilities or the entire responsibility from completion of the
work at the schedule rates and in compliance of scope of work.
12.18 No verbal agreements or influence from conversation with any officer either before,
during or after the execution of the contract agreement shall in any way affect or
modify any of the terms or obligations here in contained.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 16 of 22
12.19 Precautionary measures.
The contractor shall take all precautionary measures not to damage any electric poles,
cables, water supply or sewage pipelines and any structure, which are close to work site
or come in the way during mobilizing the machines etc. If any damage occurs the same
shall have to be rectified and made good by the contractor at his own cost.
12.20 Inspection of Sites:
The department has made available the various data in this tender document so as to
enable the contractor to get an idea of work as well as working conditions. The bid
shall not be deemed to have been based only on such data, but the contractor shall be
responsible for his own assessment and interpretation thereof.
12.21 Activity Schedule:
The contractor shall submit to the Engineer-in-charge a detailed activity schedule
showing the probable dates of commencement and completion of the work considering
the total working period in which the work is scheduled to be completed and the
Programme shall be adhered to.
12.22 Security Rules:
The contractor shall be solely responsible for the safe custody and security of the
material issued to them for the subject work and for their own material and
equipments.
12.23 A point to point compliance with respect to all the points of this specification
indicating details of deviation, if any, as mentioned in Sr. No. 6 Specification section of
this document, shall be submitted.
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 17 of 22
12.24 Virtual Desktop Infrastructure Technical Specifications:
Sr.
Description Compliance
(Y/N)
Deviation,
if any
1
VDI
Scalability,
Performance
& Reliability
Existing hardware must be supported
with ability to add them as additional
server processing nodes for load
balancing with application delivery
It must feature ability to add additional
users via re use of existing server
hardware
Must feature ability to add new
hardware as compute nodes to the
solution for future expansion
Must have Inbuilt traffic load balancer
Inbuilt traffic Load Balancer policies
must include provision for
setting/customization of RAM, CPU,
Virtual Desktop Sessions, Disk Space
and Network Parameters
Must make optimized use of the
network and must use only http traffic
ports only (port 80 and port 443) for
delivery as well as management of VDI
It must support IPv6 to enable future
upgrade of current IPv4 networks
All existing client infrastructure (end-
points, desktops, thin-clients) must be
supported seamlessly irrespective of
the make or brand or architecture
Must have the ability to auto recover
failed/non-functioning nodes
2 VDI Security
The proposed solution must be able to
secure the entire communication
process using HTTPS (SSL)
Full authentication and integration
with existing LDAP and Windows AD,
Novel Network as well as support
internal SQL based database profiles
Must support CAS for remote
authentication
Supported CAS Authentication
methods must include
CAS Authentication, Password, Remote
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 18 of 22
User authentication, Token
authentication
Must have inbuilt anti-virus (or quote
for 3rd
party antivirus for management
of the end points)
3
VDI
Management
, Control &
Logs
Web based portal for provisioning and
managing users, user groups,
applications, application groups and all
related policies
Able to set user/group quotas,
monitoring and managing usage
Able to add and deliver both Windows
and Linux applications seamless in a
single virtual desktop session
Able to publish applications directly
from web based portal to users and
user groups
Ability to add or delete applications
dynamically via web portal without
requiring a reboot of the server
Able to provide pre-login scripts
Able to change user profiles
dynamically during active session
Option to switch to maintenance mode
from production for entire solution or
part of the solution which includes
compute nodes, storage
Detailed display, monitoring and
reporting of sessions logs,
administration actions, user logging
and reporting
Able to enable debug option list in the
logs
Able to set debug levels of info,
warning, error and critical
Able to specify cache log update
interval and cache log expiry time
Automatic settings must be provided
for bandwidth adjustments of VDI
sessions
Must provide policy for administration
delegation to certain users or user
groups
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 19 of 22
The proposed solution must have
ability to boot multiple operating
systems depending on the end points
Proposed solution must be able to
access client USBs and client printers
and must have the ability to provide
controlled access to user groups
The proposed solution must have the
ability to control persistent sessions
Must feature the ability to auto-create
user profiles when non-existent
Must feature the ability to allow
sessions without a valid profile or even
when a shared folder's fileserver is
missing
Must be able to set the default mode
for user session
Must be able to set the default
language, timeout for session, as well
session access time restriction based
on the day or month
Option for enabling users to launch a
virtual desktop session even if some of
his published applications are not
available
Option for enabling users to use a
console in the virtual desktop session
for managing scripts
Option to let users bypass any admin
restrictions
Able to set or disable user profiles,
user quotas and always-on VDI
sessions
4 Storage Able to publish and provision common
shared storage folder support
Able to connect end point users to
existing/third-party SAN/NAS with user
authentication
Must provide support for disk storage
and allocation policies
Must provide support for storage
redundancy
Must provide backup and disaster
recovery from central location with
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 20 of 22
capability for bare-metal backup and
recovery of disk partitions on remote
thin clients
5
Delivery,
Collaboration
and
Functionality
Clients should be able access resources
and facilities using just Firefox, IE,
Safari, Opera and other modern web
browsers
Able to let end users collaborate with
each other in real time
Only screen updates, keystrokes and
mouse clicks traverse the network
ensuring efficient use of network
bandwidth
Provide private, secure access to user
files and folders
Able to recover lost sessions without
any loss in DATA
The entire sessions must be preserved
as-is in case of disconnections or
network disruptions and user should
be able to resume work from where
we left off
Automatic reconnections for users
with slow network connectivity
Compatible with every device having
just a html browser (thin clients,
desktops, mobile devices, tablets)
The proposed solution should be able
to deliver complete desktop via
network and full applications via
browser to the end user
Able to deliver thousands of
applications
Must support delivery of applications
to IPADs, Android based devices and
other smart devices (independent of
the firmware, operating system or
hardware)
Must be ease to use with centralized
Management (web based) portal for
controlling and managing applications
Interoperability with Windows, Linux
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 21 of 22
Able to deliver entire operating
systems via diskless boot option to the
end user
Able to do remote cloning and remote
operating system deployment to new
as well as existing systems
Able to do hardware diagnostics to
existing systems
Support delivery of windows, Linux
and other operating systems to end
points as well as other existing systems
Support remote recovery and security
diagnostics to new and existing
systems and must feature options to
support remote infrastructure
management with management tools
Must support the option to let the end
points work independently in case of
the central appliance failure
The proposed solution should support
full HD video on the end points
(1080p) at minimum of 24 frames
playback and support editing high
resolution images. It must support
major multimedia operations
The proposed solution must be
compatible with major provider like
VMware vSphere, Microsoft Hyper-V
and Citrix XenServer
Must feature the ability to host
windows as well as other OS
applications (please quote suitable
licenses for RDP, Server CALs, VDI CALS
for the said number of end points)
Must have the ability to dynamically
configure printers, webcams,
headphones, and other devices in the
end points
Must support html5, adobe flash and
Java
Must provide the ability to add existing
pcs/desktops as end-points seamlessly
without any major change in the
hardware
Annexure–1 (Indent No. 51170)
Scope, Specifications, Terms & Conditions for Design, Implementation and commissioning of
Data Center at Kaiga Site of NPCIL
Page 22 of 22
Vendor must be ready for complete
PoC on all the above points
Vendor must quote all suitable and
required licenses with 3 years support
6 Licenses
Include suitable VDI Licenses with
Installation, Security Updates/Patches,
MS VDI (if any), CALS (Server/Client if
any), Virtualization CALS (if any),
Server CALS
7 Warranty Software updates for 3 years