andryaas mamuaya visualcv resume
TRANSCRIPT
-
8/8/2019 Andryaas Mamuaya VisualCV Resume
1/7
Andryaas Mamuaya
Project Manager
PT PROFAB Indonesia
PT PROFAB
Indonesia:http://www.profab.co.id
PT PAL Indonesia: http://www.pal.co.id
See My Online CV: http://www.yourwebcv.com/cv.php?user=amamuaya
Batam, Indonesia Feb 2010 - Present
Surabaya, Other, Indonesia Jan 1992 - Jan 2010
Summary
I consider myself to be a self-motivated, hard working, punctual, and conscientious individual, capable
of working to high standards and under pressure either as part of a team or on own initiative. As a
team member, I enjoy an excellent working relationship with colleagues of all ages and personalities. I
am also able to write creatively and critically, and successfully meet deadline
Work History
PT PROFAB INDONESIA
Project Manager
The Profab group of companies provides a one stop solution for the oil & gas and related Industries
from field development to production to refining, Profab can design and manufacture all size and
material Pressure Vessels, Air Cooled Heat Exchangers, Shell & Tube Heat Exchangers. We
manufacture Process Modules and Well Head Platforms up to 2000t. Additionally we provide Valve
refurbishment and design, supply and operate onshore or offshore Drilling Derricks.
2010- Present: PT PROFABs Project Manager
2010 : Project Manager in PT PROFAB Indonesia for Chevron- Anchor Pile Project2010 : Project Manager for Skid Module for Siemens - DGF Vessel for EMAS Project
2010 : Project Manager for Dril ling Template for FMC - PT PAN -Pertamina Project
2010 : Project Manager for Thickeners Mechanism for Siemens - Hyundai-Hanwa-Arzew
Refinery
2010 : Project Manager for Fuel Gas Skid for Boustead- Cristal Project
2010 : Project Manager for Fuel Gas Skid for Boustead- Petrobas-BIH Project
PT PAL Indonesia
Project Manager
PAL INDONESIA lives up to its reputation as a primary force for national maritime-industry
development. As part of its effort to support the foundation of a solid maritime industry, we strive to
deliver knowledge, skills and technology for wider use in the national maritime industry community.
This effort has become even more relevant as it holds the key for an enhanced national maritime
industry.
Participated in GE's
Nuovo Pignone fo Tota
Tunu 7 Project
2002As a Production Engineer participan
Nuovo Pignone- Italy. PT PAL
awarded EPC Contract by Total
Indonesie, Tunu VIII & IX Gas
Compression Modules
Stator Frame for Gas
Turbine Power Plant600MW
2005
20 Unit of Stator Frame 600MW
was made in 2 years for HarbinElectric Corporation during 200
to 2007. Scope of work compris
of Material procurement,
Fabrication, Welding and
Machinery. Total weight of one
Frame is 100MT.
Brace Monopod Platfor
Kodeco KE32
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 1
http://www.profab.co.id/http://www.pal.co.id/http://www.yourwebcv.com/cv.php?user=amamuayahttp://www.yourwebcv.com/cv.php?user=amamuayahttp://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84http://www.yourwebcv.com/cv.php?user=amamuayahttp://www.yourwebcv.com/cv.php?user=amamuayahttp://www.pal.co.id/http://www.profab.co.id/ -
8/8/2019 Andryaas Mamuaya VisualCV Resume
2/7
2001-2009 : PT PALs Project Manager
1998-2001 : PT PALs Project Coordinator
1995-1998 : PT PALs Production Engineer
1992-1995 : PT PALs Supervisor
2008-2010 : Project Manager in PT PAL Indonesia for Alstom, ElTebbin, CSA Spain Project
2007 : Project Manager in PT PAL Indonesia for Metering Skid PGN Project (Perusahaan
Gas Negara)
2006-2007 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication,
Precommisioning of KE 32, Topside and Monopod Jacket for KODECO Energy Project
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for KODECO Energy Oil Co., Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) KE32 Wellhead Platform and 7 km of 12 Pipeline (from KE32 to Tee-junction along KE38-PPP)
(c) Tie-in of the KE-30 pipeline to the preinstalled KE-30 pipeline riser on PPP after PPP installation
(d) Gas Expansion Phase II Pipeline (70 km of 16 pipelines from PPP to ORF)
(e) 2 km of 16 Horizontal directional drilling (HDD) pipelines
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are
working to the planning.
2005-2006 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication,
Precommisioning of Zelda F, Topside and Monopod Jacket for Sumatra SES CNOOC Project
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for CNOOC, Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) Wellhead Platform and 7 km of 12 Pipeline (from WHP to Tee-junction along )
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are
working to the planning.
2005-2007 : Project Manager for Fabrication & Machining Stator Frame 300MW & 600MW for
China. Our client Harbin Electric Company- China awarded USD 3.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 300MW (10 units) and Stator Frame
600MW (10 units). All units will be shipped to China within 1.5 year. Project team involved are 1
Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production
Engineer, 4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders.
Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan (Manpower
plan, schedule, engineering, procurement & subcontractor), Project Execution, Project Controlling,
Reporting Status & Progress to Upper management & Client, Evaluation
2004-2005 : Project Manager for UOP Recovery Plus Project Module Refinery Plant Pertamina
Balongan. Our client UOP LLC USA awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Installation of UOP Recovery Plus Module for Pertamina Balongan. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,2 Production Engineer, 4 Shops manager ( 4 shops for welding and machining), 20 Fitter and 16
Welders. Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan
(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation
2003-2004 : PT PALs Project Manager for Pressure Vessels for TUNU 9 Field Defelopment
Project Our client was PT Astinaputera Ekaperkasa awarded USD 600.000 for Engineering,
Procurement, Fabrication, and Machining of Pressure Vessels for TUNU 9 Field. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,
2 Production Engineer, 2 Shops manager ( 2 shops for welding and machining), 10 Fitter and 15
Welders. Project Manager Jobs are: Review Contract, Manage Kick Off Meeting, Project Plan
2006
Awarded Contract by Kodeco Energ
Ltd. for KE-32 Braced Monopod
Platform
General Electric StatorFrame
General Electric award in total
Units of Stator Frame since 199
to 2002. Range of 300MW to
700MW
Alstom project delivered
to El Tebbin
Balance of Plant such as MainCondenser, LP Heater was
delivered to ElTebbin Egypt
WHP AHESS
PLATFORM "A"
WELLHEAD PLATFORM A
UJUNG PANGKAHDEVELOPMENT PROJECT
(AMERADA HESS)
JACKET 160 TON
PILES 480 TON
DECK 450 TON
TOTAL 1090 TON
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 2
http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84 -
8/8/2019 Andryaas Mamuaya VisualCV Resume
3/7
(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation
2002 : Project Manager for LPG Storage Vessels for Cemara LPG Plant. Our client PT
Wahana Insannugraha awarded USD 400.000 for Engineering, Procurement, Fabrication, and
Installation of LPG Storage Tank and scrubber to Cirebon. Project team involved are 1 Project
Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer,
4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager
jobs are: Review Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule,
engineering, procurement & subcontractor), Project Execution, Project Controlling, Updating &
Reporting Status & Progress to Upper management & Client, Evaluation
2002 : PT PALs Project Manager for Duri Steam Flood Area 11 EPC. Our client PT.
Tripatra awarded USD 400.000 for Engineering, Procurement, Fabrication, and Machining of
Pressure Vessel for Caltex Pacific Indonesia. Project team involved are 1 Project Sponsor, 1 Project
Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager
( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review
Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering,
procurement & subcontractor), Project Execution, Project Controlling, Reporting Status & Progress
to Upper management & Client, Evaluation
2001 : PT PALs Project Manager for Stator Frame 7FH2 Project (Mitsubishi Electric
Company -MELCO ) Our client Mitsubishi Electric Company-JAPAN awarded total USD 950.000
for Engineering, Procurement, Fabrication, and Machining of Stator Frame 400MW (10 units) All
units shipped to JAPAN. Project team involved are 1 Project Sponsor, 1 Project Manager, 1
Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops
for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract,
Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement &
subcontractor), Project Execution, Project Controlling, Reporting Status & Progress to Upper
management & Client, Evaluation
2001 : PT PALs Project Manager for Stator Frame 7FH2 Project (General Electric )
Our client General Electric Power System USA awarded total USD 10.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 400MW (85 units) All units shipped to
USA. Project team involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1
Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops for welding and
machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract, Manage Kick
Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement & subcontractor),
Project Execution, Project Controlling, Reporting Status & Progress to Upper management & Client,
Evaluation
2000 : PT PALs Production Engineer for Produced Fluid Heat Exchanger, CGS Area 10
Project (Caltex Project) Our client IKPT awarded USD 900.000 for Engineering, Procurement,
Fabrication, and Machining of Heat Exchanger for Caltex Pacific Indonesia. Production Engineer job
are: Detail Scheduling, Monitor and Update Status, Reporting to Project Manager.
1999 : PT PALs Production Engineer for Air Cooled H/E Project (VICO)
Our client VICO Indonesia awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Testing of Air Colled H/E. Production Engineer job are: Detail Scheduling, Monitor
and Update Status, Reporting to Project Manager.
1995 1998 : PT PALs Production Engineer for Barge Mounted Power Plant Project (PLN-IHI
Project). Our client PT PLN awarded USD 13.000.000 for Engineering, Procurement, Fabrication,
Installation and Testing of BMPP. Production Engineer job are: Detail Scheduling, Monitor andUpdate Status, Reporting to Project Manager.
1992 1995 : PT PALs Supervisor for PLTU Gresik, PLTU Paiton Project, PLTUG Suralaya
Project
Zelda F Monopod WHP
CNOOC
As Project Engineer in EPC Proj
ZELDA F MONOPOD
WELLHEAD PLATFORMCNOOC SES, Ltd
MEZZ & MAIN DECK 184 TON
CELLAR DECK 114 TON
CAISSON & BOAT LAND 212 TON
PILES 175 TON
TOTAL 685 TON
Condenser Module for
Alstom
Alstom Power is one of the long
term customer and award seve
BOP Project for Europe and Fa
East Power Plant.
Drilling Template -FMC
for PT PAN
Four leg Drilling Template
designed by FMC for PTPartalahan start fabrication by
early August 2010 and comple
by end of September 2010
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 3
http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84 -
8/8/2019 Andryaas Mamuaya VisualCV Resume
4/7
Surabaya, Indonesia Jun 1996 - Jan 2000
Surabaya, Other, Indonesia Jan 1989 - Jan 1992
Education
University of Dr. Soetomo
Bachelor Degree, English
http://fs.unitomo.ac.id/
PT PAL Education Centre
Shipbuilding Technical High School
Load Out to Supply Vessel
Template on board
Suction Pile for Chevro
In progress
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 4
http://fs.unitomo.ac.id/http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84http://fs.unitomo.ac.id/ -
8/8/2019 Andryaas Mamuaya VisualCV Resume
5/7
As Mechanic in
Mitsubishi -Kobe
It was invited by Melco-
Mitsubishi ElectricCompany for Inspection
of Stator Frame that was
ordered for 15 Unit of300MW Stator Frame to
PT PAL
Installation UOP
Module at
Balongan for Blue
Sky Project
Pertamina
The Module was
fabricated in PT PAL and
deliver to Balongan for
installation andcommisioning
Kodeco KE32
Topside
Do you ever see WHP/
Topside Platformfabricated inside of
workshop? The building
must be tall enough andthe goodness was very
quick and no obstacleslike bad weathers.
The Twilight of
Jacket
This Jacket for Kodeco
KE32 was alsofabricated inside of
workshop and load outwas in the twilight to
catch the high tide of the
seawater...
MRS Skid
More than 150 units
MRS Skid was fabricatedfor PGN Project funded
by World Bank
Balance of Plant
Alstom BOP for Egypt
ready to Sail Out.....goodbye my baby
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 5
http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84 -
8/8/2019 Andryaas Mamuaya VisualCV Resume
6/7
With PT PAL
colleagues and
Client
The background wasContainer Vessel and
taken in the evening with
friends and my clientfrom Harbin-China
Hang out in Cafe
Sampoerna for
farewell party
All my friend since 1989were in school...good
luck
My Real Project
They are my realwork.........
Lunch@Sampoerna
Cafe
UOP team in lunch time
Technical Standard, Improvement and Project Management
(Advanced)10+ Years Experience, (Currently in use)
Project Management & Skill Up Training
(Advanced)10+ Years Experience, (Currently in use)
Skills
Excellent understanding of Material specifications, standardized by ASTM, ASME and BS, DNV,
MIGAS regulation, piping oil and gas platforms.
Wide experiences on technical clarifications, material inspections and testingsUnderstanding in application of Six Sigma, TQM, Kaizen, FMEA, Earn Value Analisys, RCA in
industrial and project management.
Professional Training
2005 : ESQ Leadership Training (Certificate)
2005 : FINON (Financial for Non Finance Manager) (Certificate)
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 6
http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84 -
8/8/2019 Andryaas Mamuaya VisualCV Resume
7/7
POWER PLANT PROJECT EXPERIENCE
(Advanced)
10+ Years Experience, (Last Used 10+ years ago)
OIL & GAS PROJECT EXPERIENCE
(Advanced)
10+ Years Experience, (Last Used 10+ years ago)
2003 : Project Management Institute Training PMBOK (Certificate)
2001 : GE Supplier Project Manager Training, Port Blair, India
2000 : ASME Sec. VIII Div.I (Certificate)
1999 : Package Assembly & Testing of Gas Turbine and Centrifugal Compressor, Florence, Italy
1996 : The Pre-Advanced English Course (Conversation Level 6) (Certificate)
1997 : Peluang dan Tantangan Implementasi ISO 14000 di Industri dalam Era Pasar Bebas
(Certificate)
1997 : Indonesian Quality Convention 1997 (Certificate)
Contribution in Power Plant Project:
Supply of Balance Of Plant for several Power Plant Components Provider (General Electric Power System,
Mitsubishi Heavy Industries, Alstom Power Systems, Siemens, etc)EPCI Barge Mounted Power Plant (1 x 30 MW) PT. PLN
Supply of Balance Of Plant for Gunung Salak Geothermal Power Plant (1x65 MW) ANSALDO, ItalyRehabilitation Works of Power Plant for PLTU Priok unit #3 & #4 (2 x 50 MW) PT. PLN
EPCI 2 x 20 MW Gas Turbine Power Plant Teluk Lembu, Lampung PT. PLN
EPCI 1 x 20 MW Gas Turbine Power Plant PIM-2, Aceh PT. PLN
EPCI 2 x 2.5 MW Geothermal Power Plant Ulumbu, NTT PT. PLN (Under Construction)
Process Components for several oil & gas exploration & production (Caltex Pacific Indonesia, Vico
Indonesia, Total Indonesie)Process Components for several oil & gas contractors (IKPT, Sempec, TPEC, Rekayasa Industri)Skid Mounted for Sempec, TPEC and Punj Lloyd
Modules Packages (< 300 tons) for ARII, Total Indonesie and UOP (USA)Sub-structure monopod for ARII
Floating Structure for UNOCAL IndonesiaWellhead Platform, Topside, Jacket & Pipeline Installation (Amerada HESS Indonesia, Kodeco Energy,CNOOC)
Interests
My interest in opportunities of Oil and Gas, Power Plant Project in Project Management field
This next-generation resume was created using VisualCV
View My VisualCV Online: http://www.visualcv.com/ifjw
Page 7
http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84