analysis forms.docx
TRANSCRIPT
-
8/10/2019 analysis forms.docx
1/24
RICS Elemental Standard Form of Cost Analysis 1
Analysis FormsElemental Cost Analysis
PROJECT TITLE:Building Type: Type of work:Location: Client:Date for receipt: Date of acceptance:Date for tender/Base Month: Date of site possession:
PROJECT DESCIPTION
SITE CONDITIONS
ACCOMMODATION AND DESIGN
CREDITS
Client:Architect:Quantity surveyor:CDM Coordinator:Mechanical Engineer:Electrical Engineer:Structural Engineer:
General Contractor:
-
8/10/2019 analysis forms.docx
2/24
RICS Elemental Standard Form of Cost Analysis 2
DETAILS OF BUILDINGFloor AreasBasement floors: m Usable Area: mGround floors: 130.83m Circulation Area: mUpper floors: 392.49m 2 Ancillary Areas: m 2 Total (Gross Internal Floor Area): m Internal Divisions: mSpaces not enclosed: m Total (Gross Internal Floor Area): mInternal cube: m 2 Areas of lowest floor: m 2 Site area: m Number of Units: mStoreys
No of storeys Average storey height Nr of storeys (Primary): Nr Below ground floor(s): m Nr of storeys (Secondary): Nr Ground floor: mBasement storeys include above: Nr Above ground floor(s): m
External vertical envelope : (Ext. walls windows & floor(s) m
PERCENTAGE OF GROSS FLOOR AREA Blow ground floor % ---------average storey construction %Single storey construction % ---------average storey construction %
% ---------average storey construction %
FUNCTUNAL UNITSQuantity Unit Quantity Unit1. 2.
BUILDING ACCREDITATION SCORE(S) Scheme: Scheme:Version: Version:Score: Score:Carbon Emissions:Basis of calculation: Result:
PROCUREMENT DETAILSContract pricingDocumentationSelection of Contractor:
Type of Contract:Cost Fluctuation:Contract period Stipulated by Client: Weeks
Offered by Contractor: WeeksAgreed: Weeks
-
8/10/2019 analysis forms.docx
3/24
RICS Elemental Standard Form of Cost Analysis 3
MARKET CONDITIONTender Price IndexProject Index:Index Series:Base:
TENDER Number of tender issued: Number of tender received:Competitive tender list (where appropriate) 1. 6.2. 7.3. 8.4. 9.5. 10.Adjustment on accepted tender (where applicable):
Basic of analysis:
BREAKDOWN OF COST
Contract Analysed building (where different)Measured work Measured workPrime cost sums Prime cost sumsProvisional sums Provisional sumsPreliminaries PreliminariesOverheads and profit Overhead and profitDesign fees Design feesRisk (clients contingencies) Risk (clients contingencies) Contract sum Contract sum
-
8/10/2019 analysis forms.docx
4/24
RICS Elemental Standard Form of Cost Analysis 4
Detailed (Elemental) Cost AnalysisELEMENT Element
TotalCost
Cost perm2 GIFA
UnitQuantity Unit Rate
1 SUBSTRUCTURE m2
2 SUPERSTRUCTURE m 2 2.1 Frame m 2 2.2 Upper Floors m 2 2.3 Roof m 2 2.4 Stairs and Ramps Nr2.5 External Walls m2.6 Windows and External Doors m2.7 Internal Walls and Partitions m2.8 Internal Doors Nr
Total Superstructure
3 INTERNAL FINISHES3.1 Wall Finishes m 2 3.2 Floor Finishes m 2 3.3 Ceiling Finishes m 2
Total internal Finishes
4. FITTINGS, FURNISHING ANDEQUIPMENT m2
5. SERVICES5.1 Sanitary Installations Nr5.2 Services Equipment Nr5.3 Disposal Installations Nr5.4 Water Installations m5.5 Heat Source kW5.6 Space Heating and Air Conditioning m5.7 Ventilation Systems m5.8 Electrical Installations m5.9 Fuel Installations m5.10 Lift and Conveyor Installations Nr5.11 Fire and Lightning Protection m 2
5.12 Communication, Security and ControlInstallations m2
5.13 Specialist Installations m5.14 Builders Work in Connection with Services m 2
Total Services6 PREFABRICATED BUILDING AND
BUILDING UNITS m2
7 WORK TO EXISTING BUILDING7.1 Minor Demolition and Alteration Works m 2
Total Work to Existing Building
ELEMENT Element
-
8/10/2019 analysis forms.docx
5/24
RICS Elemental Standard Form of Cost Analysis 5
TotalCost
Cost perm2 GIFA
UnitQuantity Unit Rate
BUILDING SUB-TOTAL8 EXTERNAL WORKS8.1 Site preparation Works m 2
8.2 Roads, Paths, Paving and Surfacing m2
8.3 Soft Landscaping, Planting and IrrigationSystems m
2
8.4 Fencing, Railing and Walls m 2 8.5 External Fixtures m 2 8.6 External Drainage m 2 8.7 External Services m
8.8 Minor Building Works and AncillaryBuilding m2
Total External Works0 FACILITATING WORKS
0.1Taxic/Hazardous/Contaminated MaterialsTreatment m
2
0.2 Major Demolition Works m0.3 Temporary Support to Adjacent Structures m0.4 Specialist Ground Works m0.5 Temporary Diversion Works m0.6 Extraordinary Site Investigation m
Total Facilitating Work
9 MAIN CONTRACTORSPRELIMINARIES
10 MAIN CONTRACTORS OVERHEAD &PROFIT
CONTRACT TOTAL (excludingcontingencies and fees )
11 PROJECT/ DESIGN TEAM FEES
12 OTHER DEVELOPMENT/ PROJECTCOSTS13 RISK (CLIENTS CONTINGENCIES)
TOTAL CONTACT/PROJECT COST*
*Where the costs analysed are based on a building contract this will the total contract sum includingany employers contingencies and contractors design fees. Where other client costs are includedthese should be identified and the total will be the project cost.
Amplified (Sub-Elemental) Cost Analysis
-
8/10/2019 analysis forms.docx
6/24
RICS Elemental Standard Form of Cost Analysis 6
ELEMENT Sub-Element ElementQuantity Unit Total
CostTotalCost
Cost per m 2
UnitQuant
ity
UnitRate
1. SUBSTRUCTURE1.1 Substructure1.1.1 Standard Foundations1.1.2 Specialist Foundations1.1.3 Lowest Floor
Construction1.1.4 Basement Excavation1.1.5 Basement Retaining Walls
Substructure m
2. SUPERSTRUCTURE 2.1 Frame
2.1.1 FrameFrame m
2.2 Upper Floor2.2.1 Floors2.2.2 Balconies2.2.3 Drainage to Balconies
Upper Floors m 2
2.3 Roof2.3.1 Roof Structure2.3.2 Roof Covering2.3.3 Specialist Roof Systems2.3.4 Roof Drainage2.3.5 Rooflights, Skylights and
Openings2.3.6 Roof Features
Roof m
2.4 Stairs and Ramps2.4.1 Stair/Ramp Structures2.4.2 Stair/Ramp Finishes2.4.3 Stair/Ramp Balustrades
and Handrails2.4.4 Ladders/Chutes/Slides
Stairs Nr
ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit
-
8/10/2019 analysis forms.docx
7/24
RICS Elemental Standard Form of Cost Analysis 7
Cost Cost perm2
Quantity
Rate
2.5 External Works2.5.1 External Enclosing Walls
above Ground Level2.5.2 External Enclosing Walls below Ground Level
2.5.3 Solar/Rain Screening2.5.4 External Soffits2.5.5 Subsidiary Walls,
Balustrades andProprietary Balconies
2.5.6 Faade Access/ CleaningSystems
Include Faade Retention WorksExternal Walls m
2.6 Windows and External Doors2.6.1 External Windows2.6.2 External Doors
Windows and External Doors m 2
2.7 Internal Walls and Partitions2.7.1 Walls and Partitions2.7.2 Balustrades and Handrails2.7.3 Moveable Room Dividers2.7.4 Cubicles
Internal Walls and Partitions m2
2.8 Internal Doors2.8.1 Internal Doors
Internal Doors m
3. INTERNAL FINISHES 3.1 Wall Finishes
3.1.1 Wall FinishesWall Finishes m
3.2 Floor Finishes3.2.1 Finishes to Floors3.2.2 Raised Access Floors
Floor Finishes m
3.3 Ceiling Finishes3.3.1 Finishes to Ceilings3.3.2 False Ceiling3.3.3 Demountable Suspended
CeilingCeiling Finishes m 2
ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit
-
8/10/2019 analysis forms.docx
8/24
RICS Elemental Standard Form of Cost Analysis 8
Cost Cost perm2
Quantity
Rate
4. FITTINGS, FURNISHINGS AND EQUIPMENT 4.1 Fittings, Furnishings and Equipment
4.1.1 General Fittings,Furnishing and Equipment
4.1.2 Domestic Kitchen Fittingsand Equipment
4.1.3 Special Purpose Fittings,Furnishing and Equipment
4.1.4 Signs/ Notices4.1.5 Works of Art4.1.6 Non-Mechanical and
Non-Electrical Equipment4.1.7 Internal Planting4.1.8 Bird and Vermin Control
Fittings m 2
5. SERVICES 5.1 Sanitary Installation
5.1.1 Sanitary Appliances5.1.2 Sanitary ancillaries
Sanitary Installations Nr
5.2 Service Equipment5.2.1 Services Equipment
Service Equipment Nr
5.3 Disposal Installation5.3.1 Foul Drainage above
ground5.3.2 Chemical, Toxic and
industrial Liquid WasteDisposal
Sanitary Installations Nr
5.4 Water Installation5.4.1 Main Water Supply5.4.2 Cold Water Distribution5.4.3 Hot Water Distribution5.4.4 Local Hot Water
Distribution5.4.5 Steam and Condensate
DistributionWater Installation m
ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit
-
8/10/2019 analysis forms.docx
9/24
RICS Elemental Standard Form of Cost Analysis 9
Cost Cost per m 2 Quantity
Rate
5.5 Heat Source5.5.1 Heat Source
Heat Source kW
5.6 Space Heating and Air Conditioning5.6.1 Central Heating5.6.2 Local Heating5.6.3 Central Cooling5.6.4 Local Cooling5.6.5 Central Heating and
Cooing5.6.6 Local Heating and
Cooling5.6.7 Central Air Conditioning5.6.8 Local Air ConditioningInclude Faade Retention Works
Space Heating and Air Conditioning m
5.7 Ventilation System5.7.1 Central Ventilation5.7.2 Local and Special
Ventilation5.7.3 Smoke Extract/Control
Ventilating System m
5.8 Electrical Installation5.8.1 Electrical Mains and Sub-
Main Distribution5.8.2 Power Installation5.8.3 Lightning Installation5.8.4 Specialist Lightning
Installations5.8.5 Local Electricity
Generation Systems5.8.6 Earthing and Bonding
SystemsElectrical Installation m
5.9 Fuel Installation5.9.1 Fuel Storage5.9.2 Fuel Distribution Systems
Fuel Installations m
ELEMENT Sub-Element Element
-
8/10/2019 analysis forms.docx
10/24
RICS Elemental Standard Form of Cost Analysis 10
Quantity
Unit TotalCost
TotalCost
Cost perm2
UnitQuant
ity
UnitRate
5.10 Lift and Conveyor Installations
5.10.1 Lifts and Enclosed Hoists5.10.2 Escalators5.10.3 Moving Pavements5.10.4 Powered Stair lifts5.10.5 Conveyors5.10.6 Dock Levellers and
Scissor Lifts5.10.7 Cranes and Unenclosed
Hoists5.10.8 Car Lifts, Car Stacking
Systems, Turntables and
the like5.10.9 Document HandlingSystems
5.10.10 Other Lift and ConveyorInstallations
Lift and Conveyor Installations Nr
5.11 Fire and Lightning Protection5.11.1 Fire Lightning Systems5.11.2 Fire Suppression Systems5.11.3 Lightning Protection
Fire and Lightning Protection m 2
5.12 Communication, Security and Control Systems5.12.1 Communication Systems5.12.2 Security Systems5.12.3 Central Control/ Building
Management SystemsCommunication, Security and
Control Systems m2
5.13 Specialist Installations
5.13.1 Specialist Piped SupplyInstallations5.13.2 Specialist Refrigeration
Systems5.13.3 Specialist Mechanical
Installations5.13.4 Specialist Electrical/
Electronic Installations5.13.5 Water Features
Specialist Installations m 2
-
8/10/2019 analysis forms.docx
11/24
RICS Elemental Standard Form of Cost Analysis 11
ELEMENT Sub-Element ElementQuantity Unit Total
CostTotalCost
Cost per m 2
UnitQuant
ity
UnitRate
5.14 Builders Work in Connection with Services (BWIC) 5.14.1 Builders Work inConnection with Services
Builders Work in Connection withServices m
2
6. PREFRABRICATED BUILDINGS AND BUILDING UNITS 6.1 Prefabricated Buildings and Building Units
6.1.1 Complete Buildings6.1.2 Building Units6.1.3 Pods
Prefabricated Buildingsand Building Units m
2
7. WORK TO EXISTING BUILDING 7.1 Minor Demolitions and Alterations
7.1.1 Minor Demolitions andAlterations
Minor Demolitions and Alterations m
BUILDING SUB-TOTAL
8. EXTERNAL WORKS
8.1 Site Preparation Works8.1.1 Site Clearance8.1.2 Preparatory
GroundworksSite Preparation Works m 2
8.2 Roads, Paths, Pavings and Surfacings8.2.1 Roads, Paths and Pavings8.2.2 Special Surfacings and
PavingsRoads, Paths, Pavings and Surfacings m 2
8.3 Soft Landscaping, Planting and Irrigation Systems8.3.1 Seeding and Turfing8.3.2 External Planting8.3.3 Irrigation Systems
Soft Landscaping, Planting and IrrigationSystems m
2
ELEMENT Sub-Element Element
-
8/10/2019 analysis forms.docx
12/24
RICS Elemental Standard Form of Cost Analysis 12
Quantity Unit TotalCost
TotalCost
Cost per m 2
UnitQuant
ity
UnitRate
8.4 Fencing, Railings and Walls
8.4.1 Fencing and Railings8.4.2 Walls and Screens8.4.3 Retaining Walls8.4.4 Barriers and Guardrails
Fencing, Railings and Walls m
8.5 External Fixtures8.5.1 Site/Street Furniture and
Equipment8.5.2 Ornamental Features
External Fixtures m
8.6 External Drainage8.6.1 Surface Water and Foul
Water Drainage8.6.2 Ancillary Drainage
Systems8.6.3 External Chemical, Toxic
and Industrial LiquidWaste Drainage
8.6.4 Land DrainageExternal Drainage m
8.7 External Services8.7.1 Water Mains Supply8.7.2 Electricity Mains Supply8.7.3 External Transformation
Devices8.7.4 Electricity Distribution to
External Plant andEquipment
8.7.5 Gas Mains Supply8.7.6 Telecommunications and
other Communication
System Connection8.7.7 External Fuel Storageand Piped DistributionSystems
8.7.8 External Security System8.7.9 External/Street Lightning
Systems8.7.10 Local/District Heating
Installations8.7.11 Builders Work
Connection with ExternalServices
External Services mELEMENT Sub-Element Element
-
8/10/2019 analysis forms.docx
13/24
RICS Elemental Standard Form of Cost Analysis 13
Quantity Unit TotalCost
TotalCost
Cost per m 2
UnitQuant
ity
UnitRate
8.8 Minor Building Works and Ancillary Buildings
8.8.1 Minor Building Works8.8.2 Ancillary Buildings andStructures
8.8.3 Underpinning to ExternalSite Boundary Walls
Minor Building Works and AncillaryBuildings m
2
0. FACILITATING WORKS 0.1 Toxic/Hazardous/Contaminated Material Treatment
0.1.1 Toxic/HazardousMaterial Removal
0.1.2 Contaminated Land0.1.3 Eradication of Plant
GrowthToxic/Hazardous/contaminated
Material Treatment m2
0.2 Major Demolition Works0.2.1 Demolition Works0.2.2 Soft Strip Works
Major Demolition Works m 2
0.3 Temporary Support to Adjacent Structures0.3.1 Temporary Support to
Adjacent StructuresTemporary Support to Adjacent Structures m
0.4 Specialist Groundworks0. 4.1 Site Dewatering and
Pumping0.4.2 Soil Stabilisation
Measures0.4.3 Ground Gas Venting
MeasuresSpecialist Groundwork m 2
0.5 Temporary Diversion Works0.5.1 Temporary Diversion
WorksTemporary Diversion Works m 2
ELEMENT Sub-Element Element
-
8/10/2019 analysis forms.docx
14/24
RICS Elemental Standard Form of Cost Analysis 14
Quantity Unit TotalCost
TotalCost
Cost per m 2
UnitQuant
ity
UnitRate
0.6 Extraordinary Site Investigation
0. 6.1 ArchaeologicalInvestigation0.6.2 Reptile/Wildlife
Mitigation Measures0.6.3 Other Extraordinary Site
InvestigationExtraordinary Site Investigation m 2
9. MAIN CONTRACTORS PRELIMINARIES9.1 Employers Requirements9.2 Main Contractors Cost Item s
Preliminaries m
10. MAIN CONTRACTORS OVERHEADS and PROFIT10.1 Main Contractor s Overheads10.2 Main Contractors Profit
Overheads and Profits
TOTAL CONTRACT SUM (Excluding Contingencies and Contractors Design Fees)
11. PROJECT/DESIGN TEAM FEES 11.1 Consultants Fees 11.2 Main Contractors Pre -Construction Design Fees11.3 Main Contractors Design Fees
Project/Design Team Fees
12. OTHER DEVELOPMENT/PROJECT COSTS 12.1 Other Development/Project Costs
Other Development/Project Costs
13. RISK (CLIENTS CONTINGENCIES) 13.1 Design Development Risk13.2 Construction Risk13.3 Employer Change Risk13.4 Employer Other Risk
Risk (Contingencies)TOTAL CONTRACT/PROJECT COST*
*Where the costs analysed are based on a building contract this will be the total contract sumincluding any employers contingencies and contractors design fees. Where other client costs areincluded these should be identified and the total will be the project cost.
-
8/10/2019 analysis forms.docx
15/24
RICS Elemental Standard Form of Cost Analysis 15
Specification and Design NotesELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
1. SUBSTRUCTURE1.1 Substructure 1.1.1 Standard Foundations
Nature of Soil 1.1.2 Special Foundations
Permissible soil loading kN/m 2 1.1.3 Lowest Floor Construction
Bearing strata depth m 1.1.4 Basement Excavation
Site levels: main gradients m 1.1.5 Basement Retaining Walls
Water table depth m
Average pile loading kN
Volume of basement m
2. SUPERSTRUCTURE2.1 Frame 2.1.1 Frame
Grid pattern of main columns
2.2 Upper floors 2.2.1 Floors
Design loads kN/m 2.2.2 Balconies
Spans m 2.2.3 Drainage to Balconies
Sound insulation dB
Angle of slope deg
Area of incline for slopingsurfaces
m
2.3 Roof 2.3.1 Roof structure
Design loads kN/m 2 2.3.2 Roof Coverings
Spans m 2.3.3 Specialist Roof Systems
Angle of pitch of sloping roofs deg 2.3.4 Roof Drainage
Area of roof surface m 2.3.5 Rooflights, Skylights andOpening
Area of roof (as built) (on plan) m 2.3.6 Roof Features
-
8/10/2019 analysis forms.docx
16/24
RICS Elemental Standard Form of Cost Analysis 16
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
2.5 External Walls 2.5.1 External Enclosing Wallsabove Ground Level
Design loads of loadbearing Walls kN/m 2 2.5.2 External Enclosing Walls below Ground Level
Thermal conductivity-U value W/m 2K 2.5.3 Solar/Rain Screening
Sound Insulation dB 2.5.4 External Soffits
Area of External walls aboveground
m2 2.5.5 Subsidiary Walls,Balustrades andProprietary Balconies
Area of basement walls m 2.5.6 Faade Access/CleaningSystems
Details of faade retention work m 2.5.7 Faade Retention
2.6 Windows and External Doors 2.6.1 External Windows
Total window area m2
2.6.2 External DoorsArea of opening lights to windows m
External door area m 2
2.7 Internal walls and Partitions 2.7.1 Walls and Partitions
Sound Insulation dB 2.7.2 Balustrades and Handrails
Number of WC cubicles Nr 2.7.3 Moveable Room Dividers
2.7.4 Cubicles
2.8 Internal Doors 2.8.1 Internal Doors
Number of Doors by type and size Nr
Fire rating Hr
3. INTERNAL FINISHES3.1 Wall Finishes 3.1.1 Wall Finishes
2.4 Stairs and Ramps 2.4.1 Stairs/Ramp Structures
Total vertical height of eachstaircase and width betweenstrings
m 2.4.2 Stair/Ramp Finishes
2.4.3 Stair/Ramp Balustradesand Handrails
2.4.4 Ladders/Chutes/Slides
-
8/10/2019 analysis forms.docx
17/24
RICS Elemental Standard Form of Cost Analysis 17
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
3.2 Floor Finishes 3.2.1 Finishes to Floors
3.2.2 Raised Access Floors
3.3 Ceiling Finishes 3.3.1 Finishes to Ceiling
3.3.2 False Ceiling
3.3.3 Demountable SuspendedCeiling
4. FITTINGS, FURNISHINGS AND EQUIPMENT4.1 Fittings, Furnishings and
Equipment4.1.1 General Fittings,
Furnishings andEquipment
4.1.2 Domestic Kitchen Fittingsand Equipment
4.1.3 Special Purpose Fittings,Furnishings andEquipment
4.1.4 Sign/Notices
4.1.5 Works of Art
4.1.6 Non-Mechanical and Non Electrical Equipment
4.1.7 Internal Planting
4.1.8 Bird and Vermin Control
5. SERVICES 5.1 Sanitary Installation 5.1.1 Sanitary Application
5.1.2 Sanitary Ancillaries
5.2 Services Equipment 5.2.1 Services Equipment
5.3 Disposal Installations 5.3.1 Fuel Drainage aboveground
5.3.2 Chemical Toxic andIndustrial Liquid WasteDisposal
5.3.3 Refuse Disposal
-
8/10/2019 analysis forms.docx
18/24
RICS Elemental Standard Form of Cost Analysis 18
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
5.4 Water Installation 5.4.1 Main Supply
Total number of draw-off points Nr 5.4.2 Cold Water Distribution
5.4.3 Hot Water Distribution
5.4.4 Local Hot WaterDistribution
5.4.5 Steam and CondensateDistribution
5.5 Heat Source 5.5.1 Heat Source
Rating in kW kW
5.6 Space Heating and AirConditioning
5.6.1 Central Heating
Volume of treated space m 5.6.2 Local Heating
5.6.3 Central Cooling
5.6.4 Local Cooling
5.6.5 Central Heating andCooling
5.6.6 Local Heating and Cooling
5.6.7 Central Air Conditioning
5.6.8 Local Air Conditioning
5.7 Ventilating System 5.7.1 Central Ventilation
Volume of treated space m 5.7.2 Local and SpecialVentilation
5.7.3 Smoke Extract/Control
5.8 Electrical Installations 5.8.1 Electric Mains and Sub-Mains DistributionTotal Electric load kVA 5.8.2 Power Installations
Illumination levels lux 5.8.3 Lightning Installations
Capacity of Local electricityGeneration
% 5.8.4 Specialist LightningInstallation
Capacity for EmergencyGeneration
% 5.8.5 Local ElectricityConnection System
Capacity for uninterruptibleGeneration
% 5.8.6 Earthing and BondingSystems
Powered for uninterruptible powersupply min
-
8/10/2019 analysis forms.docx
19/24
RICS Elemental Standard Form of Cost Analysis 19
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
5.9 Fuel Installation 5.9.1 Fuel Storage
Total number of draw-off points Nr 5.9.2 Fuel Distribution System
5.10 Lifts and Conveyor Installations 5.10.1 Lifts and Enclosed Hoists
Lift-peak passenger numbers anddesigned waiting times
5.10.2 Escalators
Lifts-number,capacity,speed,number of doors & height served
5.10.3 Moving Pavements
Escalators-rise and travel 5.10.4 Powered Stairlifts
Conveyors-rise and travel 5.10.5 Conveyors
Goods lifts, hoists, cranes, docklevelers, scissor lifts, etc-designed load
kN 5.10.6 Dock Levellers andScissor Lifts
5.10.7 Cranes and UnenclosedHoists
5.10.8 Car lifts, Car StackingSystems, Turntables andthe Like
5.10.9 Document HandlingSystems
5.10.10 Other Lift and ConveyorInstallations
5.11 Fire and Lightning Protection 5.11.1 Fire Fighting Systems
Details of each installation 5.11.2 Fire Suppression Systems
5.11.3 Lightning Protection
5.12 Communication and SecurityInstallation
5.12.1 Communication Systems
Details of each installation 5.12.2 Security Systems
5.12.3 Central Control/BuildingManagement Systems
5.13 Special Installations 5.13.1 Specialist Piped SupplyInstallations
Details of each installation 5.13.2 Specialist RefrigerationSystems
5.13.3 Specialist MechanicalInstallations
5.13.4 SpecialistElectric/ElectronicInstallations/Systems
5.13.5 Water Features
-
8/10/2019 analysis forms.docx
20/24
RICS Elemental Standard Form of Cost Analysis 20
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
5.14 Builders Work in Connectionwith Services
5.14.1 Builders Work inConnection with Services
6. REFABRICATED BUILDINGS AND BUILDING UNITS6.1 Prefabricated Buildings and
Building Units6.1.1 Complete Building
Floor area of each unit or floorarea and a number of each type ofunit
6.1.2 Building Units
6.1.3 Pods
7. WORK TO EXISTING BUILDING7.1 Minor Demolitions and
Alterations7.1.1 Minor Demolitions and
Alterations
8. EXTERNAL WORKS 8.1 Site Preparation Works 8.1.1 Site Clearance
8.1.2 Preparatory Groundworks
8.2 Roads, Paths, Pavings andSurfacings
8.2.1 Roads, Paths and Pavings
8.2.2 Special Surfacing andPavings
8.3 Soft Landscaping, Planting, andIrrigation Systems 8.3.1 Seeding and Turfing8.3.2 External Planting
8.3.3 Irrigation Systems
8.4 Fencing, Railing and Walls 8.4.1 Fencing and Railings
8.4.2 Walls and Screens
8.4.3 Retailing Walls
8.4.4 Barriers and Guardrails
8.5 External Fixtures 8.5.1 Site/Street Furniture andEquipment
8.5.2 Ornamental Features
-
8/10/2019 analysis forms.docx
21/24
RICS Elemental Standard Form of Cost Analysis 21
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
8.6 External Drainage 8.6.1 Surface Water and FoulWater Drainage
8.6.2 Ancillary DrainageSystems
8.6.3 External Chemical, Toxicand industrial Liquid WaterDrainage
8.6.4 Land Drainage
8.7 External Services 8.7.1 Water Main Supply
8.7.2 Electricity Mains Supply
8.7.3 External TransformationDevices
8.7.4 Electricity Distribution toExternal Plant andEquipment
8.7.5 Gas Mains Supply
8.7.6 Telecommunications andOther CommunicationSystems Connections
8.7.7 External Fuel Storage andPiped Distribution Systems
8.7.8 External Security Systems
8.7.9 External/Street LightningSystems
8.7.10 Local/District HeatingInstallations
8.7.11 Builders Work inConnection with ExternalServices
8.8 Minor Buildings Works andAncillary Buildings
8.8.1 Minor Building Works
8.8.2 Ancillary Buildings andStructures
8.8.3 Under Pinning to ExternalSite Boundary Walls
-
8/10/2019 analysis forms.docx
22/24
RICS Elemental Standard Form of Cost Analysis 22
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
0. FACILITATING WORKS0.1 Toxic/Hazardous/Contaminated
Material Treatment0.1.1 Toxic/Hazardous Material
Removal0.1.2 Contaminated Land
0.1.3 Eradication of PlantGrowth
0.2 Major Demolition Works 0.2.1 Demolition Works
0.2.2 Soft Strip Works
0.3 Temporary Support to AdjacentStructures
0.3.1 Temporary Support toAdjacent Structures
0.4 Specialist Groundworks 0.4.1 Site dewatering andPumping
0.4.2 Soil Stabilisation Measures
0.4.3 Ground Gas VentingMeasures
0.5 Temporary Diversion Works 0.5.1 Temporary DiversionWorks
0.6 Extraordinary Site Investigation 0.6.1 ArchaeologicalInvestigation
0.6.2 Reptile/Wildlife MitigationMeasures
0.6.3 Other Extraordinary SiteInvestigation Works
9. MAIN CONTRACTORS PRELIMINARIES9.1 Employers Requirements 9.1.1 Site Accommodation
9.1.2 Site Records
9.1.3 Completion and Post-completion Requirements
9.2 Main Contractors Cost Items 9.2.1 Management and Staff
9.2.2 Site Establishment
9.2.3 Temporary Services9.2.4 security
9.2.5 Safety and EnvironmentProtection
9.2.6 Control and Protection
9.2.7 Mechanical Plant
9.2.8 Temporary Works
9.2.9 Site Records
-
8/10/2019 analysis forms.docx
23/24
RICS Elemental Standard Form of Cost Analysis 23
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
9.2 Main Contractors Cost Items 9.2.10 Completion and Post-Completion Requirements
9.2.11 Cleaning
9.2.12 Fees and Charges
9.2.13 Site Services
9.2.14 Insurance, Bonds,Guarantees and Warranties
10. MAIN CONTRACTORS OVERHEAD AND PROFIT 10.1 Main Contractors Overheads
10.2 Main Contractors Profit
11. PROJECT/DESIGN TEAM FEES11.1 Consultants Fees 11.1.1 project/Design Team
Consultants Fees 11.1.2 Other Consultants Fees
11.1.3 Site Investigation Fees
11.1.4 Specialist SupportConsultants Fees
11.2 Main Contractors Pre -
Construction Design Fees
11.2.1 Management and Staff
11.2.2 Specialist Support ServicesFees
11.2.3 Main ContractorsOverhead and Profit
11.3 Main Contractors Design Fees 11.3.1 Main Contractors DesignConsultants Fees
12. OTHER DEVELOPMENT/PROJECT COSTS 12.1 Other Development/Project
Costs12.1.1 Land Acquisition Cost
12.1.2 Employer Finance Cost
12.1.3 Fees
12.1.4 Charges
12.1.5 Planning Contributions
12.1.6 Insurance
12.1.7 Archaeological Fieldworks
12.1.8 Other SpecialistFieldworks
12.1.9 Decanting and RelocationCost
-
8/10/2019 analysis forms.docx
24/24
ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES
12.1 Other Development/ProjectCosts
12.1.10 Fittings, Furnishings andEquipment
12.1.11 TenantsCosts/Contributions
12.1.13 Other Employer Costs
13. RISK (CLIENTS CONTINGENCIES) 13.1 Design Development Risks
13.2 Construction Risks
13.3 Employer Charge Risk
13.4 Employer Other Risk