  • 8/10/2019 analysis forms.docx

    1/24

    RICS Elemental Standard Form of Cost Analysis 1

    Analysis FormsElemental Cost Analysis

    PROJECT TITLE:Building Type: Type of work:Location: Client:Date for receipt: Date of acceptance:Date for tender/Base Month: Date of site possession:

    PROJECT DESCIPTION

    SITE CONDITIONS

    ACCOMMODATION AND DESIGN

    CREDITS

    Client:Architect:Quantity surveyor:CDM Coordinator:Mechanical Engineer:Electrical Engineer:Structural Engineer:

    General Contractor:

  • 8/10/2019 analysis forms.docx

    2/24

    RICS Elemental Standard Form of Cost Analysis 2

    DETAILS OF BUILDINGFloor AreasBasement floors: m Usable Area: mGround floors: 130.83m Circulation Area: mUpper floors: 392.49m 2 Ancillary Areas: m 2 Total (Gross Internal Floor Area): m Internal Divisions: mSpaces not enclosed: m Total (Gross Internal Floor Area): mInternal cube: m 2 Areas of lowest floor: m 2 Site area: m Number of Units: mStoreys

    No of storeys Average storey height Nr of storeys (Primary): Nr Below ground floor(s): m Nr of storeys (Secondary): Nr Ground floor: mBasement storeys include above: Nr Above ground floor(s): m

    External vertical envelope : (Ext. walls windows & floor(s) m

    PERCENTAGE OF GROSS FLOOR AREA Blow ground floor % ---------average storey construction %Single storey construction % ---------average storey construction %

    % ---------average storey construction %

    FUNCTUNAL UNITSQuantity Unit Quantity Unit1. 2.

    BUILDING ACCREDITATION SCORE(S) Scheme: Scheme:Version: Version:Score: Score:Carbon Emissions:Basis of calculation: Result:

    PROCUREMENT DETAILSContract pricingDocumentationSelection of Contractor:

    Type of Contract:Cost Fluctuation:Contract period Stipulated by Client: Weeks

    Offered by Contractor: WeeksAgreed: Weeks

  • 8/10/2019 analysis forms.docx

    3/24

    RICS Elemental Standard Form of Cost Analysis 3

    MARKET CONDITIONTender Price IndexProject Index:Index Series:Base:

    TENDER Number of tender issued: Number of tender received:Competitive tender list (where appropriate) 1. 6.2. 7.3. 8.4. 9.5. 10.Adjustment on accepted tender (where applicable):

    Basic of analysis:

    BREAKDOWN OF COST

    Contract Analysed building (where different)Measured work Measured workPrime cost sums Prime cost sumsProvisional sums Provisional sumsPreliminaries PreliminariesOverheads and profit Overhead and profitDesign fees Design feesRisk (clients contingencies) Risk (clients contingencies) Contract sum Contract sum

  • 8/10/2019 analysis forms.docx

    4/24

    RICS Elemental Standard Form of Cost Analysis 4

    Detailed (Elemental) Cost AnalysisELEMENT Element

    TotalCost

    Cost perm2 GIFA

    UnitQuantity Unit Rate

    1 SUBSTRUCTURE m2

    2 SUPERSTRUCTURE m 2 2.1 Frame m 2 2.2 Upper Floors m 2 2.3 Roof m 2 2.4 Stairs and Ramps Nr2.5 External Walls m2.6 Windows and External Doors m2.7 Internal Walls and Partitions m2.8 Internal Doors Nr

    Total Superstructure

    3 INTERNAL FINISHES3.1 Wall Finishes m 2 3.2 Floor Finishes m 2 3.3 Ceiling Finishes m 2

    Total internal Finishes

    4. FITTINGS, FURNISHING ANDEQUIPMENT m2

    5. SERVICES5.1 Sanitary Installations Nr5.2 Services Equipment Nr5.3 Disposal Installations Nr5.4 Water Installations m5.5 Heat Source kW5.6 Space Heating and Air Conditioning m5.7 Ventilation Systems m5.8 Electrical Installations m5.9 Fuel Installations m5.10 Lift and Conveyor Installations Nr5.11 Fire and Lightning Protection m 2

    5.12 Communication, Security and ControlInstallations m2

    5.13 Specialist Installations m5.14 Builders Work in Connection with Services m 2

    Total Services6 PREFABRICATED BUILDING AND

    BUILDING UNITS m2

    7 WORK TO EXISTING BUILDING7.1 Minor Demolition and Alteration Works m 2

    Total Work to Existing Building

    ELEMENT Element

  • 8/10/2019 analysis forms.docx

    5/24

    RICS Elemental Standard Form of Cost Analysis 5

    TotalCost

    Cost perm2 GIFA

    UnitQuantity Unit Rate

    BUILDING SUB-TOTAL8 EXTERNAL WORKS8.1 Site preparation Works m 2

    8.2 Roads, Paths, Paving and Surfacing m2

    8.3 Soft Landscaping, Planting and IrrigationSystems m

    2

    8.4 Fencing, Railing and Walls m 2 8.5 External Fixtures m 2 8.6 External Drainage m 2 8.7 External Services m

    8.8 Minor Building Works and AncillaryBuilding m2

    Total External Works0 FACILITATING WORKS

    0.1Taxic/Hazardous/Contaminated MaterialsTreatment m

    2

    0.2 Major Demolition Works m0.3 Temporary Support to Adjacent Structures m0.4 Specialist Ground Works m0.5 Temporary Diversion Works m0.6 Extraordinary Site Investigation m

    Total Facilitating Work

    9 MAIN CONTRACTORSPRELIMINARIES

    10 MAIN CONTRACTORS OVERHEAD &PROFIT

    CONTRACT TOTAL (excludingcontingencies and fees )

    11 PROJECT/ DESIGN TEAM FEES

    12 OTHER DEVELOPMENT/ PROJECTCOSTS13 RISK (CLIENTS CONTINGENCIES)

    TOTAL CONTACT/PROJECT COST*

    *Where the costs analysed are based on a building contract this will the total contract sum includingany employers contingencies and contractors design fees. Where other client costs are includedthese should be identified and the total will be the project cost.

    Amplified (Sub-Elemental) Cost Analysis

  • 8/10/2019 analysis forms.docx

    6/24

    RICS Elemental Standard Form of Cost Analysis 6

    ELEMENT Sub-Element ElementQuantity Unit Total

    CostTotalCost

    Cost per m 2

    UnitQuant

    ity

    UnitRate

    1. SUBSTRUCTURE1.1 Substructure1.1.1 Standard Foundations1.1.2 Specialist Foundations1.1.3 Lowest Floor

    Construction1.1.4 Basement Excavation1.1.5 Basement Retaining Walls

    Substructure m

    2. SUPERSTRUCTURE 2.1 Frame

    2.1.1 FrameFrame m

    2.2 Upper Floor2.2.1 Floors2.2.2 Balconies2.2.3 Drainage to Balconies

    Upper Floors m 2

    2.3 Roof2.3.1 Roof Structure2.3.2 Roof Covering2.3.3 Specialist Roof Systems2.3.4 Roof Drainage2.3.5 Rooflights, Skylights and

    Openings2.3.6 Roof Features

    Roof m

    2.4 Stairs and Ramps2.4.1 Stair/Ramp Structures2.4.2 Stair/Ramp Finishes2.4.3 Stair/Ramp Balustrades

    and Handrails2.4.4 Ladders/Chutes/Slides

    Stairs Nr

    ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit

  • 8/10/2019 analysis forms.docx

    7/24

    RICS Elemental Standard Form of Cost Analysis 7

    Cost Cost perm2

    Quantity

    Rate

    2.5 External Works2.5.1 External Enclosing Walls

    above Ground Level2.5.2 External Enclosing Walls below Ground Level

    2.5.3 Solar/Rain Screening2.5.4 External Soffits2.5.5 Subsidiary Walls,

    Balustrades andProprietary Balconies

    2.5.6 Faade Access/ CleaningSystems

    Include Faade Retention WorksExternal Walls m

    2.6 Windows and External Doors2.6.1 External Windows2.6.2 External Doors

    Windows and External Doors m 2

    2.7 Internal Walls and Partitions2.7.1 Walls and Partitions2.7.2 Balustrades and Handrails2.7.3 Moveable Room Dividers2.7.4 Cubicles

    Internal Walls and Partitions m2

    2.8 Internal Doors2.8.1 Internal Doors

    Internal Doors m

    3. INTERNAL FINISHES 3.1 Wall Finishes

    3.1.1 Wall FinishesWall Finishes m

    3.2 Floor Finishes3.2.1 Finishes to Floors3.2.2 Raised Access Floors

    Floor Finishes m

    3.3 Ceiling Finishes3.3.1 Finishes to Ceilings3.3.2 False Ceiling3.3.3 Demountable Suspended

    CeilingCeiling Finishes m 2

    ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit

  • 8/10/2019 analysis forms.docx

    8/24

    RICS Elemental Standard Form of Cost Analysis 8

    Cost Cost perm2

    Quantity

    Rate

    4. FITTINGS, FURNISHINGS AND EQUIPMENT 4.1 Fittings, Furnishings and Equipment

    4.1.1 General Fittings,Furnishing and Equipment

    4.1.2 Domestic Kitchen Fittingsand Equipment

    4.1.3 Special Purpose Fittings,Furnishing and Equipment

    4.1.4 Signs/ Notices4.1.5 Works of Art4.1.6 Non-Mechanical and

    Non-Electrical Equipment4.1.7 Internal Planting4.1.8 Bird and Vermin Control

    Fittings m 2

    5. SERVICES 5.1 Sanitary Installation

    5.1.1 Sanitary Appliances5.1.2 Sanitary ancillaries

    Sanitary Installations Nr

    5.2 Service Equipment5.2.1 Services Equipment

    Service Equipment Nr

    5.3 Disposal Installation5.3.1 Foul Drainage above

    ground5.3.2 Chemical, Toxic and

    industrial Liquid WasteDisposal

    Sanitary Installations Nr

    5.4 Water Installation5.4.1 Main Water Supply5.4.2 Cold Water Distribution5.4.3 Hot Water Distribution5.4.4 Local Hot Water

    Distribution5.4.5 Steam and Condensate

    DistributionWater Installation m

    ELEMENT Sub-Element ElementQuantity Unit Total Total Cost Unit Unit

  • 8/10/2019 analysis forms.docx

    9/24

    RICS Elemental Standard Form of Cost Analysis 9

    Cost Cost per m 2 Quantity

    Rate

    5.5 Heat Source5.5.1 Heat Source

    Heat Source kW

    5.6 Space Heating and Air Conditioning5.6.1 Central Heating5.6.2 Local Heating5.6.3 Central Cooling5.6.4 Local Cooling5.6.5 Central Heating and

    Cooing5.6.6 Local Heating and

    Cooling5.6.7 Central Air Conditioning5.6.8 Local Air ConditioningInclude Faade Retention Works

    Space Heating and Air Conditioning m

    5.7 Ventilation System5.7.1 Central Ventilation5.7.2 Local and Special

    Ventilation5.7.3 Smoke Extract/Control

    Ventilating System m

    5.8 Electrical Installation5.8.1 Electrical Mains and Sub-

    Main Distribution5.8.2 Power Installation5.8.3 Lightning Installation5.8.4 Specialist Lightning

    Installations5.8.5 Local Electricity

    Generation Systems5.8.6 Earthing and Bonding

    SystemsElectrical Installation m

    5.9 Fuel Installation5.9.1 Fuel Storage5.9.2 Fuel Distribution Systems

    Fuel Installations m

    ELEMENT Sub-Element Element

  • 8/10/2019 analysis forms.docx

    10/24

    RICS Elemental Standard Form of Cost Analysis 10

    Quantity

    Unit TotalCost

    TotalCost

    Cost perm2

    UnitQuant

    ity

    UnitRate

    5.10 Lift and Conveyor Installations

    5.10.1 Lifts and Enclosed Hoists5.10.2 Escalators5.10.3 Moving Pavements5.10.4 Powered Stair lifts5.10.5 Conveyors5.10.6 Dock Levellers and

    Scissor Lifts5.10.7 Cranes and Unenclosed

    Hoists5.10.8 Car Lifts, Car Stacking

    Systems, Turntables and

    the like5.10.9 Document HandlingSystems

    5.10.10 Other Lift and ConveyorInstallations

    Lift and Conveyor Installations Nr

    5.11 Fire and Lightning Protection5.11.1 Fire Lightning Systems5.11.2 Fire Suppression Systems5.11.3 Lightning Protection

    Fire and Lightning Protection m 2

    5.12 Communication, Security and Control Systems5.12.1 Communication Systems5.12.2 Security Systems5.12.3 Central Control/ Building

    Management SystemsCommunication, Security and

    Control Systems m2

    5.13 Specialist Installations

    5.13.1 Specialist Piped SupplyInstallations5.13.2 Specialist Refrigeration

    Systems5.13.3 Specialist Mechanical

    Installations5.13.4 Specialist Electrical/

    Electronic Installations5.13.5 Water Features

    Specialist Installations m 2

  • 8/10/2019 analysis forms.docx

    11/24

    RICS Elemental Standard Form of Cost Analysis 11

    ELEMENT Sub-Element ElementQuantity Unit Total

    CostTotalCost

    Cost per m 2

    UnitQuant

    ity

    UnitRate

    5.14 Builders Work in Connection with Services (BWIC) 5.14.1 Builders Work inConnection with Services

    Builders Work in Connection withServices m

    2

    6. PREFRABRICATED BUILDINGS AND BUILDING UNITS 6.1 Prefabricated Buildings and Building Units

    6.1.1 Complete Buildings6.1.2 Building Units6.1.3 Pods

    Prefabricated Buildingsand Building Units m

    2

    7. WORK TO EXISTING BUILDING 7.1 Minor Demolitions and Alterations

    7.1.1 Minor Demolitions andAlterations

    Minor Demolitions and Alterations m

    BUILDING SUB-TOTAL

    8. EXTERNAL WORKS

    8.1 Site Preparation Works8.1.1 Site Clearance8.1.2 Preparatory

    GroundworksSite Preparation Works m 2

    8.2 Roads, Paths, Pavings and Surfacings8.2.1 Roads, Paths and Pavings8.2.2 Special Surfacings and

    PavingsRoads, Paths, Pavings and Surfacings m 2

    8.3 Soft Landscaping, Planting and Irrigation Systems8.3.1 Seeding and Turfing8.3.2 External Planting8.3.3 Irrigation Systems

    Soft Landscaping, Planting and IrrigationSystems m

    2

    ELEMENT Sub-Element Element

  • 8/10/2019 analysis forms.docx

    12/24

    RICS Elemental Standard Form of Cost Analysis 12

    Quantity Unit TotalCost

    TotalCost

    Cost per m 2

    UnitQuant

    ity

    UnitRate

    8.4 Fencing, Railings and Walls

    8.4.1 Fencing and Railings8.4.2 Walls and Screens8.4.3 Retaining Walls8.4.4 Barriers and Guardrails

    Fencing, Railings and Walls m

    8.5 External Fixtures8.5.1 Site/Street Furniture and

    Equipment8.5.2 Ornamental Features

    External Fixtures m

    8.6 External Drainage8.6.1 Surface Water and Foul

    Water Drainage8.6.2 Ancillary Drainage

    Systems8.6.3 External Chemical, Toxic

    and Industrial LiquidWaste Drainage

    8.6.4 Land DrainageExternal Drainage m

    8.7 External Services8.7.1 Water Mains Supply8.7.2 Electricity Mains Supply8.7.3 External Transformation

    Devices8.7.4 Electricity Distribution to

    External Plant andEquipment

    8.7.5 Gas Mains Supply8.7.6 Telecommunications and

    other Communication

    System Connection8.7.7 External Fuel Storageand Piped DistributionSystems

    8.7.8 External Security System8.7.9 External/Street Lightning

    Systems8.7.10 Local/District Heating

    Installations8.7.11 Builders Work

    Connection with ExternalServices

    External Services mELEMENT Sub-Element Element

  • 8/10/2019 analysis forms.docx

    13/24

    RICS Elemental Standard Form of Cost Analysis 13

    Quantity Unit TotalCost

    TotalCost

    Cost per m 2

    UnitQuant

    ity

    UnitRate

    8.8 Minor Building Works and Ancillary Buildings

    8.8.1 Minor Building Works8.8.2 Ancillary Buildings andStructures

    8.8.3 Underpinning to ExternalSite Boundary Walls

    Minor Building Works and AncillaryBuildings m

    2

    0. FACILITATING WORKS 0.1 Toxic/Hazardous/Contaminated Material Treatment

    0.1.1 Toxic/HazardousMaterial Removal

    0.1.2 Contaminated Land0.1.3 Eradication of Plant

    GrowthToxic/Hazardous/contaminated

    Material Treatment m2

    0.2 Major Demolition Works0.2.1 Demolition Works0.2.2 Soft Strip Works

    Major Demolition Works m 2

    0.3 Temporary Support to Adjacent Structures0.3.1 Temporary Support to

    Adjacent StructuresTemporary Support to Adjacent Structures m

    0.4 Specialist Groundworks0. 4.1 Site Dewatering and

    Pumping0.4.2 Soil Stabilisation

    Measures0.4.3 Ground Gas Venting

    MeasuresSpecialist Groundwork m 2

    0.5 Temporary Diversion Works0.5.1 Temporary Diversion

    WorksTemporary Diversion Works m 2

    ELEMENT Sub-Element Element

  • 8/10/2019 analysis forms.docx

    14/24

    RICS Elemental Standard Form of Cost Analysis 14

    Quantity Unit TotalCost

    TotalCost

    Cost per m 2

    UnitQuant

    ity

    UnitRate

    0.6 Extraordinary Site Investigation

    0. 6.1 ArchaeologicalInvestigation0.6.2 Reptile/Wildlife

    Mitigation Measures0.6.3 Other Extraordinary Site

    InvestigationExtraordinary Site Investigation m 2

    9. MAIN CONTRACTORS PRELIMINARIES9.1 Employers Requirements9.2 Main Contractors Cost Item s

    Preliminaries m

    10. MAIN CONTRACTORS OVERHEADS and PROFIT10.1 Main Contractor s Overheads10.2 Main Contractors Profit

    Overheads and Profits

    TOTAL CONTRACT SUM (Excluding Contingencies and Contractors Design Fees)

    11. PROJECT/DESIGN TEAM FEES 11.1 Consultants Fees 11.2 Main Contractors Pre -Construction Design Fees11.3 Main Contractors Design Fees

    Project/Design Team Fees

    12. OTHER DEVELOPMENT/PROJECT COSTS 12.1 Other Development/Project Costs

    Other Development/Project Costs

    13. RISK (CLIENTS CONTINGENCIES) 13.1 Design Development Risk13.2 Construction Risk13.3 Employer Change Risk13.4 Employer Other Risk

    Risk (Contingencies)TOTAL CONTRACT/PROJECT COST*

    *Where the costs analysed are based on a building contract this will be the total contract sumincluding any employers contingencies and contractors design fees. Where other client costs areincluded these should be identified and the total will be the project cost.

  • 8/10/2019 analysis forms.docx

    15/24

    RICS Elemental Standard Form of Cost Analysis 15

    Specification and Design NotesELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    1. SUBSTRUCTURE1.1 Substructure 1.1.1 Standard Foundations

    Nature of Soil 1.1.2 Special Foundations

    Permissible soil loading kN/m 2 1.1.3 Lowest Floor Construction

    Bearing strata depth m 1.1.4 Basement Excavation

    Site levels: main gradients m 1.1.5 Basement Retaining Walls

    Water table depth m

    Average pile loading kN

    Volume of basement m

    2. SUPERSTRUCTURE2.1 Frame 2.1.1 Frame

    Grid pattern of main columns

    2.2 Upper floors 2.2.1 Floors

    Design loads kN/m 2.2.2 Balconies

    Spans m 2.2.3 Drainage to Balconies

    Sound insulation dB

    Angle of slope deg

    Area of incline for slopingsurfaces

    m

    2.3 Roof 2.3.1 Roof structure

    Design loads kN/m 2 2.3.2 Roof Coverings

    Spans m 2.3.3 Specialist Roof Systems

    Angle of pitch of sloping roofs deg 2.3.4 Roof Drainage

    Area of roof surface m 2.3.5 Rooflights, Skylights andOpening

    Area of roof (as built) (on plan) m 2.3.6 Roof Features

  • 8/10/2019 analysis forms.docx

    16/24

    RICS Elemental Standard Form of Cost Analysis 16

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    2.5 External Walls 2.5.1 External Enclosing Wallsabove Ground Level

    Design loads of loadbearing Walls kN/m 2 2.5.2 External Enclosing Walls below Ground Level

    Thermal conductivity-U value W/m 2K 2.5.3 Solar/Rain Screening

    Sound Insulation dB 2.5.4 External Soffits

    Area of External walls aboveground

    m2 2.5.5 Subsidiary Walls,Balustrades andProprietary Balconies

    Area of basement walls m 2.5.6 Faade Access/CleaningSystems

    Details of faade retention work m 2.5.7 Faade Retention

    2.6 Windows and External Doors 2.6.1 External Windows

    Total window area m2

    2.6.2 External DoorsArea of opening lights to windows m

    External door area m 2

    2.7 Internal walls and Partitions 2.7.1 Walls and Partitions

    Sound Insulation dB 2.7.2 Balustrades and Handrails

    Number of WC cubicles Nr 2.7.3 Moveable Room Dividers

    2.7.4 Cubicles

    2.8 Internal Doors 2.8.1 Internal Doors

    Number of Doors by type and size Nr

    Fire rating Hr

    3. INTERNAL FINISHES3.1 Wall Finishes 3.1.1 Wall Finishes

    2.4 Stairs and Ramps 2.4.1 Stairs/Ramp Structures

    Total vertical height of eachstaircase and width betweenstrings

    m 2.4.2 Stair/Ramp Finishes

    2.4.3 Stair/Ramp Balustradesand Handrails

    2.4.4 Ladders/Chutes/Slides

  • 8/10/2019 analysis forms.docx

    17/24

    RICS Elemental Standard Form of Cost Analysis 17

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    3.2 Floor Finishes 3.2.1 Finishes to Floors

    3.2.2 Raised Access Floors

    3.3 Ceiling Finishes 3.3.1 Finishes to Ceiling

    3.3.2 False Ceiling

    3.3.3 Demountable SuspendedCeiling

    4. FITTINGS, FURNISHINGS AND EQUIPMENT4.1 Fittings, Furnishings and

    Equipment4.1.1 General Fittings,

    Furnishings andEquipment

    4.1.2 Domestic Kitchen Fittingsand Equipment

    4.1.3 Special Purpose Fittings,Furnishings andEquipment

    4.1.4 Sign/Notices

    4.1.5 Works of Art

    4.1.6 Non-Mechanical and Non Electrical Equipment

    4.1.7 Internal Planting

    4.1.8 Bird and Vermin Control

    5. SERVICES 5.1 Sanitary Installation 5.1.1 Sanitary Application

    5.1.2 Sanitary Ancillaries

    5.2 Services Equipment 5.2.1 Services Equipment

    5.3 Disposal Installations 5.3.1 Fuel Drainage aboveground

    5.3.2 Chemical Toxic andIndustrial Liquid WasteDisposal

    5.3.3 Refuse Disposal

  • 8/10/2019 analysis forms.docx

    18/24

    RICS Elemental Standard Form of Cost Analysis 18

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    5.4 Water Installation 5.4.1 Main Supply

    Total number of draw-off points Nr 5.4.2 Cold Water Distribution

    5.4.3 Hot Water Distribution

    5.4.4 Local Hot WaterDistribution

    5.4.5 Steam and CondensateDistribution

    5.5 Heat Source 5.5.1 Heat Source

    Rating in kW kW

    5.6 Space Heating and AirConditioning

    5.6.1 Central Heating

    Volume of treated space m 5.6.2 Local Heating

    5.6.3 Central Cooling

    5.6.4 Local Cooling

    5.6.5 Central Heating andCooling

    5.6.6 Local Heating and Cooling

    5.6.7 Central Air Conditioning

    5.6.8 Local Air Conditioning

    5.7 Ventilating System 5.7.1 Central Ventilation

    Volume of treated space m 5.7.2 Local and SpecialVentilation

    5.7.3 Smoke Extract/Control

    5.8 Electrical Installations 5.8.1 Electric Mains and Sub-Mains DistributionTotal Electric load kVA 5.8.2 Power Installations

    Illumination levels lux 5.8.3 Lightning Installations

    Capacity of Local electricityGeneration

    % 5.8.4 Specialist LightningInstallation

    Capacity for EmergencyGeneration

    % 5.8.5 Local ElectricityConnection System

    Capacity for uninterruptibleGeneration

    % 5.8.6 Earthing and BondingSystems

    Powered for uninterruptible powersupply min

  • 8/10/2019 analysis forms.docx

    19/24

    RICS Elemental Standard Form of Cost Analysis 19

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    5.9 Fuel Installation 5.9.1 Fuel Storage

    Total number of draw-off points Nr 5.9.2 Fuel Distribution System

    5.10 Lifts and Conveyor Installations 5.10.1 Lifts and Enclosed Hoists

    Lift-peak passenger numbers anddesigned waiting times

    5.10.2 Escalators

    Lifts-number,capacity,speed,number of doors & height served

    5.10.3 Moving Pavements

    Escalators-rise and travel 5.10.4 Powered Stairlifts

    Conveyors-rise and travel 5.10.5 Conveyors

    Goods lifts, hoists, cranes, docklevelers, scissor lifts, etc-designed load

    kN 5.10.6 Dock Levellers andScissor Lifts

    5.10.7 Cranes and UnenclosedHoists

    5.10.8 Car lifts, Car StackingSystems, Turntables andthe Like

    5.10.9 Document HandlingSystems

    5.10.10 Other Lift and ConveyorInstallations

    5.11 Fire and Lightning Protection 5.11.1 Fire Fighting Systems

    Details of each installation 5.11.2 Fire Suppression Systems

    5.11.3 Lightning Protection

    5.12 Communication and SecurityInstallation

    5.12.1 Communication Systems

    Details of each installation 5.12.2 Security Systems

    5.12.3 Central Control/BuildingManagement Systems

    5.13 Special Installations 5.13.1 Specialist Piped SupplyInstallations

    Details of each installation 5.13.2 Specialist RefrigerationSystems

    5.13.3 Specialist MechanicalInstallations

    5.13.4 SpecialistElectric/ElectronicInstallations/Systems

    5.13.5 Water Features

  • 8/10/2019 analysis forms.docx

    20/24

    RICS Elemental Standard Form of Cost Analysis 20

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    5.14 Builders Work in Connectionwith Services

    5.14.1 Builders Work inConnection with Services

    6. REFABRICATED BUILDINGS AND BUILDING UNITS6.1 Prefabricated Buildings and

    Building Units6.1.1 Complete Building

    Floor area of each unit or floorarea and a number of each type ofunit

    6.1.2 Building Units

    6.1.3 Pods

    7. WORK TO EXISTING BUILDING7.1 Minor Demolitions and

    Alterations7.1.1 Minor Demolitions and

    Alterations

    8. EXTERNAL WORKS 8.1 Site Preparation Works 8.1.1 Site Clearance

    8.1.2 Preparatory Groundworks

    8.2 Roads, Paths, Pavings andSurfacings

    8.2.1 Roads, Paths and Pavings

    8.2.2 Special Surfacing andPavings

    8.3 Soft Landscaping, Planting, andIrrigation Systems 8.3.1 Seeding and Turfing8.3.2 External Planting

    8.3.3 Irrigation Systems

    8.4 Fencing, Railing and Walls 8.4.1 Fencing and Railings

    8.4.2 Walls and Screens

    8.4.3 Retailing Walls

    8.4.4 Barriers and Guardrails

    8.5 External Fixtures 8.5.1 Site/Street Furniture andEquipment

    8.5.2 Ornamental Features

  • 8/10/2019 analysis forms.docx

    21/24

    RICS Elemental Standard Form of Cost Analysis 21

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    8.6 External Drainage 8.6.1 Surface Water and FoulWater Drainage

    8.6.2 Ancillary DrainageSystems

    8.6.3 External Chemical, Toxicand industrial Liquid WaterDrainage

    8.6.4 Land Drainage

    8.7 External Services 8.7.1 Water Main Supply

    8.7.2 Electricity Mains Supply

    8.7.3 External TransformationDevices

    8.7.4 Electricity Distribution toExternal Plant andEquipment

    8.7.5 Gas Mains Supply

    8.7.6 Telecommunications andOther CommunicationSystems Connections

    8.7.7 External Fuel Storage andPiped Distribution Systems

    8.7.8 External Security Systems

    8.7.9 External/Street LightningSystems

    8.7.10 Local/District HeatingInstallations

    8.7.11 Builders Work inConnection with ExternalServices

    8.8 Minor Buildings Works andAncillary Buildings

    8.8.1 Minor Building Works

    8.8.2 Ancillary Buildings andStructures

    8.8.3 Under Pinning to ExternalSite Boundary Walls

  • 8/10/2019 analysis forms.docx

    22/24

    RICS Elemental Standard Form of Cost Analysis 22

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    0. FACILITATING WORKS0.1 Toxic/Hazardous/Contaminated

    Material Treatment0.1.1 Toxic/Hazardous Material

    Removal0.1.2 Contaminated Land

    0.1.3 Eradication of PlantGrowth

    0.2 Major Demolition Works 0.2.1 Demolition Works

    0.2.2 Soft Strip Works

    0.3 Temporary Support to AdjacentStructures

    0.3.1 Temporary Support toAdjacent Structures

    0.4 Specialist Groundworks 0.4.1 Site dewatering andPumping

    0.4.2 Soil Stabilisation Measures

    0.4.3 Ground Gas VentingMeasures

    0.5 Temporary Diversion Works 0.5.1 Temporary DiversionWorks

    0.6 Extraordinary Site Investigation 0.6.1 ArchaeologicalInvestigation

    0.6.2 Reptile/Wildlife MitigationMeasures

    0.6.3 Other Extraordinary SiteInvestigation Works

    9. MAIN CONTRACTORS PRELIMINARIES9.1 Employers Requirements 9.1.1 Site Accommodation

    9.1.2 Site Records

    9.1.3 Completion and Post-completion Requirements

    9.2 Main Contractors Cost Items 9.2.1 Management and Staff

    9.2.2 Site Establishment

    9.2.3 Temporary Services9.2.4 security

    9.2.5 Safety and EnvironmentProtection

    9.2.6 Control and Protection

    9.2.7 Mechanical Plant

    9.2.8 Temporary Works

    9.2.9 Site Records

  • 8/10/2019 analysis forms.docx

    23/24

    RICS Elemental Standard Form of Cost Analysis 23

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    9.2 Main Contractors Cost Items 9.2.10 Completion and Post-Completion Requirements

    9.2.11 Cleaning

    9.2.12 Fees and Charges

    9.2.13 Site Services

    9.2.14 Insurance, Bonds,Guarantees and Warranties

    10. MAIN CONTRACTORS OVERHEAD AND PROFIT 10.1 Main Contractors Overheads

    10.2 Main Contractors Profit

    11. PROJECT/DESIGN TEAM FEES11.1 Consultants Fees 11.1.1 project/Design Team

    Consultants Fees 11.1.2 Other Consultants Fees

    11.1.3 Site Investigation Fees

    11.1.4 Specialist SupportConsultants Fees

    11.2 Main Contractors Pre -

    Construction Design Fees

    11.2.1 Management and Staff

    11.2.2 Specialist Support ServicesFees

    11.2.3 Main ContractorsOverhead and Profit

    11.3 Main Contractors Design Fees 11.3.1 Main Contractors DesignConsultants Fees

    12. OTHER DEVELOPMENT/PROJECT COSTS 12.1 Other Development/Project

    Costs12.1.1 Land Acquisition Cost

    12.1.2 Employer Finance Cost

    12.1.3 Fees

    12.1.4 Charges

    12.1.5 Planning Contributions

    12.1.6 Insurance

    12.1.7 Archaeological Fieldworks

    12.1.8 Other SpecialistFieldworks

    12.1.9 Decanting and RelocationCost

  • 8/10/2019 analysis forms.docx

    24/24

    ELEMENT AND DESIGN CRITERIA SPECIFICATION NOTES

    12.1 Other Development/ProjectCosts

    12.1.10 Fittings, Furnishings andEquipment

    12.1.11 TenantsCosts/Contributions

    12.1.13 Other Employer Costs

    13. RISK (CLIENTS CONTINGENCIES) 13.1 Design Development Risks

    13.2 Construction Risks

    13.3 Employer Charge Risk

    13.4 Employer Other Risk