an overview asean highway in malaysia · 1991-2000 national development policy (ndp) balanced...

12
AN OVERVIEW ASEAN HIGHWAY IN MALAYSIA The 5 th of the Working Group on the Asian Highway and Asian Highway Investment Forum Bangkok, Thailand. 7 – 10 October 2013 AH150 AH18 AH2

Upload: others

Post on 17-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

AN OVERVIEW ASEAN HIGHWAY IN MALAYSIA

The 5th of the Working Group on the Asian Highway and Asian Highway Investment Forum

Bangkok, Thailand. 7 – 10 October 2013

AH150AH18

AH2

Road Number

Road Name Route Information

Length (km)

LaneNos. %

AH2 North –South Expressway

Bukit Kayu Hitam –Alor Setar –Ipoh –Kuala Lumpur –Seremban -Johor Bahru

823 6 lane dual carriageway

24

4 lane dual carriageway

76

ROAD STATISTIC – AH2

BACKHighway Planning DivisionMinistry of Works Malaysia

Road Number

Road Name

Route Information

Length (km)

LaneNos. %

AH18 Route 3 Kota Bahru –Kuala Terengganu –Kuantan -Johor Bahru

740.8 4 lane single carriageway

7

2 lane single carriageway

93

BACK

ROAD STATISTIC – AH18

Highway Planning DivisionMinistry of Works Malaysia

Road Number

Road Name

Route Information

Length (km)

LaneNos. %

AH150 Pan Borneo Highway

Sematan –Kuching –Sibu – Miri –Kota Kinabalu – Sandakan –Lahad Datu –Tawau

Sarawak : 961Sabah : 720Total : 1,681

4 lane dual carriageway

11

2 lane single carriageway

89

BACK

ROAD STATISTIC – AH150

Highway Planning DivisionMinistry of Works Malaysia

Investment Opportunities in Asian Highway Projects

MAJOR ECONOMIC POLICIESTime Frame Policy Target

19571957--19701970 POSTPOST--INDEPENDENCE INDEPENDENCE POLICY

•• LAISSEZLAISSEZ--FAIRE / EXPORTFAIRE / EXPORT--ORIENTEDORIENTED

•• ECONOMIC AND RURAL ECONOMIC AND RURAL DEVELOPMENTDEVELOPMENT

19711971--19901990 NEW ECONOMIC POLICY (NEP)

GROWTH WITH EQUITYGROWTH WITH EQUITY

19911991--20002000 NATIONAL DEVELOPMENT POLICY (NDP)

BALANCED DEVELOPMENTBALANCED DEVELOPMENT

20012001--20102010 NATIONAL VISION POLICY (NVP)

BUILDING A RESILIENT AND BUILDING A RESILIENT AND COMPETITIVE NATIONCOMPETITIVE NATION

19911991--20202020 VISION 2020 TOTAL DEVELOPMENTTOTAL DEVELOPMENT

2nd Malaya, 1961-1965

1st Malaysia, 1966-1970

2nd Malaysia, 1971-1975

1st Malaya, 1956-1960

4th Malaysia, 1981-1985

5th Malaysia, 1986-1990

6th Malaysia, 1991-1995

3rd Malaysia, 1976-1980

7th Malaysia, 1996-2000

8th Malaysia, 2001-2005

9th Malaysia, 2006-2010

10th Malaysia, 2010-2015

11th Malaysia, 2015-2020Vision

2020

NVP

NDPNEP

Implementation: 5 Year Malaysian Plan Policy

DEVELOPMENT PLANNING PROCESSPLANNING

EVALUATION

MONITORING

IMPLEMENTATION

Budget(EPU & Cabinet)

MASTER DEVELOPMENT PLAN

IMPLEMENTOR AGENCY- PUBLIC WORK DEPARTMENT

(PWD)

MOW’s5 year Plan Project List

Engineering Values

Land Use

Federal Fund Economy Environment Social

DEVELOPMENT IMPLEMENTATION 1. Development Fund2. Privatisation

The 5th of the Working Group on the Asian Highway and Asian Highway

AH150AH18

AH2