an investigation on the bulging phenomenon in the clay...

11
Associate Professor, Civ M. Sc. in Geotech Ph. D. Student, Geote The Masjed Soleyman dam is a 490m long center core. Throug comprehensive monitoring had b dam behavior was based on m foundation. This research presen the first impounding and summ instruments are in the field of st rotation of the principal stresses points were generally constant, b observed in the downstream side would lead to bulging of the permeability of the clay materia continuing with notable progres behavior as an undrained mater area of core. This is the main re called bulging. Keywords: Rockfill dam, clay co 1- INTRODUCTION The Masjed Soleilman (MES rockfill dam (Engineering Rep power plant was commenced i completed in November 2000. 2000 and the reservoir water l the first impounding of dam r the importance the monitoring Bali, Indonesia, June 1 ST – 6 TH , 2014 he bulging phenomenon in the clay core n the stress and pore water pressure da vil Engineering Department, Ferdowsi University of Mashhad, M [email protected] hnical Engineering, Abpooy Consulting Engineers, Mashh echnical Engineering, Abpooy Consulting Engineers, Ma ABSTRACT a central clay core rockfill dam with the height of ghout the dam construction, reservoir impounding been carried out to verify the dam behavior. The mo measurement data of instruments installed on the nt research presents an overall review of the dam b marizes the recorded measurement of major instr tresses and pore water pressure in the clay core. A s direction had been investigated. The rotating angle but slight increases in the angles after full impound e of the core. This is an indicative of a progressing s core in the lower level. In the clay core due to al, the dissipating process of the pore water pressu ss (in the past 13 years after the first impounding rial and volume change is not significant especiall eason for developing the lateral deformation in the c ore, Masjed Soleyman dam, bulging, pore water pre S) dam is a 177 m high and 490 m long cen port of MES dam, 1993). Construction of the d in December 1994 and the embankment of the m . The reservoir impounding was commenced on level reached at el. 371 m on July 2002. Deform reservoir can lead to changing of dam safety, w g after the first impounding (Soroush and Araei, e of rockfill dam ata Mashhad, Iran had, Iran ashhad, Iran 177 meter and and operation onitoring of the dam body and behavior during ruments. These Also substantial es of respective dment has been shear zone and o the very low ure hadn’t been g). So the clay ly in the center clay core which essure. nter core type dam body and main dam was 19 December mations due to which implies 2006). An investigation on the bulging phenomenon in the clay core of rockfill dam based on the stress and pore water pressure data J. Bolouri Bazaz H. Gholami M.T. Bolouri Bazaz

Upload: others

Post on 11-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

��������������� ������

Associate Professor, Civil Engineering Department

M. Sc. in Geotechnical Engineering, A

Ph. D. Student, Geotechnical Engineering, A

The Masjed Soleyman dam is a central clay core rockfill dam with the height of 177 meter and

490m long center core. Throughout the dam construction, reservoir impounding and operation

comprehensive monitoring had been

dam behavior was based on measurement data of instruments installed on the dam body and

foundation. This research present research

the first impounding and summarize

instruments are in the field of stresses

rotation of the principal stresses direction had been investigated. The rota

points were generally constant, but slight increases in the angles after full impoundment ha

observed in the downstream side of the core. This

would lead to bulging of the cor

permeability of the clay material, the dissipating process of the pore water pressure hadn’t been

continuing with notable progress (in the past 13 years after the first impounding). So the clay

behavior as an undrained material and volume change is not significant especially in the center

area of core. This is the main reason for developing the lateral deformation in the clay core which

called bulging.

Keywords: Rockfill dam, clay core,

1- INTRODUCTION

The Masjed Soleilman (MES

rockfill dam (Engineering Report of MES dam

power plant was commenced in December 1994 and the embankment of the main dam was

completed in November 2000. The reservoir impounding was

2000 and the reservoir water level reached at el. 371 m on July 2002.

the first impounding of dam reservoir can lead to changing of dam safety

the importance the monitoring after

��������������� ������

Bali, Indonesia, June 1ST

– 6TH

, 2014

the bulging phenomenon in the clay core of rockfill dam

based on the stress and pore water pressure data

Associate Professor, Civil Engineering Department, Ferdowsi University of Mashhad, Mashhad

[email protected]

in Geotechnical Engineering, Abpooy Consulting Engineers, Mashhad, Iran

Geotechnical Engineering, Abpooy Consulting Engineers, Mashhad, Iran

ABSTRACT The Masjed Soleyman dam is a central clay core rockfill dam with the height of 177 meter and

center core. Throughout the dam construction, reservoir impounding and operation

comprehensive monitoring had been carried out to verify the dam behavior. The monitoring of the

dam behavior was based on measurement data of instruments installed on the dam body and

This research present research presents an overall review of the dam behavior

summarizes the recorded measurement of major instruments. These

instruments are in the field of stresses and pore water pressure in the clay core. Also substantial

rotation of the principal stresses direction had been investigated. The rotating angles of respective

points were generally constant, but slight increases in the angles after full impoundment ha

observed in the downstream side of the core. This is an indicative of a progressing shear zone and

would lead to bulging of the core in the lower level. In the clay core due to the

permeability of the clay material, the dissipating process of the pore water pressure hadn’t been

continuing with notable progress (in the past 13 years after the first impounding). So the clay

avior as an undrained material and volume change is not significant especially in the center

area of core. This is the main reason for developing the lateral deformation in the clay core which

ockfill dam, clay core, Masjed Soleyman dam, bulging, pore water pressure

MES) dam is a 177 m high and 490 m long center core type

Engineering Report of MES dam, 1993). Construction of the dam

power plant was commenced in December 1994 and the embankment of the main dam was

completed in November 2000. The reservoir impounding was commenced on 19 December

2000 and the reservoir water level reached at el. 371 m on July 2002. Deformations due

first impounding of dam reservoir can lead to changing of dam safety, which implies

the monitoring after the first impounding (Soroush and Araei,

the bulging phenomenon in the clay core of rockfill dam

based on the stress and pore water pressure data

Mashhad, Iran

, Mashhad, Iran

, Mashhad, Iran

The Masjed Soleyman dam is a central clay core rockfill dam with the height of 177 meter and

center core. Throughout the dam construction, reservoir impounding and operation

carried out to verify the dam behavior. The monitoring of the

dam behavior was based on measurement data of instruments installed on the dam body and

overall review of the dam behavior during

of major instruments. These

and pore water pressure in the clay core. Also substantial

ting angles of respective

points were generally constant, but slight increases in the angles after full impoundment has been

indicative of a progressing shear zone and

due to the very low

permeability of the clay material, the dissipating process of the pore water pressure hadn’t been

continuing with notable progress (in the past 13 years after the first impounding). So the clay

avior as an undrained material and volume change is not significant especially in the center

area of core. This is the main reason for developing the lateral deformation in the clay core which

, pore water pressure.

) dam is a 177 m high and 490 m long center core type

dam body and

power plant was commenced in December 1994 and the embankment of the main dam was

ed on 19 December

Deformations due to

, which implies

, 2006).�

An investigation on the bulging phenomenon in the clay core of rockfill dam

based on the stress and pore water pressure data

J. Bolouri Bazaz

H. Gholami

M.T. Bolouri Bazaz

� � � � � �

Page 2: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Throughout the dam construction, reservoir impounding and operation comprehensive

monitoring had been carried out to verify the dam behavior so that stability and safety of

the dam were ensured (Engineering Report of MES dam, 1993). The monitoring of the

dam behavior was based on measurement data of instrument installed in the dam body and

foundation and geodetic survey results of the dam surface as well as daily visual

inspection.

Noticeable numbers of the instruments malfunctioned or damaged in the period of the

construction. It’s notable that, the surface settlement of the dam had been continuing and it

was still not evident that the settlement had gone into a stable state. The residual excess

pore pressure in the core was still high after 11 years from first impounding. Developed

excess pore water pressure in the clay core of zoned rockfill dams during the construction

period and first stage impounding, may lead to initiation or progression of hydraulic

fracturing. The ability to predict the development and dissipation of these pore pressures is

important in assessing the performance of such structures. This phenomenon also depended

on the arching effect status of the core zone due to difference in stiffness of materials.

(Maleki and far, 2004). In present study, the received data from stress and pore water

instruments (section 260) analysised to understand the dam’s deformation behavior. Also,

the graphs drew just for available data’ instrument. The symbols of instrument’s situation

are shown in table 1.

Table 1. Symbol of instrument’s situation

symbol Situation

U/C Upstream (in core)

CL Center of core

D/C Downstream (in core)

U/Filter Upstream (in filter)

D/Filter Downstream (in filter)

U/Shell Upstream (in shell)

D/Shell Downstream (in shell)

2- EARTH PRESSURE

The stress in dam body has been measured, using total pressure cells which are installed in

the core, downstream filter and downstream shell from the beginning of the embankment

(Figure 1.), The total pressure cells in the upstream side of the core and upstream filter

malfunctioning and data in these portions were not available.

Figure 1. Earth pressure gauges in one cluster

The Stress ratio was defined as a ratio of the actual vertical pressure to the apparent

pressure calculated from the embankment weight (γH) above the measuring point. The

Total pressure cell

45 45

B

AC

� � � � � �

Page 3: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

positions of the instrument that was workable are shown in table 2. Variation of the stress

ratio (σv/γH) at respective measuring section (CH. 260) are shown in figures 2 to 4. In these

graphs, RWL is the water level behind the dam. The stress ratio in the core was in a range

(0.6 -0.7) and that in the filter are (0.7-1.40). This phenomenon caused by arching in the

core zone.

Table 2. Situation of instrument in CH. 260

Instrument Elevation Situation

2103 230 CL

2104 230 D/C

2105 230 D/Filter

2107 230 D/S

2202 270 CL

2203 270 D/C

2304 310 D/C

2305 310 D/Filter

Figure 2.Vertical stress ratio at 230 elevation (CH. 260 m).

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

Lev

el (

m)

EP-2103 EP-2104 EP-2105 EP-2107 RWL Embankment Level

Arc

hin

g R

ati

o

� �

Page 4: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 3.Vertical stress ratio at 270 elevation (CH. 260 m).

Figure 4.Vertical stress ratio at 310 elevation (CH. 260 m).

Principle stresses in the dam body are calculated from the measurement data of the total

pressure cells at the respective measuring points. Variations of the effective stress paths in

the core expressed with relationship between 1 2( ) / 2p σ σ= + and 1 2( ) / 2q σ σ= − ,

together with the measured pore pressure (pu) in this equation '

up p p= − . The values are

shown in figure 5 to 7 which indicate a trace of Mohr’s stress circle peak. The strength

parameters in this failure criterion are soil cohesion and internal friction angle. The values

of them are 20 kN/m2 and 30° respectively. The points above the failure envelope show the

yielding condition.

��

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

Lev

el (m

)

EP-2202 EP-2203 RWL Embankment Level

Arc

hin

g R

ati

o

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

-0.50

0.00

0.50

1.00

1.50

2.00

2.50

Level (

m)

Longterm Variation

EP-2304 EP-2305 EP-2306 RWL Embankment Level

Arc

hin

g R

ati

o

� � � � � �

Page 5: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 5. Effective stress path in (p'-q) space (Sec. 260, El. 230, Core CL)

Figure 6. Effective stress path in (p'-q) space (Sec, 260, EL230, Core D/S)

����

�����

�����

�����

�����

������

������

������

���� ����� ����� ����� ����� ������ ������ ������ ������ ������ ������

��� �����������

�������������������

�!�����"

�!����

����

#����

������

�#����

������

�#����

������

�#����

������

�#����

#�����

������ �#���� ������ #���� ���� #���� ������ �#���� ������

��� �����������

�������������������

�!�����"

�!����

� � � � � �

Page 6: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 7. Effective Stress Path in (p'-q) space (Sec. 260, EL270, Core CL)

Deviation of the orientation of the maximum stress from the vertical direction is presented

in Figures 8 and 9. These graphs pointed out substantial rotation of the principal stress

direction to the upstream in the core, which was indicative of a progressing shear zone and

would lead to bulging of the core.

Figure 8. Orientation of principal stress direction (Sec, 260, El. 230)

����

�����

�����

�����

�����

������

������

������

������

������ �#���� ������ #���� ���� #����

��� �����������

�������������������

�!�����"

�!����

�"

���

���

�#�

�$�

�%�

���

���

�#�

�$�

�%�

�����

�����

�����

����

�����

�����

�����

�����

������

�#&�'%�

��(�)%�

�$*��%$

��+,�%�

��-

�.%%

�#-

� ��

�%+����

�#��/��

��*����

��+,���

��0� ��

�$&�'�#

��(�)�#

��1

)���

��0, �$

��+,���

��-

� �%

��+����

� ��������� 234 5�'��6����

4�/���!�"

Ori

enta

tio

n

� � � � � �

Page 7: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 9. Orientation of principal stress direction (Sec, 260, El. 230)

3. PORE WATER PRESSURE

Pore pressure in the dam body had been measured by using pore pressure gauge installed

in the center and downstream side of the core. The pore pressure gauges in the upstream

side of the core were malfunctioning data in these portions were not available.

A ratio of the pore pressure to the measured vertical earth pressure (letter M in graphs) and

to the principal stress (letter S in the graphs) are shown in figure 10-12. Variation of these

values indicates a dissipating process of pore water and air form the core. The level of the

pore pressure ratio after 11 years from the embankment completion was high. These had

been continuously decreasing since the full impoundment at a slow rate.

The ratio of the pore pressure in the lower portion of the core was still at the high values of

90%. Therefore, the measurement results were simply indicative that the dissipating

process of the pore pressure in the core of the MES dam was extremely slow.

Considering that the pore water pressure is an isotropic tension�and the main stress is also

zero in shear conditions. It can be concluded that the pore water pressure ratios calculated

on the principal stresses is closer to reality than base on the total stress.

���

���

�#�

�$�

�%�

���

���

�#�

�$�

�%�

#����

�����

�����

�����

�����

����

�����

�����

�����

�����

#����

�#&�'%�

��(�)%�

�$*��%$

��+,�%�

��-

�.%%

�#-

� ��

�%+����

�#��/��

��*����

��+,���

��0� ��

�$&�'�#

��(�)�#

��1

)���

��0, �$

��+,���

��-

� �%

��+����

����/��

��*����

1 ���������� 234 5�'��6����

4�/���!�"

Ori

enta

tion

� � � � � �

Page 8: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 10. Pore Pressure ratio at 230 elevation (CH 260)

��

Figure 11. Pore Pressure ratio at 270 elevation (CH 260)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

0.80

0.85

0.90

0.95

1.00

1.05

EP-2103(D/S,230m,M) EP-2103(D/S,230m,S) EP-2104(D/S,229.94m,M)

EP-2104(D/S,229.94m,S) RWL Embankment Level

Longterm Variation

Po

re P

ress

ure

Ra

tio

Lev

el (m

)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

EP-2202(D/S,270m,M) EP-2202(D/S,270m,S) EP-2203(D/S,270m,M) EP-2203(D/S,270m,S) RWL Embankment Level

Po

re P

ress

ure

Ra

tio

Lev

el (

m)

! " # $

Page 9: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 12. Pore Pressure ratio at 310 elevation (CH 260)

4. EFFECTIVE STRESS

Variation of the effective stress in the middle and downstream part of the core at 280

elevation are shown in figures 13-15. In these graphs, horizontal axis is the distance of the

left side to right side of the dam axis and the elevations of abtuments are shown. Effective

stress in the CH. 260 had been very little increased after impounding, this mater indicates

that the condition is undrained and the progressive of consolidation is very low. Also at

310 elevation in CH260 the effective stress have little increase after impounding (report on

monitoring of MS dam behavior, 2014).

��

Figure 13. Effective stress in middle part of the core at 280 elevation along the axis' dam��

���

���

���

���

���

���

���

���

���

���

���

-100

-50

0

50

100

150

200

250

300

0 100 200 300 400 500

23-Nov-00

22-Jun-02

14-Dec-05

Elavation

Crest

Distance(m)

Eff

ecti

ve

stre

ss (K

N/m

2)

L/SR/S

Ele

vati

on

(m)

% % & ' ( )

Page 10: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

Figure 14. Effective stress in downstream part of the core at 280 elevation along the axis' dam

Figure 15. Effective stress in downside of the core at 310 elevation along the axis' dam��

5. CONCLUSION

By considering the fact that the surface settlement had been continuing without notable

progress of consolidation and Pore pressure ratio for most sections of core is high (over

0.8). Also, the orientation of the stress to upstream was indicative of a progressing shear

zone and would lead to bulging of the core.

Bulging of the downstream part of the core is expected to occur at mid-height and below.

Such bulging will certainly lead to a deformational response of the adjacent part of the

filter and the downstream shell. This is the main reason for developing the lateral

deformation in the clay core. It’s notable that the settlement of the foundation not expected,

so it’s lead to mobilize the pressure to adjacent part of downstream of core and amplify the

deformation this part of dam body.

ACKNOWLEDGMENT

The present research has been commissioned by the Geotechnique Department of the Ab-

Pooy Consulting Engineers. This study was a part of the Stability Analysis of Masjed

Soleyman dam project.

���

���

���

���

���

���

���

���

���

���

���

-200

-100

0

100

200

300

400

0 100 200 300 400 500

23-Nov-00

22-Jun-02

13-May-09

Elavation

Crest

Distance(m)

Eff

ecti

ve

stre

ss (K

N/m

2)

L/SR/S

Ele

vati

on

(m)

���

���

���

���

���

���

���

���

���

���

���

-50

50

150

250

350

450

550

650

750

0 100 200 300 400 500

23-Nov-00

22-Jun-02

13-May-09

Elava tion

Crest

Distance(m)

Eff

ecti

ve

stre

ss (K

N/m

2)

L/S R/S

* * + , - .

Page 11: An investigation on the bulging phenomenon in the clay ...profdoc.um.ac.ir/articles/a/1042834.pdf · continuing with notable progress (in the past 13 years after the first impounding)

REFERENCES

Abpooy consulting engineers, (2014): report on monitoring of MS dam behavior.

Khalili, A. and F. Jafarzadeh, (2006): Evaluation of strength parameters of Masjed

Soleyman Dam clay core using CPTU.

Maleki, M. and A.A. Far, (2004): safety evaluation of masjed-e-soleyman rockfill dam,

during construction and first stage impounding, in Uncertainty in Safety Evaluation of

Embankment Dams.

Soroush, A. and Araei, A.A. (2006): Analysis of behaviour of a high rockfill dam,

Proceedings of the ICE-Geotechnical Engineering, 159: p. 49-59.

Lahmeyer International and Moshanir, (1993): MES Dam Design Report, Vol. 1.

/ / 0 1 2 3