an administrative presentation november 2, 2015...an administrative presentation november 2, 2015 t...

22
Redistribution of Students: An Administrative Presentation November 2, 2015

Upload: others

Post on 20-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Redistribution of Students: An Administrative Presentation

November 2, 2015

TA

BLE OF C

ON

TENTS

Timeline

Review of Phase II: Elementary Schools Overview

Appendix B: Goals for Redistribution

Review of Phase I: Silver Spring to Monroe Enrollment Changes

Green Ridge Elementary School

Silver Spring Elementary School

Hampden Elementary School

Middlesex & Monroe Elementary School

Appendix A: Summary by Neighborhood

Shaull Elementary School

Sporting Hill Elementary School

Page 3

Page A1

Page B1

Page 19

Page 16

Page 4

Page 5

Page 6

Page 14

Page 7

Page 8

New Elementary School

Page 9

Review of Phase II: CVSD Middle Schools Overview

Transition Planning

Frequently Asked Questions

Redistribution Email

Page 10

Page 11

Page 12

Page 13

TIM

ELINE: C

ON

STRUCTIO

N & R

EDISTRIBU

TION

   

Construction and Redistribution Timeline

The Redistribution Committee will review administration’s recommendation with the full Board of School Directors at the meeting on November 9. There will be time for public comment during this meeting. From there, the board may request time for additional review and/or discussion or may consider placing the recommendation on the November 23 board meeting agenda for a vote.

Summer 2016 - Summer 2018: Construction of new elementary and middle school. 2017 - 2018: Phase I redistribution of students (pending board approval)

•  Silver Spring to Monroe 2018 - 2019: Phase II redistribution of students (pending board approval)

•  Green Ridge •  Silver Spring •  Hampden •  Middlesex & Monroe •  Shaull •  Sporting Hill •  New Elementary School •  Middle Schools

3  

PH

ASE I: S

ILVER SPRIN

G TO MO

NRO

E (2017-18 S

CHO

OL Y

EAR)

   

4

Silver  Spring  Elementary      

       Current  Enrollment  (10/15)   544  

Capacity   495  Over/Under  Capacity   49  

Percent  Capacity   109.9%          Silver  Spring  Student  to  Monroe        Trindle  Springs   30  Mulberry  Crossing/Mulberry  Dr.  -­‐  Southern  side,  west  of  Hogestown  Rd.   46  North  Rd,  South  Rd,  Rusty  Drive   5          Total   81          Projected  Silver  Spring  Enrollment   463  Percent  Capacity  Projected   93.5%  

Monroe  Elementary          Current  Enrollment  (10/15)   350  

Capacity   467  Over/Under  Capacity   117  

Percent  Capacity   74.9%          To  Monroe  Elementary      Trindle  Springs   30  Mulberry  Crossing/Mulberry  Dr.  -­‐  Southern  side,  west  of  Hogestown  Rd.   46  North  Rd,  South  Rd,  Rusty  Drive   5          Total     81                  Projected  Monroe  Enrollment   431  Percent  Capacity  Projected   92.3%  

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

PH

ASE II: E

LEMEN

TARY O

VERVIEW

(2018-19 SCH

OO

L YEA

R)

   

5

Schools   Green  Ridge   Hampden   Shaull   Silver  Spring   SporNng  Hill   Middlesex   Monroe   New  Elem.  Current  Enrollment   543   765   611   463   713   413   431   0  

Capacity   495   616   577   495   577   492   467   850  Over/Under  Capacity     48   149   34   -­‐32   136   -­‐79   -­‐36      Percent  Capacity   109.7%   124.2%   105.9%   93.5%   123.6%   83.9%   92.3%      

Current  Enrollment   543   765   611   463   713   413   431   0                  Green  Ridge  Devs.  To  New  Elem.  School   132                           132          Green  Ridge  to  Shaull   31       31                              Silver  Spring  to  Green  Ridge   73           73                  Green  Ridge  Enrollment     453                                            Hampden  To  New  Elementary  School       290                       290        Shaull  Dev  Moving  to  New  Elem.  School           88                   88        Shaull  Developments  To  Hampden       69   69                      Shaull  Enrollment           485                                                          Hampden  Enrollment       544                                        Spor<ng  Hill  to  Silver  Spring               17                  Silver  Spring  Enrollment               407                                Spor<ng  Hill  Dev.  To  New  Elem.  School                   210           210        Spor<ng  Hill  to  Silver  Spring                   17              SporNng  Hill  Enrollment                   486                      New  Elementary  Enrollment                               720          School  Enrollment   453   544   485   407   486   413   431   720  Capacity   495   616   577   495   577   492   467   850  Percent  Capacity  Projected   91.5%   88.3%   84.1%   82.2%   84.2%   83.9%   92.3%   84.7%               Green  Ridge   Hampden   Shaull   Silver  Spring   SporNng  Hill   Middlesex   Monroe   New  Elem.  Available  Space   42   72   92   88   91   79   36   130  

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

GREEN R

IDG

E ELEM

ENTA

RY    

6

Green  Ridge  Current  Enrollment  (10/15)   543  Capacity   495  Over/Under  Capacity   48  Percent  of  Capacity   110%  

Green  Ridge  Students  To  New  Elementary  School      Bunker  Hills/Bali  Hai  Road  &  West  Hill  Dr.   29  Glenwood  Farms   12  Hampden  Heights   24  Hampden  Summit   27  Signal  Hill   12  Pinehurst  Hills   19  Hunters  Gate   7  Regency  Hills   2  Versant   0  

Total   132  

Green  Ridge  Students  to  Shaull      Hawks  Landing   20  Hunter  Drive   9  West  Side  of  Lambs  Gap  Road  (I-­‐81  to  Wertzville  Rd)   2  

Total   31  

Silver  Spring  Students  to  Green  Ridge      Walden   70  Sterling  Glen   1  East  Side  of  Hogestown  Road  (Woods  Drive  to  Carlisle  Pike)   2  

Total   73  

Projected  Green  Ridge  Enrollment  August  2018   453  Percent  Capacity  Projected   91.5%  Available  Space   42  

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

SILVER S

PRING E

LEMEN

TARY

   

Silver  Spring  Enrollment   463*  Capacity   495  Over/Under  Capacity   32  Percent  Capacity   93.5%  

Silver  Spring  Students  to  Green  Ridge      Walden   70  Sterling  Glen   1  East  Side  of  Hogestown  Road  (Woods  Dr.  to  Carlisle  Pike)   2  

Total   73  

SporNng  Hill  To  Silver  Spring      Longview  Drive   5  Cicada  Drive/Monarch  Lane/Southern  Side  of  Woods  Dr.  (#'s  3-­‐19),  west  of  Silver  Spring  Road   12  

Total   17      Projected  Silver  Spring  Enrollment  (August  2018)   407  Percent  Capacity  Projected   82.2%  Available  Space   88  

*  Enrollment  number  aMer  the  2017-­‐2018  Monroe  and  Silver  Spring  redistribu<on.  

7 Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

HA

MPD

EN ELEM

ENTA

RY    

Hampden  Current  Enrollment  (10/15)   765  Capacity   616  Over/Under  Capacity   149  Percent  Capacity   124.2%  

Hampden  Students  To  New  Elementary  School      Hampden  Hearth   27  Dove  Ridge   28  Dartmouth  Green   45  Creekview   11  Hampden  Village   26  Townes  of  Cross  Creek   32  Shepherd’s  Crossing   0  Silver  Creek  At  Hampden   121  

Total   290  

Shaull  Students  to  Hampden      Timber  Chase   22  Wyndham  Place   11  Mt  View  Village   10  Roth  Village   19  Governor’s  Glen   2  Creekview  Park  North   1  West  Side  of  Orrs  Bridge  to  Kile  Drive/Good  Hope  Rd  -­‐  eastern  side  of  Good  Hope  Rd,  north  of  Creekview  and  South  of  Technology  Parkway   4  

Total   69      Projected  Hampden  Enrollment(August  2018)   544  Percent  Capacity  Projected   88.3%  Available  Space   72   8

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

MID

DLESEX &

MO

NRO

E ELEM

ENTA

RY    

Middlesex  Enrollment   413  Capacity   492  Over/Under  Capacity   79  

Percent  Capacity  (Projected)   83.9%  

9 Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

Monroe  Enrollment   431  Capacity   467  Over/Under  Capacity   36  

Percent  Capacity  (Projected)   92.3%  

SH

AU

LL ELEM

ENTA

RY    

Shaull  Current  Enrollment  (10/15)   611  Capacity   577  Over/Under  Capacity   34  Percent  Capacity   106%  

Shaull  Students  To  New  Elementary  School      Village  of  Brandywine   17  Fairwinds   48  Turnberry   23  

Total   88  

Shaull  Students  to  Hampden      Timber  Chase   22  Wyndham  Place   11  Mt  View  Village   10  Roth  Village   19  Governor’s  Glen   2  Creekview  Park  North   1  West  Side  of  Orrs  Bridge  to  Kile  Drive/Good  Hope  Rd  -­‐  eastern  side  of  Good  Hope  Rd,  north  of  Creekview  and  South  of  Technology  Parkway   4  

Total   69      Green  Ridge  Students  to  Shaull      Hawks  Landing   20  Hunter  Drive   9  West  Side  of  Lambs  Gap  Road  (I-­‐81  to  Wertzville  Road)   2  

   Total   31  

   Projected  Shaull  Enrollment  (August  2018)   485  Percent  Capacity  Projected   84.1%  Available  Space   92   10

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

SPO

RTING H

ILL ELEM

ENTA

RY    

SporNng  Hill  Enrollment  (10/15)   713  Capacity   577  Over/Under  Capacity   136  Percent  Capacity   123.6%  

SporNng  Hill  Students  to  New  Elementary  School      Rivendell   74  Salem  Park   18  Salem  Acres   20  Trindle  Spring  Heights   39  Six  Links   26  Haydon  Ct   17  Forest  Acres/Bay  Street   16  Admiral’s  Quay   0  

Total   210  

SporNng  Hill  To  Silver  Spring      Longview  Drive   5  Cicada  Drive/Monarch  Lane/Southern  Side  of  Woods  Dr.  (#'s  3-­‐19),  west  of  Silver  Spring  Road   12  

Total   17  

Projected  SporNng  Hill  Enrollment(August  2018)   486  Percent  Capacity  Projected   84.2%  Available  Space   91  

11

Note:  Numbers/percentages  reflect  October  2015  data,  informa<on  subject  to  change.    

NEW

ELEM

ENTA

RY SCH

OO

L    

12

New  Elementary  School  Capacity   850  

Green  Ridge  Students  To  New  Elementary  School  Bunker  Hills/Bali  Hai  Road  &  West  Hill  Dr.   29  Glenwood  Farms   12  Hampden  Heights   24  Hampden  Summit   27  Signal  Hill   12  Pinehurst  Hills   19  Hunters  Gate   7  Regency  Hills   2  Versant   0  

Total   132  

Hampden  Students  To  New  Elementary  School  Hampden  Hearth   27  Dove  Ridge   28  Dartmouth  Green   45  Creekview   11  Hampden  Village   26  Townes  of  Cross  Creek   32  Silver  Creek  at  Hampden   121  Shepherd’s  Crossing   0  

Total   290  

Shaull  Students  To  New  Elementary  School    

Village  of  Brandywine   17  

Fairwinds   48  

Turnberry   23  

Total   88  

SporNng  Hill  Students  to  New  Elementary  School    

Rivendell   74  

Salem  Park   18  

Salem  Acres   20  

Trindle  Spring  Heights   39  

Six  Links   26  

Haydon  Ct   17  

Forest  Acres/Bay  Street   16  

Admiral’s  Quay   0  

Total   210  

Projected  Enrollment   720  

Percent  Capacity  Projected   84.7%  

Available  Space   130  

Note:  Numbers/percentages  reflect  October  2015  data    informa<on  subject  to  change.    

MID

DLE S

CHO

OLS O

VERVIEW

(2018-19 SCH

OO

L YEA

R)

   

13

EAGLE  VIEW  MIDDLE  SCHOOL  

Eagle  View  Enrollment  (10/15)   959  Capacity   1050  Over/Under  Capacity   91  Percent  Capacity   91.30%  

Eagle  View  Students  to  New  Middle  School  Hawks  Landing   6  Hunters  Gate   1  Signal  Hill   9  Pinehurst  Hills   9  Hunter  Drive/Red  Fox     6  Bunker  Hills   14  Glenwood  Farms   9  Hampden  Heights   11  Hampden  Summit   18  Total   83  

Good  Hope  Students  to  Eagle  View  Longview  Drive   6  Monarch  Lane/Cicada   7  Total   13  

Projected  Eagle  View  Enrollment  (August  2018)   889  Percent  Capacity  Projected   84.70%  Available  Space   161  

NEW  MIDDLE  SCHOOL  

Good  Hope  Enrollment  (10/15)   1029  Capacity   1400  Over/Under  Capacity   371  Percent  Capacity   73.50%  

Eagle  View  Students  to  New  Middle  School      Hawks  Landing   6  Hunters  Gate   1  Signal  Hill   9  Pinehurst  Hills   9  Hunter  Drive/Red  Fox     6  Bunker  Hills   14  Glenwood  Farms   9  Hampden  Heights   11  Hampden  Summit   18  

Total   83  

Projected  Enrollment  (August  2018)   1112  Percent  Capacity  Projected   79.40%  Available  Space   288  

Note:  Numbers/percentages  reflect  October  2015  data    informa<on  subject  to  change.    

TRA

NSITIO

N PLA

NN

ING

   

14

The adoption of new attendance boundaries provides the foundation for the development of a complicated transition plan that is as critical to the success of our efforts as the construction of the new facilities. In doing so, the transition plan must recognize the efforts required for reorganizing within existing buildings. Regardless of whether a building’s student population is getting larger or smaller, in some ways, these moves will be more difficult and have a greater impact on teaching and learning than the impacts that result from moving into a brand new building. This understanding requires that transition planning pay equal attention to all of our schools. The Cumberland Valley School District transition plan must: •  define the philosophy, timeline, and procedures for moving students and for transferring and hiring faculty,

administration, and staff.

•  establish transition teams of teachers, counselors, administrators, and students in the elementary and middle schools to address the needs of students, faculty, and staff during the transition both within and between schools, and to celebrate milestones and accomplishments during the process.

•  identify faculty and staff within each school and throughout the district that can identify and support students who may find the transition challenging or have unique needs when making the transition.

•  determine the time table and individuals responsible for dismantling temporary instructional spaces, reassigning spaces within existing buildings and assigning spaces in the new buildings, and moving faculty and staff to those spaces.

•  identify the new locations for and move existing furniture, fixtures, texts, materials, and technology, as well as identify the logistics of purchasing, receiving, assembling, and placing millions of dollars of new furniture, fixtures, technology, and supplies in our inventory.

•  develop new guidelines, practices, procedures and routines for faculty, staff, and students that result from large changes in the size of the student body within buildings.

•  include objectives and timelines for professional development that will range from managing change, understanding new building and district guidelines and procedures, safety procedures, using new products and services, and addressing a more diverse student body.

•  include a media plan for communicating information to parents, students, faculty, staff, and stakeholders.

TRA

NSITIO

N PLA

NN

ING

   

15

(continued)

•  articulate established district goals and strategic objectives, initiatives, and changing state/federal requirements being implemented during the transition to build responsibilities and goals into the annual evaluation cycle, utilize temporary support services, budget, and to maintain academic excellence, and support continued growth toward our mission and vision.

•  demonstrate respect for all stakeholders, embrace diversity, and maintain long-standing Cumberland Valley traditions by promoting programs and opportunities that create a feeling of connectedness among stakeholders and shared responsibility for student learning across the district.

  Given the massive logistics of the transition, absent any large unanticipated events, changes to the new attendance boundaries will not be recommended. Once the new boundaries are established and transition planning is initiated each day closer toward the opening of the new facilities will make changing the attendance boundaries again exponentially more difficult and expensive.

FREQ

UEN

TLY ASK

ED QU

ESTION

S?    

16

What is the timeline for approval?

The Redistribution Committee will review administration’s recommendation with the full Board of School Directors at the meeting on November 9. There will be time for public comment during this meeting. From there, the board may request time for additional review and/or discussion or may consider placing the recommendation on the November 23 board meeting agenda for a vote.

Hampden Elementary School is already over capacity. How will we address concerns for space in the building if enrollment continues to increase prior to redistribution in 2018?

If enrollment continues to increase at Hampden and class sizes begin to exceed thresholds, we will implement practices previously used in these situations: adjusting instructional strategies by adding aide support. While our preference is smaller class sizes, we do know from our experience that Hampden students were still among the most academically-successful students when we previously implemented the teacher/aide partnerships in response to higher-than-preferred class sizes. Please remain assured that we will continue to watch enrollment closely, will remain creative, will make adjustments as necessary, and will work to avoid having to send students to temporary locations in modular classrooms or other buildings; both of which are very expensive propositions in terms of learning and tax dollars.

Silver Spring Elementary School is already over capacity. Why are we waiting until 2017 to move students from Silver Spring to Monroe? Conversely, why aren’t we waiting to redistribute these students with the remainder of the district in 2018?

Silver Spring is the fastest growing township in the Commonwealth. The plan to redistribute students from Silver Spring to Monroe is being recommended in 2017, not because we need space in the future, but because of a need now to address current enrollment and class sizes. Making this transition in the fall of 2016 was discussed, but ultimately administration decided to recommend a 2017 redistribution to provide adequate notice for students, parents, and staff.

FREQ

UEN

TLY ASK

ED QU

ESTION

S?    

17

My child is to be redistributed from Silver Spring to Monroe in 2017. What if I would prefer the move to occur in 2016 for my child or what if I would prefer my child who enters Kindergarten in 2016 to simply being at Monroe?

District administration is currently looking into these requests to determine if it’s feasible to grant exceptions to those who wish to transition from Silver Spring to Monroe a year earlier than planned.

Why does my neighborhood have to move when we only have a minimal number of students?

Neighborhoods were considered based on current number of students in those neighborhoods and potential for those homes to send students in the future. All movements were evaluated against the 10 criteria for redistribution. While any neighborhood may currently have minimal students, it’s the total of all those smaller moves that represent a substantial part of the redistricting proposal. Additionally, as we balance elementary schools we must consider the impact on secondary schools.

What happens if enrollment continues to increase and the new buildings don’t provide adequate capacity?

This is a concern shared by the district as well. This is a delicate balancing act; we don’t want to overbuild and have our funds locked into empty spaces but we also don’t want to under build and have continued capacity issues. The administrative recommendation for redistribution projects buildings to be at approximately 85% to 90% of CV’s calculated capacity. These projections include lowered class size thresholds, which does provide additional space for growth while the next phase of renovations/additions can be discussed. Options exist, if needed and approved, for additions at Hampden, Shaull, Sporting Hill, and Eagle View. In addition, the new campus provides adequate space for a third building if enrollment necessitates such construction.

FREQ

UEN

TLY ASK

ED QU

ESTION

S?    

18

What formula is used to determine capacity?

Capacity is calculated by both the Pennsylvania Department of Education (for reimbursement) and by the District (for instructional purposes). The figures in the redistribution recommendation are based on CV’s capacity coupled with growth projections. At the elementary level, CV calculates capacity as 22 students for each Kindergarten, first, and second grade classroom, 25 student for each third grade classroom, and 28 students for each fourth and fifth grade classroom. At the secondary level, it’s a bit more challenging because how a secondary classroom is used varies greatly throughout the course of each day. For CV’s capacity calculations, we assign 30 students to each classroom space and then assure, based on our schedules and instructional strategies, that we have enough auxiliary spaces (art, music, gym, IMC, etc). This is the capacity figure that was used in the recommendation for the middle schools.

How will the District determine which staff members move to which buildings?

Please see the “Transition Planning” slides on pages 14 and 15 in this presentation.

KEEP TH

E CO

NVERSA

TION G

OIN

G: D

ESIGN

ATED E

MA

IL    

19

Questions or comments: [email protected]

APPEN

DIX A

: SU

MM

ARY BY N

EIGH

BORH

OO

D    

A-1

Green  Ridge  (current  students)       Neighborhoods  to  Shaull  (18-­‐19)           Hawks  Landing   20       Hunter  Drive   9       West  side  of  Lambs  Gap  Rd  (I-­‐81  to  Wertzville  Rd)   2       TOTAL   31               Neighborhoods  to  New  Elementary  (18-­‐19)  

   Bunker  Hills/Bali  Hai  Road  &  West  Hill  Dr.   29  

    Glenwood  Farms   12       Hampden  Heights   24       Hampden  Summit   27       Signal  Hill   12       Pinehurst  Hills   19       Hunters  Gate   7       Regency  Hills   2       Versant   0                       TOTAL   132  

Hampden  Elementary  (current  students)       Neighborhoods  to  New  Elementary  (18-­‐19)           Hampden  Hearth   27       Dove  Ridge   28       Dartmouth  Green   45       Creekview   11       Hampden  Village   26       Townes  of  Cross  Creek   32  

Shepherd’s  Crossing   0       Silver  Creek  at  Hampden   121                       TOTAL   290  

Silver  Spring  (current  students)       Neighborhoods  to  Monroe  (17-­‐18)           Trindle  Springs   30  

   Mulberry  Crossing/Mulberry  Dr.  -­‐  Southern  side,  west  of  Hogestown   46  

    North  Rd,  South  Rd,  Rusty  Dr.   5       TOTAL   81               Neighborhoods  to  Green  Ridge  (18-­‐19)           Walden   70       Sterling  Glen   1       East  side  Hogestown  Rd  (Woods  Dr.  to  Carlisle  Pike)   2                       TOTAL   73  

Shaull  Elementary  (current  students)       Neighborhoods  to  Hampden  (18-­‐19)           Timber  Chase   22       Wyndham  Place   11       Mt  View  Village   10       Roth  Village   19       Governor’s  Glen   2       Creekview  Park  North   1  

   

West  Side  of  Orrs  Bridge  to  Kile  Drive/Good  Hope  Rd  -­‐  eastern  side  of  Good  Hope  Rd,  north  of  Creekview  and  South  of  Technology  Parkway   4  

    TOTAL   69               Neighborhoods  to  New  Elementary  (18-­‐19)           Village  of  Brandywine   17       Fairwinds   48       Turnberry   23                       TOTAL   88  

APPEN

DIX A

: SU

MM

ARY BY N

EIGH

BORH

OO

D    

A-2

SporNng  Hill  (current  students)       Neighborhoods  to  Silver  Spring  (18-­‐19)           Longview  Drive   5  

   

Cicada  Drive/Monarch  Lane/Southern  Side  of  Woods  Dr.  (#'s  3-­‐19),  west  of  Silver  Spring  Road   12  

    TOTAL   17               Neighborhoods  to  New  Elementary  (18-­‐19)           Rivendell   74       Salem  Park   18       Salem  Acres   20       Trindle  Spring  Heights   39       Six  Links   26       Haydon  Ct   17       Forest  Acres/Bay  St.   16  

Admiral’s  Quay   0                       TOTAL   210  

Eagle  View  (current  students)       Neighborhoods  to  New  Middle  (18-­‐19)           Hawks  Landing   6       Hunters  Gate   1       Signal  Hill   9       Pinehurst  Hills   9       Hunter  Drive/Red  Fox   6       Bunker  Hills   14       Glenwood  Farms   9       Hampden  Heights   11       Hampden  Summit   18                       TOTAL   83  

Good  Hope  (current  students)       Neighborhoods  to  Eagle  View  (18-­‐19)           Longview  Dr.   6       Monarch  Lane/Cicada   7                       TOTAL   13  

APPEN

DIX B: G

OA

LS FOR R

EDISTRIBU

TION

   

B-1

1)  A plan for redistribution of students shall be developed that reflects the greatest possible benefits for both our students and the school district as a whole.

2)  The plan shall be consistent with the Board’s Ten Statements of Function for facility master planning.

3)  New attendance boundaries shall be developed and evaluated based on equity, educational effectiveness, and efficiency of operation.

4)  As much as possible each elementary and middle school shall reflect the demographics of Cumberland Valley High School.

5)  Each school building shall have a targeted enrollment of 85-90% of PDE capacity. In cases where approved residential developments are underway, the potential impact shall be considered in the calculations.

6)  Recognizing that redistribution will result in some students having bus rides that are a little shorter and others that are a little longer, the average bus ride and/or average distance that a student will travel should not increase markedly or exceed current maximum ride times or distances.

7)  The proximity of businesses, amenities, day care centers, and preferred routes of travel within existing attendance areas shall not be used to determine the redistribution of students. Nor shall the establishment of new attendance boundaries favor such relationships.

8)  The plan shall consider the needs of our students and the school district as a whole both prior to the opening of the new elementary and middle schools in 2018 as well as after their opening.

9)  Any redistribution of students prior to the opening of the new elementary and middle schools shall only be considered if students are being moved to the same location in which they will attend when the plan is fully implemented.

10) The plan, which will take effect in its entirety at the beginning of the 2018/19, shall be published this spring and reviewed annually to provide families the opportunity to plan themselves.