amsat italia proposal for a television down link from esa ......interchange meeting on 11 nov 2010...

39
AMSAT Italia ® HAMTV AMSAT Italia Proposal for a television down link from ESA Columbus module Emanuele D’Andria, IØELE President - AMSAT Italia ARISS International Delegates Meeting October 28-29, 2011 - Houston

Upload: others

Post on 07-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ®

HAMTVAMSAT Italia Proposal

for a television down link fromESA Columbus module

Emanuele D’Andria, IØELEPresident - AMSAT Italia

ARISS International Delegates MeetingOctober 28-29, 2011 - Houston

Page 2: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

CONTENTS

• Proposal outcome• Down-link Frequency Band Identification• 2.4 GHz Band limits

• Television Standard Selection• Link Budget definition• First experiments and preliminary results

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 3: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

PROPOSAL OUTCOME

• De Paolis and Nespoli trip to Naples• Exchange of some preliminary ideas through Skype• Identification of study structure• Disclosure of the study to ARCOL WG • Ideas for an “unsolicited proposal” to ESA• ESA, Astrium, Kayser Italia and Amsat Italia Technical

Interchange Meeting on 11 Nov 2010• Contract signed between ESA and Kayser Italia on August

2011• Contract deadline February 1, 2013

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 4: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

FREQUENCY BAND IDENTIFICATION

• ITU Table of frequency allocations to services– Footnote 5.282

• 5.282 In the bands 435-438 MHz, 1 260-1 270 MHz, 2 400-2 450 MHz, 3 400-3 410 MHz (in Regions 2 and 3 only) and 5 650-5 670 MHz, the amateur-satellite service may operate subject to not causing harmful interference to other services operating in accordance with the Table (see No. 5.43). Administrations authorizing such use shall ensure that any harmful interference caused by emissions from a station in the amateur-satellite service is immediately eliminated in accordance with the provisions of No. 25.11. The use of the bands 1 260-1 270 MHz and 5 650-5 670 MHz by the amateur-satellite service is limited to the Earth-to-space direction.

• The frequency band 2400-2450 MHz is the only one usable in down link withenough bandwidth to accomodate a television transmission and for which a suitable antenna is installed on board ISS.

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 5: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

S-BAND SPECTRUM ALLOCATION

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 6: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

2.4 GHz FREQUENCY BAND LIMITS I Part

• Secondary allocation to the amateur satellite service (or even less)

• ISM Band (Wi-Fi, Bluetooth, Microwave ovens, medical equipments, WLAN, etc.)

• Wi-Fi applications on ISS• On-ground reception interfered-with by

pervasive applications (Wi-Fi, Bluetooth, microwave ovens, etc.)

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 7: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

2.4 GHz FREQUENCY BAND LIMITS II Part

• Fall-back proposal for an alternative channel (i.e. 2395 MHz) in the higher part of the band 2300-2400 MHz on non-interfering basis (RR. 4.4) in addition to the nominal channel at 2422 MHz (channel 3 of Wi-Fi raster)

• Consciousness of no primary allocation to the amateur satellite service in the UHF band (300 –3000 MHz) with a suitable bandwidth

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 8: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

TELEVISION STANDARD SELECTION

Comparison between:

• Analogue standard (FM)∆Fpp=16 MHz, BW=28 MHz

• Digital standard (DVB)DVB-S (QPSK)

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 9: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

FM ATV - ArCOL LINK BUDGETValue Unit

Downlink frequency 2.450 GHzISS to E/S range 1000 Km

EARTH STATION CHARACTERISTICSAntenna diameter 0.90 metersEfficiency 50%Rx Antenna gain 24.3 dBi

Antenna Noise Temperature (seefootnote) 100 KLNB gain 35 dBLNB noise figure 0.8 dBLNB equiv noise temp 58.7 K

FIGURE of MERIT G/TSystem Noise Temp 158.7 KSystem Noise Figure 1.9 dBG/T 2.3 dB/K

CARRIER CHARACTERISTICSPeak to Peak frequency deviation ∆Fpp 16 MHzTV signal bandwidth Bv 6 MHzModulation FMCarrier's occupied bandwidth 28 MHzpw [Unified] CCIRR Rep. 637 pre/de-emphasis 13.2 dB

TX & DownlinkTX power 10.0 dBWcable & connector losses 7.0 dBTX Antenna gain (boresight) 8.0 dBipointing losses 10.5 dBDownlink e.i.r.p. toward earth receive station 0.5 dBWDownlink path loss (free space) 160.3 dBAtmospheric losses 0.0 dBRain attenuation losses 0.0 dB

C/N (Available) -3.4 dBC/N (required due to demod. threshold) 7.0 dBMargin on C/N -10.4 dBS/N (Required for P3 video quality) 25.0 dBC/N0 (Required for P3 quality) 69.3 dBHz

C/N0 (available) 71.1 dBHzMargin on C/N0 1.8 dB

Link Margin -10.4 dB

FM TV from Columbus

pwNC

B

FNS

v

pp

03

2

23 ∆

=

Antenna noise temperature DO NOT include noise contributions from interfering systems close to the receiving station (e.g. WiFi access point, microwave ovens, video senders, etc.). A preliminary measurement of G/T is strongly recommended. Sun-noise measurement at sunrise or sunset should be a convenient method to test RX station figure-of-merit at low elevations.

Page 10: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

DVB-S TV from Columbus

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Value UnitDownlink frequency 2.450 GHzISS to E/S range 1000 Km

EARTH STATION CHARACTERISTICSAntenna diameter 0.90 metersEfficiency 50%Rx Antenna gain 24.3 dBi

Antenna Noise Temperature 100 KLNB gain 35 dBLNB noise figure 0.8 dBLNB equiv noise temp 58.7 K

FIGURE of MERIT G/TSystem Noise Temp 158.7 KSystem Noise Figure 1.9 dBG/T 2.3 dB/K

CARRIER CHARACTERISTICSData Rate 922 kbpsReed Solomon 188/204Modulation QPSKFEC 1/2Symbol Rate 1000 kbaudCarrier's occupied bandwidth 1.35 MHz

TX & DownlinkTX power 10.0 dBWcable & connector losses 7.0 dBTX Antenna gain (boresight) 8.0 dBipointing losses 10.5 dBDownlink e.i.r.p. toward earth receive station 0.5 dBWDownlink path loss (free space) 160.3 dBAtmospheric losses 0.0 dBRain attenuation losses 0.0 dB

C/No 71.1 dBHzC/N 9.8 dBEb/No (Available) 11.4 dBEb/No (Required) 4.5 dB

Link Margin 6.9 dB

Preliminary transmissionparameters based on DVB-S

Television Standard

Page 11: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Link Margin

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 12: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

POINTING LOSSES

θ

θ

Pointing losses

Page 13: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

280 s

Video link duration

Pass over the zenith of a receiving earth station

Page 14: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

DOPPLER Effect

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Computer simulations by Centro Ricerche RAI, Torino, show no negative impact due

to Doppler-rate

Page 15: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

L and S-Band ARISS antennas

Page 16: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

L and S-Band ARISS antennas

Page 17: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

L and S-Band ARISS antennas

Page 18: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

HAMTV transmitter

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 19: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Main modules

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

MPEG encoder DVB-S2 modulator

upconverter

P.A.console

Page 20: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 21: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Traditional, voice-only, bidirectional, half-duplex schoolcontact

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

SCHOOLSCHOOL

VHF bandaudio

Page 22: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

First portion of the HAMTV school contact(approx. first 3 minutes)

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

VHF bandaudio

S bandAudio & video

SCHOOLSCHOOL

Page 23: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Central part of the HAMTV school contact: live video from ISS (duration up to 5 minutes)

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

VHF bandaudio

S bandAudio & video

SCHOOSCHOOLL

NOTE: 1) VHF audio downlink acts as a backup for the school and allows ham stations within the ISS visibility circle to receive ISS voice with a simplehardware. Hams will receive ISS voice during the whole pass.2) Lip synchronizazion is guaranteed when the school listen to the “S band voice”3) Any ham station, equipped with a DVB‐S receiver similar to the one used in the school and within the ISS visibility circle, can catch the video downlink.

Page 24: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Last part (greetings) in voice-only mode

VHF bandaudio

S bandAudio & video

SCHOOLSCHOOL

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 25: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

On ground receiving station

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 26: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Ground station receiving antenna

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 27: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Ground station pointing system

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Example of a mobile receiving antenna by PRO.SIS.TEL

(Bari)80-cm dish

0.2° accuracycomplete track 6 s

Page 28: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

COTS LNBs

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 29: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

A computer model Antenna pattern

Riflettore offsetF/D=0.590 cmElica 5 spire

Page 30: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Earth Station Antenna Noise Temperature

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

100 K

Including interference

Page 31: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

TEST-BED at LTG Elettronica

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 32: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

First results in IF-LOOP

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 33: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

First results in IF-LOOP

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 34: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

First results in IF-LOOP

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

An example of noise level setting, corresponding to (C0+N0)/N0 = 4.2 dB and its effect on video quality, as shown in the image on theright. FEC = 3/2. This situation was considered to be below the receiver threshold. The threshold was at about (C0+N0)/N0 = 4.5 dB.

Page 35: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

First environment measurements

Page 36: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Chained Ground Segment

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 37: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3010

15

20

25

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 6010

15

20

25

Vid

eo c

onta

ct d

urat

ion

[min

utes

]

60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9010

15

20

25

Time starting from 1 SEP 2010 00:00:00 [days]

Video contact duration for a 90 days period starting September 1st, 2010 Chained stations (and antenna diameters):

Blue: (case A) Lisboa (1 m), Milano (1 m), Bucaresti (1 m), Moskva (1 m)Green: (case B) Tenerife (1m), Lisboa (1m), Milano (1m), Bucaresti (1m), Moskva (1m)Red: (case C) Lisboa (2.5m), Milano (1m), Bucaresti (1m), Moskva (2.5m)Cyan: (case D) Tenerife (2.5m), Lisboa (1m), Milano (1m), Bucaresti (1m), Moskva (2.5m)

Page 38: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

Hand-over among earth stations

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Page 39: AMSAT Italia Proposal for a television down link from ESA ......Interchange Meeting on 11 Nov 2010 • Contract signed between ESA and Kayser Italia on August 2011 • Contract deadline

THANKS to

AMSAT Italia ® -ARISS International Delegates Meeting 2011-Houston

Piero Tognolatti IØKPT,Francesco De Paolis IKØWGF, Tonino GiagnacovoFabio Azzarello IW8QKU,Paolo Pitacco IW3QBN, Pierluigi Poggi IW4BLG

Gaston Bertels ON4WFOliver Amend DG6BCE

and the international ARISS/ARCOL WGs