Board on Enterprise Planning (BEP)
Agenda
• BEP Charter
• BEP Membership
• Annual Partnership Topic (APT)
• BEP Status Update• Mesoscale Observing Networks APT
• Building America’s Resilience to Hurricane Disasters APT
• New APT for 2008
BEP Charter
• Review issues identified by the Steering Committee that are of long-term strategic nature with importance to the enterprise as a whole
• Focus on a selected topic annually– Annual Partnership Topic– Working Group for a specific topic– Annual Report to Steering Committee
BEP Membership
• Chair
• 13 members at large
• 3 Working Groups [WGs], one for each APT– WG membership: Private, academic, and
public sectors; user community
Annual Partnership Topic Purpose
• Give all interested parties an opportunity to express their views on the selected topic
• Summarize those views in a concise report• Identify consensus views when such consensus
exists• Clarify differences of opinion when consensus
does not exist• Offer recommendations to AMS itself and the
enterprise as a whole based on the understanding of views gained during the study
APT Selection
• Annual Partnership Topic will be selected based on nominations received by AMS during an open nomination period
• Selection based on published selection criteria• Selection made by Commission Steering
Committee• Any party may submit a nomination• All nominations will be available for comment
Annual Partnership Topic Nominal Calendar of Events
• Year One:– Annual AMS Meeting – Issue call for nominations– Spring – Open comment period– Summer – Select topic, charge WG– Remainder of Year – Organize activities for Year Two
• Year Two:– Annual AMS Meeting – Frame topic– Remainder of Year – Conduct activities appropriate to topic
• Year Three:– Annual AMS Meeting – Conduct summary session on topic– Summer – WG presents final report for review/approval– Fall – Publish final report
Annual Partnership Topic Topic Selection Criteria
1. Timeliness [30%]– Results of partnership topic activities must be
relevant to the weather and climate enterprise in relation to a 2-3 year timeline
– Topics which require results more rapidly will be rejected
– Topics which have longer time frames will be considered
2. Breadth [25%]– Partnership topic will have broad impact and
interest– Breadth judged on two factors:
• Sectoral breadth [60%] [private, academic, government]• Disciplinary breadth [40%] [scientific, policy, etc]
Annual Partnership Topic Topic Selection Criteria
3. Impact [20%]– Impact it is expected to have on the weather and climate
enterprise and on society as a whole– May be evaluated in
• Tangible terms [e.g., fraction of the U.S. economy affected]• Intangible terms [e.g., potential legal effects]
4. Interest [15%]– Estimate of the likelihood of:
• Success in forming topic Working Group• Gaining multiple contributors to the topic
5. Linkage [10%]– Potential linkage to other planned activities [e.g., topic
related to a planned activity by an organization other than AMS]
Annual Partnership Topic BEP Functions
1. Organize the APT nomination process– Issue call, make public, collect comments
2. Evaluate nominations– “Score” each nomination– Draft charge for Topic Committee
3. Fill the Topic Committee
4. Review Report
5. Submit report to Steering Committee
Annual Partnership Topic Steering Committee Functions
• Select Annual Partnership Topic
• Finalize Charge to Topic Committee
• Approve Final Report
APT 1--Mesoscale Observing Networks
Topic Committee Charge:– Criteria for Evaluating Potential Testbeds. Identify
potential technical criteria for evaluating mesoscale observing network testbeds. Propose ways the criteria can be applied to rank order potential testbeds
– Business Models for Partnerships in Mesoscale Network Testbeds. Identify potential business models. Propose ways the business criteria can be applied in conjunction with the technical criteria to rank order potential testbeds
– Potential Mesoscale Network Testbeds. Identify potential mesoscale network testbeds that meet at least some of the technical criteria
– Recommended Mesoscale Network Testbeds. Recommend at least three mesoscale network testbeds
APT 1--Mesoscale Observing Networks
WG: Fred Carr (OU) [Chair], Tim Spangler, Don Winter, Bruce Telfeyan
Topic Committee: • .edu: Rebecca Morss (NCAR), Ken
Crawford (OU), John Horel (Utah)• .com: Maria Pirone (AER), Mike Kalb (GST),
John Lasley (SAIC), Peter Neilley (WSI), Brent Shaw (Weathernews)
• .gov: Greg Mandt (NOAA), Marty Ralph (NOAA), Ralph Patterson (Utah DOT), Paul Pisano or Andy Stearns (FHWA)
APT 1--Mesoscale Observing Networks 2007 Milestones
January—THM to solicit community input
APT 1--Mesoscale Observing Networks 2008 Plan
• Complete report
APT 2—Hurricane Disasters Status
Topic Committee Charge:– [Private Sector Engagement] How can the
private sector engage more fully in hurricane disaster prevention, preparedness and recovery actions nationwide?
– [High Risk Populations] How can we do more to protect the poor and most vulnerable in hurricane disasters?
– [Educating the Enterprise] What can be done to better educate the Enterprise on responses to forecasts and warnings for hurricanes?
APT 2—Hurricane Disasters Status
WG: Jim Harrison (.gov), Kristina Peterson (.edu), Bill Massey (.com)
Topic Committee: • .edu: Joe Friday (OU), John Harrald (GWU),
Susan Cutter (U. South Carolina), Shirley Laska (U. New Orleans), Jeff Lazo (UCAR)
• .com: Paul Try (STC), Jingli Yang (ERT), George Haddow (Bullock & Haddow), Betty Hearn Morrow (SocResearch Miami)
• .gov: Margaret Davidson (NOAA), James Kunde (Coalition to Improve Management in State and Local Government)
APT 2—Hurricane Disasters 2007 Milestones
January—Topic Committee meeting in San Antonio
February—Selection of study topics for each study area (question)
July—THM at Natural Hazards Workshop in Boulder
December—Complete draft report
APT 2—Hurricane Disasters 2007 Results
Information Gathering on Study Topics:
• Private Sector Engagement– Enhance incentives for the private sector – Meet individual and community unmet needs in the recovery
phase of a hurricane disaster • High Risk Populations
– Achieve selected improvements which will have high consequence results for vulnerable populations
– Resolve selected communications issues • Educating the Enterprise
– Achieve improvements in areas related to NOAA Weather Radio All Hazards (NWR)
– Achieve improvements in education and training on hurricanes and preparedness
APT 2—Hurricane Disasters 2008 Plan
January—THM at AMS annual meeting in New Orleans
January—Topic Committee meeting in New Orleans
June—Complete final report
October—Publish final report
APT 3--Status
• January—Issue call for APT nominations• Annual Meeting -- Issue Call for APT Nominations• Annual Meeting - 31 March – Receive APT
nominations• February – 30 April -- Open comment period• 1 May – 30 June – BEP prepares APT
recommendation for CSC• Summer CSC meeting – Select topic, charge Topic
Committee• CSC Meeting – 2008 Annual Meeting –Conduct