WWTP Upgrade and Expansion Project Potential Temporary Staging Areas

Park and Recreation CommissionNovember 1, 2017

AgendaAgenda

2

Clean Water Program OverviewWastewater Treatment Plant (WWTP) Project OverviewProposed Temporary Staging Areas—Background—Proposed Temporary Uses—Post Construction Restoration Considerations

Anticipated Staging Area Use ScheduleObtain Feedback

Wastewater Treatment Plant (WWTP) Project Overview

4

LEGENDNew Facility

Existing Facility to be          Replaced/Rehabbed

CONCEPTUAL RENDERINGS

CONCEPTUAL LAYOUT

Proposed Temporary Staging AreasProposed Temporary Staging Areas

5

Area 1: Dale Ave Undeveloped Open Space

Area 2: Anchor RdPassive Open Space

Area 3: Portion of Anchor Rd Parking Lot

E. 3rd Ave

Seal Slough

SF Bay

Detroit D

r

Existing WWTP

Future WWTP Site(Detroit Dr Parcel)

Joinville Park

Shoreview Ave

Area 1: Dale Ave Undeveloped Open SpaceArea 1: Dale Ave Undeveloped Open Space

6

1

2

Dale AveExisting WWTP

Meadow View Pl

3

Future WWTP Site(Detroit Dr Parcel)

Area 1: Dale Ave Undeveloped Open SpaceProposed Temporary Uses

Area 1: Dale Ave Undeveloped Open SpaceProposed Temporary Uses

7

Temporary Uses:—Construction trailers/offices—Construction management parking (~50 parking spots)

Preparation for Use:—Grade site to level (sufficient for trailers)—Install safety/security lights & screening/fencing—Close pedestrian/bike path—Provide alternative ped/bike route(s)

Access to/from Staging Area:—From East: Through existing WWTP—From West: Access gate from Dale Ave and 

Shoreview Ave for emergency purposes only

Conceptual Alternative Ped/Bike Routes

LEGENDExisting RoutesPotential                Alternative Routes*

Shoreview Ave

*Other potential routes to be analyzed as design progresses

Area 1: Dale Ave Undeveloped Open SpacePost Construction Restoration ConsiderationsArea 1: Dale Ave Undeveloped Open Space

Post Construction Restoration Considerations

8

Minimum Restoration Identified:—Restore site to former condition—Remove lighting and screening/fencing—Re‐open pedestrian/bike path

Potential Restoration Considerations discussed between P&R & PW Staff:—Future master planning —Weed control—Lighting improvements—Pedestrian/bike path improvements—Coordinate any improvements with “Area 2: Anchor Rd Passive Space”  improvements

Future WWTP Site(Detroit Dr Parcel)

Area 2: Anchor Road Passive Open SpaceArea 2: Anchor Road Passive Open Space

9

`

4

E. 3rd Ave

Seal Slough

SF Bay

Existing WWTP

`

Future WWTP Site(Detroit Dr Parcel)

Area 2: Anchor Road Passive Open SpaceProposed Temporary Uses

Area 2: Anchor Road Passive Open SpaceProposed Temporary Uses

10

Temporary Uses:—Construction worker parking (~100 parking spots)—Equipment laydown

Preparation for Use:—Lightly grade site—Place decomposed granite (DG) surface—Install safety/security screening/fencing (around equipment only)

—Maintain & accommodate ped/bike path & boat ramp uses

Access to/from Staging Area:—From East: From 3rd Ave to Anchor Rd—Potentially From West: Path from Detroit Dr, along the front of dog park, and across bridge over Seal Slough

Decomposed Granite Parking Example

Chain Link Fence w/ Mesh Screen

w/ Slats

Area 2: Anchor Road Passive Open SpacePost Construction Restoration ConsiderationsArea 2: Anchor Road Passive Open Space

Post Construction Restoration Considerations

11

Minimum Restoration Identified:—Remove DG surfacing—Restore grade—Replace top soil 

Potential Restoration Considerations discussed between P&R & PW Staff:—Pedestrian/bike path improvements—Lighting improvements—Community Garden—Coordinate any improvements with “Area 1: Dale Ave Undeveloped Open Space” future improvements 

Area 3: Portion of Anchor Road Parking LotArea 3: Portion of Anchor Road Parking Lot

12

Further coordination for lot portioning required to maintain some public parking & access during staging area usage

65

SF Bay

Bay Trail

Parking Lot

Area 3: Portion of Anchor Road Parking LotProposed Temporary Uses

Area 3: Portion of Anchor Road Parking LotProposed Temporary Uses

13

Temporary Uses:—Worker parking —Equipment laydown

Preparation for Use:—No modification required—Accommodate vehicle parking and access—If additional parking is needed:

• Lightly grade non‐paved areas• Clear & grub non‐paved areas• Tree trimming & potential removal• Place DG surface

Access to/from Staging Area:—3rd Ave & Anchor Rd intersection

Parking Lot

3rd Ave

Area 3: Portion of Anchor Road Parking LotPost Construction Restoration ConsiderationsArea 3: Portion of Anchor Road Parking LotPost Construction Restoration Considerations

14

Minimum Restoration Identified:—Fix excessive wear or damage by patching, seal‐coating, and/or striping

—If additional parking is needed: remove DG surfacing, restore grade, re‐landscape

Potential Restoration Considerations discussed between P&R & PW Staff:—Lighting improvements—Landscape improvements—Potential relocation of Recology sourced compost piling

Current Recology Compost Piling Location

Future WWTP Site(Detroit Dr Parcel)

Temporary Staging Area Use ScheduleTemporary Staging Area Use Schedule

15

Area Start Use* End Use*

1: Dale Ave Undeveloped Open Space Summer/Fall 2018 Nov 2023

2: Anchor Rd Passive Open Space Summer/Fall 2018 Nov 2023

3: Anchor Road Parking Lot Summer/Fall 2018 Aug 2023

* Dates are based on current schedule and are subject to change

Questions & FeedbackQuestions & Feedback

16

Area 1: Dale Ave Undeveloped Open Space

Area 2: Anchor RdPassive Open Space

Area 3: Portion of Anchor Rd Parking Lot

E. 3rd Ave

Seal Slough

SF Bay

Detroit D

r

Existing WWTP

Joinville Park

Shoreview Ave

Future WWTP Site(Detroit Dr Parcel)