WELL COMPLETION SCHEMATICFEET METERS WITH BHA

Customer:

Well: Zone:

308 ft 94.0 m 18"5/8 Cas Date:

Capacities

5,899 ft 1,798.0 m 13"3/8 Cas 1.75" CT, 2.31 ppf, 1.482 ID 0.0021 bbl/ft

1.75" CT X 5.5" Tub 0.0203 bbl/ft

5.5" Tub, 17 ppf, 4.892 ID 0.0232 bbl/ft

1.75" CT X 7" Tub 0.0342 bbl/ft

6,722 ft 2,049.0 m 7" Tubing 7.0" Tub, 29 ppf, 6.184 ID 0.0371 bbl/ft

1.75" CT X 7" Lin 0.0383 bbl/ft

7.0" Liner, 26 ppf, 6.276 ID 0.0382 bbl/ft

6,739 ft 2,054.1 m 5 1/2" Tub 1.75" CT X 9"5/8 Cas 0.0733 bbl/ft

9.625" Cas, 47 ppf, 8.681 ID 0.0732 bbl/ft

6,830 ft 2,081.7 m 7" Liner

CT Annular Volume to End of Coil

7" Tu 6,722 ft 0.0342 bbl/ft 229.8 bbls

9"5/8 107 ft 0.0733 bbl/ft 7.9 bbls

7" Lin 572 ft 0.0383 bbl/ft 21.9 bbls

SUB-TOTAL 259.5 bbls

Annular Volume - End of Coil to TD

7" Lin #REF! 0.0383 bbl/ft #REF!

6,970 ft 2,124.5 m 9"5/8 Cas TOTAL #REF!

TOTAL #REF!

Displacement Volume of CT

7,044 ft 2,147.0 m 1.75" 8,500 ft 0.0021 bbl/ft 18.1 bbls

Niveau A

7,080 ft 2,158.0 m BOTTOM HOLE ASSEMBLY Length

7,101 ft 2,164.3 m

Niveau B

7,187 ft 2,190.5 m

7,210 ft 2,197.5 m

Niveau C

7,326 ft 2,233.0 m Depth

7,365 ft 2,245.0 m

Estimated Reservoir Pressure 2,851 psi7,402 ft 2,256.0 m 7" Liner Shoe

7,438 ft 2,267.0 m TD

Min ID Tubing Nipples

WELL COMPLETION SCHEMATICFEET METERS WITH BHA

Customer:

Well:308 ft 94.0 m 18"5/8 Cas Date:

Capacities

5,899 ft 1,798.0 m 13"3/8 Cas 1.75" CT, 2.31 ppf, 1.482 ID

1.75" CT X 5.5" Tub5.5" Tub, 17 ppf, 4.892 ID1.75" CT X 7" Tub

6,722 ft 2,049.0 m 7" Tubing 7.0" Tub, 29 ppf, 6.184 ID

1.75" CT X 7" Lin

7.0" Liner, 26 ppf, 6.276 ID

6,739 ft 2,054.1 m 5 1/2" Tub 1.75" CT X 9"5/8 Cas

9.625" Cas, 47 ppf, 8.681 ID

6,830 ft 2,081.7 m 7" Liner

CT Annular Volume to End of Coil

7" Tu 6,722 ft

9"5/8 107 ft

7" Li 572 ft

Annular Volume - End of Coil to TD

7" Li #REF!

6,970 ft 2,124.5 m 9"5/8 Cas

Displacement Volume of CT

7,044 ft 2,147.0 m 1.75" 8,500 ft

Niveau A

7,080 ft 2,158.0 m BOTTOM HOLE ASSEMBLY

7,101 ft 2,164.3 m

Niveau B

7,187 ft 2,190.5 m

7,210 ft 2,197.5 m

Niveau C

7,326 ft 2,233.0 m

7,365 ft 2,245.0 m

Estimated Reservoir Pressure

7,402 ft 2,256.0 m 7" Liner Shoe

7,438 ft 2,267.0 m TD

Min ID Tubing Nipples

WELL COMPLETION SCHEMATICWITH BHA

Zone:

1.75" CT, 2.31 ppf, 1.482 ID 0.0021 bbl/ft

1.75" CT X 5.5" Tub 0.0203 bbl/ft

5.5" Tub, 17 ppf, 4.892 ID 0.0232 bbl/ft

1.75" CT X 7" Tub 0.0342 bbl/ft

7.0" Tub, 29 ppf, 6.184 ID 0.0371 bbl/ft

1.75" CT X 7" Lin 0.0383 bbl/ft

7.0" Liner, 26 ppf, 6.276 ID 0.0382 bbl/ft

1.75" CT X 9"5/8 Cas 0.0733 bbl/ft

9.625" Cas, 47 ppf, 8.681 ID 0.0732 bbl/ft

CT Annular Volume to End of Coil

0.0342 bbl/ft 229.8 bbls0.0733 bbl/ft 7.9 bbls0.0383 bbl/ft 21.9 bbls

SUB-TOTAL 259.5 bblsAnnular Volume - End of Coil to TD

0.0383 bbl/ft #REF!TOTAL #REF!TOTAL #REF!

Displacement Volume of CT

0.0021 bbl/ft 18.1 bbls

BOTTOM HOLE ASSEMBLY Length

Depth

Estimated Reservoir Pressure 2,851 psi

Min ID Tubing Nipples

M.H.A. M.H.A D.F.C.V. Mk IV Disc D.C.Sub Hyd DiscDisc (w) D.F.C.VPull Disc T-P Disc

T-P Disc

E-Z Conn

Bleed Sub Diff Valve Straight Bar Hyd Cent Fluted Cent Hyd T-E-L T.E.L. Spiral Wash

Weight Bar

Hydro-JetGauge Cut Magnet Blind Box L.I.B. Nozzle Roto-Wash45 Deg Nozle Nozzle

Box to Pin Pin to Pin Int Conn

Pin to Box Box to Box

D.C.Sub Kick K/Joint K/Joint T-P Disc Ext F/N

W/L Grab Scraper Index ToolCarsac Conn

Junk Mill Taper Mill Cement Mill P-D-C Mill Cement Mill Under-Reamer V.J.J.B c/w V.J.J.B.Mill Guide Standard

Burn Shoe D-Mond Servco Cone SkirtedSaw Tooth Mill Cement Mill Mill Mill

Bleed Sub Anchor Tub Cutter Mud Motor Hydraulic H-Duty HydraulicCentraliser Centraliser

V.J.J.B. c/w Box to Box Pin to PinExtension

Pin to Box Box to Pin

Bi-Directional Bi-Directional Bi-Directional Bi-Directional Bi-Directional Bi-Directional

Mechanical Mechanical Hydraulic Hydraulic Impact Impact

Accelerator Jar Accelerator Jar Accelerator Jar

Bowen 150 Series Bowen 150 Flo-Release Flo-Release Bowen Short Bowen Short

Over Shot Cut Lip Guide Over Shot O-Shot Skirt Catch O-Shot Catch O-Shot

Bowen 150 c/w

G-S Profile Sub Mech-Release Flo-Release Bowen Itco G-S Profile

Bull-Dog Spear Bull-Dog Spear Spear Sub

Wire-Line Grab W-Line Spear Taper Tap Drive Sub c/w Drive Sub c/w Drive Sub c/w

Spear Bowen Spear G-S Tool

W-Line Prong Rope-Socket

c/w Skirt

Straight Bar Tungsten Filled

Weight Bar

Weight Stem Lead Filled Trip-Ball Mech-Pull

Weight Stem Disconnect Disconnect

Flo-Release

Ext Pull Tool

c/w Prong

Bowen c/w Flo-Release Ported Prong

G-S Sub Ext Pull Tool

MHA Flo-Rel Flo-Release Flo-Release 3.00" - 4.00"

Retrieval Tool Ext c/w Skirt G-S Pull Tool G-S Pull Tool

c/w Prong c/w Wash-Tool

Drive Sub c/w Drive Sub c/w Wire-Cutting

O-Shot Pulling Tool Blind Box

Coil Motor Head Dual Check Splined Hyd MK II Disconnect Snap LatchConnector Assembly Valve Duisconnect Disconnect Receptacle Seal Assy

XFLO Ball Lock X-over Bull Plug Snorkel Tube Snorkel Tube Snorkel TubeJDC Circ Sub Guide Nose w/ Receptacle

Hydraulic Set Wireline Set C/T Packer C/T Packer Jet Pack SH Hydraulic WRPPacker Packer Tension Compression Packer Packer Bridge Plug

Inflatable Pkr Inflatable Pkr Inflatble Bridge Inflatble Bridge Thermal Screen JointRun in Set Plug RIH Plug Set Compensator Perforated Pup

IRPP Pump Out Pump OutPump out Plug Plug Ball Seat

Universal Spinning Hydro BlastValve Wash Tool Tool

Bottom TopSub Sub

Arrow PakPacker

Mech Disc. Centralizer Set Down Injection w/ Flapper Nipple Loc Unloader Sub

Fluid Injection Sucker Rod Cast Iron CementValve X-over Bridge Plug Retainer

Expansion Dual Ball Kelly Permanent SLPJoint Check Valve Packer Packer

Joint GS Pulling Quick Connect Quick ConnectTool separated

Seal BoreExtension

Arrow Set I Cup TypeRBP

EPST

Client: Lease:Address: Field

ParishOCS-G

Platform: Co. ManWell Number: PhoneType of Operation:

Item Tool Description BHA Tool O/D Tool I/D Length Fish Neck Connection Asset No.

DRILLING & INTERVENTION SERVICES THRU TUBING PACKER INTERVENTION

Total Length of B.H.A. :- 0.00 (Meters) 0.00 (Feet) B.H.A Prepared by Date :-

Please note that all O/D's and I/D's are approximate, and are given as a guideline only(B.H.A. #) (Run #) Bob Murphy

Client: Lease:Address: Field

ParishOCS-G

Platform: Co. ManWell Number: PhoneType of Operation:

Item C/T to Surface Tool Description Tool O/D Tool I/D Length Fish Neck Connection Asset No.

DRILLING & INTERVENTION SERVICES THRU TUBING PACKER INTERVENTION

Total Length of B.H.A. :- 0.00 (Meters) 0.00 (Feet) B.H.A Prepared by Date :-

Please note that all O/D's and I/D's are approximate, and are given as a guideline only(B.H.A. #) (Run #)