WELL COMPLETION SCHEMATICFEET METERS WITH BHA
Customer:
Well: Zone:
308 ft 94.0 m 18"5/8 Cas Date:
Capacities
5,899 ft 1,798.0 m 13"3/8 Cas 1.75" CT, 2.31 ppf, 1.482 ID 0.0021 bbl/ft
1.75" CT X 5.5" Tub 0.0203 bbl/ft
5.5" Tub, 17 ppf, 4.892 ID 0.0232 bbl/ft
1.75" CT X 7" Tub 0.0342 bbl/ft
6,722 ft 2,049.0 m 7" Tubing 7.0" Tub, 29 ppf, 6.184 ID 0.0371 bbl/ft
1.75" CT X 7" Lin 0.0383 bbl/ft
7.0" Liner, 26 ppf, 6.276 ID 0.0382 bbl/ft
6,739 ft 2,054.1 m 5 1/2" Tub 1.75" CT X 9"5/8 Cas 0.0733 bbl/ft
9.625" Cas, 47 ppf, 8.681 ID 0.0732 bbl/ft
6,830 ft 2,081.7 m 7" Liner
CT Annular Volume to End of Coil
7" Tu 6,722 ft 0.0342 bbl/ft 229.8 bbls
9"5/8 107 ft 0.0733 bbl/ft 7.9 bbls
7" Lin 572 ft 0.0383 bbl/ft 21.9 bbls
SUB-TOTAL 259.5 bbls
Annular Volume - End of Coil to TD
7" Lin #REF! 0.0383 bbl/ft #REF!
6,970 ft 2,124.5 m 9"5/8 Cas TOTAL #REF!
TOTAL #REF!
Displacement Volume of CT
7,044 ft 2,147.0 m 1.75" 8,500 ft 0.0021 bbl/ft 18.1 bbls
Niveau A
7,080 ft 2,158.0 m BOTTOM HOLE ASSEMBLY Length
7,101 ft 2,164.3 m
Niveau B
7,187 ft 2,190.5 m
7,210 ft 2,197.5 m
Niveau C
7,326 ft 2,233.0 m Depth
7,365 ft 2,245.0 m
Estimated Reservoir Pressure 2,851 psi7,402 ft 2,256.0 m 7" Liner Shoe
7,438 ft 2,267.0 m TD
Min ID Tubing Nipples
WELL COMPLETION SCHEMATICFEET METERS WITH BHA
Customer:
Well:308 ft 94.0 m 18"5/8 Cas Date:
Capacities
5,899 ft 1,798.0 m 13"3/8 Cas 1.75" CT, 2.31 ppf, 1.482 ID
1.75" CT X 5.5" Tub5.5" Tub, 17 ppf, 4.892 ID1.75" CT X 7" Tub
6,722 ft 2,049.0 m 7" Tubing 7.0" Tub, 29 ppf, 6.184 ID
1.75" CT X 7" Lin
7.0" Liner, 26 ppf, 6.276 ID
6,739 ft 2,054.1 m 5 1/2" Tub 1.75" CT X 9"5/8 Cas
9.625" Cas, 47 ppf, 8.681 ID
6,830 ft 2,081.7 m 7" Liner
CT Annular Volume to End of Coil
7" Tu 6,722 ft
9"5/8 107 ft
7" Li 572 ft
Annular Volume - End of Coil to TD
7" Li #REF!
6,970 ft 2,124.5 m 9"5/8 Cas
Displacement Volume of CT
7,044 ft 2,147.0 m 1.75" 8,500 ft
Niveau A
7,080 ft 2,158.0 m BOTTOM HOLE ASSEMBLY
7,101 ft 2,164.3 m
Niveau B
7,187 ft 2,190.5 m
7,210 ft 2,197.5 m
Niveau C
7,326 ft 2,233.0 m
7,365 ft 2,245.0 m
Estimated Reservoir Pressure
7,402 ft 2,256.0 m 7" Liner Shoe
7,438 ft 2,267.0 m TD
Min ID Tubing Nipples
WELL COMPLETION SCHEMATICWITH BHA
Zone:
1.75" CT, 2.31 ppf, 1.482 ID 0.0021 bbl/ft
1.75" CT X 5.5" Tub 0.0203 bbl/ft
5.5" Tub, 17 ppf, 4.892 ID 0.0232 bbl/ft
1.75" CT X 7" Tub 0.0342 bbl/ft
7.0" Tub, 29 ppf, 6.184 ID 0.0371 bbl/ft
1.75" CT X 7" Lin 0.0383 bbl/ft
7.0" Liner, 26 ppf, 6.276 ID 0.0382 bbl/ft
1.75" CT X 9"5/8 Cas 0.0733 bbl/ft
9.625" Cas, 47 ppf, 8.681 ID 0.0732 bbl/ft
CT Annular Volume to End of Coil
0.0342 bbl/ft 229.8 bbls0.0733 bbl/ft 7.9 bbls0.0383 bbl/ft 21.9 bbls
SUB-TOTAL 259.5 bblsAnnular Volume - End of Coil to TD
0.0383 bbl/ft #REF!TOTAL #REF!TOTAL #REF!
Displacement Volume of CT
0.0021 bbl/ft 18.1 bbls
BOTTOM HOLE ASSEMBLY Length
Depth
Estimated Reservoir Pressure 2,851 psi
Min ID Tubing Nipples
M.H.A. M.H.A D.F.C.V. Mk IV Disc D.C.Sub Hyd DiscDisc (w) D.F.C.VPull Disc T-P Disc
T-P Disc
E-Z Conn
Bleed Sub Diff Valve Straight Bar Hyd Cent Fluted Cent Hyd T-E-L T.E.L. Spiral Wash
Weight Bar
Hydro-JetGauge Cut Magnet Blind Box L.I.B. Nozzle Roto-Wash45 Deg Nozle Nozzle
Box to Pin Pin to Pin Int Conn
Pin to Box Box to Box
D.C.Sub Kick K/Joint K/Joint T-P Disc Ext F/N
W/L Grab Scraper Index ToolCarsac Conn
Junk Mill Taper Mill Cement Mill P-D-C Mill Cement Mill Under-Reamer V.J.J.B c/w V.J.J.B.Mill Guide Standard
Burn Shoe D-Mond Servco Cone SkirtedSaw Tooth Mill Cement Mill Mill Mill
Bleed Sub Anchor Tub Cutter Mud Motor Hydraulic H-Duty HydraulicCentraliser Centraliser
V.J.J.B. c/w Box to Box Pin to PinExtension
Pin to Box Box to Pin
Bi-Directional Bi-Directional Bi-Directional Bi-Directional Bi-Directional Bi-Directional
Mechanical Mechanical Hydraulic Hydraulic Impact Impact
Accelerator Jar Accelerator Jar Accelerator Jar
Bowen 150 Series Bowen 150 Flo-Release Flo-Release Bowen Short Bowen Short
Over Shot Cut Lip Guide Over Shot O-Shot Skirt Catch O-Shot Catch O-Shot
Bowen 150 c/w
G-S Profile Sub Mech-Release Flo-Release Bowen Itco G-S Profile
Bull-Dog Spear Bull-Dog Spear Spear Sub
Wire-Line Grab W-Line Spear Taper Tap Drive Sub c/w Drive Sub c/w Drive Sub c/w
Spear Bowen Spear G-S Tool
W-Line Prong Rope-Socket
c/w Skirt
Straight Bar Tungsten Filled
Weight Bar
Weight Stem Lead Filled Trip-Ball Mech-Pull
Weight Stem Disconnect Disconnect
Flo-Release
Ext Pull Tool
c/w Prong
Bowen c/w Flo-Release Ported Prong
G-S Sub Ext Pull Tool
MHA Flo-Rel Flo-Release Flo-Release 3.00" - 4.00"
Retrieval Tool Ext c/w Skirt G-S Pull Tool G-S Pull Tool
c/w Prong c/w Wash-Tool
Drive Sub c/w Drive Sub c/w Wire-Cutting
O-Shot Pulling Tool Blind Box
Coil Motor Head Dual Check Splined Hyd MK II Disconnect Snap LatchConnector Assembly Valve Duisconnect Disconnect Receptacle Seal Assy
XFLO Ball Lock X-over Bull Plug Snorkel Tube Snorkel Tube Snorkel TubeJDC Circ Sub Guide Nose w/ Receptacle
Hydraulic Set Wireline Set C/T Packer C/T Packer Jet Pack SH Hydraulic WRPPacker Packer Tension Compression Packer Packer Bridge Plug
Inflatable Pkr Inflatable Pkr Inflatble Bridge Inflatble Bridge Thermal Screen JointRun in Set Plug RIH Plug Set Compensator Perforated Pup
IRPP Pump Out Pump OutPump out Plug Plug Ball Seat
Universal Spinning Hydro BlastValve Wash Tool Tool
Bottom TopSub Sub
Arrow PakPacker
Mech Disc. Centralizer Set Down Injection w/ Flapper Nipple Loc Unloader Sub
Fluid Injection Sucker Rod Cast Iron CementValve X-over Bridge Plug Retainer
Expansion Dual Ball Kelly Permanent SLPJoint Check Valve Packer Packer
Joint GS Pulling Quick Connect Quick ConnectTool separated
Seal BoreExtension
Arrow Set I Cup TypeRBP
EPST
Client: Lease:Address: Field
ParishOCS-G
Platform: Co. ManWell Number: PhoneType of Operation:
Item Tool Description BHA Tool O/D Tool I/D Length Fish Neck Connection Asset No.
DRILLING & INTERVENTION SERVICES THRU TUBING PACKER INTERVENTION
Total Length of B.H.A. :- 0.00 (Meters) 0.00 (Feet) B.H.A Prepared by Date :-
Please note that all O/D's and I/D's are approximate, and are given as a guideline only(B.H.A. #) (Run #) Bob Murphy
Client: Lease:Address: Field
ParishOCS-G
Platform: Co. ManWell Number: PhoneType of Operation:
Item C/T to Surface Tool Description Tool O/D Tool I/D Length Fish Neck Connection Asset No.
DRILLING & INTERVENTION SERVICES THRU TUBING PACKER INTERVENTION
Total Length of B.H.A. :- 0.00 (Meters) 0.00 (Feet) B.H.A Prepared by Date :-
Please note that all O/D's and I/D's are approximate, and are given as a guideline only(B.H.A. #) (Run #)