1
Phung Van Khoa
Forest Development Fund
Hanoi, November, 2011
A Small-scale AR-CDM Pilot Project,Cao Phong district, Hoa Binh province
VIETNAM
Cao Phong Reforestation Project
2
1. Project BriefProject formulation
Formulated with the assistance of JICA Study on Capacity Development for AR-CDM Promotion in VN (Oct. 2006~Dec. 2008)
Project Owner
Forest Development Fund, Hoa Binh, a social fund established in April 2008 according to Decree No.148/2007/ND-CP. The founders are Cao Phong DPC and Vietnam Forestry University.
Project Fund A total of 3.5 billion VND to be donated to FDF by Honda Vietnam Co., Ltd. The fund will be recovered by sharing benefits from the plantations (timbers and CER).
Project Area A total of 308.5 ha located in Xuan Phong and Bac Phong communes, Cao Phong district, Hoa Binh province
3
1. Project Brief (cont.)Local participants
320 households/ holders of the land using certificate of the project area will conduct planting, tending, protecting and managing of the plantations.
Project period
16 years
Validation JICA provided the fund for validation, which was done by JACO CDM (DOE) from 28 July to 1 Aug. 2008
DNA Approval The PDD was approved by DNA on 20 November,2008
UNFCCC Registration
The project was registered on 28 April, 2009 by UNFCCC as a small scale AR-CDM project, which became the first AR-CDM project in Vietnam
5
Xuan Phong commune
Site-1 Lu cu 20.7 ha
Site-2 Nhoi 64.7 ha
Site-3 Can 93.8 ha
Sub-total 179.2 ha
Bac Phong commune
Site-4 Bac son 57.3 ha
Site-5 Ma 72.0 ha
Sub-total 129.3 ha
TOTAL 308.5 ha
Net planting area
14
Sharing ratio of cost and benefit
Benefits / products The Project (FDF)
Participants
Forest products
Firewood - 100%
Chip wood 25% 75%
Round wood 25% 75%
Carbon credit (CER) 50% 50%
Others (such as livestock raising)
- 100%
15
t-CER to be Obtained (estimation)
Credit period = 16 yearsTotal tCER = 59,953
0
10,000
20,000
30,000
40,000
50,000
0 5 10 15 20Project Year
GHG
remo
val (t
on-C
O2)
End of credit period(Year 16)
1st verification:3,267 t-CO2
2nd verification:17,887 t-CO2
3rd verification:38,799 t-CO2
16
Signing and groundbreaking ceremony of the reforestation funded by Honda VN and technical supported by the
Forestry University of Vietnam
17
Result of CDM Forest Plantation in 2009
• In 2009, 131 ha of Acacia Mangium wereplanted, reaching 93.4% of the yearly plan(i.e. 140.2 ha).
• There were 232 households participated.
• 6 training courses involving 240 participantswere conducted at the hamlet and communelevels.
22
Result of CDM Forest Plantation in 2010
• In 2010, 120.6 ha planted, 112 households.
• In addition, 4 training courses involving 240participants were conducted at the communeand hamlet levels.
• Total forestation area after two yearsimplemented is 251.6 ha, or 81.5% of theproject expectation.