United Phosphorus Limited
F ( . - - ' " " ] , 0 , 3 . r a t dl . $a r? l ?g t l g l r ' : l w ' r :
f{3 U *rz;,*',a.'--, a I VC
\'c D\
\Eftzvc'2ototrr6 Aug, 2Ol2
t.s.o
$Responsible Caie
3l{t5tl4c. GrDG-.AEr 3fit 002, Guiaat (lndia)Ptut : (1116,5125O5ilA 2flXtdl Fax : (02646) 25143'f
Unit # 2Plot # 3405 I 3406, GIDC, Ankleshwar - 393 002
Dr. A Mehrotra, Director (S)Ministry of Environment and ForestsWestern Region OfficeKendriya Paryavaran BhavanLink Road # 3, E - 5, Ravi Shankar NasarBhopal - 462 016 (M.P)
Dear Sir;
Sub: - Compliance to conditions of Environmental Cletrlanee
Ref: - Enr-iroruuental clearance #J. 1 1 0 1 1 /7 7/2 0 0 2 - IA-l I dat_e,d_llU-2 !03
Ktndlv refer above Environmental Clearance #J.t 101 117712002-lA.l l dated 77 .07 .2003to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar-393002, Dist -Bharuch, Gujarat.
We are sending herewith the compliance report along with various other required;information with respect to rrur unit #2 for your kind reference and records. Thedetails given are withr respect to the period Jan io Jun 2012. i
We would like to bring to your kind attention the following imgrovements at our Unitwith respect to' environment.
1. Ambient Air monitoring as per new standard - started monitor for parametersPM10 and PM 2 .5
2. Effluent Discharge Line Extended upto B-Pumping Station (app. I Km) assuggested by GPCB
We hope that the above is in order. In case you need any additional information, wecan provide the same on hearing from you.Sa$ ioly af Errc nprt ir alro f'ov,cld irr qDThanking you
Yours faithfullyFor, United Phos
D R P N PVice Presir
ARAMESdent -Env
a\-
\>,tsD : 1l!116 ]I. C n L! tttr Red, Khar (\At), Mumbai.
b llD -'fGrrl.rffi .F-.: (@2126(X0.167
Encl : a/a
Copy to:
{\
a
I\
a
a
{
a
a
a
a
The Zonal OfficerCentral Pollution Control BoardParivesh Bhavan
Opp VMC ward Office-10Subhanpura, Baroda-3900 2 3
Mr.J D Kalyani - Regional OfficerGujarat Pollution Control BoardPlot No1 501, GIDC,Ankleshwar -393002
?
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
The Ex Post Facto Environmental Clearance is granted for the following products;
Phorate / Turbuphos @ 3600 MT / Year; and (2400 MT after product mix)
Complied.
Acephate @ 960 MT / Year (1920 MT after product mix) the product mix have been revised
without increasing pollution load and after obtaining No Increase in Pollution Load certificate
from GPCB.
We have obtained product mix change and details attached in Annexure - A
Land of project area is 65,625 m2. Project does not involve forest land and displacement of people.
Water requirement is 340.1 m3 / day. Solid waste in form of ETP Sludge (7.5 MT / Month),
incinerator ash (9 MT / Month) and Inorganic Salts from Evaporation System (30 MT / Month) will
be disposed off in BEIL landfill. Public Hearing was done on 16.01.2002. GPCB has granted NOC
for 300 MT / Month of Phorate / Turbuphos on 17.11.1995; and 80 MT / Month of Acephate on
02.04.1996. Cost of the project is Rs 16.50 Crores.
MOEF accords Environmental Clearance to the project under provisions of EIA Notification dated
27.01.1994 as amended subsequently subject to compliance of various special and general
conditions;
A SPECIFIC CONDITIONS
1 Gaseous emissions (SO2, NOX, HCl, HC, NH3,
H2S, Cl2) and PM from various process units to be
conform to standards. At no time, emissions to go
beyond standards. In case of failure of pollution
control systems, unit should not be restarted until
the systems are rectified to achieve desired
efficiency
Complied
For all parameters monitoring is done
through internally by our lab and
externally trough M/s Enpro
Envirotronics Pvt Ltd., Monitoring
reports are attached for the period Jan to
Jun 2012
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
2 Fugitive emissions in workplace environment,
product, raw material storage areas, to be
monitored. Fugitive emissions containing solvent
from process and storage tank vents and accidental
leakage of EM and TBM to be subjected to
thermal destruction in fume incinerator. Flue gas
emissions from incinerator to conform to the
standards prescribed by GPCB
Complied
Fugitive emission monitoring at various
locations are being carried out by our
Quality Assurance Department and data
being maintained. Please refer enclosed
details for fugitive emissions.
Fume incinerator is in operation
3 Process emissions (H2S, NH3, MeCl2, and VOC) to
be scrubbed through venturi and packed column
scrubbers and conform to prescribed standards. The
efficiency of scrubber to be improved and
maintained as per best practicable technology.
VOC data to be monitored and submitted to the
Ministry
Complied
VOC Monitoring is done and monitoring
reports are attached
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
4 As reflected in EIA / EMP Report, effluent
generation not to exceed 218 m3 / day. To reduce
organic load, various effluent streams to be
segregated and following treatment system to be
followed;
Organic waste water streams generated from
process, low boilers and distillation residues
generated from process, which are organic in
nature, to be collected separately and
incinerated
Effluent stream containing high dissolved
solids before discharging in solar evaporation
pond having an area of 4000 sq m, to be
treated suitably. Solvents from effluent to be
recovered before discharging in solar
evaporation pond. Besides, as reflected in EIA
/ EMP Report, aqueous stream containing high
dissolved solid to be evaporated by installation
of forced evaporation system with the help of
steam
Streams with high organic load (high COD and
BOD) to be treated chemically with Hydrogen
Peroxide and sent to ETP for treatment
Dilute waste streams generated from process,
utilities including blow downs of cooling
towers and boilers, and waste water from
softening plant and domestic waste water to be
given primary, secondary and tertiary
treatment. Treated effluent after conforming
the standards, to be discharged in GIDC drain.
The effluent quality before disposal to Amla
Khadi, to be as follows;
PH @ 5.5 to 8.5
BOD @ 30 mg / l
COD @ 100 mg / l
SS @ 100 mg / l
Complied
Summarized data of effluent generation
and quantity discharged is attached
herewith for the period Jan to Jun 2012
Complied .Organic waste and Aqueous
waste is being sent to common
Incinerator, BEIL, Ankleshwar for
incineration.
Complied
Four Reactors of forced evaporator are in
operation. About 40 kl / day can be
evaporated in this system. Details of
quantity treated during Jan to Jun 2012
is attached herewith
Complied
In the chemical treatment section,
effluent having high COD is treated with
Hydrogen Peroxide. The treated effluent
is further treated at ETP. Details of
quantity treated during Jan to Jun 2012
is attached herewith
Complied
Primary, secondary and tertiary treatment
facilities are in operation
Company is sending treated effluent
through GIDC drain to FETP, NCTL
(BEAIL), and Ankleshwar for further
treatment and disposal to deep sea.
ETP has been expanded from 300 KLD
capacity to 550 KLD capacity. In the new
ETP System, we have utilized Membrane
Bio Reactor (MBR), an advanced
technology.
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
Oil and Grease @ 10 mg / l
Phenol @ 1 mg / l
Sulphide @ 0.5 mg / l
5 Company to recover MECL (CH3CL) by
installation of CH3CL recovery plant. Further,
solvent recovery to be improved and attempts to be
made to achieve at least 90 % recovery wherever
possible. Rest solvent which can’t be recovered,
to be incinerated. Action plan to be submitted to
Ministry within 3 months
Complied.
The Company has not manufactured
Dichlorovos (one of products) at the site,
which is major generator of MECL.
6 Company to upgrade existing incinerator for
incineration of hazardous waste. Organic aqueous
and solid waste generated should be collected and
incinerated for total destruction. As reflected in
EIA / EMP Report, solid waste and ash to be
stored in the plant premises in a pit with
impervious flooring and leachate collection
system. The ash and sludge from ETP to be
finally disposed in BEIL landfill. Leachate to be
sent to ETP for treatment
Complied.
Our Incinerator is dismantled.
Company is utilizing Common
Incinerator facility of BEIL, Ankleshwar.
ETP sludge is being disposed to BEIL for
landfilling. Leachate is taken to ETP for
further treatment.
Hazardous waste storage area constructed
as per CPCB, Guideline.
7 As per commitment given to Ministry, existing
incineration system to be up graded by 31.03.2004.
Company to also take membership of Common
Incineration System of BEIL
Complied.
The Company has taken membership of
the Common Incineration System being
set up at BEIL. The company is sending
incinerable material to BEIL,
Ankleshwar for Incineration. Details are
attached for the period Jan to Jun 2012
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
8 Destruction efficiency of incinerator to be assessed
by agency like CPCB and report submitted.
Company to monitor VOC’s and data submitted to
Ministry / CPCB / GPCB regularly.
Complied.
The Company has taken membership of
the Common Incineration System set up
at BEIL, Ankleshwar. The company has
started sending incinerable material to
BEIL, Ankleshwar for Incineration.
Details are attached for the period Jan to
Jun 2012
9 As per CREP, bio assay test method to be replaced
by Toxicity Factor test method developed by
CPCB. Tf=4 to be achieved by December 2003
and Tf=2 by July 2006. Action plan to be
submitted within 3 months to Ministry
Complied.
Reports of monitoring done are attached
herewith for the period Jan to Jun 2012
10 As per action plan submitted to Ministry,
Company to adopt waste minimization and cleaner
production techniques to reduce solvent, raw
material, water and energy consumption.
Company to install modified P2S5 handling system
with tote bins to prevent spillages. To reduce
decontamination and disposal, company to re cycle
the drums
Complied.
This is an on going activity.
Drums recycling for FG packing
in Plants.
Steam condensate is recycled in
to Boilers.
We have reduced the raw material
consumption norms.
We have increased Solvent
recovery upto 96%.
Vent scrubber provided for
hazardous chemical storage tanks
vents.
Additional vent condenser
provided and improved solvent
recovery.
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
11 Company to undertake rain water harvesting as per
action plan submitted to this Ministry
Complied.
The rain water harvesting system consists
of collection of rain water from the total
surface area of approximately 1400 m2.
The total rain water collection
(considering 24” rain fall) comes to 840
kL in a year. The collected rain water is
used in cooling tower make up. Also, part
of the rain water collected is taken to
storage tanks. The storage tank capacity
is 650 kl.
12 Company to comply with environmental
protection measures and safeguards recommended
in EIA / EMP / RRA Reports as well as
recommendations of Public Hearing Panel
Complied.
13 Green belt of adequate width and density in project
area of 1200 sq m in addition to 7642 sq m to be
provided to mitigate effect of fugitive emissions
all around plant. Development of green belt along
boundary wall, open space and avenue roads, to be
improved in consultation with local DFO as per
CPCB guidelines
Complied.
This is an ongoing activity.
During Jan to Jun 2012, about 600 nos
saplings have been planted
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
14 As per policy decision taken by this Ministry,
Company to earmark a separate fund @ 1 % of
project cost (Rs 16.50 Crores) for eco development
measures including community welfare measures
in project area. Amount to be deposited within 2
months in a separate account to be maintained by
GPCB. Plans to be submitted to Ministry and
GPCB within 3 months. After approval of action
plan by GPCB, amount deposited may be released
in two installments based on progress of
implementation
Complied.
We have submitted details to GPCB as
we have already spent more than Rs
16.50 Lacs for eco development and
other community welfare schemes.
B GENERAL CONDITIONS
1 Company to adhere to stipulations made by GPCB Complied.
2 No further expansion / modifications in the plant
to be carried out without prior approval of MOEF.
In case of deviations / alterations in the project
proposals from those submitted, a fresh reference
to be made to Ministry to assess adequacy of
conditions imposed and add additional
environmental protection measures required, if any
Complied.
We have obtained Environmental
Clearance # F. No. J-11011/1281/2007-
IA(II) dated 15.04. 2008 for proposed
expansion of pesticide and Intermediate
Products. Applied for consent to establish
(NOC).We have obtained Consent to
Establish (CTE) # 42403 issued by GPCB letter # GPCB/BRCH/CTE-144(6)/ID-15832/84970 dated 24.06.2011 and received provisional Consent to operate for product mix change from GPCB details are attached in Annexure A
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
3 Company to comply with MSIHC Rules 2000.
Prior approvals of Chief Inspector of Factories,
Chief Inspector of Explosives, Fire Safety
Inspectorate etc, to be obtained
Complied.
The company is having various statutory
licenses and approvals
4 Company to comply with HWM Rules and
authorization from GPCB to be obtained
Complied.
The unit was granted CCA vide no.
32225 dated 13.05.2009 & dated
13.10.2010 which was valid up to
01.09.2013.
5 Overall noise levels in and around plant area to be
kept within the standards (85 dBA) by providing
noise control measures including acoustic hoods,
silencers, enclosures etc, on all sources of noise
generation. Ambient noise levels to conform to
standards i.e. 75 dBA (day time) and 70 dBA
(night time)
Complied.
Being monitored and found to be within
limits
Monitoring is done internally & Reports
are attached herewith for the period Jan
to Jun 2012
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
6 Occupational health surveillance program to be
undertaken as regular exercise for all employees,
specifically for those engaged in handling
hazardous substances. First aid facilities in OHC
to be strengthened and medical records of each
employee to be maintained.
Complied.
The company is having full time medical
doctor and also OHC. Pre employment
and routine medical examinations are
being carried out. Regular BCA test for
employees is also being carried out. All
medical records are being maintained.
Every two years, complete medical
examination is carried out. The frequency
of check up is as follows;
Blood Cholinesterase Activity (BCA)
Test is carried out every 15 days
Brief Medical examination is done
half yearly for blood, urine etc
Full medical examination is done
every alternate year including
Physical examination, Hemoglobin
,Complete Blood Count, ESR,
Complete Urine Examination, Lever
Function, Kidney Function,
Creatinine, Blood Sugar, Electro
Cardiogram, X Ray for chest and
Sonography etc
During the period Jan to Jun 2012
Medical check up done for 126 No’s
employees.
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
7 A separate Environment Management Cell with
full fledged laboratory to be set up to carry out the
environmental management and monitoring
functions
Complied.
Environmental Cell is in operation. VP
(Env) from Corporate Level supports the
units in environmental compliances. The
various environmental protection
measures are coordinated by a Sr.
Manager. Waste water analysis, bio assay
test, ambient air monitoring, stack
monitoring, solid waste analysis, noise
level monitoring, VOC Monitoring are
carried out. Also, environmental audit is
being carried out
8 Company to provide adequate funds for recurring
and non-recurring expenses to implement the
conditions stipulated by MOEF as well as state
government along with implementation schedule
for all conditions stipulated. The funds should not
be diverted for any other purposes
Complied.
The funds are already provided as a part
of manufacturing activities and operation
of ETP / Incinerator. Separate Cost
Codes are also available
9 Implementation of the project and Environmental
Action Plan to be monitored by MOEF, Regional
Office at Bhopal, GPCB / CPCB. A six monthly
compliance report to be submitted to monitoring
agencies
Being complied.
Half yearly reports is being sent during
first week of February and August every
year
10 Company to inform that public that project has
been accorded Environmental Clearance by
Ministry and copies are available with GPCB and
may be seen at MOEF’s web site. This should be
advertised within 7 days in two local news papers
and copies to be submitted to RO
Complied.
Advertisements were given in two news
papers and copy submitted to MOEF
Period Jan-Jun 2012
Compliance Report for the conditions in the
Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003
Issued by Ministry of Environment and Forests, New Delhi
for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat
Condition Status of Compliance
Period: Jan-Jun 2012
No Description
11 Company to inform RO as well as Ministry, date
of financial closure and final approval of the
project by concerned authorities and date of
commencing the land development work, if any
Complied.
Since this is an ex post-facto
Environmental Clearance for an existing
unit, this conditions is not applicable.
- Ministry may revoke or suspend the clearance, if
implementation of any of the conditions is not
satisfactory
Noted
- Ministry reserves the right to stipulate additional
conditions if required. Company, in a time bound
manner, will implement the same
Noted
- The above conditions will be enforced inter-alia
under provisions of various acts and rules
Noted
PRODUCTION DETAILS (QUANTITY IN MT)
MONTH
ACEPHATE
PHORATE
TERBUPHOS
DETA
DEVRINOL
METAMITRON
JAN’ 12
135.000 113.259 86.741 0.000 0.000 24.000
FEB’ 12
148.000 152.317 45.627 0.000 0.000 12.000
MAR’ 12
148.000 95.340 104.647 0.000 0.000 12.000
APR’ 12
147.000 140.059 54.934 26.775 140.000 12.000
MAY’ 12
136.000 199.987 0.000 22.725 134.415 24.000
JUN’ 12
147.000 159.808 0.000 79.204 140.000 12.000
MONTH
SURFLAN –
MT/M
ZnDTP –MT/M
ETHOFUMISATE –
MT/M
METASYSTOX RVL –MT/M
JAN’ 12
40.000 302.450 43.500 -
FEB’ 12
38.400 303.410 0.000 -
MAR’ 12
38.400 269.730 0.000 -
APR’ 12
37.920 417.260 0.000 0.000
MAY’ 12
40.000 305.150 0.000 0.000
JUN’ 12
38.400 265.340 0.000 40.040
FORMULATION PRODUCTS (QUANTITY IN MT)
Solid Formulation products
MONTH
ACEPHATE 97
%
ACEPHATE 75
%
PHORATE 10
%
DEVRINOL
50 % DF
SURFLAN 85 %
JAN’ 12
205.000 0.000 7.015 0.000 30.000
FEB’ 12
300.000 74.500 0.000 0.000 0.000
MAR’ 12
286.800 0.000 20.430 150.000 0.000
APR’ 12
300.000 27.350 0.000 150.000 0.000
MAY’ 12
300.000 100.000 0.000 150.000 17.600
JUN’ 12
300.000 100.000 148.917 150.000 0.000
Liquid formulation products
MONTH
MONOCROTOPHOS
(MCP 36 %)
PQDC
FORMULATION
PD 50%
METAMITRON 70
% WP
JAN’ 12
100.000 0.000 0.000 0.000
FEB’ 12
17.065 37.284 5.85 0.000
MAR’ 12
100.000 0.000 100.00 0.000
APR’ 12
51.750 0.000 100.000 0.000
MAY’ 12
100.000 0.000 0.000 0.000
JUN’ 12
100.000 4.400 35.650 0.000
DETAILS OF WATER CONSUMPTION AND TREATED EFFLUENT DISCHARGE TO FETP, NCTL,
ANKLESHWAR
MONTH
WATER
CONSUMPTION
TREATED EFFLUENT DISCHARGE
QUANTITY ( INDUSTRIAL+ DOMESTIC)
TO FETP, (NCTL, ANKLESHWAR
ALL QUANTITIES IN KL
JAN’ 12 10002 5072
FEB’ 12 10002 4854
MAR’ 12 10658 5179
APR’ 12 15066 5473
MAY’ 12 7270 6181
JUN’ 12 7270 6691
HIGH TDS EFFLUENT TREATMENT AT EVAPORATION SYSTEM
MONTH
Evaporation QTY KL/ MONTH
JAN’ 12 190
FEB’ 12 257
MAR’ 12 893
APR’ 12 1296
MAY’ 12 1333
JUN’ 12 1676
DETAILS OF HIGH COD EFFLUENT TREATMENT: CHEMICAL TREATMENT BY H2O2
MONTH
HIGH COD EFFLUENT
CHEMICAL TREATMENT
(H2O2 TREATMENT) - QTY
KL/MONTH
JAN’ 12 504
FEB’ 12 432
MAR’ 12 568
APR’ 12 488
MAY’ 12 552
JUN’ 12 688
INCINERATION WASTE DETAILS
MONTH OP. STOCK
GENERATION DISPOSAL
CL. STOCK ORGANIC
PROCESS
WASTE
AQ
PROCESS
WASTE
TOTAL
(ORGANIC+
AQ PROCESS
) WASTE
SENT TO BEIL,
ANKLESHWAR
FOR
INCINERATION
ALL QTY IN MT
JAN’ 12 8.193 141.000 288.000 437.193 431.370 5.823
FEB’ 12 5.823 139.000 403.000 547.823 539.560 8.263
MAR’ 12 8.263 138.500 362.000 508.763 501.180 7.583
APR’ 12 7.083 138.000 385.000 530.083 520.650 9.433
MAY’ 12 9.433 139.500 452.000 600.933 593.520 7.413
JUN’ 12 7.413 140.000 702.000 849.413 840.170 9.243
SOLID WASTE DETAILS
MONTH OP
STOCK
GENERATION SOLID(*
)DISPOSAL
TO BEIL CL. STOCK ETP
EVAPORATION
SALT TOTAL
MONTHLY
ALL QTY IN MT
JAN’ 12 9.664 120.000 215.000 344.664 336.78 8.634
FEB’ 12 7.859 104.000 81.500 193.359 186.15 7.209
MAR’ 12 7.290 25.600 223.000 255.89 247.370 8.52
APR’ 12 8.439 38.000 491.000 537.439 531.45 8.479
MAY’ 12 8.479 29.850 518.000 556.329 549.79 7.669
JUN’ 12 7.669 26.000 731.000 764.669 759.61 8.659
TOTAL DISPOSAL QTY TO BEIL –MT/M- LANDFILLING
MONTH SOLIDS(*) PLASTIC
WASTE
INSULATION
WASTE
CONSTRUCTION
DEBRIS*SENT
TO BEIL FOR
LANDFILLING
TOTAL WASTE
SENT TO BEIL
FOR
LANDFILLING
ALL QTY IN MT
JAN’ 12 336.030 0.0 0.75 102.42 439.2
FEB’ 12 186.15 0.0 0.0 530.04 716.19
MAR’ 12 247.37 0.0 0.0 0.0 247.37
APR’ 12 528.960 0.0 2.490 0.0 531.45
MAY’ 12 548.66 0.0 1.13 0.0 549.79
JUN’ 12 756.01 0.0 3.6 0.0 759.61
* Construction debris is generated from ETP expansion project activity and other construction work..
AMBIENT AIR ANALYSIS REPORT
(INTERNAL LAB)
AMBIENT AIR ANALYSIS REPORT: SCRAP YARD
MONTH JAN -2012
AREA/
DATE
SPM
SO2
NOX
NH3
HCL
CHLORINE
LOCATION 500 µgm/m3
80
µgm/m3 80 µgm/m3 400 µgm/m3 200 µgm/m3
100 µgm/m3
SCRAP YARD 01/01/12 255 28 18 70 ....... Nil
SCRAP YARD 03/01/12 200 25 17 13 Nil .......
SCRAP YARD 05/01/12 222 26 21 39 ....... Nil
SCRAP YARD 07/01/12 252 45 22 15 Nil .......
SCRAP YARD 09/01/12 246 21 21 43 ....... Nil
SCRAP YARD 11/01/12 186 25 25 24 Nil .......
SCRAP YARD 13/01/12 209 16 15 6 ....... Nil
SCRAP YARD 15/01/12 204 23 15 17 Nil .......
SCRAP YARD 17/01/12 269 31 30 18 ....... Nil
SCRAP YARD 19/01/12 225 53 16 15 Nil .......
SCRAP YARD 21/01/12 224 21 10 7 ....... Nil
SCRAP YARD 23/01/12 211 36 19 16 Nil .......
SCRAP YARD 25/01/12 193 21 18 14 ....... Nil
SCRAP YARD 27/01/12 224 34 16 17 Nil .......
SCRAP YARD 29/01/12 ....... Nil
30/01/12 211 21 17 19 Nil .......
Maximum
269
53
30
70
0
0
Minimum
186
16
10
6
0
0
Average JAN -12
222
28
18
22
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
MONTH FEB -2012
AREA/
DATE SPM SO2 NOX NH3 HCL CHLORINE
LOCATION
500
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
SCRAP YARD 02/02/12 238 29 18 70 ....... Nil
SCRAP YARD 04/02/12 212 30 18 13 Nil .......
SCRAP YARD 06/02/12 215 27 18 39 ....... Nil
SCRAP YARD 08/02/12 197 37 21 15 Nil .......
SCRAP YARD 10/02/12 215 26 20 43 ....... Nil
SCRAP YARD 12/02/12 193 43 23 24 Nil .......
SCRAP YARD 14/02/12 204 23 15 6 ....... Nil
SCRAP YARD 16/02/12 232 21 12 17 Nil .......
SCRAP YARD 18/02/12 209 23 12 18 ....... Nil
SCRAP YARD 20/02/12 215 22 14 15 Nil .......
SCRAP YARD 22/02/12 247 27 19 7 ....... Nil
SCRAP YARD 24/02/12 239 24 21 16 Nil .......
SCRAP YARD 26/02/12 193 25 24 14 ....... Nil
SCRAP YARD 28/02/12 224 26 22 17 Nil .......
Maximum 247 43 24 70 0 0
Minimum 193 21 12 6 0 0
Average FEB-
12
217
27
18
22
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
MONTH MARCH -2012
AREA/
DATE
SPM
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
SCRAP YARD 01/03/12 191 21 16 15 Nil .......
SCRAP YARD 03/03/12 193 25 18 27 ....... Nil
SCRAP YARD 05/03/12 272 25 17 40 Nil .......
SCRAP YARD 07/03/12 195 23 15 6 ....... Nil
SCRAP YARD 09/03/12 241 27 27 10 Nil .......
SCRAP YARD 11/03/12 239 30 20 23 ....... Nil
SCRAP YARD 13/03/12 161 23 18 17 Nil .......
SCRAP YARD 15/03/12 246 21 21 43 ....... Nil
SCRAP YARD 17/03/12 244 24 21 36 Nil .......
SCRAP YARD 19/03/12 244 27 19 14 ....... Nil
SCRAP YARD 21/03/12 233 41 21 28 Nil .......
SCRAP YARD 23/03/12 244 24 21 9 ....... Nil
SCRAP YARD 25/03/12 238 23 13 8 Nil .......
SCRAP YARD 27/03/12 224 31 16 17 ....... Nil
SCRAP YARD 29/03/12 234 10 9 5 Nil .......
SCRAP YARD 31/03/12 221 19 6 15 ....... Nil
Maximum 272 41 27 43 0 0
Minimum 161 10 6 5 0 0
Average MAR
-12
226
25
17
20
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
MONTH APRIL-2012
AREA/
DATE
SPM
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
SCRAP YARD 02/04/12 235 27 18 17 Nil .......
SCRAP YARD 04/04/12 228 26 21 3 ....... Nil
SCRAP YARD 06/04/12 258 25 20 4 Nil .......
SCRAP YARD 08/04/12 240 30 19 13 ....... Nil
SCRAP YARD 10/04/12 229 22 19 8 Nil .......
SCRAP YARD 12/04/12 259 25 20 13 ....... Nil
SCRAP YARD 14/04/12 245 24 21 36 Nil .......
SCRAP YARD 16/04/12 237 19 21 7 ....... Nil
SCRAP YARD 18/04/12 218 34 13 17 Nil .......
SCRAP YARD 20/04/12 243 30 15 9 ....... Nil
SCRAP YARD 22/04/12 238 29 34 23 Nil .......
SCRAP YARD 24/04/12 244 24 21 9 ....... Nil
SCRAP YARD 26/04/12 224 34 16 17 Nil .......
SCRAP YARD 28/04/12 239 30 15 17 ....... Nil
SCRAP YARD 30/04/12 248 35 23 13 Nil .......
Maximum
259
35
34
36
0
0
Minimum
218
19
13
3
0
0
Average APR
-12
239
28
20
14
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
MONTH MAY-2012
AREA/
DATE
SPM
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
SCRAP YARD 02/05/12 271 21 19 13 ....... Nil
SCRAP YARD 04/05/12 221 24 19 17 Nil .......
SCRAP YARD 06/05/12 213 19 18 17 ....... Nil
SCRAP YARD 08/05/12 246 34 24 15 Nil .......
SCRAP YARD 10/05/12 280 38 17 9 ....... Nil
SCRAP YARD 12/05/12 258 44 29 28 Nil .......
SCRAP YARD 14/05/12 226 31 19 22 ....... Nil
SCRAP YARD 16/05/12 236 23 15 23 Nil .......
SCRAP YARD 18/05/12 255 28 18 11 ....... Nil
SCRAP YARD 20/05/12 244 29 23 17 Nil .......
SCRAP YARD 22/05/12 234 28 17 17 ....... Nil
SCRAP YARD 24/05/12 230 38 27 19 Nil .......
SCRAP YARD 26/05/12 229 25 20 17 ....... Nil
SCRAP YARD 28/05/12 245 24 21 36 Nil .......
SCRAP YARD 30/05/12 248 28 22 17 ....... Nil
Maximum
280
44
29
36
0
0
Minimum
213
19
15
9
0
0
Average
MAY -12
242
29
20
19
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
MONTH JUNE-2012
AREA/
DATE
SPM
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
SCRAP YARD 01/06/12 227 38 19 10 ....... Nil
SCRAP YARD 03/06/12 197 32 21 19 Nil .......
SCRAP YARD 05/06/12 220 28 24 22 ....... Nil
SCRAP YARD 07/06/12 233 24 19 18 Nil .......
SCRAP YARD 09/06/12 248 30 14 19 ....... Nil
SCRAP YARD 11/06/12 266 14 23 7 Nil .......
SCRAP YARD 13/06/12 257 18 17 12 ....... Nil
SCRAP YARD 15/06/12 247 25 28 17 Nil .......
SCRAP YARD 17/06/12 258 35 20 15 ....... Nil
SCRAP YARD 19/09/12 237 43 21 25 Nil .......
SCRAP YARD 21/06/12 197 37 21 22 ....... Nil
SCRAP YARD 23/06/12 221 13 18 11 Nil .......
SCRAP YARD 25/06/12 218 25 23 14 ....... Nil
SCRAP YARD 17/06/12 233 24 23 12 Nil .......
SCRAP YARD 29/06/12 246 34 24 21 ....... Nil
Maximum
266
43
28
25
0
0
Minimum
197
13
14
7
0
0
Average
JUNE -12
234
28
21
16
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
AMBIENT AIR ANALYSIS REPORT: ETP SIDE
MONTH JAN -2012
AREA/
DATE
SPM
PM 10
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
100
microgm/m3 80 microgm/m3 80 microgm/m3 400 microgm/m3
200
microgm/m3
100
microgm/m3
ETP SIDE 01/01/12 235 44 20 18 145 ....... Nil
ETP SIDE 03/01/12 223 66 21 13 22 Nil .......
ETP SIDE 05/01/12 243 90 21 12 32 ....... Nil
ETP SIDE 07/01/12 220 38 15 13 29 Nil .......
ETP SIDE 09/01/12 230 28 32 21 117 ....... Nil
ETP SIDE 11/01/12 225 67 20 13 7 Nil .......
ETP SIDE 13/01/12 244 46 21 14 18 ....... Nil
ETP SIDE 15/01/12 211 51 21 18 44 Nil .......
ETP SIDE 17/01/12 237 48 28 23 69 ....... Nil
ETP SIDE 19/01/12 219 56 18 11 7 Nil .......
ETP SIDE 21/01/12 269 61 17 20 72 ....... Nil
ETP SIDE 23/01/12 223 37 23 19 14 Nil .......
ETP SIDE 25/01/12 206 37 18 10 10 ....... Nil
ETP SIDE 27/01/12 199 35 11 10 6 Nil .......
ETP SIDE 29/01/12 244 75 27 23 23 ....... Nil
31/01/12 242 89 20 13 35 Nil .......
Maximum 269 90 32 23 145 0 0
Minimum
199
28
11
10
6
0
0
Average JAN -
12
229
54
21
16
41
0
0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH FEB -2012
AREA/
DATE
SPM
PM 10
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500 microgm/m3 100 microgm/m3 80 microgm/m3 80 microgm/m3 400 microgm/m3 200 microgm/m3 100 microgm/m3
ETP SIDE 02/02/12 216 68 15 12 6 .......
ETP SIDE 04/02/12 194 33 21 12 11 Nil
ETP SIDE 06/02/12 209 46 46.5 21 12 14 .......
ETP SIDE 08/02/12 224 68 20 14 3 Nil
ETP SIDE 10/02/12 224 88 13 19 22 .......
ETP SIDE 12/02/12 177 52 17 20 10 Nil
ETP SIDE 14/02/12 224 88 52 13 19 22 .......
ETP SIDE 16/02/12 219 65 19 11 5 Nil
ETP SIDE 18/02/12 236 71 18 11 5 .......
ETP SIDE 20/02/12 249 65 40 20 17 17 Nil
ETP SIDE 22/02/12 238 64 17 9 8 .......
ETP SIDE 24/02/12 224 65 20 18 11 Nil
ETP SIDE 26/02/12 239 49 44.5 21 22 14 .......
ETP SIDE 28/02/12 220 64 16 17 8 Nil
Maximum 249 88 52 21 22 22 0
Minimum 177 33 40 13 9 3 0
Average FEB-
12
225
67
46
17
16
12
0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH MARCH -2012
AREA/
DATE
SPM
PM 10
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500 microgm/m3
100
microgm/m3
80
microgm/m3 80 microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
ETP SIDE 01/03/12 207 49 22 17 40 Nil .......
ETP SIDE 03/03/12 206 53 21 19 75 ....... Nil
ETP SIDE 05/03/12 289 78 30 17 177 Nil .......
ETP SIDE 07/03/12 250 57 27 19 206 ....... Nil
ETP SIDE 09/03/12 225 67 20 13 7 Nil .......
ETP SIDE 11/03/12 250 57 39 27 227 ....... Nil
ETP SIDE 13/03/12 234 48 25 16 70 Nil .......
ETP SIDE 15/03/12 237 53 20 16 74 ....... Nil
ETP SIDE 17/03/12 280 78 36 28 67 Nil .......
ETP SIDE 19/03/12 224 55 21 16 77 ....... Nil
ETP SIDE 21/03/12 243 49 40 24 20 Nil .......
ETP SIDE 23/03/12 287 48 34 19 37 ....... Nil
ETP SIDE 25/03/12 251 55 19 24 24 Nil .......
ETP SIDE 27/03/12 262 57 37 22 79 ....... Nil
ETP SIDE 29/03/12 219 39 32 20 118 Nil .......
ETP SIDE 31/03/12 249 54 19 21 19 ....... Nil
Maximum 289 78 40 28 227 0 0
Minimum 206 39 19 13 7 0 0
Average MAR -12 245 56 28 20 82 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH APRIL-2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION 500 microgm/m3 100 microgm/m3
80
microgm/m3
80
microgm/m3 400 microgm/m3 200 microgm/m3 100 microgm/m3
ETP SIDE 02/04/12 241 58 25 16 57 Nil .......
ETP SIDE 04/04/12 255 67 32 19 14 ....... Nil
ETP SIDE 06/04/12 268 69 31 17 13 Nil .......
ETP SIDE 08/04/12 243 61 24 17 63 ....... Nil
ETP SIDE 10/04/12 244 49 28 15 10 Nil .......
ETP SIDE 12/04/12 285 57 29 17 15 ....... Nil
ETP SIDE 14/04/12 248 65 30 17 13 Nil .......
ETP SIDE 16/04/12 230 56 17 20 73 ....... Nil
ETP SIDE 18/04/12 223 60 35 17 104 Nil .......
ETP SIDE 20/04/12 239 63 19 21 32 ....... Nil
ETP SIDE 22/04/12 244 70 30 19 78 Nil .......
ETP SIDE 24/04/12 287 48 34 19 37 ....... Nil
ETP SIDE 26/04/12 251 55 32 19 24 Nil .......
ETP SIDE 28/04/12 230 47 28 12 70 ....... Nil
ETP SIDE 30/04/12 211 67 20 12 92 Nil .......
Maximum 287 70 35 21 104 0 0
Minimum 211 47 17 12 10 0 0
Average APR -
12 246 59 28 17 46 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH MAY-2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION
500
microgm/m3
100
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
ETP SIDE 02/05/12 244 49 30 21 92 ....... Nil
ETP SIDE 04/05/12 218 52 21 18 63 Nil .......
ETP SIDE 06/05/12 221 58 16 16 70 ....... Nil
ETP SIDE 08/05/12 233 65 27 23 70 Nil .......
ETP SIDE 10/05/12 272 54 30 21 149 ....... Nil
ETP SIDE 12/52012 307 88 44 18 122 Nil .......
ETP SIDE 14/05/12 234 31 51 21 85 ....... Nil
ETP SIDE 16/05/12 244 46 46 17 72 Nil .......
ETP SIDE 18/05/12 184 41 21 14 14 ....... Nil
ETP SIDE 20/05/12 224 50 24 21 70 Nil .......
ETP SIDE 22/05/12 222 59 25 13 89 ....... Nil
ETP SIDE 24/05/12 224 58 30 23 76 Nil .......
ETP SIDE 26/05/12 226 62 21 18 69 ....... Nil
ETP SIDE 28/05/12 285 57 29 17 15 Nil .......
ETP SIDE 30/05/12 234 52 24 18 89 ....... Nil
Maximum 307 88 51 23 149 0 0
Minimum 184 31 16 13 14 0 0
Average MAY -12 238 55 29 19 76 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH JUNE-2012
AREA/ DATE
SPM
PM 10
SO2
NOX
NH3
HCL
CHLORINE
LOCATION
500
microgm/m3
100
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
ETP SIDE 01/06/12 231 26 20 27 109 ....... Nil
ETP SIDE 03/06/12 228 57 20 19 76 Nil .......
ETP SIDE 05/06/12 237 52 21 17 81 ....... Nil
ETP SIDE 07/06/12 241 62 22 21 70 Nil .......
ETP SIDE 09/06/12 227 80 49 28 78 ....... Nil
ETP SIDE 11/06/12 264 54 27 22 69 Nil .......
ETP SIDE 13/06/12 282 67 22 26 90 ....... Nil
ETP SIDE 15/06/12 221 59 22 23 64 Nil .......
ETP SIDE 17/06/12 294 100 31 25 96 ....... Nil
ETP SIDE 19/09/12 244 70 30 19 78 Nil .......
ETP SIDE 21/06/12 214 39 35 17 92 ....... Nil
ETP SIDE 23/06/12 268 69 24 21 57 Nil .......
ETP SIDE 25/06/12 211 58 23 19 64 ....... Nil
ETP SIDE 17/06/12 221 53 19 20 70 Nil .......
ETP SIDE 29/06/12 223 63 28 20 64 ....... Nil
Maximum
294
100
49
28
109
0
0
Minimum
211
26
19
17
57
0
0
Average JUNE -12
241
60
26
22
77
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
Nil
AMBIENT AIR ANALYSIS REPORT: MAIN GATE
MONTH JAN -2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION 500 microgm/m3 100 microgm/m3 80 microgm/m3
80
microgm/m3 400 microgm/m3
200
microgm/m3
100
microgm/m3
MAIN GATE 01/01/12 255 69 18 6 28 ....... .......
MAIN GATE 03/01/12 201 65 33 24 7 Nil Nil
MAIN GATE 05/01/12 226 33 10 18 19 ....... .......
MAIN GATE 07/01/12 219 35 11 12 6 Nil Nil
MAIN GATE 09/01/12 247 48 31 20 13 ....... .......
MAIN GATE 11/01/12 274 78 29 10 24 Nil Nil
MAIN GATE 13/01/12 224 37 20 6 6 ....... .......
MAIN GATE 15/01/12 203 69 18 13 7 Nil Nil
MAIN GATE 17/01/12 174 28 18 16 18 ....... .......
MAIN GATE 19/01/12 219 56 18 11 7 Nil Nil
MAIN GATE 21/01/12 200 27 26 14 11 ....... .......
MAIN GATE 23/01/12 188 21 15 4 6 Nil Nil
MAIN GATE 25/01/12 206 37 18 10 10 ....... .......
MAIN GATE 27/01/12 199 35 11 10 6 Nil Nil
MAIN GATE 29/01/12 245 75 27 23 23 ....... .......
31/01/12 22 85 13 9 9 Nil Nil
Maximum 274 85 33 24 28 0 0
Minimum 22 21 10 4 6 0 0
Average JAN -12 200 50 20 12 12 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH FEB -2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION 500 microgm/m3
100
microgm/m3 80 microgm/m3 80 microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
MAIN GATE 02/02/12 216 68 15 12 6 ....... Nil
MAIN GATE 04/02/12 194 33 21 12 11 Nil .......
MAIN GATE 06/02/12 209 46 21 12 14 ....... Nil
MAIN GATE 08/02/12 224 68 20 14 3 Nil .......
MAIN GATE 10/02/12 224 88 13 19 22 ....... Nil
MAIN GATE 12/02/12 177 52 17 20 10 Nil .......
MAIN GATE 14/02/12 224 88 13 19 22 ....... Nil
MAIN GATE 16/02/12 219 65 19 11 5 Nil .......
MAIN GATE 18/02/12 236 71 18 11 5 ....... Nil
MAIN GATE 20/02/12 249 65 20 17 17 Nil .......
MAIN GATE 22/02/12 238 64 17 9 8 ....... Nil
MAIN GATE 24/02/12 224 65 20 18 11 Nil .......
MAIN GATE 26/02/12 239 49 21 22 14 ....... Nil
MAIN GATE 28/02/12 220 64 16 17 8 Nil .......
Maximum 249 88 21 22 22 0 0
Minimum 177 33 13 9 3 0 0
Average FEB-
12 225 67 17 16 12 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH MARCH -2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION
500
microgm/m3 100 microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3 200 microgm/m3
100
microgm/m3
MAIN GATE 01/03/12 245 54 10 13 3 Nil .......
MAIN GATE 03/03/12 212 56 15 19 12 ....... Nil
MAIN GATE 05/03/12 215 61 30 19 18 Nil .......
MAIN GATE 07/03/12 242 66 15 14 2 ....... Nil
MAIN GATE 09/03/12 274 78 29 10 24 Nil .......
MAIN GATE 11/03/12 242 66 30 20 10 ....... Nil
MAIN GATE 13/03/12 228 43 21 12 15 Nil .......
MAIN GATE 15/03/12 203 29 16 13 14 ....... Nil
MAIN GATE 17/03/12 265 54 22 22 26 Nil .......
MAIN GATE 19/03/12 232 57 17 15 9 ....... Nil
MAIN GATE 21/03/12 237 37 20 14 18 Nil .......
MAIN GATE 23/03/12 247 67 14 21 8 ....... Nil
MAIN GATE 25/03/12 268 94 15 16 15 Nil .......
MAIN GATE 27/03/12 262 57 37 22 79 ....... Nil
MAIN GATE 29/03/12 222 87 14 21 10 Nil .......
MAIN GATE 31/03/12 231 61 13 18 36 ....... Nil
Maximum 274 94 37 22 79 0 0
Minimum 203 29 10 10 2 0 0
Average MAR -12 243 61 21 17 22 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH APRIL-2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION 500 microgm/m3 100 microgm/m3
80
microgm/m3
80
microgm/m3 400 microgm/m3 200 microgm/m3 100 microgm/m3
MAIN GATE 02/04/12 240 60 17 15 11 Nil .......
MAIN GATE 04/04/12 246 51 13 15 5 ....... Nil
MAIN GATE 06/04/12 240 67 11 15 2 Nil .......
MAIN GATE 08/04/12 229 62 21 14 9 ....... Nil
MAIN GATE 10/04/12 203 47 13 14 6 Nil .......
MAIN GATE 12/04/12 230 56 15 15 9 ....... Nil
MAIN GATE 14/04/12 236 67 15 20 9 Nil .......
MAIN GATE 16/04/12 227 63 20 19 13 ....... Nil
MAIN GATE 18/04/12 213 65 21 18 10 Nil .......
MAIN GATE 20/04/12 227 58 13 17 16 ....... Nil
MAIN GATE 22/04/12 216 39 15 17 3 Nil .......
MAIN GATE 24/04/12 247 67 14 21 8 ....... Nil
MAIN GATE 26/04/12 261 87 15 16 15 Nil .......
MAIN GATE 28/04/12 219 45 25 10 11 ....... Nil
MAIN GATE 30/04/12 247 69 24 15 9 Nil .......
Maximum 261 87 25 21 16 0 0
Minimum 203 39 11 10 2 0 0
Average APR -12 230 60 17 17 10 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH MAY-2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION 500 microgm/m3 100 microgm/m3 80
microgm/m3 80 microgm/m3 400 microgm/m3 200
microgm/m3 100
microgm/m3
MAIN GATE 02/05/12 230 58 24 15 11 ....... Nil
MAIN GATE 04/05/12 231 54 17 16 11 Nil .......
MAIN GATE 06/05/12 210 52 13 13 13 ....... Nil
MAIN GATE 08/05/12 225 66 22 17 11 Nil .......
MAIN GATE 10/05/12 269 61 21 15 10 ....... Nil
MAIN GATE 12/52012 220 84 27 17 26 Nil .......
MAIN GATE 14/05/12 216 39 10 21 19 ....... Nil
MAIN GATE 16/05/12 224 49 12 5 19 Nil .......
MAIN GATE 18/05/12 247 65 18 21 15 ....... Nil
MAIN GATE 20/05/12 216 58 18 20 13 Nil .......
MAIN GATE 22/05/12 228 61 22 9 14 ....... Nil
MAIN GATE 24/05/12 224 58 30 23 76 Nil .......
MAIN GATE 26/05/12 220 58 17 16 18 ....... Nil
MAIN GATE 28/05/12 224 37 20 6 6 Nil .......
MAIN GATE 30/05/12 209 57 17 16 7 ....... Nil
Maximum 269 84 30 23 76 0 0
Minimum 209 37 10 5 6 0 0
Average MAY -12 227 57 19 15 20 0 0
%Deviation Nil Nil Nil Nil Nil Nil Nil
MONTH JUNE 2012
AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE
LOCATION
500
microgm/m3
100
microgm/m3
80
microgm/m3
80
microgm/m3
400
microgm/m3
200
microgm/m3
100
microgm/m3
MAIN GATE 01/06/12 265 36 36 22 17 ....... Nil
MAIN GATE 03/06/12 225 19 19 18 15 Nil .......
MAIN GATE 05/06/12 220 19 19 17 19 ....... Nil
MAIN GATE 07/06/12 213 19 19 16 15 Nil .......
MAIN GATE 09/06/12 227 25 25 17 28 ....... Nil
MAIN GATE 11/06/12 257 10 10 17 3 Nil .......
MAIN GATE 13/06/12 227 20 20 20 15 ....... Nil
MAIN GATE 15/06/12 269 21 21 15 10 Nil .......
MAIN GATE 17/06/12 270 15 15 19 11 ....... Nil
MAIN GATE 19/09/12 265 10 10 17 3 Nil .......
MAIN GATE 21/06/12 232 23 23 25 38 ....... Nil
MAIN GATE 23/06/12 222 19 19 19 8 Nil .......
MAIN GATE 25/06/12 236 21 21 13 7 ....... Nil
MAIN GATE 17/06/12 230 18 18 18 13 Nil .......
MAIN GATE 29/06/12 216 25 25 16 13 ....... Nil
Maximum 270 36 36 25 38 0 0
Minimum 213 10 10 13 3 0 0
Average JUNE -
12
241
19
19
18
14
0
0
%Deviation
Nil
Nil
Nil
Nil
Nil
Nil
Nil
UNITED PHOSPHORUS LTD,UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
AMBIENT AIR ANALYSIS REPORT Jan-June 2012
(By Mahabal Enviro Engineers Pvt. Ltd) Jan-Mar 2012 (By Enpro Enviro Tech & Engineers Pvt. Ltd) Apr-Jun 2012
Month LOCATION DATE OF PM2.5 RSPM (PM10)
SOx NOx HCL NH3 H2S H.C. CHLORI
NE HF
SAMPLING
60 µg /m3
100 µg /m3
80 µg /m3
80 µg /m3
200 µg /m3
400 µg /m3
500 µg /m3
160 µg /m3
100 µg /m3
60 µg /m3
January Near
Boiler area 06.01.2012 - 72.8 16.4 20.5 26.7 23.9 BDL BDL BDL BDL
Feburary Near
Boiler area 18.02.2012 - 78.5 19.8 23.7 28.2 24.1 BDL BDL BDL BDL
March Near
Boiler area 14.03.2012 - 71.1 17.4 18.8 18.6 21.9 BDL BDL BDL BDL
April Near
Boiler area 20.04.2012 42.2 79.6 26.9 28.4 39.6 19.7 BDL BDL BDL BDL
May Near
Boiler area 19.05.2012 45.6 82.3 27.8 29.5 43.7 21.2 BDL BDL BDL BDL
June Near
Boiler area 16.06.2012 39.4 75.2 23.6 25.9 46.5 24.7 BDL BDL BDL BDL
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Jan-2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20
mg/Nm3 40
mg/Nm3 5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
06.01.2012 BDL BDL BDL 9.2 BDL 7.4 BDL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
Plant not
in operation
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
06.01.2012 3.1
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
Plant not in operation
06.01.2012
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
Plant not in operation
06.01.2012
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
06.01.2012
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
06.01.2012
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
06.01.2012
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
06.01.2012 NOT IN OPERATION
10
BOILER GT-3201
06.01.2012 BDL BDL 13.7
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Feb-2012
Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20
mg/Nm3 40
mg/Nm3 5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
14/02/12 BDL BDL BDL 16.7 BDL 9.3 BDL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
Plant not
in operation
14/02/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
14/02/12 2.8
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
Plant not in operation
14/02/12
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
Plant not in operation
14/02/12
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
14/02/12 20.4
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
Plant not in operation
14/02/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
14/02/12 11.8
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
14/02/12 NOT IN OPERATION
10
BOILER GT-3201
14/02/12 BDL BDL 25.9
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Mar-2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20
mg/Nm3 40
mg/Nm3 5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
14/03/12 BDL BDL BDL 14.3 BDL 10.3 BDL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
Plant not
in operation
14/03/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
14/03/12 3.7
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
Plant not in operation
14/03/12
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
Plant not in operation
14/03/12
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
14/03/12 25.2
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER 14/03/12
NOT IN OPERATION
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
14/03/12 NOT IN
OPERATION
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
14/03/12 BDL BDL 9.6
10
BOILER GT-3201
14/03/12 NOT IN OPERATION
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Apr 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
20/04/12 BDL BDL BDL 11.8 BDL 8.2 BDL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
NOT IN
OPERATION
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
20/04/12 5
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
NOT IN OPERATION
20/04/12
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
NOT IN OPERATION
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
20/04/12 16.2
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
NOT IN OPERATION
20/04/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
20/04/12 10
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
20/04/12 BDL BDL 9.4
10
BOILER GT-3201
20/04/12 BDL BDL 8.8
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): May 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
19/05/12 BDL BDL BDL 8.9 BDL 5.2 BDL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
NOT IN
OPERATION
19/05/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
19/05/12 4.3
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
NOT IN OPERATION
19/05/12
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
NOT IN OPERATION
19/05/12
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
19/05/12 17.4
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
NOT IN OPERATION
19/05/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
19/05/12 10.8
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
19/05/12 BDL BDL 10.7
10
BOILER GT-3201
19/05/12 BDL BDL 9.6
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Jun 12 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0 mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
16/06/12 BDL BDL BDL 10.3 BDL 6.7 -
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
NOT IN
OPERATION
16/06/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
16/06/12 3.7
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
NOT IN OPERATION
16/06/12
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
NOT IN OPERATION
16/06/12
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
16/06/12 18.2
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
16/06/12 NOT IN
OPERATION
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
16/06/12 11.3
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
16/06/12 BDL BDL 10
10
BOILER GT-3201
16/06/12 BDL BDL 9.1
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab.): Jan 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30 mg/Nm3
50 mg/Nm3
20 mg/Nm3 40
mg/Nm3 5.0
mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/01/12 NIL NIL NIL 9.6 19 29.5 NIL
20/01/12 NIL NIL NIL 7.5 18 26.5 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/01/12
Plant not in operation
20/01/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/01/12 1
20/01/12 2
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOPPER
05/01/12 5
20/01/12 5
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/01/12 NIL
20/01/12 NIL
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/01/12 26
20/01/12 Plant not in operation
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/01/12
Plant not in operation
20/01/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/01/12
Plant not in operation
20/01/12
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/01/12 50.2 14.0 8.7
07/01/12 50.5 7.7 6.1
10
BOILER GT-3201
16/01/12 56.9 16.5 4.0
22/01/12 62.5 13.4 3.7
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab): Feb 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/02/12 NIL NIL NIL 5.6 20 30.1 NIL
20/02/12 NIL NIL NIL 9.1 19 36.0 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/02/12 Plant not in operation
20/02/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/02/12 2
20/02/12 1
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
05/02/12 3
20/02/12 3
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/02/12 NIL
20/02/12 NIL
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/02/12 26
20/02/12 8.0
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/02/12 Plant not in operation
20/02/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/02/12 Plant not in operation
20/02/12 Plant not in operation
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/02/12 29.7 5.8 2.4
10/02/12 39.2 8.7 1.0
10
BOILER GT-3201
15/02/12 19.5 16.3 1.5
22/02/12 29.2 6.2 2.0
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab): MARCH 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/03/12 NIL NIL NIL 6.7 20 32.6 NIL
20/03/12 NIL NIL NIL 3.3 18 31.6 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/03/12 Plant not in operation
20/03/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/03/12 2
20/03/12 1
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
05/03/12 4
20/03/12 3
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/03/12 NIL
20/03/12 NIL
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/03/12 12
20/03/12 18
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/03/12 PLANT NOT
IN OPERATION
20/03/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/03/12
Plant not in operation
20/03/12
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/03/12 43.2 8.4 0.9
22/03/12 59.9 10.4 0.6
10
BOILER GT-3201
08/03/12 41.5 11.4 1.0
25/03/12 19.4 10.2 0.7
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab): APRIL 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/04/12 NIL NIL NIL 1.4 20 29.0 NIL
20/04/12 NIL NIL NIL 4.7 20 28.4 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/04/12 Plant not in operation
20/04/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/04/12 1
20/04/12 2
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
05/04/12 2
20/04/12 5
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/04/12 NIL
20/04/12 NIL
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/04/12 20
20/04/12 16
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/04/12
PLANT NOT IN OPERATION
20/04/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/04/12 1.0
20/04/12 2.0
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/04/12 22.3 8.2 0.5
24/04/12 25.8 9.4 2.0
10
BOILER GT-3201
07/04/12 16.3 5.0 1.0
18/04/12 22.2 10.5 1.8
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab): MAY 2012 Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/05/12 NIL NIL NIL 2.0 18 30.4 NIL
21/05/12 NIL NIL NIL 3.4 19 32.4 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/05/12 PLANT NOT
IN OPERATION
21/05/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/05/12 1
21/05/12 2
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
05/05/12 2
21/05/12 4
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/05/12 NIL
21/05/12 NIL
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/05/12 16
21/05/12 24
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/05/12
PLANT NOT IN
OPERATION
21/05/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/05/12 2.0
21/05/12 1.0
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/05/12 22.5 7.9 1.8
10/05/12 24.1 12.0 1.4
10
BOILER GT-3201
22/05/12 17.5 13.9 1.0
28/05/12 19.7 3.7 1.3
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
STACK MONITORING REPORT (By Our Internal Lab): JUNE 2012
Sr. No.
AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S
(STACK) SAMPLING 20 mg/Nm3 5.0
mg/Nm3 30
mg/Nm3 50
mg/Nm3 20 mg/Nm3
40 mg/Nm3
5.0 mg/Nm3
1
IN PHORATE PLANT STACK ATTACHED TO
FUME INCINERATOR
05/06/12 NIL NIL NIL 5.8 16 35 NIL
20/06/12 NIL NIL NIL 8.0 18 33 NIL
2
IN DEVRINOL PLANT STACK ATTACHED TO
( FOR FORMULATION PLANT)
05/06/12 Plant not in operation
20/06/12
3
IN PHORATE PLANT STACK ATTACHED TO
ALKALI SCRUBBER ( H2S VENT)
05/06/12 4
3 20/06/12
4
IN PHORATE PLANT STACK ATTACHED TO
P2S5 CHARGING HOOPER
05/06/12 4
20/06/12 5
5
IN PHORATE PLANT STACK ATTACHED TO
LOCAL VENT CARBON FILTER
05/06/12 NIL
NIL 20/06/12
6
IN ACEPHATE PLANT STACK ATTACHED TO
NH3 SCRUBBER
05/06/12 22
20/06/12 28
7
IN POSHPOMIDON PLANT STACK ATTACHED TO
WATER SCRUBBER
05/06/12
Plant not in operation
20/06/12
8
IN DEVRINOL PLANT STACK ATTACHED TO
CPC SCRUBBER
05/06/12 4.0
2.0
20/06/12
AREA IDENTIFICATION DATE OF SPM SO2 NOX
(STACK) SAMPLING 150 mg/Nm3 100 ppm 50 ppm
9
BOILER GT-3507
04/06/12 31.3 11.6 2.8
07/06/12 27.1 7.4 2.2
10
BOILER GT-3201
15/06/12 24.5 8.2 1.8
21/06/12 38.0 7.8 2.1
11
IN INCINERATOR PLANT STACK ATTACHED TO
AQUEOUS & SOLID WASTE INCINERATOR
Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation , PLANT UNDER SHUT DOWN.
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH JAN -2012
DATE ==> 5/1/12 20/01/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 42.8 41.8 41.2 41
Near Tank Farm Area 42.6 41.5 40.6 40.1
B/H Alcohol Plant 40.3 40.1 39.8 39.8
Between DMMP & Boiler 52.1 51.9 51.8 51.6
Between ETP / Incinerator 63.8 63.6 64.2 64
B/H Acephate Plant 61.2 61 61.6 61.4
Near Canteen 51.5 51.4 51.8 51.4
B/H Evaporation Pond Towards road side 56.3 53.8 57.3 57.0
DG Room Outside (1 Meter distance in ambient ) 68.3 68.2 68.5 68.4
Inside Boiler House 65.8 66 62.3 62.2
Near Phorate Fume Incinerator 50.7 50.7 51.2 51
Phorate utility (kc-12) 60.8 60.6 62.2 62.1
Acephate utility (kc-12) 69.2 69.2 68.8 68.8
Mecl utility (kc-93) 69.5 69.5 69.6 69.6
HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH FEB – 2012
DATE ==> 5/2/12 20/02/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 41.3 41.0 41.5 41
Near Tank Farm Area 42.2 41.9 42.6 42.5
B/H Alcohol Plant 38.2 38.0 38.5 38.4
Between DMMP & Boiler 54.4 54.3 56.5 56.4
Between ETP / Incinerator 59.2 56.1 59.5 59.5
B/H Acephate Plant 60.2 60.1 60.3 60.3
Near Canteen 52.6 52.5 53.2 53.1
B/H Evaporation Pond Towards road side 54.2 54.2 55.2 54.8
DG Room Outside (1 Meter distance in ambient ) 69.5 69.5 69.5 69.4
Inside Boiler House 65.8 65.4 67.1 67
Near Phorate Fume Incinerator 46.8 46.8 47.1 47.1
Phorate utility (kc-12) 66.4 66.2 66.8 67
Acephate utility (kc-12) 68.3 68.2 68.5 68.5
Mecl utility (kc-93) 69.4 69.4 69.5 69.5
PREPARED BY : JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH MARCH -2012
DATE ==> 5/3/12 20/03/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 45.4 45.2 46.3 45.6
Near Tank Farm Area 48.3 46.4 49.5 47.8
B/H Alcohol Plant 42.3 42.3 42.5 42.4
Between DMMP & Boiler 58.3 58.4 57.6 57.2
Between ETP / Incinerator 62.4 62.4 65.8 65.6
B/H Acephate Plant 61.8 61.6 62.2 62.1
Near Canteen 56.3 56.2 55.3 55.2
B/H Evaporation Pond Towards road side 55.8 55.6 56.7 56.7
DG Room Outside (1 Meter distance in ambient ) 69.3 69.2 69.5 69.7
Inside Boiler House 66.3 66 67.3 67.2
Near Phorate Fume Incinerator 47.2 47.2 52.5 52.3
Phorate utility (kc-12) 66.8 66.6 67.2 67.3
Acephate utility (kc-12) 68.6 68.5 68.8 68.7
Mecl utility (kc-93) 69.8 69.8 69.5 69.5
HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH APRIL-2012
DATE ==> 5/4/12 20/04/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 45.4 43.6 46.3 45
Near Tank Farm Area 50.6 42.2 51.6 42.3
B/H Alcohol Plant 56.3 45.4 57.1 46.1
Between DMMP & Boiler 53.6 53.2 54.1 54
Between ETP / Incinerator 60.2 60.1 61.1 60.6
B/H Acephate Plant 59.4 59.2 59.6 59.5
Near Canteen 52.2 51.8 52.6 52.5
B/H Evaporation Pond Towards road side 50.6 50.4 53.1 53.0
DG Room Outside (1 Meter distance in ambient ) 68.3 68.3 69.2 69
Inside Boiler House 65.2 65.2 64.3 64.2
Near Phorate Fume Incinerator 49.4 49.3 50.6 50.2
Phorate utility (kc-12) 56.4 56.5 59.2 58.8
Acephate utility (kc-12) 69.2 69 69 69
Mecl utility (kc-93) 69.5 69.5 69.6 69.6
HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2
Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH MAY-2012
DATE ==> 5/5/12 20/05/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 44.8 43.2 44.6 44.3
Near Tank Farm Area 51.8 44.2 52.2 46.0
B/H Alcohol Plant 58.3 56.8 58.4 56.9
Between DMMP & Boiler 54.6 54.2 55.3 55.1
Between ETP / Incinerator 65.6 65.5 66.8 66.8
B/H Acephate Plant 66.2 66.1 67.3 67.2
Near Canteen 51.8 51.6 52 51.8
B/H Evaporation Pond Towards road side 53.2 53.1 56.8 56.7
DG Room Outside (1 Meter distance in ambient ) 69.3 69.2 69.4 69.4
Inside Boiler House 66.7 66.6 66.8 66.8
Near Phorate Fume Incinerator 53.2 53.1 53.8 54
Phorate utility (kc-12) 57.1 57.2 60.7 60.5
Acephate utility (kc-12) 68.8 68.6 68.9 68.9
Mecl utility (kc-93) 69.6 69.4 69.8 69.8
HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
NOISE MONITORING DETAILS
MONTH JUNE-2012
DATE ==> 5/6/12 20/06/12
TIME ==> DAY NIGHT DAY NIGHT
LIMIT ==> 75 dba 70 dba 75 dba 70 dba
LOCATION
Near Main Gate 45.2 45.0 46.3 45.2
Near Tank Farm Area 52.4 52.4 56.6 54.8
B/H Alcohol Plant 59.2 59.1 60.4 60.1
Between DMMP & Boiler 56.3 56.2 58.6 58.1
Between ETP / Incinerator 64.3 64.2 66.3 66.3
B/H Acephate Plant 60.3 60.1 65.3 65
Near Canteen 53.3 53.2 54.6 54.2
B/H Evaporation Pond Towards road side 51.6 51.4 58.3 58.1
DG Room Outside (1 Meter distance in ambient ) 69.3 69.2 68.9 69
Inside Boiler House 66.3 66.2 67.3 67.3
Near Phorate Fume Incinerator 56.4 56.3 56.8 56.6
Phorate utility (kc-12) 62.4 62.4 63.8 63.6
Acephate utility (kc-12) 69.5 69.6 69.1 69.1
Mecl utility (kc-93) 69.8 69.8 69.6 69.6
HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2
Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water Carried out with carbon bed outlet sample (05 Fish)
MONTH JAN-2012
DATE pH COD BOD TDS TOXICITY TYPE
FACTOR OF FISH
01/01/12 8.0 93 26 2060 1 ZIBRA
04/01/12 7.8 93 22 2020 1 ZIBRA
07/01/12 7.8 69 12 1650 1 ZIBRA
10/01/12 7.7 84 24 2000 1 ZIBRA
13/01/12 7.4 93 26 1900 1 ZIBRA
16/01/12 8.1 94 26 2100 2 ZIBRA
19/01/12 7.3 94 24 2100 2 ZIBRA
22/01/12 7.8 73 24 1540 1 ZIBRA
25/01/12 7.8 94 20 1200 2 ZIBRA
28/01/12 7.7 85 24 1210 1 ZIBRA
31/01/12 7.5 94 24 1750 2 ZIBRA
Maximum 8.1 94 26 2100 2
Minimum 7.3 69 12 1200 1
Average JAN -12
7.7 88 23 1775 1
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water
Carried out with carbon bed outlet sample (05 Fish)
MONTH FEB-2012
DATE pH COD BOD TDS TOXICITY TYPE
FACTOR OF FISH
03/02/12 7.4 84 18 1410 1 ZIBRA
06/02/12 7.5 84 20 1580 1 ZIBRA
09/02/12 8.5 100 26 1900 2 ZIBRA
12/02/12 7.5 100 30 1770 2 ZIBRA
15/02/12 7.3 100 28 2050 2 ZIBRA
18/02/12 7.2 97 28 2050 2 ZIBRA
21/02/12 7.4 88 26 1650 1 ZIBRA
24/02/12 6.8 92 26 1600 1 ZIBRA
27/02/12 6.6 95 26 1900 2 ZIBRA
Maximum 8.5 100 30 2050 2
Minimum 6.6 84 18 1410 1
Average FEB -12 7.4 93 25 1768 2
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2
Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water Carried out with carbon bed outlet sample (05 Fish)
MONTH MARCH -2012
DATE pH COD BOD TDS TOXICITY TYPE
FACTOR OF FISH
02/03/12 6.7 95 26 1950 2 ZIBRA
05/03/12 7.0 82 22 1610 1 ZIBRA
08/03/12 7.2 97 42 1410 2 ZIBRA
11/03/12 7.8 75 16 1460 1 ZIBRA
14/03/12 7.5 97 28 1740 2 ZIBRA
17/03/12 7.0 84 20 1840 2 ZIBRA
20/03/12 6.7 98 26 2080 2 ZIBRA
23/03/12 6.6 89 22 2070 1 ZIBRA
26/03/12 6.9 81 24 1930 1 ZIBRA
29/03/12 6.7 76 12 1940 1 ZIBRA
Maximum 7.8 98 42 2080 2
Minimum 6.6 75 12 1410 1
Average MAR -12 7.0 87 24 1803 2
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2
Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water Carried out with carbon bed outlet sample (05 Fish)
MONTH APRIL-2012
DATE pH COD BOD TDS TOXICITY TYPE
FACTOR OF FISH
01/04/12 6.5 88 24 1550 1 ZIBRA
04/04/12 6.6 80 26 1760 1 ZIBRA
07/04/12 7.1 84 26 1330 1 ZIBRA
10/04/12 7.1 91 28 1640 2 ZIBRA
13/04/12 7.0 100 30 1800 2 ZIBRA
16/04/12 7.0 92 28 1890 2 ZIBRA
19/04/12 6.6 80 26 1450 1 ZIBRA
22/04/12 6.8 96 26 1810 2 ZIBRA
25/04/12 6.6 88 26 1600 1 ZIBRA
28/04/12 6.9 96 28 1590 2 ZIBRA
Maximum 7.1 100 30 1890 2
Minimum 6.5 80 24 1330 1
Average APR -12 6.8 90 27 1642 2
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water
Carried out with carbon bed outlet sample (05 Fish)
MONTH MAY-2012
DATE pH COD BOD TDS TOXICITY FACTOR
TYPE OF FISH
02/05/12 7.2 99 28 1800 2 ZIBRA
05/05/12 7.1 99 30 1690 2 ZIBRA
08/05/12 7.5 91 24 1940 2 ZIBRA
11/05/12 7.6 78 24 1850 1 ZIBRA
14/05/12 7.8 87 28 1760 1 ZIBRA
17/05/12 8.3 89 28 1690 2 ZIBRA
20/05/12 7.8 89 26 1700 2 ZIBRA
23/05/12 7.7 81 22 1910 2 ZIBRA
26/05/12 7.5 89 24 2090 1 ZIBRA
29/05/12 7.3 73 20 2100 1 ZIBRA
Maximum 8.3 99 30 2100 2
Minimum 7.1 73 20 1690 1
Average MAY -12 7.6 88 25 1853 2
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
Toxicity factor monitoring details for ETP out let water
Carried out with carbon bed outlet sample (05 Fish)
MONTH JUN-2012
TOXICITY FACTOR : Carried out with carbon bed outlet sample (05 Fish)
DATE pH COD BOD TDS TOXICITY TYPE
01/06/12 7.3 98 28 1900 2 ZIBRA
04/06/12 7.5 91 26 1600 2 ZIBRA
07/06/12 7.8 70 22 1330 1 ZIBRA
10/06/12 7.5 83 24 1470 1 ZIBRA
13/06/12 7.5 78 22 1620 1 ZIBRA
16/06/12 7.5 100 28 1660 3 ZIBRA
19/06/12 7.7 92 26 1410 2 ZIBRA
22/06/12 7.9 87 24 1960 2 ZIBRA
25/06/12 8.0 83 22 1920 1 ZIBRA
28/06/12 8.0 78 20 1730 1 ZIBRA
Maximum 8.0 100 28 1960 3
Minimum 7.3 70 20 1330 1
Average June -12 7.7 86 24 1660 2
%Deviation Nil
PREPARED BY: JAYESH R. PATIL HOD ( Q.A.)
FUGITIVE EMISSIONS DATA JAN 2012
Dragger Tube Analysis - Mg/nm3 05/01/12 20/01/12
1) Cl2 in PD/DDVP Plant - mg/nm3 Nil Nil
2) EM in Phorate Plant Nil Nil
3) H2S in Phorate Plant - Mg/nm3 1.0 1.0
4) Ammonia in ACPT Plant –Mg/nm3 2.0 2.0
FEB 2012
Dragger Tube Analysis (mg/nm3 5/02/2012 20/02/12
1) Cl2 in PD/DDVP Plant Nil Nil
2) EM in Phorate Plant - Mg/nm3 0.1 0.1
3) H2S in Phorate Plant 1.0 1.0
4) Ammonia in ACPT Plant 2.0 2.0
MAR 2012
Dragger Tube Analysis (mg/nm3) 05/03/2012 20/03/2012
1) Cl2 in PD/DDVP Plant Nil Nil
2) EM in Phorate Plant Nil Nil
3) H2S in Phorate Plant 1.0 Nil
4) Ammonia in ACPT Plant 1.0 1.0
APRIL 2012
Dragger Tube Analysis (mg/nm3) 05/04/2012 20/04/2012
1) Cl2 in PD/DDVP Plant Nil Nil
2) EM in Phorate Plant Nil Nil
3) H2S in Phorate Plant 1.0 1.0
4) Ammonia in ACPT Plant 2.0 2.0
MAY 2012
Dragger Tube Analysis (mg/nm3) 05/05/2011 20/05/2011
1) Cl2 in PD/DDVP Plant Nil Nil
2) EM in Phorate Plant Nil Nil
3) H2S in Phorate Plant 1.0 1.0
4) Ammonia in ACPT Plant 2.0 2.0
JUNE 2012
Dragger Tube Analysis (mg/nm3) 05/06/2012 20/06/2012
1) Cl2 in PD/DDVP Plant Nil Nil
2) EM in Phorate Plant Nil Nil
3) H2S in Phorate Plant 1.0 1.0
4) Ammonia in ACPT Plant 2.0 3.0
BHARUCH ENVIRO INFRASTRUCTURE LTD,
ANALYTICAL REASERCH LABORATORY CERTIFICATE OF ANALYSIS
Report No. HW/199 Date:
Name and Address of the Customer
UPL- 2 GIDC Ankleshwar
Sample Description
VOC Analysis by Photovac 2020 combo Pro
Sample Identification/Code
--
Order Ref. -
Sample Quantity - Date of Sampling
Sampling Location Date of Receipt of Sample
Sample Collected by Nayan Patel Date of Start of Analysis Sampling Procedure
-- Date of Completion of Analysis
Sr. No.
Location Parameters Unit Result
1 Near main Gate TVOC PPB BDL
2 In front of Phorate Plant TVOC PPB BDL 3 Near Adm Building TVOC PPB BDL 4 Near Tank Pharm Area TVOC PPB BDL 5 Inside phorate plant TVOC PPB BDL 6 In ber’n Phorate & Devrinol TVOC PPB BDL 7 Phorate plant near Inci. TVOC PPB BDL 8 Scrap Yard Area TVOC PPB BDL 9 Scrap yard drum weighing area TVOC PPB BDL
10 Behind DevrinolPlant TVOC PPB 7 11 FBD area TVOC PPB BDL 12 Inside PD plant TVOC PPB BDL 13 TOP floor PD plant TVOC PPB BDL 14 In between PD & Acephate plant TVOC PPB BDL 15 Inside Acephate plant TVOC PPB BDL 16 Acephate Plant RVD area TVOC PPB BDL 17 In front of Acephate plant TVOC PPB BDL 18 Near Evaporation TVOC PPB BDL 19 Top floor Evaporation TVOC PPB BDL 20 Near ETP plant TVOC PPB BDL
Remarks:BDl:-Below Detection Limit MDL:-1 PPB For Bharuch Enviro Infrastructure Ltd.
Dr J K Astik Chemist DGM-QA
UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR
Monitoring of VOC & other pollutants : Jan -12 to June -2012
Concentration
in ppm
Date Plant Location –
Floor EA BENZENE XYLENE TOLUENE MDC TERBOFOS PHORATE ACEPHATE DDVP PD EM TBM DEVRINOL DMMP TMP MECL EDC
04/01/11 Phorate
plant First - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
05/01/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
07/01/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
08/01/11 Devrinol First BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
09/01/11 PD First BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
10/01/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
12/01/11 Acephate First BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
15/01/11 Acephate Second BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
05/02/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
07/02/11 Phorate
plant First - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
08/02/11 Devrinol First BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
09/02/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
10/02/11 PD Ground BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
12/02/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
13/02/11 Acephate First BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
15/02/11 Acephate Ground BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
06/03/11 Phorate
plant First - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
07/03/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
10/03/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
11/03/11 Devrinol First BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
12/03/11 PD First BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
15/03/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
18/03/11 Acephate Second BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
19/03/11 Acephate First BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
08/04/11 Phorate First - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
plant
09/04/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
10/04/11 Devrinol Ground BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
12/04/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
14/04/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
15/04/11 PD Ground BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
16/04/11 Acephate First BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
18/04/11 Acephate Second BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
06/05/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
07/05/11 Phorate
plant Ground - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
08/05/11 Devrinol First BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
09/05/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
10/05/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
12/05/11 PD First BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
14/05/11 Acephate First BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
15/05/11 Acephate Ground BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
08/06/11 Phorate
plant Second - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
09/06/11 Phorate
plant Third - BDL BDL BDL - BDL BDL - - - BDL BDL - BDL BDL - -
11/06/11 Devrinol Second BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
12/06/11 Devrinol First BDL BDL BDL BDL BDL - - - - - BDL BDL BDL BDL BDL - BDL
13/06/11 PD Second BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
14/06/11 PD First BDL BDL BDL BDL BDL - - BDL BDL BDL - - - - BDL BDL BDL
15/06/11 Acephate Second BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
17/06/11 Acephate Ground BDL BDL BDL BDL - - - BDL - - - - - - - BDL BDL
Analysed by: (J.R.PATIL) (Dr.A.MAHAJAN)
JDS/JRP Sr. Executive,QA H.O.D.,QA
Annexure – A
We have obtained Consent to Establish (CTE) # 42403 issued by GPCB letter # GPCB/BRCH/CTE-144(6)/ID-15832/84970 dated 24.06.2011 and received provisional Consent to operate for product mix change from GPCB
Sr No Product Name Existing Quantity (MT / Month)
Quantity after product mix change
(MT / Month)
01 Dichlorovos
OR
Ethofumisate
85 85
OR
50
02 Terbuphos / Phorate / Metasystox (combined
capacity)
200 (excluding Metasystox)
200